Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMERCIAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Energy Savings Impacts of Airtightness in U.S. Commercial Buildings

Air leakage in commercial buildings in the U.S. accounts for about one quad of energy annually. As the thermal resistance of commercial building envelopes continues to improve, the relative contribution of air leakage to heating and cooling loads is increasing. Several manufacturers have developed advance air barrier technologies and construction practices to reduce the air leakage in buildings. To help in the market penetration of these advance technologies, advances in easy to use tools for determining the impact of air leakage are needed. Oak Ridge National Laboratory (ORNL), the Air Barrier Association of America, the National Institute of Standards and Technology, and the US-China Clean Energy Research Center for Building Energy Efficiency partnered to develop an online calculator that estimates the potential energy and cost savings in major US, Canadian, and Chinese cities from improvements in airtightness. The calculator estimates the energy and cost savings potential based on the pre and post retrofit air leakage rates for prototype commercial buildings. This report explores extending these savings to determine the national level energy savings potential based on the weightage of commercial building type in different ASHRAE climate zone locations. The base infiltration rate of 1.07 CFM/ft2 was assumed for these calculations and the savings were calculated for three different air infiltration target rates of 0.4 CFM/ft2, 0.25 CFM/ft2, and 0.06 CFM/ft2. The national source energy savings of 238, 283, and 313 TBtu respectively were estimated for these target air infiltration rates.

Bhandari, Mahabir↗

Commercial Energy Code Compliance – Just the Facts, Ma’am

What percent of newly constructed commercial buildings comply with the energy code? How much energy and cost could be saved if the compliance increased? Which code requirements have both low compliance rates and high savings potential? These are the questions U.S. Department of Energy (DOE) is trying to answer through its Commercial Energy Code Field Study. Previous commercial studies have been very limited and did not result in a widely accepted and tested methodology. DOE’s goal is to create a standardized methodology that can produce actionable results at a reasonable study cost, that can be used by state and local governments and utilities and provides valuable information to policy makers. This paper builds on the methodology presented at the 2016 Summer Study and provides a first glimpse of the results as seen in the field. The field study team has implemented the pilot methodology, compiling a data set of over 200 office and retail buildings in climate zones 2A and 5A. The approach is based on identifying lost savings on a total energy cost basis rather than simply counting the quantity of measures that do not meet code. This paper will review the findings of that analysis, discuss critical aspects of the methodology, such as sampling and recruitment strategies, and identify areas where the greatest return—bang for the buck—exists in improving compliance with codes in commercial buildings. In addition, the team will make specific recommendations for jurisdictions looking to use the methodology to maximize energy code savings achieved in the field.

Cheslak, Kimberly↗

An Energy Calculator for Simple Commercial Buildings

According to the EIA, simple commercial buildings account for 97% of total commercial building stock. However, most simple commercial buildings for example small- to mid-sized offices, retail, schools and warehouses do not benefit from the data-driven decision-making capabilities of whole-building energy modeling. The high cost of custom modeling limits the use of energy modeling of simple buildings for new construction or retrofit measures. Lack of tools providing helpful information on interactive savings estimates creates difficulties in meeting aggressive decarbonization and energy efficiency goals for simple building designers and utility program managers. This paper reviews a beta phase Simple Building Calculator with the ability to generate relatively accurate and interactive modeling results based on a limited but robust set of inputs. It can evaluate whole-building or single measure savings in new or existing buildings, compare measure package choices, or provide simplified performance modeling for energy codes and utility incentives. The tool combines physical (annual whole building prototype simulation) and statistical modeling techniques to predict annual energy performance. It supports a variety of building characteristics for envelope, HVAC, and lighting with parameters ranging from vintage to max tech configurations, as well as support for single-zone and simple multi-zone HVAC systems. The Simple Building Calculator was designed to provide immediate feedback for otherwise computationally intensive tasks like measure comparison, development of multiple measure package combinations, or verification that measures meet efficiency targets—all with the goal of providing a tool for quick annual energy simulation of simple commercial buildings.

Hart, Reid↗

Microstructural Characterization of A709 Commercial Heats with Precipitation Treatment

This report discusses work conducted at Idaho National Laboratory in fiscal year 2022 associated with the precipitates in Alloy 709 (A709). The purpose of this work is to support the development of the A709 Code Cases to qualify A709 in Section III, Division 5 of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. This would permit the use of A709 for elevated-temperature nuclear construction. This work encompassed two broad goals. The first goal was to understand the microstructure of the second commercial heat of plate A709 purchased through the Advanced Reactors Technologies Program in both the solution-annealed and precipitation-treated conditions. Transmission electron microscopy was utilized to characterize these microstructures. Direct comparisons were then made between the solution-annealed and precipitation-treated conditions as well as between the first and second commercial heats of plate A709. The second goal was to understand the impact of variations in the time and temperature of the precipitation treatment on the properties of A709. The precipitation treatment temperature was varied from 750°C to 800°C for times ranging from 3 hours to 30 hours. The hardness of each precipitation treatment variation was measured. All of the precipitation treatment variations investigated besides a specimen from the second commercial heat of plate A709 precipitation treated at 800? for 9 hours met the room-temperature hardness requirement specified in ASTM A213 and SA-213 for UNS S31025. The hardness measured for the specimen from the second commercial heat of plate A709 that was precipitation treated at 800? for 9 hours is considered an outlier. The next step is to look at the extremes of the precipitation treatment variations investigated and conduct elevated-temperature mechanical testing. The purpose of this testing would be to assess if these time and temperature variations have any impact on the mechanical performance.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Connecting Electric Vehicle Charging Infrastructure to Commercial Buildings

Electric vehicles (EVs) are growing in popularity and gaining meaningful market share with record sales year over year in the last decade. EV charging equipment, also known as EV chargers (EVC) or EV supply equipment (EVSE), must proportionally match the growing number of new EVs on the road for a comparable experience to gas-powered vehicles. The majority of EV charging currently happens at residential buildings. However, demand for EV charging at commercial buildings will significantly increase with wider mainstream EV adoption and as businesses return to more normal operation following COVID-19 pandemic disruptions. Charging equipment can include various sub-systems like power conditioning module, control software, safety devices, metering, communication, cooling, connectors, and its wiring. EV charging at commercial buildings could be used for public, workplace, and commercial fleet charging. This document aims to describe how EVC can be connected to commercial buildings, including considerations for facility managers, and the effects that charging will have on the buildings electrical distribution system. More specifically, this resource provides an overview of: understanding EV charging basics: how charging equipment connects to the building and to EVs; required infrastructure updates needed at the building site to connect EVC to existing distribution systems; network strategies for cost-effective operation; metering and utility considerations for billing and incentives; charging equipment ownership options; future trends in EVC connection to buildings.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Experimental Aging and Lifetime Prediction in Grid Applications for Large-Format Commercial Li-Ion Batteries

Due to the growth of electric vehicle and stationary energy storage markets, the production and use of lithium-ion batteries has grown exponentially in recent years. For many of these applications, large-format lithium-ion batteries are being utilized, as large cells have less inactive material relative to their energy capacity and require fewer electrical connections to assemble into packs. And especially for stationary energy storage systems, where energy delivered is the only revenue source, the economics of these battery systems is highly dependent on cell lifetime. However, testing of large-format lithium-ion batteries is time consuming and requires high current channels and large testing chambers, making information on the performance of commercial, large-format lithium-ion batteries hard to come by. Here, accelerated aging test data from four commercial large-format lithium-ion batteries is reported. These batteries span both NMC-Gr and LFP-Gr cell chemistries, pouch and prismatic formats, and a range of cell designs with varying power capabilities. Accelerated aging test results are analyzed to examine both cell performance, in terms of efficiency and thermal response under load, as well as cell lifetime. Cell thermal response is characterized by measuring temperature during cycle aging, which is used to calculated a normalized thermal resistance value that may help estimate both cell cooling needs or to help extrapolate aging test results to different thermal environments. Cell lifetime is evaluated qualitatively, considering simply the average calendar and cycle life across a range of conditions, as well as quantitatively, using statistical modeling and machine-learning methods to identify predictive aging models from the accelerated aging data. These predictive aging models are then used to investigate cell sensitivities to stressors, such as cycling temperature, voltage window, and C-rate, as well as to predict cell lifetime in various stationary storage applications. Results from this work show that cell lifetime and sensitivity to aging conditions varies substantially across commercial cells, necessitating testing for specific cell formats to make quantitative lifetime predictions. That being said, all commercial cells tested here are predicted to reach at least 10-year lifetimes for stationary storage applications. Based on the aging test results and modeling, some cells are expected to be relatively insensitive to temperature and use-case, making them suited for simple use cases with little or no thermal management and simple controls, while the lifetime of other cells could be extended to 20+ years if operated with thermal management and degradation-aware controls.

battery↗

Spatio-temporal and weather characterization of road loads of electrified heavy-duty commercial vehicles across U.S. interstate roads

Adoption of battery electric vehicles (BEV) in heavy duty (HD) commercial freight transportation is difficult due to technological and economic hurdles. Beyond safety and compliance, fleet and operational logistics necessitate both high uptime and parity with diesel system productivity/Total Cost of Ownership to support widespread deployment of electric powertrains. However, relatively high energy storage costs, along with the higher weight of BEV systems, limit the viability of HD commercial freight transport to shorter-range applications where smaller batteries will serve for mission energy requirements (single operational shift). Knowing the energy consumption and operating variations of these commercial vehicle systems is crucial for effectively sizing the energy storage systems. This paper is the first in a series of studies to understand the regional specific operating design domain variations of commercial Class 8 HD trucks and the associated impact to their energy requirements. In particular, the local weather conditions are shown to influence the total vehicle energy usage. Further, the impact of temperature, pressure, and humidity changes are shown to impact the local air density. This is needed to calculate aerodynamic drag on vehicles and has been found to play a significant role in the overall performance of a vehicle. Although the methodology of calculating air density varies only slightly throughout the literature, the application to transportation has still been limited. This study provides a means by which air density can be estimated for the contiguous U.S. using the NOAA MADIS dataset. These air density estimates were then used to determine vehicle performance in varying regions of the country to highlight the importance of consideration of weather variables when monitoring vehicle performance, but also to provide recommendations based on these locales upon fleet conversion to BEVs.

Moore, Amy↗

Routing Options for Transporting Commercial Spent Nuclear Fuel in the Continental United States - 17504

The U.S. Department of Energy (DOE) has a goal to develop solutions for the long-term, sustainable management of the nation's spent nuclear fuel and high-level radioactive waste. The DOE is planning for an integrated waste management system to transport, store, and dispose of spent nuclear fuel and high-level radioactive waste from commercial electricity generation, as well national defense activities. The DOE Office of Nuclear Energy (DOE-NE), Office of Spent Fuel and Waste Disposition's (SFWD) Integrated Waste Management (IWM) program is applying integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. Integrated waste management system architecture analyses are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all aspects of the back-end of the nuclear fuel cycle (transportation, storage, and disposal). One aspect of a potential future nuclear waste management system is transportation of spent nuclear fuel from the fleet of commercial nuclear reactors to destinations where waste management facilities, such as an interim storage facility, would be located. Example rail transportation routes from commercial nuclear reactor sites to various locations in the continental U.S. - chosen as hypothetical locations for future waste management system facilities - were evaluated in 2014 using DOE's GIS-based Stakeholder Tool for Assessing Radioactive Transportation (START). The objective of that evaluation was to identify and parameterize generic transportation routes for use in integrated waste management system analyses, the associated uncertainty in these selections, and the uncertainty associated with different transportation route selection criteria. The analysis presented herein considers rail transportation routes from commercial nuclear reactor sites to hypothetical destinations within the continental U.S. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sealed Source Security Challenges and Solutions: The Impact of Increased Commercial Disposal Access - 16557

Several recent developments have transformed the sealed source disposal landscape in the United States in ways unimaginable just a few years ago, including the initiation of operations at the first new commercial LLRW facility to open in the United States in decades; publication by the Nuclear Regulatory Commission (NRC) of revised commercial low-level radioactive waste (LLRW) disposal guidance; and the development and certification by the Department of Energy National Nuclear Security Administration (DOE/NNSA) of new transportation package designs for high-activity sources/devices. These developments will likely enable LLRW generators to dispose of risk-significant radioactive sealed sources that for decades have been without a commercial disposal pathway. However, challenges remain with regard to ensuring that these new commercial disposal pathways are effective, and that sealed source licensees take advantage of the new options in a timely manner. These challenges include costs related to both transportation and disposal that are likely much higher than most generators expected when they purchased their sources. DOE/NNSA is actively engaged with Federal, State, regional, private sector partners to address these challenges, including measures to encourage financial planning for end-of-life management of radioactive sealed sources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of the SNF Transportation Infrastructure at Operating Commercial Nuclear Power Plant Sites - 18466

The U.S. Department of Energy (DOE) has a goal to develop solutions for the long-term, sustainable management of the nation's spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The DOE Office of Nuclear Energy's (DOE-NE) Office of Integrated Waste Management (IWM) is applying integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. One aspect of an integrated nuclear waste management system architecture is transportation of spent nuclear fuel from the fleet of commercial nuclear reactors to interim storage and/or disposal facilities. This paper presents a preliminary evaluation of the SNF transportation infrastructure at existing commercial nuclear power plant sites. Reactor site surveys performed by DOE in the 1990's and early 2000's that described the transportation infrastructure at commercial reactor sites at that time served as the starting point for the evaluation. Geographical information systems (GIS) and available open-source information about the reactor sites were used to identify changes in the transportation infrastructure at operating commercial nuclear power plant sites. The data and schematics contained within the previous surveys were comparatively analyzed alongside the GIS tools Google Earth, Google Maps, and DOE's Stakeholder Tool for Assessing Radioactive Transportation (START) to determine potential transportation modes and to identify improvements to the transportation infrastructure that may be needed at each of the sites. The preliminary results obtained and the insight gained from this effort support both integrated waste management system architecture analyses and future planning efforts. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spectrum Interference from Commercial devices in 6 & 7/8 GHz

FCC repurposed spectrum in the 6 GHz band allocated to DOE for commercial use of Wi-Fi 6E/7 in 2020.The 2024 National Spectrum Strategy (NSS) implementation plan is now considering 7/8 GHz band as well for co-existence of commercial devices with federal incumbents such as DOE. This poster summarizes INL’s work on a scientific study on the potential harmful interference caused by the commercial devices in real-world scenarios. It includes research in INL for the following projects funded by DOE: 1) DOE-CIO: Spectrum security for advanced wireless technologies; 2) DOE-OE: 7 GHz Spectrum interference study; 3) DOE-CESER: Harmful interference in 6 GHz from commercial Wi-Fi 6E/7 devices on utility links in the energy sector; 4) DOE/NTIA for NSS Implementation plan: Interference study in 7/8 GHz bands identified in the NSS. 5) NSF: Spectrum Innovation Initiative- National Radio Dynamic Zones (SII-NRDZ).

6 GHz↗

Nationwide Analysis of U.S. Commercial Building Solar Photovoltaic (PV) Breakeven Conditions

The commercial sector offers strong potential for solar photovoltaics (PV) owing to abundant available roof space suitable for PV and the opportunity to offset the sector's substantial retail electricity purchases. This report evaluated the breakeven price of PV for 15 different building types and various financing options by calculating electricity savings based on detailed rate structures for most U.S. utility territories (representing approximately two thirds of U.S. commercial customers). We find that at current capital costs, an estimated 1/3 of U.S. commercial customers break even in the cash scenario and approximately 2/3 break even in the loan scenario. Variation in retail rates is a stronger driver of breakeven prices than is variation in building load or solar generation profiles. At the building level, variation in the average breakeven price is largely driven by the ability for a PV system to reduce demand charges.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

City and County Commercial Building Inventories

The Commercial Building Inventories provide modeled data on commercial building type, vintage, and area for each U.S. city and county. Please note this data is modeled and more precise data may be available through county assessors or other sources. Commercial building stock data is estimated using CoStar Realty Information, Inc. building stock data. This data is part of a suite of state and local energy profile data available at the "State and Local Energy Profile Data Suite" link below and builds on Cities-LEAP energy modeling, available at the "EERE Cities-LEAP Page" link below. Examples of how to use the data to inform energy planning can be found at the "Example Uses" link below.

Array↗

A Process for Defining Prototype Building Models: Courthouse Case Study for U.S. Commercial Energy

Buildings currently consume 36% of the world’s energy and contribute nearly 40% of CO 2 emissions. Many countries desire to generate virtual models of their nation’s buildings in order to coordinate research activities and inform market opportunities for a more sustainable built environment. The United States Department of Energy uses a suite of Commercial Prototype Building Models, which currently includes 16 building types and covers 80% of US commercial floorspace. Efforts are underway to expand this suite by developing prototype models for additional building types. In this paper, we outline a systematic approach to defining the building, collecting relevant information and creating a flexible model while doing so in the pragmatic context of a courthouse building. Informed by building design guides, databases, documented projects and inputs from courthouse design experts, we define a small, 69,324 ft 2 (6440 m 2 ), four-courtroom, low-rise courthouse as the prototype to represent an average-size courthouse in the US. We present building characteristics relevant for energy model development and provide the rationale for their selection. These details combined with climate- and construction-vintage-specific requirements for the building envelope and systems from building standards will be used for developing the courthouse model for the Commercial Prototype Building Models suite. The comprehensive information presented will also guide model modification to capture the dynamics of smaller or larger courthouses more accurately for building or system size-specific research.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Progression of Space Transportation - Transitioning from Government to Commercial

Spaceflight began as the exclusive province of government, however, starting in the 1980's the United States began to promote commercial participation in space transportation. Beginning with Executive policy and extending through legislation and regulation, NASA has embarked on facilitating the commercialization of space transportation to serve NASA needs and enable a non-NASA market place. This presentation provides background on the transition to commercial space transportation and the specific role NASA is playing in that endeavor.

Commercialization↗

ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

IN2 Profile: Reducing Energy Prices for Commercial Buildings with NETenergy’s Black ICE Technology

To cool a commercial building properly and cost-effectively, the owners of NETenergy have created a thermal battery that works much like an electrical battery except instead of storing energy electrically, it stores energy thermally. Through the Wells Fargo Innovation Incubator (IN²) program, NETenergy will be able to advance modeling of their system and increase product development. The IN² program launched in October 2014 and is part of Wells Fargo’s 2020 Environmental Commitment to provide $100 million to environmentally-focused nonprofits and universities. The goal is to create an ecosystem that fosters and accelerates the commercialization of promising commercial buildings technologies that can provide scalable solutions to reduce the energy impact of buildings. According to the Department of Energy, nearly 40 percent of energy consumption in the U.S. today comes from buildings at an estimated cost of $413 billion.

25 ENERGY STORAGE↗