Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transmission deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Creating Accurate Methane Emission Inventories through Data-Driven Airborne Survey Strategies

Because natural gas emits less carbon than other fossil fuels, it holds promise as a green energy transition fuel. However, the overall carbon footprint of natural gas is significantly elevated by methane emissions that occur during its production and transmission (Cusworth et al. 2022). Methane “super-emitters,” while comprising only about 1% of sites, are responsible for the majority of oil- and gas-sourced methane emissions, making their detection and mitigation critical in reducing the climate impact of natural gas and in meeting national and global sustainability goals (Sherwin et al. 2024). Yet, despite advancements in detection, significant uncertainties remain regarding the size, frequency, and duration distributions of methane emissions (e.g., Frankenberg et al. 2016, Cusworth et al. 2022, Chen, Sherwin et al. 2022, Conrad et al. 2023, Johnson et al. 2023, Sherwin et al. 2024) underscoring the need for comprehensive emissions inventories segmented by basin across the US. Airborne surveys are well-suited for collecting data to build these comprehensive, basin-level inventories because they allow for extensive spatial coverage, and have the spatial resolution, and the sensitivity to pinpoint individual methane sources. As remote sensing technologies enable rapid basin-scale surveys, it is imperative to establish scientifically and statistically robust standards to generate reliable and actionable emissions inventories. Recent work has shown that differences in airborne sampling strategies, detection technologies, and analysis can lead to large differences between survey conclusions if not correctly accounted for (Chen et al. 2024). This elevates the importance of incorporating proper sampling and analysis techniques when designing a methane emissions monitoring campaign to produce accurate results and facilitate cross-study comparisons. In this paper, we describe a survey strategy designed using the latest conclusions from the literature to align results from different aerial surveys. We identify several sampling and analysis principles, including large sample sizes, balanced sampling across oil and gas production, careful survey area definition, and a unified protocol for analysis, to be vital to producing an unbiased estimate of basin-scale emissions. We present results from a Department of Energy-funded project that deployed this survey strategy in two understudied oil and gas- producing regions in the United States: the Haynesville Basin in Texas and Louisiana, and the Woodford Shale in the Anadarko Basin in Oklahoma.

03 NATURAL GAS↗

Predictive-Maintenance Practices: For Operational Safety of Battery Energy Storage Systems

Changes in the Demand Profile and a growing role for renewable and distributed generation are leading to rapid evolution in the electric grid. These changes are beginning to considerably strain the transmission and distribution infrastructure. Utilities are increasingly recognizing that the integration of energy storage in the grid infrastructure will help manage intermittency and improve grid reliability. This recognition, coupled with the proliferation of state-level renewable portfolio standards and rapidly declining lithium-ion (Li-ion) battery costs, has led to a surge in the deployment of battery energy storage systems (BESSs). Additionally, although BESSs represented less than 1% of grid-scale energy storage in the United States in 2019, they are the preferred technology to meet growing demand because they are modular, scalable, and easy to deploy across diverse use cases and geographic locations.

25 ENERGY STORAGE↗

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance

Orcas Power & Light Cooperative (OPALCO) is a member-owned, nonprofit cooperative utility that provides energy services to approximately 11,200 customers across 20 islands in San Juan County, Washington. OPALCO’s mostly hydroelectric power is generated by Bonneville Power Administration and delivered to the islands by submarine cables. In 2016, as part of the second round of funding from the Washington state Clean Energy Fund, OPALCO received a $1 million matching grant to support a project that deployed a 504-kW LG community photovoltaic (PV) system in combination with a 1 MW/2 MWh lithium-iron-phosphate battery energy storage system (BESS) on Decatur Island, Washington. The Decatur Island Substation is essential to ensuring reliable energy for the residents of the San Juan Islands as it is the point of interconnection with the mainland transmission system. The BESS, in combination with the community solar array, will deliver an innovative method to both defer the costly upgrade of the transmission system and allow for other high-value applications intended to benefit the utility and its customers. In 2018, Pacific Northwest National Laboratory (PNNL) completed a preliminary economic assessment for several identified use cases in collaboration with OPALCO. Between August 2021 and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (a) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline) and are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (b) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with OPALCO. Four use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) outage mitigation, and 4) transmission deferral. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help OPALCO understand the performance of the Decatur Island BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

Cybersecurity for Energy Delivery Systems

The Cyber Resilient Energy Delivery Consortium (CREDC) started operations on October 1, 2015. The original period of performance ended September 30, 2020. During this span, CREDC developed projects with significant and measurable sector impact, achieved by involving industry partners (asset owners, equipment vendors, and technology providers) early and often, from helping us to identify critical sector needs, to performing pilot deployment and technology adoption. The central project goal was to create a research and development ecosystem where research results lead directly to development of applications and methodologies which are then validated in realistic contexts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Change Agent: Energy Storage as a Driver of Regulatory Evolution

Purpose of Review Dividing the electric grid into the functions of generation, transmission, anddistribution enabled the drawing of jurisdictional lines and the application of the U.S.Constitution’s federalist system to energy regulation. Energy storage technologies,which can be placed throughout the grid to increase flexibility, can provide serviceacross all three of those functions. But the jurisdictional boundaries that have beendrawn around those functions have created barriers that restrict energy storagetechnologies from achieving their full potential. This review analyzes regulatory changes made to reduce barriers to storage deployment and their broader impacts on energy regulation in the U.S. Recent Findings Major energy regulations promulgated at the state and federal levels have generally focused on liberalizing the U.S. electric system through deregulation and increased competition. Paradoxically, however, these efforts have erected strict regulatory barriers that prevent energy storage technologies from providing service across multiple functions. A new wave of regulations in recent years has endeavored to reduce and remove those barriers. Summary Energy regulations adopted in recent years to reduce barriers to energy storage functionality in recent years have had deep and far-reaching impacts on U.S. electric regulation. These impacts go beyond storage and affect all energy technologies. This paper traces the development of energy regulation in U.S., the functional barriers that they created that impede energy storage functionality, recent efforts to remove those barriers, and the broader effects of those efforts. It concludes with a brief discussion of remaining barriers that prevent energy storage from reaching their full potential on the U.S. electric grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Near Term Reliability and Resilience: Revisiting Resilience Metrics for the Electric Grid

This report presents the metrics employed in the Near-Term Reliability and Resilience (NTRR) project to study the inter-dependencies between electric and natural gas infrastructures, particularly under challenging conditions. These metrics were developed and applied to evaluate the reliability and resilience of the electric grid and natural gas systems in near-term scenarios (within the next 10 years) involving extreme weather events and major supply disruptions. The report defines the metrics, explains how they are calculated, and describes the process by which they are used to evaluate reliability and resilience across simulated scenarios. It also demonstrates how the resilience metrics integrate with other project activities and summarizes the software tools deployed to calculate and visualize the results.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cyber-physical Resilient Interoperable Microgrid Networks

The paper presents the results of an industry-academic collaboration between ABB, Duke Energy and the University of Illinois at Urbana-Champaign (UIUC) that has developed and demonstrated a cyberphysical resilient control and communication architecture for deployment of multiple microgrid networks, as well as retrofitting the existing distribution grids by increasing DER penetration levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Efficient Reinforcement Learning for Real-Time Hardware-Based Energy System Experiments: Preprint

In the context of urgent climate challenges and the pressing need for rapid technology development, Reinforcement Learning (RL) stands as a compelling data-driven method for controlling real-world physical systems. However, RL implementation often entails time-consuming and computationally intensive data collection and training processes, rendering them inefficient for real-time applications that lack non-real-time models. To address these limitations, real-time emulation techniques have emerged as valuable tools for the lab-scale rapid prototyping of intricate energy systems. While emulated systems offer a bridge between simulation and reality, they too face constraints, hindering comprehensive characterization, testing, and development. In this research, we construct a surrogate model using limited data from simulated systems, enabling an efficient and effective training process for a Double Deep Q-Network (DDQN) agent for future deployment. Our approach is illustrated through a hydropower application, demonstrating the practical impact of our approach on climate-related technology development.

deep Q-learning↗

RADIANCE Executive Summary

Microgrids are gaining attention from organizations and cities because of their potential reliability and resilience benefits, especially in remote geographic areas: Microgrids can provide local power during emergencies, and they can reduce the costs of imported fuel by reducing overall fuel use. But the complexities and novelties of microgrid technologies are often barriers to deployment that require testing and validation to overcome. This report describes the testing, validation, and deployment of microgrid technologies in Cordova, Alaska, completed through the U.S. Department of Energy (DOE) Grid Modernization Laboratory Consortium (GMLC) project Resilient Alaskan Distribution system Improvements using Automation, Network analysis, Control, and Energy storage (RADIANCE).

ARIES↗

TDD LoRa and Delta Encoding in Low-Power Networks of Environmental Sensor Arrays for Temperature and Deformation Monitoring

Abstract Densely distributed sensor networks can revolutionize environmental observations by providing real-time data with an unprecedented spatiotemporal resolution. However, field deployments often pose unique challenges in terms of power provisions and wireless connectivity. We present a framework for wirelessly connected distributed sensor arrays for near-surface temperature and/or deformation monitoring. Our research focuses on a novel time division duplex implementation of the LoRa protocol, enabling battery powered base stations and avoiding collisions within the network. In order to minimize transmissions and improve battery life throughout the network, we propose a dedicated delta encoding algorithm that utilizes the spatial and temporal similarity in the acquired data sets. We implemented the developed technologies in a AA battery powered hardware platform that can be used as a wireless data logger or base station, and we conducted an assessment of the power consumption. Without data compression, the projected battery life for a data logger is 4.74 years, and a wireless base stations can last several weeks or months depending on the amount of network traffic. The delta encoding algorithm can further improve this battery life with a factor of up to 3.50. Our results demonstrate the viability of the proposed methods for low-power environmental wireless sensor networks.

54 ENVIRONMENTAL SCIENCES↗

Investigation of Nanoparticle Degradation in Hydrogen Fuel Cell Systems through Automated Electron Microscopy

Proton exchange membrane fuel cells (PEMFC) are promising devices for the deployment of hydrogen-powered heavy-duty vehicles, providing a higher efficiency for similar driving range and fueling time than the existing ones. However, PEMFCs still encounter durability challenges mainly due to catalyst degradation in the cathode. Mitigating these performance losses requires a better understanding of the degradation mechanisms under heavy-duty accelerated stress tests (ASTs) [1]. Scanning transmission electron microscopy (STEM) combined with energy dispersive X-ray spectroscopy (EDS) are key tools for the analysis of Pt and PtCo nanoparticle size, spatial distribution and composition [2]. Electron tomography is also used to determine the rate and type of degradation of catalyst nanoparticles as a function of their position on the carbon support. In this work, automated data acquisition software, paired with a custom Python code, have been used to study the effect of different accelerated stress tests (ASTs) on nanoparticle coarsening [2]. Figure 1 shows high-angle annular dark-field (HAADF)-STEM images and EDS maps comparing the cathodes of membrane electrode assemblies (MEAs) following an electrocatalyst AST performed under H2/N2 with that of the heavy-duty AST performed under H2/air. We will discuss how AST conditions affect considerably the spatial distribution of the nanoparticles across the electrode between the membrane and microporous layer. Although the median particle size increased more in the MEA aged under the heavy-duty AST, as determined using a high-throughput image analysis, the quantitative EDS measurements demonstrate that the electrocatalyst AST resulted in more Pt and Co dissolution from the cathode, which is another important indicator of electrocatalyst degradation. We will further present the impact of the relative humidity (% RH) on the degradation mechanisms demonstrated using the same approach. Electron tomography has been used to distinguish the Pt nanoparticles residing on the carbon support surface (exterior) from those within the pore structure (interior) in order to determine the relative stability of interior and exterior nanoparticles. As shown in Figure 2, we will compare the Pt catalyst particle size at the beginning of test (BOT) and end of test (EOT), and discuss the importance of automating the electron tomography workflow, i.e. acquisition, reconstruction, and visualization, to increase sampling and determine the standard deviation of these measurement. The outlook for utilizing low-dose cryo-tomography for limiting damage to the catalyst, support, and especially proton-conducting ionomer will also be discussed [3].

Amichi, Lynda↗

Extreme-scale stochastic optimization and simulation via learning-enhanced decomposition and parallelization (Final Technical Report)

Stochastic optimization and simulation models ubiquitously arise in designing and operating complex service/engineering systems. They can be extreme in scale due to high-dimensional data and decisions, and can also involve decisions made sequentially in response to newly revealed data, both causing significant computational challenge. The objective of this research is to explore a unified framework that integrates machine learning with discrete optimization and risk-averse modeling, to improve the efficiency of decomposition paradigms for stochastic optimization and simulations at extreme scale. The models we consider represent a broad class of complex decision-making problems, where 0-1 or continuous decisions are made before and/or after knowing multiple sources of uncertainties that could be correlated. We will employ machine learning methods to dynamically decide and prioritize computational procedures, including cut generation, branching, and bounding of the optimal objective. Furthermore, the research will shed new lights on the traditional decomposition algorithms for extreme-scale computing. Deliverables of the research include new modeling and computational methods for advancing the state-of-the-art research in optimization and simulation, bringing many relevant risk-averse, data-driven optimization problems in practice within the range of tractability. Examples include distributed computing server scheduling and sensor deployment for monitoring critical infrastructures. Success in this effort will enable progress in solving multiple extreme-scale problems in the complex system design and operations arising from DoE missions in energy, environment, and national security.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Faster-than-real-time Simulation with Demonstration for Resilient DER Integration

The US electric grid is facing operational, stability, and security challenges. Transmission system operators need some measure of visibility into distribution system renewable generation. Distribution system generation needs to support transmission system voltage. The grid is experiencing an expansion in measurement systems. How to take full advantage of this expansion and defend against attacks, both cyber and physical, poses additional challenges. The Faster-than-real-time Simulation with demonstration for Resilient DER Integration project set out to do the following: a. Flatten the voltage profile through the feeders and system for cost saving and voltage stabilization needs. b. Increase the amount of intermittent distributed energy resources (IDERs) that could be deployed on a utility feeder and provide 100% or more energy needed for the demands on that feeder, and c. based on an accurate model (Digital Twin) of the utilities system, be able to detect any abnormalities on the utilities distribution system. To manage the voltage and increase IDER penetration (a,b), Graph Trace Analysis is employed in a time-series, optimal power flow to coordinate the time-varying feedback control setpoints of a distribution feeder’s utility control devices. Under the coordinated control are a Load Tap Changing Transformer, a voltage regulator, and five switched capacitor banks. The feeder serves over 2000 customers, the feeder secondaries are modeled, and the feeder has 2.3 MW of PV generation, corresponding to a 17.4% penetration of PV generation. The feeder model has over 12,000 components, where every customer load bus and PV generator are modeled. The accuracy of the power flow solution is compared against historical meter voltage measurements, the improvement in conservation voltage reduction energy savings as a function of the coordinated control desired voltage profile is investigated, and the increase in PV penetration of the coordinated control over the existing control is presented. To achieve improved control performance while observing system operation constraints, bellwether Advanced Metering Infrastructure (AMI) voltage measurements are used to adjust the desired voltage profile used by the optimal power flow analysis. To detect and alleviate or negate attacks or failures on the distribution and transmission utility grids (c) the grid needs to be resilient and self-healing. In this project software was designed to do just that. At the center of the software is an Integrated System Model (ISM) that spans from transmission to secondary distribution. The ISM is employed in real-time abnormality detection, voltage stability forecasting, and multi-mode control. Testing results are presented for: 1—attacks on utility infrastructure; 2—energy savings from optimal control; 3—distribution system control response during a low voltage transmission system event; 4—cyber-attacks on PV inverters, where physical inverters are used in hard-ware-in-the-simulation-loop studies. Contributions of this work include real-time analysis that spans from three-phase transmission through secondary distribution; an approach for detecting abnormalities that employs measurements from three independent measurement systems; and a multi-mode distribution system control that responds to cyber-attacks, physical attacks, equipment failures, and transmission system needs.

Integrated System Model, Graph Trace Analysis, Adv↗

Study of eVTOL Charging Impact on Airport Electrical Grids

Growth in commercial air traffic has increased the aviation industry's contribution to global emissions. Aircraft electrification can reduce greenhouse gas emissions along with being efficient and reliable. Advanced air mobility introduces the idea of an advanced and more efficient air transportation system. Electric and hybrid aircraft designs, such as electric vertical takeoff and landing (eVTOL), are being considered for a number of applications, such as urban air mobility, cargo delivery, and medical emergencies. Although the electrification of aircraft provides environmental benefits, their charging needs will place significant demand on the electrical grid. This work presents a grid impact study and infrastructure upgrade requirements analysis of eVTOL charging on a realistic distribution grid through power flow simulation analysis. The case study results show that the eVTOL charging can lead to power quality issues, such as undervoltage and equipment capacity overloading. Grid infrastructure, such as lines and transformers, would need to be upgraded, and voltage management strategies would need to be deployed to accommodate eVTOL charging at an existing airport.

advanced air mobility (AAM)↗

Tool-Based Case Studies on Strategic Deployment of Untapped Micro-Pumped Hydro Storage in Michigan

With most classical hydropower sites already utilized and the global push for rapid integration of renewable energy sources accelerating, there is a critical need to identify alternative energy storage solutions. Pumped hydro energy storage, which accounts for the vast majority of global grid-scale storage, remains one of the most cost-effective and long-duration storage technologies available. Hence, this study presents a novel tool designed to assess the untapped potential of inland lakes and reservoirs for micro-PSH, using Michigan’s relatively flat landscape as a case study due to its extensive but underutilized water infrastructure. To ensure accuracy and reliability, the tool incorporates extensive data gathered from authorized sources, covering more than 420 water facilities and potential reservoirs in the state. The tool evaluates key parameters such as horizontal and vertical distances, volume, and the total storage capacity of each reservoir. Its robust assessment framework integrates these metrics to evaluate each site’s potential. The tool’s intuitive interface and geospatial visualizations support actionable insights for planners and scalable deployment of distributed storage infrastructure.

13 HYDRO ENERGY↗

A Reconfigurable Neural Network ASIC for Detector Front-End Data Compression at the HL-LHC

Despite advances in the programmable logic capabilities of modern trigger systems, a significant bottleneck remains in the amount of data to be transported from the detector to off-detector logic where trigger decisions are made. We demonstrate that a neural network (NN) autoencoder model can be implemented in a radiation-tolerant application-specific integrated circuit (ASIC) to perform lossy data compression alleviating the data transmission problem while preserving critical information of the detector energy profile. For our application, we consider the high-granularity calorimeter from the Compact Muon Solenoid (CMS) experiment at the CERN Large Hadron Collider. The advantage of the machine learning approach is in the flexibility and configurability of the algorithm. By changing the NN weights, a unique data compression algorithm can be deployed for each sensor in different detector regions and changing detector or collider conditions. To meet area, performance, and power constraints, we perform quantization-aware training to create an optimized NN hardware implementation. The design is achieved through the use of high-level synthesis tools and the hls4ml framework and was processed through synthesis and physical layout flows based on a low-power (LP)-CMOS 65-nm technology node. The flow anticipates 200 Mrad of ionizing radiation to select gates and reports a total area of 3.6 mm 2 and consumes 95 mW of power. The simulated energy consumption per inference is 2.4 nJ. Furthermore, this is the first radiation-tolerant on-detector ASIC implementation of an NN that has been designed for particle physics applications.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗