Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Policy, Regulatory, Legal, and Permitting Case Study Subtask 3.2 – Topical Report

This report summarizes the policy, regulatory, legal, and permitting requirements to-date for the siting of a CO 2 injection and storage project in the CarbonSAFE Illinois East Sub-Basin pre-feasibility study area. Where applicable, the East Sub-Basin case study focuses on a proposed carbon capture and storage (CCS) site location in West Terre Haute, Indiana. Indiana has established the legal mechanisms to obtain rights to the subsurface mineral estate with the expectation to apply to reservoir pore space for CO 2 storage in an analogous manner to storage of natural gas, which is a common practice in Indiana. There is, however, no precedent in Indiana to take liability for stored CO 2 . There are currently no Indiana State incentives for CCS, but at the Federal level, tax credits for carbon capture and storage under 26. U.S. Code § 45Q constitute the greatest incentive targeted at CCS projects. The amendment to these credits put forth in the Bipartisan Budget Act (the FUTURE Act) of 2018 substantially increases the per-ton incentive for CCS—from $22.66 per ton in tax year 2017 up to $50 per ton in tax year 2027, for CO 2 not used as an injectant (i.e. saline storage). Additional economic opportunities may exist for the provision of CO 2 for potential EOR in the Illinois Basin. Policies that may support the development of CO 2 pipelines and/or CCS projects in Indiana include: 1) Title 41 of the FAST Act (2015), which created a new governance structure, procedures, and funding authorities in order to improve and expedite Federal review and authorization of covered infrastructure projects, including pipelines, and 2) the Eminent Domain for Transportation of Carbon Dioxide by Pipeline (IC 14-39, Indiana State, 2011), which declares pipeline transportation of CO 2 exclusively to a carbon management application, including sequestration, enhanced oil recovery, and deep saline injection as a benefit to the welfare of Indiana and the people. The US Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) Program Class VI rule and permit requirements address all components pertaining to CO 2 injection and monitoring for long-term storage, and outline the minimum technical criteria to protect underground sources of drinking water at, and surrounding, injection well sites. The Class VI requirements also address financial responsibility for corrective action, post-injection site care, and site closure. In addition, UIC Program public notice requirements include that the EPA issue notice of the draft permit preparation to key stakeholders, and open a public comment period of not less than 30 days. A public hearing about the permit would also be held, if specifically requested by the public. A potential Class VI CO 2 injection well permit for the East Sub-Basin case study site would be obtained through the US EPA Region 5, because the State of Indiana does not have UIC Class VI primacy. Although no CO 2 injection wells have been permitted in Indiana, the US EPA Region 5 (which covers Illinois and Indiana) and the East Sub-Basin CarbonSAFE team (via the Midwest Geological Sequestration Consortium [MGSC]) have Class VI permitting experience from several projects located in Illinois. Based on our experience, applying for a Class VI permit can be an intensive and iterative process requiring clear communication and numerous interactions with EPA staff. In addition to gathering and preparing the data/models and documentation necessary for a permit application’s initial submittal, the subsequent public comments, EPA response and review, and answering of any follow-up questions/requests by the EPA could significantly increase the timeframe of draft permit issuance. The US EPA offers guidance documents regarding the specific Class VI permit requirements, and shows a general permitting timeline example from the FutureGen Alliance 2.0 covering one-and-a-half years from permit submittal to issuance. However, the overall permitting process to-date has a high degree of variability, and in MGSC’s project experience we observed a more extended timeline to receive Class VI permits for each of two CO 2 injection wells.

01 COAL, LIGNITE, AND PEAT↗

INTEGRATION OF FLEX EQUIPMENT AND OPERATOR ACTIONS IN PLANT FORCE-ON-FORCE MODELS WITH DYNAMIC RISK ASSESSMENT

The overall operation and maintenance cost to protect nuclear power plants accounts for approximately 7% of the total cost of power generation, with labor accounting for half of this cost. In the current research, from interaction with utilities and other stakeholders, it was determined that physical security forces account for nearly 20% of the entire workforce at several nuclear power plants. Labor costs continue to rise in the U.S., so any measures to reduce the cost of operating a nuclear power plant will need to include a reduction in labor. The physical security pathway within the DOE’s Light Water Reactor Sustainability program aims to lower the cost of physical security through directed research into modeling and simulation, application of advanced sensors or deployment of advanced weapons. This report presents a modeling and simulation framework for integrating Diverse and Flexible Mitigation Capability (FLEX) portable equipment performance with Force on Force models of a plant’s physical security posture. The generic framework is described in detail, followed by a case study of modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical nuclear power plant. Two different FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial Force on Force tool are integrated with the FLEX deployment model in INL’s dynamic modeling tool EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework integrating FLEX equipment with Force on Force models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security.

97 MATHEMATICS AND COMPUTING↗

LWR Aging Management for Life Beyond 80

While several decades of materials degradation research enabled the current US fleet of Light Water Reactors (LWR) to plan to produce electrical power through extended operations up to 80 years of plant life, it now seems appropriate to evaluate what issues, methods, and timelines need to be considered to meet the expected electric power demands for life beyond eighty (LBE) years. To address these questions, it will be necessary to review the electrical capacity and the projected LWR fleet capacity including new builds and advanced reactors. This effort should begin with a materials degradation assessment focused on known and possible unknown issues using a reduced Expanded Materials Degradation Assessment [1], which was employed to identify knowledge gaps for a second license renewal (60-80 yrs.). The focus of the LBE assessment should include: Establishing a timeline to initiate assessments of possible materials aging issues and to ensure sufficient time to evaluate materials degradation research gaps; assessing components and materials to be evaluated, e.g., metals (reactor pressure vessels and alloys within and outside the pressure boundary), concrete, cables, as well as mitigation methods, advanced monitoring, and validation with ex-service materials; initiating a LBE research plan focused on developing an expanded mechanistic understanding of materials degradation and refined models through Codes and Standards evaluation for use by the nuclear industry; and maintaining and strengthening the nuclear materials human knowledge base to address new and as yet unknown degradation modes.

Chen, Xiang↗

Vendor Irradiation Capsule A quick summary and update

Vendor Irradiation Capsule (VIC) update and summary. Includes what the VIC is, why it is needed, options, how data will be used, and what is concluded from using VIC. Also discusses realistic irradiation timelines, available MTRs and realisitic irradiation positions, disassembly and PIE timelines, processes and conclusions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Use of generic and site-specific underground research laboratories to support siting, design, and safety assessment - 15417

Under the auspices of the International Atomic Energy Agency (IAEA), nationally developed underground research laboratories (URLs) and associated research institutions are being offered for use by other nations. These facilities form an Underground Research Facilities (URF) Network for training in and demonstration of waste disposal technologies and the sharing of knowledge and experience related to geologic repository development, research, and engineering. In order to achieve its objectives, the URF Network regularly sponsors workshops and training events related to the knowledge base that is transferable between existing URL programs and to nations with an interest in developing a new URL. Toward that end, a three-day workshop was held in Albuquerque, New Mexico in October 2014 to identify and compare the understanding of URF Network members on the place and role of generic and site-specific URLs in the overall, iterative geological disposal development process, including repository siting, design, and post-closure safety assessment. Attention was also given to the need for URLs in salt host rock, since there is currently no such facility in operation in the world. This paper describes some of the outcomes of the workshop in the context of the general timeline for repository development and the evolving role of research, development, and demonstration (RD and D) activities in URLs. Of particular interest is the relationship between technology maturity, as measured by technology readiness level (TRL), and the stages or milestones in the repository development timeline. The long history of RD and D in worldwide URLs (> 40 years) can be argued to be the primary reason that nuclear waste disposal systems are currently at a high level of maturity. One of the key recommendations from the workshop was that an international, easily accessible knowledge base should soon be established to avoid the loss of important experiences and information obtained from existing and closed URLs. It was also recognized that a new generic URL in salt host rock would provide a number of benefits, but one should not be initiated until a national program specifically decides to site its repository in salt. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Logistics Modeling of the Integrated Wash Aid Treatment Emergency Reuse System - 19495

We employed Analysis of Mobility Platform (AMP) and GoldSim software to model the logistics of deploying materials to implement the Integrated Wash Aid Treatment Emergency Reuse System (IWATERS) in a hypothetical cesium-contamination scenario covering a four-block strip of downtown Chicago, IL. In this deployment of IWATERS, buildings were washed down via fire-hosing and contaminated wash solution was collected in the city's waste/stormwater collection system. The contaminated wash water was treated to remove Cs via ad hoc sand/clay filtration beds, and the treated wash solution was recycled during continuing decontamination operations. A detailed task timeline for the IWATERS deployment and information (or assumptions) on the availability and location of required resources for operations provided input parameters, as well as a framework, to enable the AMP and GoldSim simulations. From the decision to deploy IWATERS to the end of operations, including the completion of processing all contaminated wash water, took 49 days with decontamination teams active for 35 days and treatment bed teams active for 37 days. The modeling results showed the availability of vermiculite clay (based on data supplied by its commercial vendors/distributors) as the limiting factor for deploying treatment bed teams and, consequentially, the recycling rate of wash water and the timeline for decontamination operations. These simulations represent the first attempt at understanding the material and personnel requirements for large-scale IWATERS operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Policy Reforms to Unleash Domestic Critical Minerals Mining and Processing

The United States faces growing strategic and economic risks due to its limited ability to mine, process, and refine the minerals required for national defense, energy systems, advanced manufacturing, and emerging technologies. Although the country possesses significant geological resources, development has been slowed by long and unpredictable permitting timelines, fragmented regulatory responsibilities, limited midstream processing capacity, and a shrinking technical workforce. These structural barriers have created supply chain vulnerabilities that constrain industrial growth and reduce national resilience. This report presents a comprehensive set of reforms intended to modernize the nation’s approach to critical minerals. The recommendations address federal permitting, environmental review processes, the legal framework governing mining activities, interagency coordination, domestic processing and refining capacity, and the education and workforce systems needed to support long term industry development. The analysis emphasizes practical steps to shorten project timelines, improve regulatory clarity, expand processing infrastructure, enable recovery from both conventional and nontraditional sources, and update outdated requirements that hinder the development of essential materials. Taken together, the recommended reforms would strengthen domestic supply chains, improve investment certainty, and reduce dependence on external minerals and processing infrastructure. By aligning policy, regulatory frameworks, and workforce capabilities with national needs, the United States can build a more resilient and secure critical minerals ecosystem that supports long term economic competitiveness and technological leadership.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Affordable and Scalable Modular Multifamily Housing: A Case Study on Cost, Construction Time Savings, and Waste Reduction in California: Preprint

Modular construction can significantly reduce waste when compared to traditional methods. This case study evaluates cost, construction time, and waste metrics for a 195-unit stick-built project and for a 66-unit modular project both based in Los Angeles, CA. We partner with SoLa Impact (real estate developer) and Model/Z (modular manufacturer) to evaluate the impact of Model/Z's 1-bedroom modular unit which is produced in a 160,000 sq ft local factory in South Los Angeles. We compare them to similar stick-built/site-built multifamily construction by the same developer in Los Angeles. This study finds that modular production reduced construction waste through precise prefabrication, concentrated workforce expertise, and streamlined logistics while cutting transportation needs, improving project efficiency and lowering associated timelines and costs. Economies of scale are being realized as Model/Z has produced over 500 affordable housing units and supplied for projects up to 188 units, shortening schedules and lowering per-unit costs and supporting affordable housing goals in income-challenged South Los Angeles. Modular methods offer a scalable, resource-efficient pathway to increasing affordable housing supply while reducing total development costs by 10-15% and project timelines by 50%, while simultaneously creating local jobs and training opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

International Offshore Geologic Carbon Storage Story Map

The International Offshore Geologic Carbon Storage Story Map provides an overview of offshore geologic carbon storage (GCS) project maturity on a global scale. This story map reviews the history of CO2 storage in offshore sedimentary basins, basic geologic requirements, project timelines and lessons learned through defined project stage progression, areas previously studied for potential future domestic offshore GCS development, and regulatory considerations within different global regions. This resource is a distillation of information collected and recorded in the Offshore Geologic Carbon Storage Inventory Version 1.0 (https://edx.netl.doe.gov/dataset/offshore-gcs-data-inventory).

Assessment↗

Offshore Wind Technology Data Update (2019) [Slides]

The 2019 Offshore Wind Technology Data Update compiles information from peer-reviewed literature, market reports, press releases, industry news reports, manufacturer specification sheets, and offshore wind project announcements to provide a comprehensive snapshot of the state of the global wind industry in 2019. These data, including capacity projections, project characteristics, technology trends, and cost estimates, are categorized, tabulated, and plotted to provide easily recognizable and understandable summaries. A particular focus is given to the United States offshore wind project pipeline, including project announcements, state procurements, deployment timelines, infrastructure investments, grid interconnections, and other related developments. The update is intended to be used as a reference document by researchers, analysts, industry practitioners, and government officials.

17 WIND ENERGY↗

Spacecraft Disposal Rosetta Stone: Parametric Tool for Orbital Lifetime, Disposal, and Cost Assessment

This Technical Memorandum documents a simplified, parametric method for evaluating spacecraft orbital lifetime, disposal compliance, and disposal-related cost impacts during early mission formulation and preliminary design. The method captures the dominant drivers of orbital decay—effective ballistic coefficient, operating altitude, and solar-cycle variability—using conservative bounding assumptions. Solar maximum conditions are used to bound achievable mission lifetime, while solar minimum conditions are used to bound disposal timelines and compliance with orbital debris requirements. A single tabulated dataset provides orbital lifetime under both solar-cycle extremes together with representative disposal ΔV required to ensure compliant disposal, enabling rapid assessment of disposal feasibility, cost sensitivity, and system-level impacts prior to committing to higher-fidelity analyses.

Orbital debris mitigation↗

Refining the Definition of a Geothermal Exploration Success Rate

The geothermal exploration process impacts project development timelines, costs, and overall perceived risk. However, the success in the exploration phase of a geothermal project - and the calculation of a success rate - is universally ill-defined. In previous studies, the success of a geothermal process is loosely defined as the number of wells that result in commercially-viable production. This work focuses on refining the definition of success for the exploration process to represent an upper bound to the likelihood a project will proceed into commercial production. This research examines the topic of success from both a top-down and bottom-up approach: a review of previous assessments of success rate that identifies common conditions leading to successful exploration, and a project-level review of geothermal sites in the western United States focused on decision points in the geothermal exploration process. The analysis not only considers the impact of factors outside of the geothermal reservoir (i.e. delays due to financing or permitting), but also touches on the length of the exploration process and the symbiosis between exploration methods. Using a combination of these analyses, future work will investigate which levers within the geothermal exploration process have the strongest influence on overall project success.

15 GEOTHERMAL ENERGY↗

Machine Learning Modeling for Accelerated Battery Materials Design in the Small Data Regime

Abstract Machine learning (ML)‐based approaches to battery design are relatively new but demonstrate significant promise for accelerating the timeline for new materials discovery, process optimization, and cell lifetime prediction. Battery modeling represents an interesting and unconventional application area for ML, as datasets are often small but some degree of physical understanding of the underlying processes may exist. This review article provides discussion and analysis of several important and increasingly common questions: how ML‐based battery modeling works, how much data are required, how to judge model performance, and recommendations for building models in the small data regime. This article begins with an introduction to ML in general, highlighting several important concepts for small data applications. Previous ionic conductivity modeling efforts are discussed in depth as a case study to illustrate these modeling concepts. Finally, an overview of modeling efforts in major areas of battery design is provided and several areas for promising future efforts are identified, within the context of typical small data constraints.

Sendek, Austin D.↗

Conceptual range estimation for total cost of ownership of modular process‐intensified chemical plants

Abstract Chemical companies have used modularization to reduce capital costs and project timelines, putting capital to work faster and lowering the risk of entering new markets. Nevertheless, the impacts of using modularization along with advanced technologies, such as process intensification, have not yet been fully realized, often due to the uncertain business risks associated with their implementation. Therefore, new methods are needed for quantifying the impact of modular chemical process intensification (MCPI) on the capital and operating costs of chemical plants to help build a business case for this novel approach. This article presents a new conceptual range estimation technique for total cost of ownership that addresses the deficiencies of existing methods for quantifying MCPI impacts. The incorporation of percentage range estimates was employed to allow for adaptability across various cost and size scales. This work also begins to elucidate how chemical engineering and construction firms can benefit from MCPI and identifies barriers that inhibit MCPI applications in the chemical industry.

Alhamouri, Khaled I.↗

Responding to the US national pollinator plan: a case study in Michigan

The long‐term health of pollinators is a critical issue for the functioning of natural habitats and for agricultural production. In response to widespread public concern about the future of these ecologically and economically important animals, in 2015 the US Government released a national strategy to support pollinators, including research priorities, directives for funding, and timelines for achieving three overarching goals. Five years after this strategic plan was released, we evaluate progress toward the national targets for improved honey bee ( Apis mellifera ) overwintering survival, expanded pollinator habitat, and larger monarch butterfly ( Danaus plexippus ) populations, and find that the three goals of the plan have not yet been reached. Our research and extension programs to improve the health of honey bees, wild bees, and monarch butterflies in the US state of Michigan are described, providing opportunities to contribute to the national pollinator goals.

Bloom, Elias H.↗

Perceived Conflicts of Systems Engineering in Early-Stage Research and Development 1

Early Systems Research and Development (ESR&D) is one of the most crucial phases in the product development process. It both blends and blurs the lines between science and engineering, and requires a risk-based, disciplined, and graded approach to effectively manage scope, cost, and complexity of the final product. Many leaders, program managers, and scientists are unwilling to involve systems engineering because of the perception that systems engineering is heavily process oriented, adds unnecessary costs, and should be applied only to mature technologies. The value of systems engineering as applied to ESR&D is unclear to these key individuals. The unfortunate result is that system engineering is not applied to ESR&D. This results in R&D efforts that may have solved the wrong problem, selected the wrong architecture, require technical rework, have difficulty transitioning later maturity levels, and result in higher R&D costs and extended development timelines. This work discusses the difficulty of introducing systems engineering to the research and early development process and their inclination perspectives of researchers, engineers, and managers. The article shall offer potential means to manage the cultural transformation of early adoption of right-sized systems engineering in ESR&D and reverse the attitudinal positions.

42 ENGINEERING↗

The Basic Results of Alignment and Summary of Operations of the Main K-1000-60/3000 Turbine Unit with a Small Number of Bearings at the Bushehr Nuclear Power Plant

The results of vibration alignment and the first years of use of the prototype K-1000-60/3000-3 turbine unit of the Bushehr NPP in 2011 – 2016 are examined. As a result of conducting an extensive set of studies and actions, the claimed high-quality operating characteristics of the new design bearings that were used and the high degree of vibrational reliability of the turbine unit were confirmed, and these made it possible to ensure successful commissioning on a short timeline, despite the novelty of the design and the uniqueness of development of the majority of units, taking into account the integration of the equipment with the existing base and the condenser group. During the commissioning work, it was shown that this turbine unit is not inferior in any manner to turbine units of analogous power from other firms.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗