Immediate Deployment of Waste Energy Technologies at Multiple Sites

Verso Paper Corp. implemented a portfolio of 13 commercially available proven industrial technologies each exceeding 30% minimum threshold efficiency and at least 25% efficiency increase. These sub-projects are a direct result of a grant received from the Department of Energy (DOE) through its FOA 0000044 (Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficient Industrial Equipment), which was funded by the American Recovery Act. These were installed at 3 sites in 2 states and are helping to reduce Verso costs, making the facilities more competitive. This created approximately 100 construction jobs (FTE’s) and reduced impacted Verso facilities’ expense budgets. These sub-projects were deployed at Verso paper mills located in Jay, Maine, Bucksport, Maine, and Sartell, Minnesota. The paper mills are the economic engines of the rural communities in which these mills are located. Reinvestment in waste energy recovery capital improvements is providing a stimulus to help maintain domestic jobs and to competitively position the US pulp and paper industry with rising energy costs. Energy efficiency improvements are also providing a positive environmental impact by reducing greenhouse gas emissions, the quantity of wastewater treated and discharged, and fossil fuel demand. As a result of these projects, when fully operating, Verso realized a total of approximately 1.5 TBtu/Year reduction in overall energy consumption, which is 119% of the project objectives. Note that three paper machines have since been permanently curtailed. However even with these shutdowns, the company still met its energy objectives. Note also that the Sartell mill’s paper machine is down due to a recent fire which damaged the mill’s electrical infrastructure (the company has not decided on the mill’s future).

distributed energy, combined heat and power, CHP, ↗

Reducing Contingency through Sampling at the Luckey FUSRAP Site - 13186

Typically, the greatest risk in developing accurate cost estimates for the remediation of hazardous, toxic, and radioactive waste sites is the uncertainty in the estimated volume of contaminated media requiring remediation. Efforts to address this risk in the remediation cost estimate can result in large cost contingencies that are often considered unacceptable when budgeting for site cleanups. Such was the case for the Luckey Formerly Utilized Sites Remedial Action Program (FUSRAP) site near Luckey, Ohio, which had significant uncertainty surrounding the estimated volume of site soils contaminated with radium, uranium, thorium, beryllium, and lead. Funding provided by the American Recovery and Reinvestment Act (ARRA) allowed the U.S. Army Corps of Engineers (USACE) to conduct additional environmental sampling and analysis at the Luckey Site between November 2009 and April 2010, with the objective to further delineate the horizontal and vertical extent of contaminated soils in order to reduce the uncertainty in the soil volume estimate. Investigative work included radiological, geophysical, and topographic field surveys, subsurface borings, and soil sampling. Results from the investigative sampling were used in conjunction with Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software to update the contaminated soil volume estimate for the site. This updated volume estimate was then used to update the project cost-to-complete estimate using the USACE Cost and Schedule Risk Analysis process, which develops cost contingencies based on project risks. An investment of $1.1 M of ARRA funds for additional investigative work resulted in a reduction of 135,000 in-situ cubic meters (177,000 in-situ cubic yards) in the estimated base volume estimate. This refinement of the estimated soil volume resulted in a $64.3 M reduction in the estimated project cost-to-complete, through a reduction in the uncertainty in the contaminated soil volume estimate and the associated contingency costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Target Diagnostic Menu Lawrence Livermore National Laboratory SYSM-5620: Design Thinking and Systems Engineering

Target Diagnostic’s Engineering Science (TDES) currently supports over 80 diagnostic systems, all of which draw from a fixed budget that covers staff time and procurement. As the division continues to add new diagnostics, demand on these limited resources increases, yet the budget remains unchanged. Shot Responsible Individuals (RIs) have unrestricted freedom to select any number or type of diagnostics for each experiment, often by copying previous shot configurations with only minor modifications. This practice makes it easy to generate new shots but does not encourage critical evaluation of diagnostic necessity. As a result, many diagnostics are routinely included in a shot without a clear justification, and in practice, much of the data collected is not analyzed. The ever-growing arsenal of diagnostics also increases the burden on TDES personnel, requiring more staff for support, maintenance, and service. This environment creates challenges in focusing resources on diagnostics that provide the greatest value to the NIF mission and raises concerns about the continued justification for maintaining all existing systems. The static TDES budget cannot sustain the ongoing growth in demand for new diagnostic systems. Shot RIs currently face no constraints on the number or type of diagnostics they assign to each experiment, often defaulting to previous configurations without critically assessing the necessity of each diagnostic. This results in the routine inclusion of diagnostics whose data may not be analyzed or may no longer directly support the NIF mission. Consequently, TDES is required to maintain and support an expanding set of diagnostics, straining limited resources and risking inefficient use of staff and funding. There is a need for TDES to efficiently allocate limited resources by establishing a process that requires shot RIs to critically evaluate and justify the inclusion of each diagnostic in their experiments. This process should discourage the routine, unexamined inclusion of diagnostics, support the identification of underutilized or obsolete systems, and ensure that only those diagnostics providing the greatest value to the NIF mission are maintained and supported. Ultimately, this approach must enable TDES to operate within budget constraints while maximizing scientific impact and operational efficiency.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Beyond Coordination: Joint Planning and Program Execution. The IHPRPT Materials Working Group

"Partnership is more than just coordination," stated then-Commander of the Air Force Research Laboratory (AFRL), Major General Dick Paul (USAF-Ret), at this year's National Space and Missile Materials Symposium. His comment referred to the example of the joint planning and program execution provided by the Integrated High Payoff Rocket Propulsion Technology (IHPRPT) Materials Working Group (IMWG). Most people agree that fiscal pressures imposed by shrinking budgets have made it extremely difficult to build upon our existing technical capabilities. In times of sufficient budgets, building advanced systems poses no major difficulties. However, with today's budgets, realizing enhanced capabilities and developing advanced systems often comes at an unaffordable cost. Overcoming this problem represents both a challenge and an opportunity to develop new business practices that allow us to develop advanced technologies within the restrictions imposed by current funding levels. Coordination of technology developments between different government agencies and organizations is a valuable tool for technology transfer. However, rarely do the newly developed technologies have direct applicability to other ongoing programs. Technology requirements are typically determined up-front during the program planning stage so that schedule risk can be minimized. The problem with this process is that the costs associated with the technology development are often borne by a single program. Additionally, the potential exists for duplication of technical effort. Changing this paradigm is a difficult process but one that can be extremely worthwhile should the right opportunity arise. The IMWG is one such example where NASA, the DoD, and industry have developed joint requirements that are intended to satisfy multiple program needs. More than mere coordination, the organizations comprising the group come together as partners, sharing information and resources, proceeding from a joint roadmap.

Stropki, Michael A.↗

Spatial Information Technology Center at Fulton-Montgomery Community College

The Spatial Information Technology Center (SITC) at Fulton-Montgomery Community College (FMCC) continued to fulfill its mission and charter by successfully completing its third year of operations under Congressional funding and NASA sponsorship. Third year operations (01 Oct 02 - 30 Sep 03) have been funded and conducted utilizing two authorized Research Grants NAG 13-00043 (via a one-year no-cost extension expiring Sep 03) and NAG 13-02053 (one-year no-cost extension expiring Sep 04). Drawdowns and reporting of fiscal activities for SlTC operations continues to pass through the Institute for the Application of Geo-spatial Technology (IAGT) at Cayuga Community College in Auburn, New York. Fiscal activity of the Center is reported quarterly via SF 272 to IAGT, thus this report contains only a budgetary overview and forecast of future expenditures for the remaining funds of NAG 13 - 02053. Funds from NAG 13 - 00043 were exhausted during the fourth quarter of fiscal year FY02 - 03, which necessitated initial draw down of NAG 13 - 02053. The IAGT receives no compensation for administrative costs as authorized and approved by NASA in each award budget. This report also includes the necessary addendums for each NAG award, as required by federal guidelines, though no reportable activities took place within this report period. Attached are the signed Report of New Technology/lnventions and a Final Property Report identifying qualifying equipment purchased by the Center. As an academic, economic and workforce development oriented program, the Center has made significant strides in bringing the technology, knowledge and applications of the spatial information technology field to the region it serves. Through the mission of the Center, the region's educational, economic development and work force communities have become increasingly educated to the benefits of spatial (Geospatial) technology, particularly in the region's K-12 arena. SlTC continues to positively affect the region's education, employment and economic development, while expanding its services and operations designed to be customer driven, growing infrastructure and affecting systemic change.

Flinton, Michael E.↗

Characterizing Distributed Concurrent Engineering Teams: A Descriptive Framework for Aerospace Concurrent Engineering Design Teams

As aerospace missions grow larger and more technically complex in the face of ever tighter budgets, it will become increasingly important to use concurrent engineering methods in the development of early conceptual designs because of their ability to facilitate rapid assessments and trades in a cost-efficient manner. To successfully accomplish these complex missions with limited funding, it is also essential to effectively leverage the strengths of individuals and teams across government, industry, academia, and international agencies by increased cooperation between organizations. As a result, the existing concurrent engineering teams will need to increasingly engage in distributed collaborative concurrent design. This paper is an extension of a recent white paper written by the Concurrent Engineering Working Group, which details the unique challenges of distributed collaborative concurrent engineering. This paper includes a short history of aerospace concurrent engineering, and defines the terms 'concurrent', 'collaborative' and 'distributed' in the context of aerospace concurrent engineering. In addition, a model for the levels of complexity of concurrent engineering teams is presented to provide a way to conceptualize information and data flow within these types of teams.

Concept Design↗

Human Health Science Building Geothermal Heat Pump Systems

The grant objectives of the DOE grant funded project have been successfully completed. The Human Health Building (HHB) was constructed and opened for occupancy for the Fall 2012 semester of Oakland University. As with any large construction project, some issues arose which all were overcome to deliver the project on budget and on time. The facility design is a geothermal / solar-thermal hybrid building utilizing both desiccant dehumidification and variable refrigerant flow heat pumps. It is a cooling dominant building with a 400 ton cooling design day load, and 150 ton heating load on a design day. A 256 vertical borehole (320 ft depth) ground source heat pump array is located south of the building under the existing parking lot. The temperature swing and performance over 2013 through 2015 shows the ground loop is well sized, and may even have excess capacity for a future building to the north (planned lab facility). The HHB achieve a US Green Building Counsel LEED Platinum rating by collecting 52 of the total 69 available LEED points for the New Construction v.2 scoring checklist. Being Oakland's first geothermal project, we were very pleased with the building outcome and performance with the energy consumption approximately 1/2 of the campus average facility, on a square foot basis.

15 GEOTHERMAL ENERGY↗

Mixed Material Scintillator Systems Quarterly Report FY20Q4

This project aims to invent, model, and prototype architected multimaterial scintillator systems (AMSSs), a new class of radiation detectors that use heterogenous internal structures of different scintillating materials to detect additional properties of radiation. These internal structures can be produced using additive manufacture (AM, i.e. 3D printing) of scintillator, a currently emerging application of additive manufacture technology. AMSSs combine the low cost and complexity of conventional scintillation detectors with capabilities currently only available in more expensive and complex detectors. By identifying promising AMSS designs, this project will enable a new class of detectors to meet DNN’s mission needs for SNM detection. In past reporting, we have described this detector concept as “mixed material scintillator systems” (MMSS), but as part of preparing papers for publication we have concluded the term “architected multimaterial scintillator systems” (AMSS) better reflects the importance of structure in these detectors. We plan to use the AMSS acronym going forward. This quarter, we participated in an Independent Assessment of the work so far. The panelists on the review concluded that the AMSS concept has great potential and our work so far was effective at bringing that potential to light. They highly encouraged further work on this topic. The panelists also had several useful suggestions, which we took to heart. This review is described in more detail below. This quarter saw a resumption of work on the final task of this project, prototyping. In the first half of the quarter, this work focused on solving specific technical barriers to achieve 1x1x1 cm prints. In the second half, we focused on producing high-quality samples and making characterization measurements of those samples, with an eye on our deliverable report on the prototyping task. This report can be expected along with the end-of-year report on October 30. This project successfully spent the entirety of its remaining funds this quarter, except for $13k refunded to this project in the last days of the fiscal year due to LLNL cost adjustments. This project has captured the interest of many LLNL experts, and so we have been able to effectively use our budget to harness the available effort.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Methodology for Assessing Reusability of Spaceflight Hardware

In 2011 the Space Shuttle, the only Reusable Launch Vehicle (RLV) in the world, returned to earth for the final time. Upon retirement of the Space Shuttle, the United States (U.S.) no longer possessed a reusable vehicle or the capability to send American astronauts to space. With the National Aeronautics and Space Administration (NASA) out of the RLV business and now only pursuing Expendable Launch Vehicles (ELV), not only did companies within the U.S. start to actively pursue the development of either RLVs or reusable components, but entities around the world began to venture into the reusable market. For example, SpaceX and Blue Origin are developing reusable vehicles and engines. The Indian Space Research Organization is developing a reusable space plane and Airbus is exploring the possibility of reusing its first stage engines and avionics housed in the flyback propulsion unit referred to as the Advanced Expendable Launcher with Innovative engine Economy (Adeline). Even United Launch Alliance (ULA) has announced plans for eventually replacing the Atlas and Delta expendable rockets with a family of RLVs called Vulcan. Reuse can be categorized as either fully reusable, the situation in which the entire vehicle is recovered, or partially reusable such as the National Space Transportation System (NSTS) where only the Space Shuttle, Space Shuttle Main Engines (SSME), and Solid Rocket Boosters (SRB) are reused. With this influx of renewed interest in reusability for space applications, it is imperative that a systematic approach be developed for assessing the reusability of spaceflight hardware. The partially reusable NSTS offered many opportunities to glean lessons learned; however, when it came to efficient operability for reuse the Space Shuttle and its associated hardware fell short primarily because of its two to four-month turnaround time. Although there have been several attempts at designing RLVs in the past with the X-33, Venture Star and Delta Clipper Experimental (DC-X), reusability within the spaceflight arena is still in its infancy. With unlimited resources (namely, time and money), almost any launch vehicle and its associated hardware can be made reusable. However, an endless supply of funds for space exploration is not the case in today's economy for neither government agencies nor their commercial counterparts. Therefore, any organization wanting to be a leader in space exploration and remain competitive in this unforgiving space faring industry must confront shrinking budgets with more cost conscious and efficient designs. Therefore, standards for developing reusable spaceflight hardware need to be established. By having standards available to existing and emerging companies, some of the potential roadblocks and limitations that plagued previous attempts at reuse may be minimized or completely avoided.

Childress-Thompson, Rhonda↗

Rapid Development of the Seeker Free-Flying Inspector Guidance, Navigation, and Control System

Seeker is an automated extravehicular free-flying inspector CubeSat designed and built in-house at the Johnson Space Center (JSC). As a Class 1E project funded by the International Space Station (ISS) Program, Seeker had a streamlined process to flight certification, but the vehicle had to be designed, developed, tested, and delivered within approximately one year after authority to pro-ceed (ATP) and within a $1.8 million budget. These constraints necessitated an expedited Guidance, Navigation, and Control (GNC) development schedule, development began with a navigation sensor trade study using Linear Covariance (LinCov) analysis and a rapid sensor downselection process, resulting in the use of commercial off-the-shelf (COTS) sensors which could be procured quickly and subjected to in-house environmental testing to qualify them for flight. A neural network was used to enable a COTS camera to provide bearing measurements for visual navigation. The GNC flight software (FSW) algorithms utilized lean development practices and leveraged the Core Flight Software (CFS) architecture to rapidly develop the GNC system, tune the system parameters, and verify performance in simulation. This pace was anchored by several Hardware-Software Integration (HSI) milestones, which forced the Seeker GNC team to develop the interfaces both between hardware and software and between the GNC domains early in the project and to enable a timely delivery.

Sullivan, Jacob↗

Rapid Development of the Seeker Free-Flying Inspector Guidance, Navigation, and Control System

Seeker is an automated extravehicular free-flying inspector CubeSat designed and built in-house at the Johnson Space Center (JSC). As a Class 1E project funded by the International Space Station (ISS) Program, Seeker had a stream-lined process to flight certification, but the vehicle had to be designed, developed, tested, and delivered within approximately one year after authority to proceed (ATP) and within a $1.8 million budget. These constraints necessitated an expedited Guidance, Navigation, and Control (GNC) development schedule. Development began with a navigation sensor trade study using Linear Covariance (LinCov) analysis and a rapid sensor down-selection process, resulting in the use of commercial off-the-shelf (COTS) sensors which could be procured quickly and subjected to in-house environmental testing to qualify them for flight. A neural network was used to enable a COTS camera to provide bearing measure-ments for visual navigation. The GNC flight software (FSW) algorithms utilized lean development practices and leveraged the Core Flight Software (CFS) architecture to rapidly develop the GNC system, tune the system parameters, and verify performance in simulation. This pace was anchored by several Hardware-Software Integration (HSI) milestones, which forced the Seeker GNC team to develop the interfaces both between hardware and software and between the GNC domains early in the project and to enable a timely delivery.

Sullivan, Jake↗

Mars Surveyor Program 2001 Mission Overview

The Mars Surveyor 2001 mission to Mars was initially a key element in the Mars sample return sequence of missions. A capable rover, carrying the Cornell Athena instruments would be placed on Mars to roam over several kilometers, select samples, and place them in a cache for return by a subsequent mission. Inevitably, budget constraints forced descopes. At one critical point, the landed payload consisted only of the HEDS (Human Exploration and Development of Space) payloads selected for testing environmental properties of the surface for future human exploration. Then Congress intervened and put back some of the funding that had been deleted. NASA next redefined the payload to include as many of the Athena instruments as possible, to be distributed between the lander deck and a Sojourner class rover. This payload would then be placed on a modified version of the Mars Polar Lander rather than on the much larger, and more expensive, lander that had been originally designed for the mission. With this functionality restored the '01 mission remains an important and pivotal element of the Mars Surveyor program. It completes the Mars Observer objectives with the gamma ray spectrometer mapping. This mission will largely complete the global characterization phase of Mars exploration and mark the beginning of focused surface exploration leading to return of the first samples and the search for evidence of past Martian life. MSP'01 also is the first mission in the combined Mars exploration strategy of the HEDS and Space Science Enterprises of NASA. This mission, and those to follow, will demonstrate technologies and collect environmental data that will provide the basis for a decision to send humans to Mars. The NASA exploration strategy for Mars includes orbiters, landers and rovers launched in 2001 and 2003 and a sample return mission to be launched in 2005, returning a sample by 2008. The purpose of the rovers is to explore and characterize sites on Mars. The 2003 and 2005 missions will select rocks, soil, and atmosphere for return to earth.

Saunders, R. Stephen↗

Developing affordable and efficient heating devices for enhanced live cell imaging in confocal microscopy

Temperature control is crucial for live cell imaging, particularly in studies involving plant responses to high ambient temperatures and thermal stress. This study presents the design, development, and testing of two cost-effective heating devices tailored for confocal microscopy applications: an aluminum heat plate and a wireless mini-heater. The aluminum heat plate, engineered to integrate seamlessly with the standard 160 mm × 110 mm microscope stage, supports temperatures up to 36°C, suitable for studies in the range of non-stressful warm temperatures (e.g., 25-27°C forArabidopsis thaliana) and moderate heat stress (e.g., 30-36°C forA. thaliana). We also developed a wireless mini-heater that offers rapid, precise heating directly at the sample slide, with a temperature increase rate over 30 times faster than the heat plate. The wireless heater effectively maintained target temperatures up to 50°C, ideal for investigating severe heat stress and heat shock responses in plants. Both devices performed well in controlled studies, including the real-time analysis of heat shock protein accumulation and stress granule formation inA. thaliana. Our designs are effective and affordable, with total construction costs lower than $300. This accessibility makes them particularly valuable for small laboratories with limited funding. Future improvements could include enhanced heat uniformity, humidity control to mitigate evaporation, and more robust thermal management to minimize focus drift during extended imaging sessions. These modifications would further solidify the utility of our heating devices in live cell imaging, offering researchers reliable, budget-friendly tools for exploring plant thermal biology.

Plant Sciences↗

Development of Human System Integration at NASA

Human Systems Integration seeks to design systems around the capabilities and limitations of the humans which use and interact with the system, ensuring greater efficiency of use, reduced error rates, and less rework in the design, manufacturing and operational deployment of hardware and software. One of the primary goals of HSI is to get the human factors practitioner involved early in the design process. In doing so, the aim is to reduce future budget costs and resources in redesign and training. By the preliminary design phase of a project nearly 80% of the total cost of the project is locked in. Potential design changes recommended by evaluations past this point will have little effect due to lack of funding or a huge cost in terms of resources to make changes. Three key concepts define an effective HSI program. First, systems are comprised of hardware, software, and the human, all of which operate within an environment. Too often, engineers and developers fail to consider the human capacity or requirements as part of the system. This leads to poor task allocation within the system. To promote ideal task allocation, it is critical that the human element be considered early in system development. Poor design, or designs that do not adequately consider the human component, could negatively affect physical or mental performance, as well as, social behavior. Second, successful HSI depends upon integration and collaboration of all the domains that represent acquisition efforts. Too often, these domains exist as independent disciplines due to the location of expertise within the service structure. Proper implementation of HSI through participation would help to integrate these domains and disciplines to leverage and apply their interdependencies to attain an optimal design. Via this process domain interests can be integrated to perform effective HSI through trade-offs and collaboration. This provides a common basis upon which to make knowledgeable decisions. Finally, HSI must be considered early in the requirements development phase of system design and acquisition. This will provide the best opportunity to maximize return on investment (ROI) and system performance. HSI requirements must be developed in conjunction with capability ]based requirements generation through functional. HSI requirements will drive HSI metrics and embed HSI issues within the system design. After a system is designed, implementation of HSI oversights can be very expensive. An HSI program should be included as an integral part of a total system approach to vehicle and habitat development. This would include, but not limited to, workstation design, D&C development, volumetric analysis, training, operations, and human -robotic interaction. HSI is a necessary process for Human Space Flight programs to meet the Agency Human ]System standards and thus mitigate human risks to acceptable levels. NASA has been involved in HSI planning, procedures development, process, and implementation for many years, and has been building several internal and publicly accessible products to facilitate HSI fs inclusion in the NASA Systems Engineering Lifecycle. Some of these products include: NASA STD 3001 Volumes 1 and 2, Human Integration Design Handbook, NASA HSI Implementation Plan, NASA HSI Implementation Plan Templates, NASA HSI Implementation Handbook, and a 2 ]hour short course on HSI delivered as part of the NASA Space and Life Sciences Directorate Academy. These products have been created leveraging industry best practices and lessons learned from other Federal Government agencies.

Whitmore, Mihriban↗

Integrated policy assessment and optimisation over multiple sustainable development goals in Eastern Africa

Heavy reliance on traditional biomass for household energy in eastern Africa has significant negative health and environmental impacts. The African context for energy access is rather different from historical experiences elsewhere as challenges in achieving energy access have coincided with major climate ambitions. Policies focusing on household energy needs in eastern Africa contribute to at least three Sustainable Development Goals (SDGs): Climate Action, Good Health, and Improved Energy Access. This study uses an integrated assessment model to simulate the impact of land policies and technology subsidies, as well as the interaction of both, on Greenhouse gas (GHG) emissions, exposure to air pollution and energy access in eastern Africa under a range of socioeconomic pathways. We find that land policies focusing on increasing the sustainable output of biomass resources can reduce GHG emissions in the region by about 10%, but also slightly delay progress in health and energy access goals. An optimised portfolio of energy technology subsidies of 11 to 14 dollars per capita up to 2030 can yield another 10% savings in GHG emissions, as well as 20% lower mortality related to air pollution, while improving energy access by up to 15%. After 2030, both land and technology subsidy policies become less cost-effective, and more dependent on the overall development path of the region. The analysis shows that subsidies for biogas technology should be prioritised in both the short and long term, while the distribution of a potential subsidy budget over LPG (health and energy access), PV (energy access), ethanol (climate and health) and charcoal (climate; if linked to land policies) pathways would depend on the most relevant sustainable development goal from the perspective of local policymakers or international organisations such as the Green Climate Fund. We suggest that integrated policy analysis is needed in the African context for simultaneously reaching progress in multiple SDGs.

54 ENVIRONMENTAL SCIENCES↗

An Overview of the United States Department of Energy's Nuclear Criticality Safety Program and Future Challenges

The United States (US) Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Criticality Safety Program (NCSP) was formally established in January 1998 as part of the Defense Nuclear Facility Safety Board (DNFSB) Recommendation 97-2 implementation plan. The NCSP was initially focused on seven NCSP tasks: Critical Experiments, Benchmarking, Analytical Methods, Nuclear Data, Training and Qualification, Information Preservation and Dissemination, and Applicable Ranges of Bounding Curves and Data. The first NCSP 5-year plan was published in August 1999. Now, more than 20 years later, NCSP continues to serve the United States and the nuclear criticality safety (NCS) community around five technical program elements (TPEs): Analytical Methods, Information Preservation and Dissemination, Integral Experiments, Nuclear Data, and Training and Education. NCSP has three chartered support groups, the Criticality Safety Support Group, the Nuclear Data Advisory Group, and the DOE Criticality Safety Coordinating Team, all of which provide technical advisement to the NCS community, to DOE, and to the NCSP manager. NCSP has a comprehensive mission and vision document that provides technical and budget priorities for TPE attributes and goals to ensure that the needs of the NCS community and DOE NCS are prioritized appropriately to meet the goals defined by the 1998 DNFSB recommendation. Like any DOE/NNSA program, NCSP faces significant challenges in the future that involves program funding, rising nuclear facility costs, aging critical assembly infrastructure, knowledge retention, and other issues. This paper discusses NCSP and provides some insights into these and other challenges moving into the future.

Bowen, Douglas G.↗

Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robust Decision Making

The Idaho National Laboratory (INL) is funded through the Department of Energy (DOE) Office of Nuclear Energy and other customers who have direct contracts with the Laboratory. The people, equipment, facilities and other infrastructure at the laboratory require continual investment to maintain and improve the laboratory’s capabilities. With ever tightening federal and customer budgets, the ability to direct investments into the people, equipment, facilities and other infrastructure which are most closely aligned with the laboratory’s mission and customers’ goals grows increasingly more important. The ability to justify those investment decisions based on objective criteria that can withstand political, managerial and technical criticism also becomes increasingly more important. The Systems Engineering tools of decision analysis, risk management and roadmapping, when properly applied to such problems, can provide defensible decisions.

99 GENERAL AND MISCELLANEOUS↗