Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CEMENT INDUSTRY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

UR 2 : Ultra-rapid reactivity test for real-time, low-cost quality control of calcined clays

To reduce cement's carbon footprint, there is growing interest in commercial adoption of sustainable SCMs such as calcined clays. However, the existing ASTM standard (R 3 test, C1897) to test the reactivity of such clays takes up to 7 days and cannot be used for real-time quality control in an industrial setting. We address this issue by introducing a 5-min Ultra-Rapid Reactivity (UR 2 ) test. By dissolving 47 clay specimens in 4 M NaOH solutions at 90°C, we report that a dissolution index of 1.54Al + Si correlates strongly to the 7-day R 3 heat (R 2 = 0.92, RMSE = 94.1 J/g). This dissolution index also correlates to the 28-day compressive strength for 14 clay mixtures (R 2 = 0.94, RMSE = 1.7 MPa). This UR 2 test relies on colorimetry and can be conducted via off-the-shelf, low-cost cameras. Overall, our new UR 2 test opens a pathway for real-time, low-cost quality control of calcined clays.

36 MATERIALS SCIENCE↗

The role of gas flow distributions on CO 2 mineralization within monolithic cemented composites: coupled CFD-factorial design approach

The carbonation kinetics of monolithic cementing composites are strongly affected by gas transport which is, in turn, influenced by microstructural resistances and the presence of liquid water within pore networks. The non-uniform gas flow distribution within the CO 2 mineralization reactor can impart mass transfer resistance in the monolith microstructure, which affects the uptake of CO 2 (“carbonation”) of the cementing composites. This paper demonstrates how the gas spatial distribution (velocity and flow rate; quantified by CFD analysis) and processing conditions (temperature, relative humidity, and flow rate; quantified by factorial design) affect drying and carbonation, and in turn, the engineering properties of a representative ‘monolithic’ carbonate-cemented concrete component (i.e., herein concrete masonry unit: CMUs, also known as concrete block). It is shown that the gas flow distribution affects drying front penetration and results in moisture and carbonation gradients within the monolith. Particularly, variations in drying kinetics caused by non-uniformity of the contacting gas velocity impose gradients in moisture saturation, which results in increasing microstructural resistance to CO 2 transport. The resultant non-uniform carbonate-mineral formation (i.e., carbonate cementation), if not controlled, can produce gradients in mechanical properties and may alter failure patterns upon loading. Finally, these insights inform the optimal design of gas flow distribution systems and processing conditions within CO 2 mineralization reactors for the manufacturing of low-CO 2 concrete components using CO 2 -dilute industrial flue gas streams.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The Polymers for Liquid Radioactive Waste Solidification: a Lost Chapter in the History of Engineering or a Step Forward? - 13529

Ideas on the application of polymers for the liquid radioactive waste immobilization go a way back, and the first studies in the area were published 30-40 years ago. One should admit that regardless of the fairly large number of publications appeared in the past years currently the interest in this work came down greatly. It was the successful assimilation and worldwide implementation of the LRW cementation technology caused a slump in the interest in polymers. But today it's safe to say that the situation slowly changes, particularly due to the market appearance of the high-tech polymers manufactured by Nochar Company, and unique properties of these polymers gradually raise the demand in various countries. The results of multiple experiments performed with the simulated solutions have passed the comprehensive tests with actual waste. The economic effect from the implementation of the new technology is defined by the volume reduction of waste coming onto the repository, by the decline in the cost of transportation and of the repository construction on account of cutting down the construction volume. Interesting results have been obtained during the search for the technical decisions that would allow using the polymer materials in the processing technology of the industrial toxic waste. One more promising area of the possible application of polymers should be pointed out. It is the application of polymer materials as the assets for the emergency damage control when the advantages of the polymers become obvious. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA Swamp Works at Kennedy Space Center: Advanced Technology Development

The American Concrete Institution (ACI) Universidad de Cuenca Chapter, from Ecuador, is pleased to inform you that Mr. Rob Mueller, Director of Swamp Works, is invited to our academic event named II International Symposium of Cement and Concrete Technology. The dates of the event are from the 8th to 9th of October 2019 in the Carlos Cueva Tamariz Theater, Cuenca - Ecuador. This event is part of the commencement of the 80 years of institutional life of the Faculty of Engineering and is ideal opportunity to establish connections with the industry and academia.During this experience Senior Technologist Rob Mueller will have the opportunity to speak in two 45 min sessions about The Swamp Works. Topic: The rapid, innovative, and cost-effective exploration mission solutions of NASA.

Mueller, Robert P.↗

Assessment of CO 2 Storage Resources in Depleted Oil and Gas Fields in the Ship Shoal Area, Gulf of Mexico

The Gulf of Mexico is one of the most important regions in the United States for energy resources and infrastructure. Gulf of Mexico federal offshore oil and gas production accounts for 17% of total U.S. crude oil production and 5% of total U.S. gas production (EIA Gulf of Mexico Fact Sheet). This region presents an excellent combination of high need and significant opportunity for large scale geologic storage of CO 2 . The Ship Shoal Area is located about 20 miles offshore Louisiana within the Gulf Coast federal waters. Miocene and Pliocene sediments in the Ship Shoal Area are proven to provide excellent and secure traps for oil and gas. The Ship Shoal Area contains a large number of depleted oil and gas fields either currently abandoned, or planned for abandonment by 2025, which may provide very significant potential CO 2 storage capacity. GeoMechanics Technologies conducted a comprehensive research project to better characterize Neogene sediments in the Ship Shoal Area for high volume CO 2 storage. The data generated from literature, well data, well log, and formation evaluation were input into Rockwork 16 geologic software to create a detailed geologic model for the Ship Shoal study area. The geologic grids were then fed into TOUGH2, the gas migration model software and FLAC 3D, the geomechanical model software. The fluid flow modeling for both the Miocene and Pliocene simulation from both Block 107 and Block 84 indicated that Pliocene and Miocene are a good reservoir for the CO 2 sequestration. Thirty years of CO 2 injection (at a rate of 1 million metric tons CO 2 per year) and 30 years of observation simulations were run with the fluid flow modeling. The 3D geomechanical modeling for Ship Shoal Block 107 and Block 84 were developed to evaluate induced surface deformation and potential fault reactivation after 30 years CO 2 injection at base of Pliocene and at upper Miocene injection locations. Evaluation results indicate low to no risks for fault slips or fault reactivation. Twelve well bores and 76 well bores for Ship Shoal Blocks 84 and 107 respectively were reviewed for their cement history. Most wells (57 out of 76 and 7 out of 12 wells in Ship Shoal Block 107 and 84 respectively) have good integrity. Nineteen and 5 wells (in Ship Shoal Block 107 and 84 respectively) with no top plug, incomplete cement or Plug and Abandonment information are given yellow cautionary indicators. These cautionary wells may provide leakage paths of CO 2 through the well bores to the USDWs. Using our Quantitative Risk & Decision Analysis Tool (QRDAT) for caprock integrity evaluation, we compared Ship Shoal’s risk to that of In Salah, Sleipner, Kevin Dome, Loudon, Illinois Industrial CCS and Wilmington Graben. We found the risk at the Ship Shoal Blocks 84 and 107 fields are similar to the known CO 2 active sequestration sites, but lower than the Wilmington Graben turbidities offshore California studied site. The risk of natural seismicity in the Gulf of Mexico is relatively low. Geomechanics Technologies has documented the top 25 CO 2 emission sources within the close proximity of the Ship Shoal Block 84 and 107 fields. All the offshore and onshore pipelines have been digitized and can be viewed in an interactive website (http://www.geomechanicstech.com/shipshoal.html). We also performed a feasibility study on the potential for converting existing oil or gas pipelines for CO 2 transport. There are abandoned, idled and retired onshore and offshore pipelines. However, there is no standard specification for maximum pipeline pressures needed for CO 2 transport. It is a function of design, materials, and testing provided; thus it will be the responsibility of the pipeline operator to correctly determine, maintain and operate within the limits of the pipelines. There are a few transit corridors extending from onshore Louisiana (Cailou Bay) to offshore trunk-lines. The cost for constructing a pipeline has increased about 46% from 2015 to an average cost of $5,064,046 per mile in 2016. We use the NETL CO 2 storage resource mass estimate to calculate the potential resources for Ship Shoal Block 84 and 107 fields using the depleted oil and gas reservoir volume and sand volume generated from our geologic modeling. The estimated storage resource results are greater when using the sand volumes derived through geologic modeling than the oil and gas reservoir data. The difference is due to the depleted oil and gas reservoir information not accounting for the water-flooded sand located below the oil/gas-water contact or unproductive sand units. Resource calculation using the sand volume obtained through geologic modeling overestimate the storage capacity as the model accounts for all sand within the formation, not just the interconnected sand.

02 PETROLEUM↗

French Innovative Thermal Treatment Processes for The Management Radioactive Organic Liquid Waste - 19017

The nuclear industry as well as hospitals or some research laboratories produce Radioactive Organic Liquid Waste (ROLW) such as scintillation cocktails for medical imaging, labeled molecules for medical research or liquids from former activities. In order to be compatible with disposal facilities requirements, this waste must be inerted and stabilized in solid matrix. The route generally used is incineration in the Centraco facilities at the Marcoule site (Gard, France), ashes produced being cemented downstream. However, liquids whose chemical or radiological characteristics are not compatible with the incinerator operating rules (high level of {sup 14}C or halogen content, corrosive gas production etc.) cannot follow this path. The purpose of the MILOR project is then to propose alternative paths to treat all kinds of ROLW. Initiated in September 2017, this project has the technical objective of developing, over a four-year period, two pilot-scale mineralization processes. Two variants of complementary plasma technologies are evaluated: aerial plasma with the 'IDOHL' process and submerged plasma with the 'ELIPSE' process. Compared with other methods, thermal plasmas have unique characteristics such as rapid decomposition with high throughput, fast startup and shutdown, and high-energy delivery. The process called IDOHL consists of a process involving an induction plasma in which the liquids are directly introduced. It has been designed for organic liquids without mineral load and for treatment rates less than 0.5 l/h. This type of plasma allows the destruction of liquid organohalogens without any prior evaporation or treatment. Specific gas treatment systems have been developed to direct the gas produced to a dry or wet gas treatment system. One aim of the project is to subsequently install the process in a radioactive zone at Saclay DRF. The second called ELIPSE consists of a breakthrough process involving a submerged plasma at the heart of which organic liquids are also introduced. Current research has demonstrated that such a technique may enable the instantaneous and complete destruction of liquids with a wide variety of constituents, such as chlorine, fluorine, or phosphorus. The submersion solution offers many advantages: quenching and cleaning of combustion gases; filtering of the particles they contain; and cooling maintained for the entire process, which guarantees excellent corrosion control. An advantage of this type of design is that the gas treatment system can be reduced to a demister-condenser followed by a simple safety filter, thereby offering the additional advantage of an extremely compact treatment system. This design also allows the ELIPSE process to become by this way an embeddable process if required. The MILOR project, financed by the French State through investment program is a tripartite project bringing together Andra, in charge of radioactive waste management, the CEA in charge of leading scientific and technological researches to propose effective ways of treatment and the company A3i whose role is to ensure the subsequent industrial development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An integrated appraisal of energy recovery options in the United Kingdom using solid recovered fuel derived from municipal solid waste

This paper reports an integrated appraisal of options for utilising solid recovered fuels (SRF) (derived from municipal solid waste, MSW) in energy intensive industries within the United Kingdom (UK). Four potential co-combustion scenarios have been identified following discussions with industry stakeholders. These scenarios have been evaluated using (a) an existing energy and mass flow framework model, (b) a semi-quantitative risk analysis, (c) an environmental assessment and (d) a financial assessment. A summary of results from these evaluations for the four different scenarios is presented. For the given ranges of assumptions; SRF co-combustion with coal in cement kilns was found to be the optimal scenario followed by co-combustion of SRF in coal-fired power plants. The biogenic fraction in SRF (ca. 70%) reduces greenhouse gas (GHG) emissions significantly ({approx}2500 g CO{sub 2} eqvt./kg DS SRF in co-fired cement kilns and {approx}1500 g CO{sub 2} eqvt./kg DS SRF in co-fired power plants). Potential reductions in electricity or heat production occurred through using a lower calorific value (CV) fuel. This could be compensated for by savings in fuel costs (from SRF having a gate fee) and grants aimed at reducing GHG emission to encourage the use of fuels with high biomass fractions. Total revenues generated from coal-fired power plants appear to be the highest ( Pounds 95/t SRF) from the four scenarios. However overall, cement kilns appear to be the best option due to the low technological risks, environmental emissions and fuel cost. Additionally, cement kiln operators have good experience of handling waste derived fuels. The scenarios involving co-combustion of SRF with MSW and biomass were less favourable due to higher environmental risks and technical issues.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEMOLISHING A COLD-WAR-ERA FUEL STORAGE BASIN SUPERSTRUCTURE LADEN WITH ASBESTOS

The K East (KE) Basin facilities are located near the north end of the Hanford Site's 100 K area. The facilities were built in 1950 as part of the KE Reactor complex and constructed within 400 meters of the Columbia River, which is the largest river in the Pacific Northwest and by volume the fourth largest river in the United States. The basin, located adjacent to the reactor, was used for the underwater storage of irradiated nuclear fuel discharged from the reactor. The basin was covered by a superstructure comprising steel columns and beams, concrete, and cement asbestos board (CAB) siding. The project's mission was to complete demolition of the structure over the K East basin within six months of tumover from facility deactivation activities. The demolition project team implemented open-air demolition techniques to demolish the facility to slab-on-grade. Several innovative techniques were used to control contamination and maintain contamination control within the confines of the demolition exclusion zone. The techniques, which focused on a defense-in-depth approach, included spraying fixatives on interior and exterior surfaces before demolition began; applying fixatives; misting using a fine spray of water during demolition; and demolishing the facility systematically. Another innovation that aided demolition was to demolish the building with the non-friable CAB remaining in place. The CAB siding covered the exterior of the building, portions of the interior walls, and was an integral part of the multiple layered roof. The project evaluated the risks involved in removing the CAB material in a radiologically contaminated environment and determined that radiological dose rates and exposure to radiological contamination and industrial hazards would be significantly reduced by removing the CAB during demolition using heavy equipment. The ability to perform this demolition safely and without spreading contamination (radiological or asbestos) demonstrates that similar open-air demolition ofcontaminated structures can be performed successfully.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluating an Exterior Insulation and Finish System for Deep Energy Retrofits

This report provides a case study of a deep energy retrofit using a site-applied exterior insulation and finish system (EIFS). Prefabricated EIFS panels are also discussed as a potential wall insulation retrofit solution. EIFSs are common in new and retrofit commercial construction. Such products typically consist of five layers installed over the top of a water resistive barrier as follows: (1) Adhesive (2) Foam insulation (3) Base coat (4) Reinforcing mesh embedded in the base coat (5) Top or finish coat. They can be applied to new or existing buildings that employ wood or masonry construction, and can utilize an insulation thickness of up to 16 in. However, such systems are rarely used in lowrise residential retrofits. Reasons for this might include a lack of demand for or knowledge of the systems in residential retrofit industry, high cost, and/or lack of suitable distribution channels serving the residential market. While the final appearance of an EIFS installation resembles stucco, it is a distinctly different system. Stucco is a generic cementitious-based material, whereas EIFSs are proprietary synthetic formulations distributed by manufacturers to a network of authorized applicators. An EIFS is composed of polymeric (organic) bonded aggregate and cement reinforced with a glass mesh. Stucco is made of inorganic cement, sand, and lime. In this project, a home was retrofitted using a site-applied 4-in.-thick EIFS. Site-specific details were developed as required for the residential retrofit application. Site work and the costs of the EIFS were documented. The case study home was modeled using version 2 of the National Renewable Energy Laboratory-developed Building Energy Optimization (BEopt) energy and cost analysis software. While a package utilizing the 4-in. EIFS is the optimal retrofit of the options analyzed in terms of annualized energy-related costs, it is higher cost than replacing the siding with midrange vinyl alone. However, compared to high-end vinyl, the EIFS package has a lower annualized energy cost. This held true for both the Islip, New York (climate zone 4) and Boston (climate zone 5) case studies. The report discusses the risks, selection criteria, interactions with other building systems, cost, performance, and other aspects of using an EIFS in a deep energy retrofit. EIFSs do not require special site safety precautions beyond general construction site precautions. Moisture design is important. Trapping moisture between two vapor/air barriers is a risk of all wall systems, including EIFS cladding applications if an interior vapor barrier exists and if there is not adequate ventilation through the drainage plane behind the insulation layer. Face-sealed approaches that rely on exposed sealants do not provide acceptable rain control or durability and are very risky. Generally, fire codes permit EIFSs for most building types and conditions.

airtightness↗

Optimizing Geothermal Drilling: Oil and Gas Technology Transfer

There is a significant amount of financial risk associated with geothermal drilling; however, there are opportunities to improve upon current practices and technologies used. The scope of this drilling operational study included 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'perfect well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.), poor data collection, and difficult to ascertain handwriting. An online software database was used to format drilling data to IADC coded daily drilling reports and generate analysis figures. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averages 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million would be lost due to non-productive time in the 21 geothermal wells and only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry. It is the use of Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. However, a work-flow must also be established in order for there to be an efficient drilling program. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.

15 GEOTHERMAL ENERGY↗

Chromizing of 3Cr Steel

Grade 315 steel (Fe-2.9 Cr-1.7 W-0.7 Mo-0.3 Mn-0.3 Si-0.2 V-0.1 Ni-0.13 C-0.01 N) was chromized by the halide-activated pack cementation (HAPC) process. Key process parameters, i.e., coating temperatures and pack compositions, were investigated. Ammonium chloride-activated packs in the 700-1000 C range produced coatings nominally in the 1-8 {micro}m range, as determined by optical and scanning electron microscopy (SEM). Coatings applied in the 900-1000 C temperature range resulted in Cr-rich coatings. The predominant phase in the coating was identified as Cr23C6 by X-ray diffraction. In addition, the presence of chromium nitride, Cr2N, was observed in the coating. The power generation industry is faced with an ever-increasing demand for energy while simultaneously having to reduce carbon emissions. These goals can be facilitated by increasing plant efficiency through the use of higher operating temperatures and pressures. Traditional construction materials, e.g., the ferritic Grade 22 high strength low alloy steel, are limited to operations below {approx} 550 C. Therefore, new materials are required for future plants designed to operate up to 650 C and possibly higher. These new materials need to have improved tensile strength, ductility, toughness, corrosion resistance, and creep properties at elevated temperatures. Oak Ridge National Laboratory (ORNL) is investigating the oxidation and creep behavior of various coatings on Grade 315 steel (Fe-2.9 Cr-1.7 W-0.7 Mo-0.3 Mn-0.3 Si-0.2 V-0.1 Ni-0.13 C-0.01 N), a super-bainitic steel developed for superior creep properties. Thin, chemical vapor-deposited (CVD) aluminide coatings were used to compensate for the reduced corrosion and oxidation resistance that resulted from the low chromium content of the alloy. However, the aluminized Grade 315 alloys performed less-than-favorably under conditions relevant to fossil boilers, leading to the conclusion that higher chromium contents are required for the formation of corrosion-resistant oxide scales in these environments. The halide activated pack cementation (HAPC) process offers a promising low-cost and versatile alternative to CVD as a means of improving corrosion resistance via formation of a protective Cr-containing coating.

36 MATERIALS SCIENCE↗

Considerations for the Design of a Gas Transport System for Co-location of Microalgae Cultivation with CO 2 Sources

Co-locating microalgae cultivation facilities with sources of waste CO 2 may present opportunities for cost savings that could benefit the algal biomass industry and industries or utilities that have incentives to manage carbon emissions. However, the cost savings have not been quantified. We compare the cost of utilizing CO 2 from flue gas transported to 405-ha, base-case, open-pond microalgae facilities to the commercial purchase price of CO 2 . Sources of CO 2 include coal- and natural gas-fired power plants and ethanol, ammonia, and cement production plants in the United States. The transport of CO 2 -containing gases to the microalgae cultivation facility requires infrastructure and electricity. This engineering analysis explores the parameters that affect the infrastructure and transport distance over which emitted flue gases can be cost-effectively transported to microalgae cultivation facilities, compared to the cost of commercially purchased CO 2 (i.e., the break-even distance). Parameters that are varied include size of facility pond area, productivity, and daily duration of waste CO 2 emissions that are transported to algae. Under our assumptions and under all cases in this study, cost savings can be achieved by co-locating microalgae facilities near waste CO 2 sources. The break-even distance, which is estimated here to range from under 2 to 80 km, depends primarily on the concentration of CO 2 in flue gas, algae productivity, facility size, and pipeline system design considerations. Greater break-even distances are simulated if electricity cost is minimized, rather than if capital cost is minimized.

09 BIOMASS FUELS↗

Combustion Byproducts Recycling Consortium

Each year, over 100 million tons of solid byproducts are produced by coal-burning electric utilities in the United States. Annual production of flue gas desulfurization (FGD) byproducts continues to increase as the result of more stringent sulfur emission restrictions. In addition, stricter limits on NOx emissions mandated by the 1990 Clean Air Act have resulted in utility burner/boiler modifications that frequently yield higher carbon concentrations in fly ash, which restricts the use of the ash as a cement replacement. Controlling ammonia in ash is also of concern. If newer, 'clean coal' combustion and gasification technologies are adopted, their byproducts may also present a management challenge. The objective of the Combustion Byproducts Recycling Consortium (CBRC) is to develop and demonstrate technologies to address issues related to the recycling of byproducts associated with coal combustion processes. A goal of CBRC is that these technologies, by the year 2010, will lead to an overall ash utilization rate from the current 34% to 50% by such measures as increasing the current rate of FGD byproduct use and increasing in the number of uses considered 'allowable' under state regulations. Another issue of interest to the CBRC would be to examine the environmental impact of both byproduct utilization and disposal. No byproduct utilization technology is likely to be adopted by industry unless it is more cost-effective than landfilling. Therefore, it is extremely important that the utility industry provide guidance to the R&D program. Government agencies and private-sector organizations that may be able to utilize these materials in the conduct of their missions should also provide input. The CBRC will serve as an effective vehicle for acquiring and maintaining guidance from these diverse organizations so that the proper balance in the R&D program is achieved.

01 COAL, LIGNITE, AND PEAT↗

DEMOLISHING A COLD WARE ERA FULE STORAGE BASIN SUPERSTRUCTURE LADEN WITH ASBESTOS

The K East (KE) Basin facilities are located near the north end of the Hanford Site's 100 K area. The facilities were built in 1950 as part of the KE Reactor complex and constructed within 400 meters of the Columbia River, which is the largest river in the Pacific Northwest and by volume the fourth largest river in the United States. The basin, located adjacent to the reactor, was used for the underwater storage of irradiated nuclear fuel discharged from the reactor. The basin was covered by a superstructure comprising steel columns and beams, concrete, and cement asbestos board (CAB) siding. The project's mission was to complete demolition of the structure over the KE Basin within six months of turnover from facility deactivation activities. The demolition project team applied open-air demolition techniques to bring the facility to slab-on-grade. Several innovative techniques were used to control contamination and maintain contamination control within the confines of the demolition exclusion zone. The techniques, which focused on a defense-in-depth approach, included spraying fixatives on interior and exterior surfaces before demolition began; applying fixatives during the demolition; misting using a fine spray of water during demolition; and demolishing the facility systematically. Another innovative approach that made demolition easier was to demolish the building with the non-friable CAB remaining in place. The CAB siding covered the exterior of the building and portions of the interior walls, and was an integral part of the multiple-layered roof. The project evaluated the risks involved in removing the CAB material in a radiologically contaminated environment and determined that radiological dose rates and exposure to radiological contamination and industrial hazards would be significantly reduced by using heavy equipment to remove the CAB during demolition. The ability to perform this demolition safely and without spreading contamination (radiological or asbestos) demonstrates that contaminated structures can be torn down successfully using similar open-air demolition techniques.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FLUOR HANFORD DECOMMISSIONING UPDATE

Fluor Hanford is completing D&D of the K East Basin at the U.S. Department of Energy's (DOE's) Hanford Site in southeastern Washington State this spring, with demolition expected to begin in June. Located about 400 yards from the Columbia River, the K East Basin is one of two indoor pools that formerly contained irradiated nuclear fuel, radioactive sludge and tons of contaminated debris. In unique and path-breaking work, workers finished removing the spent fuel from the K Basins in 2004. In May 2007, workers completed vacuuming the sludge into containers in the K East Basin, and transferring it into containers in the K West Basin. In December, they finished vacuuming the remainder of K West Basin sludge into these containers. The K East Basin was emptied of its radioactive inventory first because it was more contaminated than the K West Basin, and had leaked in the past. In October 2007, Fluor Hanford began physical D&D of the 8,400-square foot K East Basin by pouring approximately 14-inches of grout into the bottom of it. Grout is a type of special cement used for encasing waste. Two months later, Fluor Hanford workers completed sluicing contaminated sand from the large filter that had sieved contaminants from the basin water for more than 50 years. Next, they poured grout into the filter housing and the vault that surrounds the filter, as well as into ion exchange columns that also helped filter basin water. For a six-week period in February and March, personnel drained the approximately one million gallons of contaminated water from the K East Basin. The effort required more than 200 tanker truck loads that transported the water to an effluent treatment facility for treatment and then release. A thin fixative was also applied to the basin walls as the water was removed to hold residual contamination in place. As soon as the water was out of the basin, Fluor pumped in approximately 18 feet of 'controlled density fill' material (somewhat similar to sand) to shield workers to a safe level from the residual radioactivity. Workers then continued preparations for demolishing the structure. Currently, they are isolating utilities, removing asbestos, draining oils, and removing other items not allowed to be disposed in Hanford's Environmental Restoration Disposal Facility (ERDF). The basin's superstructure will be demolished using a heavy industrial excavator equipped with a shear. This portion of the work is expected to be completed in September, with removal of the basin substructure to follow in 2009. D&D of the K East Basin eliminated the final major radioactive sources there, and made the Columbia River and the adjacent environment safer for everyone who lives downstream.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Prairie Island Nuclear Station Spent Filter Processing for Direct Disposal - 12333

This paper will discuss WMG's filter processing experience within the commercial nuclear power industry, specifically recent experience processing high activity spent filters generated by Xcel Energy's Prairie Island Nuclear Station (Prairie Island), located in Welch, MN. WMG processed for disposal eighty-four 55-gallon drums filled with varying types of high activity spent filters. The scope of work involved characterization, packaging plan development, transport to the WMG's Off-Site Processing location, shredding the filter contents of each drum, cement solidifying the shredded filter material, and finally shipping the solidified container of shredded filter material to Clive, Utah where the container was presented to EnergySolutions Disposal site for disposal in their Containerised Waste Facility. This sequence of events presented in this paper took place a total of nine (9) times over a period of four weeks. All 1294 filters were successfully solidified into nine (9) -WMG 142 steel liners, and each was successfully disposed of as Class A Waste at EnergySolutions Disposal Site in Clive, Utah. Prairie Island's waste material was unique in that all its filters were packaged in 55-gallon drums; and since the station packaged its filters in drums it was much easier to develop packaging plans for such a large volume of legacy filters. For this author, having over 20-years of waste management experiences, storing and shipping waste material in 55-gallon drums is not immediately thought of as a highly efficient method of managing its waste material. However, Prairie Island's use of 55-gallon drums to store and package its filters provided a significant advantage. Drums could be mixed and matched to provide the most efficient processing method while still meeting the Waste Class A limits required for disposal. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coal-derived graphene materials for industrial applications

The project (Award DE-FEO-0032274), led by Iowa State University in collaboration with the University of Wyoming, sought to improve the production and utility of graphene oxide (GO), reduced graphene oxide (rGO), and related advanced materials from coal char. The three overall objectives of this project were: 1) to improve production of graphene oxide using Powder River Basin (PRB) coal as feedstock; 2) to continue testing and improvement of a hard carbon sodium-ion battery prototype and test device; and 3) to determine properties and performance of concrete using GO and rGO as a concrete additive or cement replacement.

01 COAL, LIGNITE, AND PEAT↗

Implications of information from LANDSAT-4 for private industry

The broader spectral coverage and higher resolution of LANDSAT-4 Thematic Mapper (TM) data open the door for identification from space of spectral phenomena associated with mineralization and microseepage of hydrocarbon. Digitally enhanced image products generated from TM data allow the mapping of many major and minor structural features that mark or influence emplacement of mineralization and accumulation of hydrocarbons. These improvements in capabilities over multispectral scanner data should accelerate the acceptance and integration of satellite data as a routinely used exploration tool that allows rapid examination of large areas in considerable detail. Imagery of Southern Ontario, Canada as well as of Cement, Oklahoma and Death Valley, California is discussed.

Everett, J. R.↗