Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CALENDARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada For Calendar Year 2022

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 (Rev. 6) associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; CAU 112, Area 23 Hazardous Waste Trenches. All post-closure inspections and evaluations were performed in accordance with requirements set out in RCRA Permit NEV HW0101, Rev. 6.

54 ENVIRONMENTAL SCIENCES↗

Underground Test Area: Calendar Year 2022 Quality Assurance Report, Nevada National Security Site, Nevada

This report is required by the Underground Test Area (UGTA) Activity QAP and identifies the UGTA QA activities for CY 2022. The QA activities included conducting assessments for UGTA Activity QAP compliance, identifying findings and completing corrective actions, evaluating laboratory performance, reviewing technical work, and publishing documents. DRI; LANL; and MSTS did not conduct QA activities for the UGTA Activity in 2022.

54 ENVIRONMENTAL SCIENCES↗

Non-Resource Conservation and Recovery Act Corrective Action Unit (CAU) Post-Closure Inspection Report, Nevada National Security Site, Nevada: For Calendar Year 2023

This report includes visual inspection results, descriptions of maintenance and repair activities, and recommendations for CY 2023 for URs at CASs located on the NNSS and on the NTTR that are accessed through the NNSS Main Gate. This document is formatted by project activity (i.e., Industrial Sites, Soils, and DTRA]; then by CAU; and then by CAS.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environment Report for Calendar Year 2023 - Princeton Plasma Physics Laboratory

This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. In 2023, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2023, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 27, 2023.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Annual Site Environmental Report for Pantex Plant, Calendar Year 2023

The 2023 Annual Site Environmental Report (ASER) summarizes Pantex’s status, data, and efforts for the environmental compliance, protection, and restoration programs. It has been prepared in accordance with DOE O 231.1B, Environment, Safety and Health Reporting, and DOE O 458.1, Radiation Protection of the Public and the Environment. These orders outline the requirements for environmental protection programs at DOE facilities to ensure that programs fully comply with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies.

54 ENVIRONMENTAL SCIENCES↗

PNNL-Richland Campus Radionuclide Air Emissions Report for Calendar Year 2023

This report documents radionuclide air emissions that result in the 2023 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL-Richland campus MEI from routine emissions sources, excluding radon, in 2023 from campus sources is 2.0E-5 mrem (2.0E-7 mSv) EDE. The dose from radon emissions is 4.0E-7 mrem (4.0E-09 mSv) EDE. No nonroutine emissions occurred in 2023. The total radiological dose to the MEI from all PNNL-Richland campus radionuclide emissions, including fugitive emissions and radon, is 2.1E-5 mrem (2.1E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL-Richland campus is in compliance.

40 CFR 61 Subpart H↗

PNNL-Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2023

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL-Sequim campus has only fugitive emissions sources.

40 CFR 61 Subpart H↗

PNNL-Richland Campus Radionuclide Air Emissions Report for Calendar Year 2024

This report documents radionuclide air emissions that result in the 2024 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The total dose to the MEI from all PNNL-Richland campus radionuclide emissions in 2024, including fugitive emissions and radon, is 1.3E-05 mrem (1.3E-07 mSv) EDE, or 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland campus is in compliance. The dose attributable to radon emissions is 4.1E-10 mrem (4.1E-12 mSv) EDE.

40 CFR 61 Subpart H↗

PNNL-Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2024

The U.S. Department of Energy Office of Science’s Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory (PNNL) Sequim campus. Facility operations include radiological operations with the potential to emit low levels of radioactive materials.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Ecological Monitoring Report for Calendar Year 2017

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing the U.S. Department of Energy’s (DOE) activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site required for decision making under the National Environmental Policy Act and Comprehensive Environmental Response, Compensation, and Liability Act. DOE/EIS-0222-FU, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement, (CLUP) evaluates potential environmental impacts associated with implementing a comprehensive land use plan for the Hanford Site over the next 50 years. The vision for the DOE-RL-managed portion of the Hanford Site focuses not only on the cleanup of nuclear facilities and waste sites but on the protection of groundwater, the Columbia River, and the restoration of the land for access and use. To reach these goals DOE-RL is working closely with partners, such as the U. S. Fish and Wildlife Service (FWS) and National Park Service, to enable use of the Hanford land consistent with the CLUP. As DOE-RL moves toward accomplishing this vision, monitoring the ecological resources present to determine whether there is a need for conservation and/or protection of any resources will be critical for making informed decisions for responsible site stewardship.

54 ENVIRONMENTAL SCIENCES↗

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 2024

This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2024 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2024. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the US and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2024. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2024, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for nonradiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2024, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 25, 2024.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Raptor Nest Monitoring Report for Calendar Years 2024 and 2025

The focus of this report is to document the distribution and abundance of nesting raptors on the HFO-managed portion of the Hanford Site. Raptor nest surveys provide land managers with specific locations of nest sites so that the nests can be avoided and disturbances minimized during the nesting season. Long-term trends in nesting raptor populations also allow for the assessment of potential impacts from Hanford Site operations.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Y-12 National Security Complex Biological Monitoring and Abatement Program—2024 Calendar Year Report

This report provides the results of the CY 2024 sampling of East Fork Poplar Creek (EFPC) as part of the Y-12 National Security Complex (Y-12) Biological Monitoring and Abatement Program (BMAP). The results are presented in the context of historical trends. The Y-12 BMAP was developed in 1985 to demonstrate that the effluent limits established for Y-12 protected the classified uses of the receiving stream, particularly the growth and propagation of aquatic life (Loar et al. 1989). Over the years, the BMAP has become an important and valuable long-term measure of stream conditions resulting from actions and activities at the Y-12 Complex. The BMAP currently consists of three tasks: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. The benthic macroinvertebrate community monitoring task includes studies to evaluate the receiving stream’s biological integrity annually in comparison with Tennessee Water Quality Criteria following Tennessee Department of Environment and Conservation (TDEC) protocols. In addition to presenting the EFPC biological monitoring results, this report includes results from Comprehensive Environmental Response, Compensation, and Liability Act–funded BMAP programs in Bear Creek and McCoy Branch (presented in Appendixes A and B, respectively), as required in the Y-12 National Pollutant Discharge Elimination System (NPDES) permit. Additional biological testing at the Y-12 Complex includes toxicity testing of select storm drains as required in the NPDES permit. Although toxicity testing is not formally part of the BMAP, toxicity testing results from 2024 are provided in Appendix C.

54 ENVIRONMENTAL SCIENCES↗