Financial sustainability in municipal solid waste management – Costs and revenues in Bahir Dar, Ethiopia

Highlights: • Cost-revenue analysis over 2 years revealed insufficient cost-recovery. • Expenses for motorized secondary collection increased by 82% over two years. • Low fee collection rate and reliance on only one revenue stream are problematic. • Different options for cost reduction and enhanced revenue streams are recommended. • Good public–private alliance is crucial to plan and implement improvement measures. - Abstract: Providing good solid waste management (SWM) services while also ensuring financial sustainability of the system continues to be a major challenge in cities of developing countries. Bahir Dar in northwestern Ethiopia outsourced municipal waste services to a private waste company in 2008. While this institutional change has led to substantial improvement in the cleanliness of the city, its financial sustainability remains unclear. Is the private company able to generate sufficient revenues from their activities to offset the costs and generate some profit? This paper presents a cost-revenue analysis, based on data from July 2009 to June 2011. The analysis reveals that overall costs in Bahir Dar’s SWM system increased significantly during this period, mainly due to rising costs related to waste transportation. On the other hand, there is only one major revenue stream in place: the waste collection fee from households, commercial enterprises and institutions. As the efficiency of fee collection from households is only around 50%, the total amount of revenues are not sufficient to cover the running costs. This results in a substantial yearly deficit. The results of the research therefore show that a more detailed cost structure and cost-revenue analysis of this waste management service is important with appropriate measures, either by the privates sector itself or with the support of the local authorities, in order to enhance cost efficiency and balance the cost-revenues towards cost recovery. Delays in mitigating the evident financial deficit could else endanger the public-private partnership (PPP) and lead to failure of this setup in the medium to long term, thus also endangering the now existing improved and currently reliable service. We present four options on how financial sustainability of the SWM system in Bahir Dar might be enhanced: (i) improved fee collection efficiency by linking the fees of solid waste collection to water supply; (ii) increasing the value chain by sales of organic waste recycling products; (iii) diversifying revenue streams and financing mechanisms (polluter-pays-, cross-subsidy- and business-principles); and (iv) cost reduction and improved cost-effectiveness. We argue that in a PPP setup such as in Bahir Dar, a strong alliance between the municipality and private enterprise is important so that appropriate solutions for improved financial sustainability of a SWM system can be sought and implemented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost estimation for solid waste management in industrialising regions - Precedents, problems and prospects

Highlights: Black-Right-Pointing-Pointer We review cost estimation approaches for solid waste management. Black-Right-Pointing-Pointer Unit cost method and benchmarking techniques used in industrialising regions (IR). Black-Right-Pointing-Pointer Variety in scope, quality and stakeholders makes cost estimation challenging in IR. Black-Right-Pointing-Pointer Integrate waste flow and cost models using cost functions to improve cost planning. - Abstract: The importance of cost planning for solid waste management (SWM) in industrialising regions (IR) is not well recognised. The approaches used to estimate costs of SWM can broadly be classified into three categories - the unit cost method, benchmarking techniques and developing cost models using sub-approaches such as cost and production function analysis. These methods have been developed into computer programmes with varying functionality and utility. IR mostly use the unit cost and benchmarking approach to estimate their SWM costs. The models for cost estimation, on the other hand, are used at times in industrialised countries, but not in IR. Taken together, these approaches could be viewed as precedents that can be modified appropriately to suit waste management systems in IR. The main challenges (or problems) one might face while attempting to do so are a lack of cost data, and a lack of quality for what data do exist. There are practical benefits to planners in IR where solid waste problems are critical and budgets are limited.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IEA Wind Task 26 - Multi-national Case Study of the Financial Cost of Wind Energy: Work Package 1 Final Report

The lifetime cost of wind energy is comprised of a number of components including the investment cost, operation and maintenance costs, financing costs, and annual energy production. Accurate representation of these cost streams is critical in estimating a wind plant's cost of energy. Some of these cost streams will vary over the life of a given project. From the outset of project development,investors in wind energy have relatively certain knowledge of the plant's lifetime cost of wind energy. This is because a wind energy project's installed costs and mean wind speed are known early on, and wind generation generally has low variable operation and maintenance costs, zero fuel cost, and no carbon emissions cost. Despite these inherent characteristics, there are wide variations in thecost of wind energy internationally, which is the focus of this report. Using a multinational case-study approach, this work seeks to understand the sources of wind energy cost differences among seven countries under International Energy Agency (IEA) Wind Task 26 - Cost of Wind Energy. The participating countries in this study include Denmark, Germany, the Netherlands, Spain, Sweden,Switzerland, and the United States. Due to data availability, onshore wind energy is the primary focus of this study, though a small sample of reported offshore cost data is also included.

17 WIND ENERGY↗

A Systematic Framework for Projecting the Future Cost of Offshore Wind Energy

Offshore wind costs are expected to decline rapidly in the short and medium term future as the industry grows and gains experience in manufacturing, installing, and operating commercial scale projects. Estimating the future costs of offshore wind energy is critical for evaluating the technology's economic performance, how it can fit into a broader clean energy economy, and how R&D investment can be allocated to advance the technology. We present a newly developed approach for forecasting these costs which focuses on an empirically-derived learning rate for capital costs and prescribed cost and performance improvements for operational costs and capacity factor. We establish baseline costs for a series of reference fixed-bottom and floating projects in 2021 and project cost trajectories to 2035, presenting both an average cost trajectory as well as describing the range of potential future costs associated with site-specific cost variations and uncertainty in the estimate of the learning rate. We also conduct sensitivity analyses showing the impact of different global deployments by 2035 and variations in the prescribed operational costs and capacity factors. The results show that fixed-bottom and floating offshore wind capital costs could decrease to around $\$$2,400/kW and $\$$3,300/kW by 2035, respectively, with ranges of $\$$2,100/kW - $\$$2,750/kW for fixed-bottom projects and $\$$2,850/kW - $\$$5,500/kW for floating projects. The levelized cost of energy of fixed-bottom and floating wind projects could decrease to $\$$53.1/MWh and $\$$63.9/MWh by 2035, with ranges of $\$$48.4/MWh - $\$$59.7/MWh for fixed-bottom projects and $\$$46.5/MWh - $\$$99.9/MWh for floating projects. By presenting the uncertainty associated with the forecast we provide a transparent description of the spectrum of potential cost trajectories for offshore wind.

17 WIND ENERGY↗

Validation of the NLR Pumped Storage Hydropower Cost Model

The National Laboratory of the Rockies (NLR) first released its pumped storage hydropower (PSH) cost model in 2023 as the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The PSH cost model cannot replace detailed site-level studies and design, but it is important to validate it against other industry PSH cost estimates. The initial model methodology report validated the cost model for a single proposed site, the Eagle Mountain Project in California. This slide deck documents an expanded validation exercise using cost data from six other sites: Goldendale (Washington), Seminoe (Wyoming), Gordon Butte (Montana), Swan Lake (Oregon), White Pine (Oregon), and Lewis Ridge (Kentucky). It compares itemized costs from Federal Energy Regulatory Commission (FERC) applications and other reported costs with NLR PSH cost model outputs after customizing inputs for each site. The validation exercise finds that the NLR model's conservative indirect cost assumptions often drive overall cost overestimation, with direct cost comparisons typically agreeing more closely. All cost model estimates are well within an Association for the Advancement of Cost Engineering (AACE) Class 5 estimation range (-50% to +100%), with five within the AACE Class 4 range (-30% to +50%) and four being within 15%. This result is considered reasonable performance for a parametric model applied at a preliminary design stage.

13 HYDRO ENERGY↗

Identification of Flights for Cost-Efficient Climate Impact Reduction

The aircraft-induced climate impact has drawn attention in recent years. Aviation operations affect the environment mainly through the release of carbon-dioxide, nitrogen-oxides, and by the formation of contrails. Recent research has shown that altering trajectories can reduce aviation environmental cost by reducing Absolute Global Temperature Change Potential, a climate assessment metric that adapts a linear system for modeling the global temperature response to aviation emissions and contrails. However, these methods will increase fuel consumption that leads to higher fuel costs imposed on airlines. The goal of this work is to identify ights for which the environmental cost of climate impact reduction outweighs the increase in operational cost on an individual aircraft basis. Environmental cost is quanti ed using the monetary social cost of carbon. The increase in operational cost is considering cost of additional fuel usage only. For this paper, an algorithm has been developed that modi es the trajectories of ights to evaluate the e ect of environ- mental cost and operational cost of ights in the United States National Airspace System. The algorithm identi es ights for which the environmental cost of climate impact can be reduced and modi es their trajectories to achieve maximum environmental net bene t, which is the di erence between reduction in environmental cost and additional operational cost. The result shows on a selected day, 16% of the ights among eight major airlines, or 2,043 ights, can achieve environmental net bene t using weather forecast data, resulting in net bene t of around $500,000. The result also suggests that the long-haul ights would be better candidates for cost-ecient climate impact reduction than the short haul ights. The algorithm will help to identify the characteristics of ights that are capable of applying cost-ecient climate impact reduction strategy.

climate impact reduction↗

Impact of hydrogen refueling configurations and market parameters on the refueling cost of hydrogen

The cost of hydrogen in early fuel cell electric vehicle (FCEV) markets is dominated by the cost of refueling stations, mainly due to the high cost of refueling equipment, small station capacities, lack of economies of scale, and low utilization of the installed refueling capacity. Using the hydrogen delivery scenario analysis model (HDSAM), this study estimates the impacts of these factors on the refueling cost for different refueling technologies and configurations, and quantifies the potential reduction in future hydrogen refueling cost compared to today’s cost in the United States. The current hydrogen refueling station levelized cost, for a 200 kg/day dispensing capacity, is in the range of 6–8 dollars/kg H 2 when supplied with gaseous hydrogen, and 8–9 dollars/kg H 2 for stations supplied with liquid hydrogen. After adding the cost of hydrogen production, packaging, and transportation to the station’s levelized cost, the current cost of hydrogen at dispensers for FCEVs in California is in the range of 13–15 dollars/kg H 2 . The refueling station capacity utilization strongly influences the hydrogen refueling cost. The underutilization of station capacity in early FCEV markets, such as in California, results in a levelized station cost that is approximately 40% higher than it would be in a scenario where the station had been fully utilized since it began operating. In future mature hydrogen FCEV markets, with a large demand for hydrogen, the refueling station’s levelized cost can be reduced to 2 dollars/kg H 2 as a result of improved capacity utilization and reduced equipment cost via learning and economies of scale.

33 ADVANCED PROPULSION SYSTEMS↗

Installed Cost Benchmarks and Deployment Barriers for Residential Solar Photovoltaics with Energy Storage: Q1 2016

In this report, we fill a gap in the existing knowledge about PV-plus-storage system costs and value by providing detailed component- and system-level installed cost benchmarks for residential systems. We also examine other barriers to increased deployment of PV-plus-storage systems in the residential sector. The results are meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede solar plus storage deployment. In addition, our periodic cost benchmarks will document progress in cost reductions over time. To analyze costs for PV-plus-storage systems deployed in the first quarter of 2016, we adapt the National Renewable Energy Laboratory's component- and system-level cost-modeling methods for standalone PV. In general, we attempt to model best-in-class installation techniques and business operations from an installed-cost perspective. In addition to our original analysis, model development, and review of published literature, we derive inputs for our model and validate our draft results via interviews with industry and subject-matter experts. One challenge to analyzing the costs of PV-plus-storage systems is choosing an appropriate cost metric. Unlike standalone PV, energy storage lacks universally accepted cost metrics, such as dollars per watt of installed capacity and lifetime levelized cost of energy. We explain the difficulty of arriving at a standard approach for reporting storage costs and then provide the rationale for using the total installed costs of a standard PV-plus-storage system as our primary metric, rather than using a system-size-normalized metric.

14 SOLAR ENERGY↗

Estimating the Life Cycle Cost of Space Systems

A space system's Life Cycle Cost (LCC) includes design and development, launch and emplacement, and operations and maintenance. Each of these cost factors is usually estimated separately. NASA uses three different parametric models for the design and development cost of crewed space systems; the commercial PRICE-H space hardware cost model, the NASA-Air Force Cost Model (NAFCOM), and the Advanced Missions Cost Model (AMCM). System mass is an important parameter in all three models. System mass also determines the launch and emplacement cost, which directly depends on the cost per kilogram to launch mass to Low Earth Orbit (LEO). The launch and emplacement cost is the cost to launch to LEO the system itself and also the rockets, propellant, and lander needed to emplace it. The ratio of the total launch mass to payload mass depends on the mission scenario and destination. The operations and maintenance costs include any material and spares provided, the ground control crew, and sustaining engineering. The Mission Operations Cost Model (MOCM) estimates these costs as a percentage of the system development cost per year.

Life cycle cost↗

Low-Moisture Switchgrass Bulk-Format Logistics Costs Based on Engineering Data

Abstract. Logistics costs that spanned harvest, transport, storage, preprocessing, and year-round delivery of 371,870 dMg year -1 of milled, low-moisture switchgrass (SG) to a local biorefinery were determined for bulk-format versus round-bale systems. Separate spreadsheet analyses were conducted for three diesel fuel prices ($0.53 L -1 , $0.92 L -1 , and $1.32 L -1 ) because of the wide range of fuel prices during the project. A detailed analysis scenario identified a common harvest period, equipment annual use, other equipment uses, and protected SG storage on gravel pad, along with equipment performances based on previously published tests primarily for commercially available equipment. The bulk-format system used a depot equipped with stacker/reclaimer technology for storage, whereas the round-bale system used field-side bale stacks for storage, with both systems assuming 6% losses, primarily attributed to storage. Results indicated total costs for bulk-format versus round-bale systems of $54.63 per dry Mg (dMg -1 ), $60.41 dMg -1 , and $66.21 dMg -1 versus $54.59 dMg -1 , $62.10 dMg -1 , and $67.93 dMg -1 corresponding with diesel fuel costs of $0.53 L -1 , $0.92 L -1 , and $1.32 L -1 , respectively. The most significant bulk-format system total cost of $22.79 dMg -1 was associated with a stacker/reclaimer, conveyance, and dust collection at the depot, which was 42% of total costs at a diesel fuel cost of $0.53 L -1 . For the round-bale system, bale chopping total costs was highest and represented an average of 27% of total costs, with costs ranging from $14.63 dMg -1 to $19.08 dMg -1 for diesel fuel input costs ranging from $0.53 L -1 to $1.32 L -1 , respectively. For comparison, the forage harvester provided harvesting and chopping in the bulk-format system at total costs ranging from $6.47 dMg -1 to $8.80 dMg -1 across the same range of diesel fuel input cost. The forage harvester provided an economic advantage in size reduction compared to tub grinding. Truck hauling for both the bulk-format and round-bale systems represented significant expenses at all selected fuel costs. In addition, the multiple times that round bales were handled represented accumulating costs that were sensitive to diesel fuel costs. Keywords: Bales, Bioenergy, Bulk format, Densification, Field chop, Logistics, Transportation.

Agriculture↗

Costs to Automate Demand Response - Taxonomy and Results from Field Studies and Programs

During the past decade, the technology to automate demand response (DR) in buildings and industrial facilities has advanced significantly. Automation allows rapid, repeatable, reliable operation. This study focuses on costs for DR automation in commercial buildings with some discussion on residential buildings and industrial facilities. DR automation technology relies on numerous components, including communication systems, hardware and software gateways, standards-based messaging protocols, controls and integration platforms, and measurement and telemetry systems. This report compares cost data from several DR automation programs and pilot projects, evaluates trends in the cost per unit of DR and kilowatts (kW) available from automated systems, and applies a standard naming convention and classification or taxonomy for system elements. Median costs for the 56 installed automated DR systems studied here are about $200/kW. The deviation around this median is large with costs in some cases being an order of magnitude great or less than the median. This wide range is a result of variations in system age, size of load reduction, sophistication, and type of equipment included in cost analysis. The costs to automate fast DR systems for ancillary services are not fully analyzed in this report because additional research is needed to determine the total cost to install, operate, and maintain these systems. However, recent research suggests that they could be developed at costs similar to those of existing hot-summer DR automation systems. This report considers installation and configuration costs and does include the costs of owning and operating DR automation systems. Future analysis of the latter costs should include the costs to the building or facility manager costs as well as utility or third party program manager cost.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enabling Staged Pressurized Oxy-Combustion: Improving Flexibility and Performance at Reduced Cost

Introduction: The staged pressurized oxy-combustion (SPOC) process, developed by Washington University in St. Louis (WUSTL), is an oxy-combustion carbon capture technology that employs a steam power cycle to generate electricity. As with atmospheric-pressure oxy-combustion processes, carbon dioxide (CO 2 ) capture rates of 90% or higher can be achieved. The staged-combustion approach of the SPOC process, when operated at elevated gas pressure, allows for near elimination of flue gas recycle (FGR) and leads to significant improvements in efficiency and reduced costs. The primary goal of this project was to investigate the potential for SPOC for flexible operation beyond the capabilities of conventional coal-fired power plants, particularly those employing carbon capture and storage (CCS). Oxy-combustion differs from conventional coal combustion in that the combustion of coal is carried out using oxygen as opposed to air. The resultant flue gas is a mixture of primarily CO 2 and water, greatly simplifying CO 2 capture. As SPOC does the oxy-combustion process under pressure, it is higher efficiency and lower cost than atmospheric oxy-combustion. The project was led by the Electric Power Research Institute, Inc., with the assistance of WUSTL, Doosan Babcock (DBL – boiler plant original equipment manufacturer), and Air Liquide (AL – air separation experts). The specific objectives of the project were to: (1) Evaluate the SPOC concept and develop a risk-based approach to the heating surface layout ensuring that performance (gas and steam side), manufacturing, transportation, and plant erection considerations were fully accounted for in the system design. (2) Improve the technology to ensure its performance and cost potential are substantially better than today’s baseline pulverized coal power plant with post-combustion capture (PCC) or atmospheric oxy-combustion, and show progress toward performance commensurate with projected commercial operation, including 90% or more CO 2 capture. (3) Address critical technology gaps and improving overall system performance for the technology. (4) Perform combustion tests at scale under commensurate pressure to the commercial operating system validate combustor and advance the SPOC combustion modeling tools that will facilitate full-scale design. Combustion Testing: Testing was initially carried out at atmospheric pressure with methane to ensure that all systems were correctly operating. Following this, the testing then proceeded to moderate pressure operation at 4 bara, where different stoichiometric conditions were used across an extended heat input range, showing that a stable flame could be maintained. Testing then proceeded at 10 and 15 bara where it was shown that the ignition system needed to be replaced at these operating conditions. When testing recommenced, a similar stable flame shape was achieved, without any methane support, and the full 100 kWth coal oxy-combustion was demonstrated. Heat flux measurements showed 400 kW/m 2 (0.126 MMBtu/hr-ft 2 ) from the flame, within the 450 kW/m 2 (0.142 MMBtu/hr-ft 2 ) preferred limit defined by DBL for the full-scale design case. Carbon monoxide and carbon-in-ash measurements showed that complete combustion was possible with ultra-low excess oxygen at 1 vol % in the product flue gas. This allowed the full-scale models to be calculated based on this level of excess oxygen, improving the performance of the system as lower feed oxygen is produced in the air separation unit (ASU), saving auxiliary power. Full-Scale Design: The full-scale design is sized to deliver 550 MWe net electrical power output to allow direct comparison with the National Energy Technology Laboratory (NETL) baseline cases using the same Montana Powder River Basin (PRB) fuel. The cases used for direct comparison are: Case S12A (supercritical [SC] coal without CO 2 capture), Case S12B (SC coal with PCC at 90% CO 2 capture, and Case S12F (atmospheric oxy-combustion SC coal with 90% CO 2 capture). The SPOC stages were configured to be identical arrangements, allowing for a more straightforward design, construction, and control strategy. Each stage consists of two PVs, the first being the combustor PV module and the second being the convective PV module. The combustor module is the tallest vessel, with local coal feeding equipment and the burner FGR and oxygen plenums at the top and ash management at the bottom. The combustor module is effectively an open cross section with membrane tubes around the circumference – this unobstructed slender profile ensures that the relatively slower burnout mechanism needed for the low-speed turbulent mixing burner can proceed unimpeded and that molten ash will not attach to any surfaces at an angle to the predominant flue gas flow. The steam turbine used in the SPOC design is essentially the same unit utilized in the atmospheric oxy-combustion case except the degree of heat recovery possible allows the low-pressure (LP) feedwater heater train to be eliminated. This is a result of being able to capture the latent heat of evaporation of the moisture produced in the combustion (normally lost to the stack). The SPOC system outperforms the NETL atmospheric oxy-combustion baseline case by 3.3% points and the PCC case by 7.5% points. This performance increase is mainly a result of the improved heat recovery possible from the product flue gas and from the reduced auxiliary power consumption from the ASU and the CO 2 compression and purification unit over the atmospheric equivalent. The combined improvement in boiler efficiency and reduction in the steam turbine heat rate resulted in a net improvement in the overall plant efficiency by 0.61%, to 35.6% on a HHV basis. This relatively small improvement in plant efficiency between sub-bituminous and bituminous coals shows the value of useful moisture latent heat recovery offered by the SPOC system when using low rank fuels. Flexibility and Turndown: The SPOC system has inherent high turndown capabilities because of a demonstrated high range of combustion stability and the ability to bypass stages, thereby reducing steam generation rates proportionally without altering firing rates in operating stages. ASU units do not generally offer significant turndown opportunities as they are limited by the performance of the compression plant. The baseline SPOC design has a 2-train ASU configuration, needed to be able to meet the 10,500 tonnes per day duty, that can deliver efficient turndown points between 85–100% load with both trains operating, and at 45–50% load with a single train operating. Outside these operating points, the flexibility and efficiency are limited and may be uncompetitive at loads below 45% as the ASU systems are unable to turndown beyond 85% for the base case and 70% for the flexible case. The ASU cold box for the flexible case was designed to operate at loads between 40-100%, below this operating range the purity of the produced oxygen cannot be guaranteed, resulting in additional load for the CPU equipment. The additional power consumption of these cases yields an uneconomic operating condition with poor efficiency when operating at low loads such as 25% and 12%. To address this flexibility constraint, AL evaluated how the ASU configuration could be altered to deliver efficient oxygen supply over the load range. This involved integrating the compressor duties across both ASU trains into a shared duty arrangement with multiple compressors, strategically sized to deliver the duty required across all load ranges between 40–100% by enabling different combinations of the main air compressors and the booster air compressors. The oxygen purity cannot be guaranteed below 40% load for each train – the power consumption at 25% and 12% loads were estimated based on the multi-compressor configuration at maximum turndown as these load cases were not considered in the flexible ASU design. With a different cold box configuration, i.e. number of trains, the entire load range could be delivered within oxygen purity specifications. Although there is a small efficiency reduction at full load, there are significant improvements in overall plant performance during low-load operation. The exact ASU configuration needed will therefore be dependent on the expected operating profile of the unit. Economic Analysis: Cost estimates for the baseline and the flexible cases were developed using NETL baseline case data for common BOP items and an Association for the Advancement of Cost Engineering International Class 5 (conceptual/screening study) assessment of key components unique to the SPOC system. The capital, operating, and maintenance costs were assessed along with the first-year power cost, levelized cost of electricity, and CO 2 captured and avoided cost for the SPOC cases were compared against the relevant NETL baseline cases in January 2019 dollars. Both SPOC cases achieve a lower cost that the alternative NETL baseline cases (with the flexible SPOC case being slightly higher than the baseline SPOC case due to the compounded impact of higher capital costs and lower efficiency at full load). The SPOC cases deliver a lower cost of CO 2 avoided than the NETL baseline cases due to greater efficiency in generating low-carbon power. However, the cost of CO 2 captured is higher because the higher efficiency of the SPOC process generates less CO 2 , hence less needs to be captured, resulting in a high capital cost being shared over a reduced CO 2 quantity. The flexible ASU adds 1.6% overall to the plant cost in comparison to the baseline case, but the efficiency improvements at loads below 50% are significant. Subsequently, depending on the plant load-profile expectation, the flexible ASU would be beneficial if the plant spends a significant portion of its operating life below 50% load. This kind of operating profile is likely to be required for all fossil plants when more renewable electricity generators are installed on the local grid, particularly solar power that can be predicted ahead of time, allowing for appropriate pricing signals to be incorporated into the diurnal cycle. R&D Recommendations: SPOC, while a promising technology, is a relatively recent concept and, as such, operability issues of combustor design and steam-side integration for such systems at a scale relevant to commercial deployment have not been evaluated. WUSTL has conducted extensive small pilot-scale (100 kWth) research to understand and advance pressurized oxy-combustion processes, including investigation of combustion and flame characteristics, radiative heat flux, burner operability, turn down, char burnout, ash characteristics, water-wash column operation, etc. for pressurized oxy-combustion systems. Nonetheless, at this stage in the development of the SPOC process, what is needed is a large-scale pilot plant that can serve to study pressurized oxy-combustion systems and components at a scale commensurate with the maturity of the technology. A scale of 10 MWth, which includes steam-side integration and two stages would yield essential information with respect to heat transfer characteristics both in the radiative and convective sections of the pressure vessels, and the ability to operate the fuel staging process. In addition, while modeling results indicate that combustion and flame characteristics improve with scale, direct studies of the combustor at this scale will ensure that the models can be relied upon for scale up to commercial scale. Furthermore, a detailed analysis must be performed to understand the scaling aspects of key components and systems.

20 FOSSIL-FUELED POWER PLANTS↗

Enhancement of Optical Efficiency of CSP Mirrors for Reducing O&M Cost via Near-Continuous Operation of Self-Cleaning Electrodynamic Screens (EDS). Final Report

Over the past decade, techno-economical advancements in solar energy systems, particularly the improvement in the conversion efficiency of PV modules made with mono-crystalline silicon solar cells from 12% to 20%, as well as the cost reduction in manufacturing by a factor of about 10%, have made it possible to achieve a levelized cost of electricity (LCOE) in PV plants that is comparable to, or less than, the cost of deriving electricity from fossil fuels. Operating PV plants in mid-latitude sun-belt regions, where the solar irradiance level is highest, provides a high annual energy-yield (kWh/kWp) due to two factors: (1) the availability of predictable high solar irradiance throughout the year with the fewest interruptions in solar flux from clouds and rain, and (2) the increased conversion efficiency of crystalline solar cells, as recombination loss has decreased with increased intensity of the sunlight that illuminates the silicon solar cells. Semi-arid and desert regions, however, are plagued by high atmospheric dust concentrations and frequent sand storms. The deposition of a layer of dust on the optical surfaces of solar collectors such as PV modules and concentrating mirrors reduces the transmission efficiency of sunlight that actually reaches the solar cells or receivers, resulting in high energy-yield soiling loss. There are two major cost components to operating a solar plant: (1) installation costs, and (2) operation-and-maintenance (O&M) costs. There is no fuel cost; hence operating a solar plant in a semi-arid or desert region provides high returns on investment if soiling losses are mitigated via efficient cleaning methods and optimized cleaning frequency. If solar collectors are not cleaned, the accumulation of dust layers on solar collectors may cause the operation of such plants in arid regions to become economically unviable. Washing solar collectors with water and detergent, as is most commonly done now, is an efficient method for cleaning. The conventional approach in utility-scale solar plants is to use a large truck with a water tank and pump system for spraying deionized water on the surface of the solar collectors. Robotic cleaning with brushes, used for many solar plants, requires lesser water for cleaning. The water consumed using semi-automated cleaning of PV modules in utility-scale solar plants is approximately 2 liters/m 2 per cleaning cycle. The total optical surface area of the solar collectors in 1 TW-scale solar installation will be more than 3 × 109 m 2 ; hence an enormous amount of water be needed for cleaning. There simply is not enough fresh water in the sun-belt areas of the world for predicted cleaning needs. In solar power plants, the estimated cost of cleaning solar collectors includes expenses related to the equipment used, labor, cost of transportation of water, the energy required for cleaning, plus ancillary costs whereas the cost of water is not considered. The water used is obtained from sources located close to plant sites, unmindful of the environmental and societal impact as the power plants are oftentimes located in regions that face severe drought. This practice is very similar to the cost calculations in deriving the levelized cost of electricity (LCOE) in conventional power plants based on burning fossil fuel such as coal and gas, while disregarding the cost of climate change and health effects. Unless a water-free or low-water cleaning method is established, the expansion of solar plants may lose public support in areas suffering long intervals of drought. The goal of this research project has been the development and application of the Electrodynamic Screen (EDS) as a means for a water-free, scalable cleaning process applicable to solar-power installations, including rooftop applications. We describe here the development of an EDS film-based cleaning process as an emerging method for use on PV modules, parabolic troughs, and heliostats. This report aims to show the feasibility of integrating or retrofitting EDS films onto the optical surfaces of solar collectors (both PV and CSP) while maintaining high transmission or reflection efficiency. The cleaning action provided by the EDS film is an active method to remove dust deposits by electrodynamic force. Current lab-scale prototype EDS films, retrofitted onto solar panels and mirrors, have shown to be capable of maintaining optical transmission or specular-reflection efficiencies higher than 90% of initial values under clean conditions. The optical surfaces of solar collectors laminated with EDS films can remove more than 90% of deposited dust when the EDS is activated for less than two minutes. As an electrodynamic dust removal process, the EDS film-based method is designed primarily for the removal of dust in solar installations located in semi-arid and desert areas, where the atmosphere is often dry and dusty and rainfall is infrequent. While EDS film application minimizes water consumption and facilitates cleaning as frequently as needed, it has limitations in removing contaminants such as soot, organic pollutants deposited as fine films on the surface, and bird droppings. The dust removal efficiency of the EDS is maximum at relative humidity RH is 40 to 50% and decreases at when RH > 65%. Many solar plant sites undergo diurnal and seasonal cycles of high ambient, early afternoon temperatures and an RH that reaches the dew point early in the morning. These variations in atmospheric conditions do not limit the operation of the EDS film. This report presents a brief review of the progress and the potential of EDS film technology for mitigating the impact of dust on solar collectors via water-free cleaning, as well as current technical challenges regarding efficiency and durability. Our experimental data on the performance of EDS films show that: (1) the dust-removal efficiency (DRE) can reach levels higher than 90%, (2) the specular reflectivity (SR) of EDS film-laminated second-surface mirrors reach levels in excess of 90%, (3) the specular reflectivity restoration (SRR) can exceed 90%, (4) the output-power restoration (OPR) of PV modules can exceed 95%, and (5) the optical transmission efficiency (TE) of the EDS films can be greater than 90%. Working with Sandia National Laboratories (NM), Corning Research and Development Corporation (NY), Eastman Kodak (NY), Tomark-Worthen Industries (NH), and EDS Chile SPA (Chile), we have produced EDS film-laminated PV modules and demonstrated their self-cleaning functions without requiring water. We have demonstrated that the operational range of EDS films will cover the expected ambient temperature of solar fields at RH cycling varying from 20 to 95% as long as the EDS films are activated in the RH range 20 to 50%. (Typical solar-field climates in deserts and semi-arid lands often reach near dew point in coastal areas.) Our experiments on the application of hydrophobic-fluorinated nanoparticle coatings on EDS film surfaces show that the EDS operational range can be extended to higher RH levels that approach the dew point. At Eastman Kodak, as one of our industrial partners, we were able to establish a process for manufacturing EDS films using flexographic printing of the electrodes onto transparent polymer films. This process utilizes an existing manufacturing line at Eastman Kodak that allows fabrication of medium-scale EDS films (26 cm × 30 cm). The manufacturing process has the capacity to produce EDS films at high production speeds. The medium-scale EDS films that have been printed at Kodak were evaluated in the lab at Boston University. The EDS films produced at Kodak were laminated at Tomark-Worthen using an industrial scale vacuum laminator to produce EDS film stacks, which can be affixed onto the optical surfaces of PV modules or concentrating mirrors. The EDS film stack consists of the EDS films that have Willow® Glass (WG) which has a thickness of 100 μm as the front surface. The WG sheets obtained from Corning Research and Development Corporation are customized in size and shape to cover the active area of the EDS films. The back surface of the EDS film stack is integrated onto the optical surface of the solar panel or mirror using optically clear adhesive (OCA) films or silicone adhesives. The OCA films (thickness 25 μm) are produced by 3M. The EDS film stacks have the architecture: WG/OCA/EDS Film/OCA/ over PV module or solar mirror. The power-supply units needed for activating the electrodes of the EDS film were designed and produced at Boston University. These power supply units provide three-phase, 1.2 kV voltage pulses at a very low current (micro-ampere) level and at a low frequency (≈ 5 Hz). The voltage pulses are applied to the electrodes in a sequence such that the train of pulses resembles a unidirectional traveling wave of electrical field on the surface of the EDS film. The dust particles on the surface become charged electrostatically and are levitated by the Coulomb force. The lateral sweeping action of the traveling electric field created by the three-phase voltages pulses then sweeps the dust off the surface. The energy consumed by the EDS electrodes is less than 0.2 Wh/m 2 /cleaning cycle, enabling energy-efficient restoration of output power (OPR) of PV module or specular reflectivity restoration (SRR) for solar mirrors. The EDS system consists of (1) an EDS film stack laminated onto the solar collectors, (2) connection of the EDS film to its power supply unit and (3) Interconnection of the power supply to PV modules or solar mirrors. Design, construction and assessment of field-testing units that have EDS stack laminated PV modules for evaluating the performance of the EDS films in solar fields is being carried out at BU. Our progress under this project, aimed at the advancement of EDS film technology, has reached DOE Technology Readiness Level (TRL) 6. Based on the extensive laboratory evaluations and limited field trials, as well as contacts with potential users, we believe that the technology has reached its commercial stage. We are conducting a cost analysis using the National Renewable Energy Laboratory (NREL) System Advisory Model (SAM) and are preparing for field trials of EDS films in different solar fields in the US, Chile, India and in the Middle East. A brief description of EDS film performance, construction and testing of the field-test unit, autonomous operation of the field-test unit for evaluating EDS performance in increasing energy yield, associated revenue savings, and water conservation is presented.

14 SOLAR ENERGY↗

Long-term hydro-economic analysis tool for evaluating global groundwater cost and supply: Superwell v1.1

Abstract. Groundwater plays a key role in meeting water demands, supplying over 40 % of irrigation water globally, with this role likely to grow as water demands and surface water variability increase. A better understanding of the future role of groundwater in meeting sectoral demands requires an integrated hydro-economic evaluation of its cost and availability. Yet substantial gaps remain in our knowledge and modeling capabilities related to groundwater availability, recharge, feasible locations for extraction, extractable volumes, and associated extraction costs, which are essential for large-scale analyses of integrated human–water system scenarios, particularly at the global scale. To address these needs, we developed Superwell, a physics-based groundwater extraction and cost accounting model that operates at sub-annual temporal and at the coarsest 0.5° (≈50 km × 50 km) gridded spatial resolution with global coverage. The model produces location-specific groundwater supply–cost curves that provide the levelized cost to access different quantities of available groundwater. The inputs to Superwell include recent high-resolution hydrogeologic datasets of permeability, porosity, aquifer thickness, depth to water table, recharge, and hydrogeological complexity zones. It also accounts for well capital and maintenance costs, as well as the energy costs required to lift water to the surface. The model employs a Theis-based scheme coupled with an amortization-based cost accounting formulation to simulate groundwater extraction and quantify the cost of groundwater pumping. The result is a spatiotemporally flexible, physically realistic, economics-based model that produces groundwater supply–cost curves. We show examples of these supply–cost curves and the insights that can be derived from them across a set of scenarios designed to explore model outcomes. The supply–cost curves produced by the model show that most (90 %) nonrenewable groundwater in storage globally is extractable at costs lower than USD 0.57 m−3, while half of the volume remains extractable at under USD 0.108 m−3. The global unit cost is estimated to range from a minimum of USD 0.004 m−3 to a maximum of USD 3.971 m−3. We also demonstrate and discuss examples of how these cost curves could be used by linking Superwell's outputs with other models to explore coupled human–environmental system challenges, such as water resources planning and management, or broader analyses of multisectoral feedbacks.

Global Change Analysis Model (GCAM)↗

Process-Based Cost Estimation for Ramjet/Scramjet Engines

Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

Singh, Brijendra↗

Launch Vehicle Production and Operations Cost Metrics

Traditionally, launch vehicle cost has been evaluated based on $/Kg to orbit. This metric is calculated based on assumptions not typically met by a specific mission. These assumptions include the specified orbit whether Low Earth Orbit (LEO), Geostationary Earth Orbit (GEO), or both. The metric also assumes the payload utilizes the full lift mass of the launch vehicle, which is rarely true even with secondary payloads.1,2,3 Other approaches for cost metrics have been evaluated including unit cost of the launch vehicle and an approach to consider the full program production and operations costs.4 Unit cost considers the variable cost of the vehicle and the definition of variable costs are discussed. The full program production and operation costs include both the variable costs and the manufacturing base. This metric also distinguishes operations costs from production costs, including pre-flight operational testing. Operations costs also consider the costs of flight operations, including control center operation and maintenance. Each of these 3 cost metrics show different sensitivities to various aspects of launch vehicle cost drivers. The comparison of these metrics provides the strengths and weaknesses of each yielding an assessment useful for cost metric selection for launch vehicle programs.

Watson, Michael D.↗

Parametric Cost Estimates of Four 20 Ton Payload Mars EDL Vehicle Concepts

Cost is one of the biggest obstacles to sending humans to Mars. Many studies have examined various vehicles and/or technologies which could be used to send humans to Mars. However, nearly all of these studies have either ignored cost or have used the mass of the vehicles as a surrogate for cost. This work presents parametric cost estimates of four Mars Entry, Descent, and Landing vehicle concepts capable of landing 20 tons of payload on the surface of Mars. The concepts are the Co-Optimization Blunt-body Re-entry Analysis-Mid lift to drag ratio Rigid Vehicle (Cobra–MRV), Adaptive Deployable Entry and Placement Technology (ADEPT), Hypersonic Inflatable Aerodynamic Decelerator (HIAD), and Capsule concepts. Two variants of the HIAD concept are studied, one with a single HIAD heatshield and one with two HIADs. The study presents the development and production cost of each vehicle and the total cost to build five flight units and fifteen flight units. Five flight units is representative of a single mission, or a "Flags and Footprints" style campaign, whereas fifteen flight units is representative of multiple missions going to multiple sites on Mars. All costs presented in this work are normalized to the average of the first unit production cost of the lander concepts. There is a large amount of uncertainty both in the design of the vehicles and the cost of the vehicles and it is impossible to claim with certainty which vehicle will cost the least. However, it is likely that the total cost to produce five flight units will be in the following ranking from least costly to most costly, Single HIAD, Capsule, Dual HIAD, Cobra, ADEPT. The ranking for fifteen units is similar but with the positions of the Dual HIAD and Cobra reversed. This study only considers the cost of the entry vehicle and does not take into account the effect of the entry vehicle’s mass on the cost of the in-space propulsion stage or launch vehicle.

Paul D Friz↗

Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PVsystem installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by projectmanagers at leading U.S. installers. The cost models are constructed through a 'bottoms-up' assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to aninstaller, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.