Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Assembly and Manufacturing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

The AXAF technology mirror assembly program - An overview

The manufacture and testing of the Technology Mirror Assembly (TMA), a prototype Wolter I telescope scaled to the dimensions of the innermost element of the High-Resolution Mirror Assembly for the NASA Advanced X-ray Astrophysics Facility (AXAF), are reviewed. Consideration is given to the grinding, polishing, coating, and assembly of the zerodur TMA blanks, the TMA mount design, and the test procedures used at the MSFC X-ray Calibration Facility. Test results indicate FWHM resolution less than 0.5 arcsec, but with significant near-field scattering attributed to ripple; further long-lap polishing is suggested.

Wyman, Charles L.↗

Ceramic matrix composite turbine nozzle shell and method of assembly

A method of manufacturing a ceramic matrix composite (CMC) turbine nozzle shell is provided. The method includes: assembling a primary outer nozzle platform, a primary inner nozzle platform, a core and trailing edge preform, and an airfoil-shaped body; joining the primary outer nozzle platform to a secondary outer nozzle platform of the airfoil-shaped body; and joining the primary inner nozzle platform to a secondary inner nozzle platform of the airfoil-shaped body. Composite plies circumferentially surround the airfoil-shaped body, and their longitudinal edges are cut into fingers that are folded down. The fingers are interleaved between secondary platform plies to form the secondary outer and inner nozzle platforms.

de Diego, Peter↗

Advanced Manufacturing Technologies (AMT): Additive Manufactured Hot Fire Planning and Testing in GRC Cell 32 Project

The objective of this project is to hot fire test an additively manufactured thrust chamber assembly TCA (injector and thrust chamber). GRC will install the additively manufactured Inconel 625 injector, two additively manufactured (SLM) water cooled Cu-Cr thrust chamber barrels and one additively manufactured (SLM) water cooled Cu-Cr thrust chamber nozzle on the test stand in Cell 32 and perform hot fire testing of the integrated TCA.

Fikes, John C.↗

Benchmarks of Global Clean Energy Manufacturing, 2014-2016

Benchmarks of Global Clean Energy Manufacturing provides an assessment of the global state of clean energy manufacturing over 3 years from 2014 to 2016. Four technologies were examined - wind turbine components (blade, tower, nacelle), crystalline silicon (c-Si) solar photovoltaic (PV) modules, light-duty vehicle (LDV) lithium-ion battery (LIB) cells, and light-emitting diode (LED) packages for lighting and other consumer products. The analysis looked along each technology's manufacturing supply chain, including processing raw materials, producing required subcomponents, and assembling final products. Manufacturing supply chains were evaluated across 13 economies that are the primary manufacturing hubs for these technologies. This Highlights summary report features key findings across the manufacturing supply chains.

42 ENGINEERING↗

MEMS Microshutter Array System for James Webb Space Telescope

A complex MEMS microshutter array system has been developed at NASA Goddard Space Flight Center (GSFC) for use as a multi-object aperture array for a Near-Infrared Spectrometer (NIRSpec). The NIRSpec is one of the four major instruments carried by the James Webb Space Telescope (JWST), the next generation of space telescope after the Hubble Space Telescope retires. The microshutter arrays (MSAs) are designed for the selective transmission of light with high efficiency and high contrast. It is demonstrated in Figure 1 how a MSA is used as a multiple object selector in deep space. The MSAs empower the NIRSpec instrument simultaneously collect spectra from more than 100 targets therefore increases the instrument efficiency 100 times or more. The MSA assembly is one of three major innovations on JWST and the first major MEMS devices serving observation missions in space. The MSA system developed at NASA GSFC is assembled with four quadrant fully addressable 365x171 shutter arrays that are actuated magnetically, latched and addressed electrostatically. As shown in Figure 2, each MSA is fabricated out of a 4' silicon-on-insulator (SOI) wafer using MEMS bulk-micromachining technology. Individual shutters are close-packed silicon nitride membranes with a pixel size close to 100x200 pm (Figure 3). Shutters are patterned with a torsion flexure permitting shutters to open 90 degrees with a minimized mechanical stress concentration. In order to prevent light leak, light shields are made on to the surrounding frame of each shutter to cover the gaps between the shutters and the Game (Figure 4). Micro-ribs and sub-micron bumps are tailored on hack walls and light shields, respectively, to prevent sticktion, shown in Figures 4 and 5. JWST instruments are required to operate at cryogenic temperatures as low as 35K, though they are to be subjected to various levels of ground tests at room temperature. The shutters should therefore maintain nearly flat in the entire temperature range between 35K and 300K. Through intensive numerical simulations and experimental studies, an optically opaque and electrically conductive metal-nitride thin film was selected as a coating material deposited on the shutters with the best thermal-expansion match to silicon nitride - the shutter blade thin film material. A shutter image shown in Figure 6 was taken at room temperature, presenting shutters slightly bowing down as expected. Shutters become flat when the temperature decreases to 35K. The MSAs are then bonded to silicon substrates that are fabricated out of 6" single-silicon wafers in the thickness of 2mm. The bonding is conducted using a novel single-sided indium flip-chip bonding technology. Indium bumps fabricated on a substrate are shown in Figure 7. There are 180,000 indium bumps for bonding a flight format MSA array to its substrate. Besides a MSA, each substrate houses five customer-designed ASIC (Application Specific Integrated Circuit) multiplexer/address chips for 2-dimensional addressing, twenty capacitors, two temperature sensors, numbers of resistors and all necessary interconnects, as shown in Figure 8. Complete MSA quadrant assemblies have been successfully manufactured and fully functionally tested. The assemblies have passed a series of critical reviews required by JWST in satisfying all the design specifications. The qualification tests cover programmable 2-D addressing, life tests, optical contrast tests, and environmental tests including radiation, vibration, and acoustic tests. A 2-D addressing pattern with 'ESA' letters programmed in a MSA is shown in Figure 9. The MSAs passed 1 million cycle life tests and achieved high optical contrast over 10,000. MSA teams are now making progress in final fabrication, testing and assembly (Figure 10). The delivery of flight-format MSA system is scheduled at the end of 2008 for being integrated to the focal plane of the NIRSpec detectors.

Li, Mary J.↗

Robotic Manufacturing of 5.5 Meter Cryogenic Fuel Tank Dome Assemblies for the NASA Ares I Rocket

The Ares I rocket is the first launch vehicle scheduled for manufacture under the National Aeronautic and Space Administration's (NASA's) Constellation program. A series of full-scale Ares I development articles have been constructed on the Robotic Weld Tool at the NASA George C. Marshall Space Flight Center in Huntsville, Alabama. The Robotic Weld Tool is a 100 ton, 7-axis, robotic manufacturing system capable of machining and friction stir welding large-scale space hardware. This presentation will focus on the friction stir welding of 5.5m diameter cryogenic fuel tank components; specifically, the liquid hydrogen forward dome (LH2 MDA), the common bulkhead manufacturing development articles (CBMDA) and the thermal protection system demonstration dome (TPS Dome). The LH2 MDA was the first full-scale, flight-like Ares I hardware produced under the Constellation Program. It is a 5.5m diameter elliptical dome assembly consisting of eight gore panels, a y-ring stiffener and a manhole fitting. All components are made from aluminumlithium alloy 2195. Conventional and self-reacting friction stir welding was used on this article. An overview of the manufacturing processes will be discussed. The LH2 MDA is the first known fully friction stir welded dome ever produced. The completion of four Common Bulkhead Manufacturing Development Articles (CBMDA) and the TPS Dome will also be highlighted. Each CBMDA and the TPS Dome consists of a 5.5m diameter spun-formed dome friction stir welded to a y-ring stiffener. The domes and y-rings are made of aluminum 2014 and 2219 respectively. The TPS Dome has an additional aluminum alloy 2195 barrel section welded to the y-ring. Manufacturing solutions will be discussed including "fixtureless" welding with self reacting friction stir welding.

Jones, Ronald E.↗

Task planning and control synthesis for robotic manipulation in space applications

Space-based robotic systems for diagnosis, repair and assembly of systems will require new techniques of planning and manipulation to accomplish these complex tasks. Results of work in assembly task representation, discrete task planning, and control synthesis which provide a design environment for flexible assembly systems in manufacturing applications, and which extend to planning of manipulatiuon operations in unstructured environments are summarized. Assembly planning is carried out using the AND/OR graph representation which encompasses all possible partial orders of operations and may be used to plan assembly sequences. Discrete task planning uses the configuration map which facilitates search over a space of discrete operations parameters in sequential operations in order to achieve required goals in the space of bounded configuration sets.

Sanderson, A. C.↗

Stiffener Jumping for Unitized Stitched Composite Preform Manufacturing

A single-sided stitching head is used to assemble unitized three-dimensional preforms using the NASA Langley Research Center (LaRC) Integrated Structural Assembly of Advanced Composites (ISAAC) robotic manufacturing system. Typically, assembly of a preform includes a “skin” that is stiffened by stiffener elements stitched to the skin. The single-sided stitching head has two needles that pass through the preform from the same side to form the stitch, typically from the smooth outer surface so the needles penetrate through the preform towards the stiffener side. The single-sided head cannot stitch across stiffening elements (e.g., stringer, frame, integral cap, etc.) because the needles would penetrate into the stiffener web, which would not allow the stitch form because the thread movement would be impeded. As a result, stitching seams cannot cross stiffening elements, and therefore are very short and must remain in the skin/flange connections within the space between the stiffening element webs. Each short segment requires a stop and cut process that takes a significant amount of time. A stiffener jumping stitching method was developed that eliminates the need to cut and restart seams when encountering a stiffener, thus providing a long, continuous seam with a significant reduction in stitching time by eliminating cutting operations and associated excess thread end trimming. This stiffener jumping process places what could be considered a very long stitch that bridges the stiffener to connect the end of one segment of the seam with the beginning of the next segment of the seam to provide a longer continuous seam. As a result, all intermediate thread cuts that would be done at the end of each individual segment of the seam are eliminated, with only a single cut at the end of the seam. The process and programming requirements for carrying out the stiffener jumping stitching approach are presented in this paper. Using the presented stiffener jumping approach to produce the long continuous seams, the stitching time for a representative commercial transport unitized stiffened wing cover panel can possibly be reduced by at least 25 percent.

stitched↗

Manufacturing techniques - Split torque path helicopter transmission

A description of the manufacturing techniques, capital equipment, tooling plan, and assembly methods necessary to manufacture the split torque path gearbox is presented. This transmission was designed and built for the advanced rotorcraft transmission program of the U.S. Army and NASA. Consideration is given to the engineering technology advancements along with a description of the integrated product development team process.

Mitchell, George D., Jr.↗

Tessellation and Numerical Simulation of the in-Space Assembled Telescope (iSAT) Reflector

A novel tessellation method has been developed to allow the use of uniform truss modules to form curved or doubly curved surfaces. To illustrate the method, the structural support for the doubly curved in-Space Assembled Telescope primary reflector is developed. The method intentionally leaves gaps at the nodes between identical connecting modules; the gaps are relatively small, on the order of 0.5% of the lattice characteristic cell size. Uniquely shaped nodal connectors called multi-nuts are generated to fill in the nodal gaps and connect adjacent modules. With optimization techniques, the size of these nodal gaps can be minimized to thereby minimize the incurred structural efficiency losses. Finite element analyses of the primary reflector were performed, and the structural efficiency losses amounted to a natural frequency reduction of 5%. The benefits of having uniform truss modules outweigh the structural penalties as it will greatly simplify assembly and lower manufacturing costs.

Tessellation↗

Gripper Test Assembly Status of Fabrication and Assembly Report – FY2023

The Gripper Test Assembly (GrTA) is an experimental test article designed for use at the Mechanisms Engineering Test Loop (METL) at Argonne National Laboratory (ANL). The GrTA will test mechanical components intended for use in compact in-vessel fuel handling machines (FHM) for sodium cooled fast reactors (SFR). The GrTA will test radial and thrust ball bearings, radial and thrust roller bearings, ball screws and nuts, spline shafts and ball nuts, radial spur gears, and universal joints submerged in liquid sodium at high temperatures (250°C-650°C). These components will be tested in a prototypic, full-scale gripper head and under prototypic SFR fuel handling loads. The design of the GrTA was completed in FY2022 and has progressed into fabrication and initial assembly. All custom manufactured components have been fabricated and delivered to ANL following inspection. All custom gears have been fabricated and delivered to ANL. Bearings, ball screws, and spline shafts have been purchased to allow for initial assembly in air, and sodium compatible versions have either been purchased or are in design at appropriate manufacturers. The drive motor systems that operate the various functions of the GrTA have been purchased and delivered to ANL. Instrumentation and control hardware has been purchased and delivered to ANL as well. All sodium facing components of the GrTA have been assembled and show proper fit. The three main functions of the GrTA are to raise or lower a gripper head under prototypic fuel handling loads, rotate the gripper head while carrying a fuel handling load, and extend or retract gripper jaws that lock a fuel assembly to the gripper head. All three functions have been demonstrated in air, while under no load. The GrTA project will move forward next fiscal year by completing the initial assembly, incorporating the drive system and I&C, and preparing the assembly for introduction to sodium.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Survey of Modeling and Simulation Techniques for Advanced Manufacturing Technologies Volume I – Predicting Initial Microstructures

This report summarizes the current state of modeling and simulation methods for predicting the initial structure and properties of material in components assembled using advanced manufacturing technologies (AMTs). The report is the first volume in a two-volume series. This first volume focuses on predicting initial microstructures of AM material. The second volume discusses predicting material properties given the initial microstructure. The focus is on technologies of particular relevance to the design and manufacture of nuclear reactor components. The purpose of the report is to help develop the technical knowledge base to support regulatory decisions that will be needed to assess nuclear components manufactured with AMTs as these components are installed at nuclear power plants (NPPs). The report develops a list of AMTs of particular interest to the NRC and summarizes the key microstructural features and corresponding processing parameters relevant to each technology. Further sections describe available physically-based and data-driven prediction methods and survey widely available software tools. The report concludes with a summary of gaps that may be of particular interest to the NRC when evaluating modeling and simulation methods for AMTs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Membrane electrode assembly and method of making the same

Disclosed herein is a method of manufacturing a membrane electrode assembly (MEA) including directly depositing a liquid suspension containing a platinum precursor onto an ionically conductive membrane (e.g., proton-exchange membrane) that, when the platinum precursor deposit layer is reduced, provides a layer that will scavenge hydrogen that has diffused back through the membrane due to cell stack pressure differential.

08 HYDROGEN↗

Tessellation and Numerical Simulation of the in-Space Assembled Telescope (iSAT) Reflector

A novel tessellation method has been developed to allow the use of uniform truss modules to form curved or doubly curved surfaces. To illustrate the method, the structural support for the doubly curved in-Space Assembled Telescope primary reflector is developed. The method intentionally leaves gaps at the nodes between identical connecting modules; the gaps are relatively small, on the order of 0.5% of the lattice characteristic cell size. Uniquely shaped nodal connectors called multi-nuts are generated to fill in the nodal gaps and connect adjacent modules. With optimization techniques, the size of these nodal gaps can be minimized to thereby minimize the incurred structural efficiency losses. Finite element analyses of the primary reflector were performed, and the structural efficiency losses amounted to a natural frequency reduction of 5%. The benefits of having uniform truss modules outweigh the structural penalties as it will greatly simplify assembly and lower manufacturing costs.

Tessellation↗

Automated aray assembly, phase 2

A manufacturing process suitable for the large-scale production of silicon solar array modules at a cost of less than $500/peak kW is described. Factors which control the efficiency of ion implanted silicon solar cells, screen-printed thick film metallization, spray-on antireflection coating process, and panel assembly are discussed. Conclusions regarding technological readiness or cost effectiveness of individual process steps are presented.

Daiello, R. V.↗