Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “time synchronization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

International Space Station Future Correlation Analysis Improvements

Ongoing modal analyses and model correlation are performed on different configurations of the International Space Station (ISS). These analyses utilize on-orbit dynamic measurements collected using four main ISS instrumentation systems: External Wireless Instrumentation System (EWIS), Internal Wireless Instrumentation System (IWIS), Space Acceleration Measurement System (SAMS), and Structural Dynamic Measurement System (SDMS). Remote Sensor Units (RSUs) are network relay stations that acquire flight data from sensors. Measured data is stored in the Remote Sensor Unit (RSU) until it receives a command to download data via RF to the Network Control Unit (NCU). Since each RSU has its own clock, it is necessary to synchronize measurements before analysis. Imprecise synchronization impacts analysis results. A study was performed to evaluate three different synchronization techniques: (i) measurements visually aligned to analytical time-response data using model comparison, (ii) Frequency Domain Decomposition (FDD), and (iii) lag from cross-correlation to align measurements. This paper presents the results of this study.

time synchronization↗

Bounds of linear time‐varying systems with applications to quantify model gap of synchronous generators

Abstract Linear time‐varying (LTV) systems play a key role in many engineering problems, for example, trajectory sensitivity analysis of power systems. Because LTV systems do not generally have closed‐form solutions, estimates of their bounds are crucial to their analysis. In this paper, bounds for LTV systems with known inputs and unknown but bounded inputs are obtained via Grönwall's inequality. The estimated bounds are then used to quantify the gap between synchronous generators and their models in different scenarios through simulation.

42 ENGINEERING↗

A review of satellite time-transfer technology: Accomplishments and future applications

The research accomplishments by NASA in meeting the needs of the space program for precise time in satellite tracking are presented. As a major user of precise time signals for clock synchronization of NASA's worldwide satellite tracking networks, the agency provides much of the necessary impetus for the development of stable frequency sources and time synchronization technology. The precision time required for both satellite tracking and space science experiments has increased at a rate of about one order of magnitude per decade from 1 millisecond in the 1950's to 100 microseconds during the Apollo era in the 1960's to 10 microseconds in the 1970's. For the Tracking and Data Relay Satellite System, satellite timing requirements will be extended to 1 microsecond and below. These requirements are needed for spacecraft autonomy and data packeting.

Cooper, R. S.↗

A Discussion of Time Management Concepts and Time Constraint Equations for Multi-Rate Federation Executions

The High Level Architecture (HLA) is a simulation interoperability standard developed by the Simulation Interoperability Standards Organization (SISO) and published as the international standard IEEE 1516-2010 by the Institute for Electrical and Electronics Engineers (IEEE). HLA is a widely used standard for the development and execution of collaborative distributed simulations. HLA provides a number of Management Services to simulation developers: Federation, Declaration, Object, Ownership, Data Distribution, and Time. Of those services, Time Management Services is probably one of the least understood and least used. However, Time Management Services are critical to technical simulations like those created for space systems using the Space Reference Federation Object Model (SpaceFOM). Time Management can be used to insure data coherence and execution repeatability in distributed simulations. When combined with real time execution policies, Time Management is being used to support real time execution of mixed software and hardware in the loop integration, verification, and validation simulations for active space systems development. This paper starts by providing an overview of the HLA Time Management Services. This provides the background to discuss the challenges associated with Time Management and its use, starting with simple common rate frame scheduled simulations, then simple multi-rate simulations, and ending with complex mixed rate simulations. The authors then formulate the significant time constraint relationships between identified frame scheduling parameters. The intent of the paper is to provide a concise discussion of how to use Time Management in both simple cases and in more complex mixed frame rate federation executions.

Simulation Interoperability↗

A Discussion of Time Management Concepts and Time Constraint Equations for Multi-Rate Federation Executions

The High Level Architecture (HLA) is a simulation interoperability standard developed by the Simulation Interoperability Standards Organization (SISO) and published as the international standard IEEE 1516-2010 by the Institute for Electrical and Electronics Engineers (IEEE). HLA is a widely used standard for the development and execution of collaborative distributed simulations. HLA provides a number of Management Services to simulation developers: Federation, Declaration, Object, Ownership, Data Distribution, and Time. Of those services, Time Management Services is probably one of the least understood and least used. However, Time Management Services are critical to technical simulations like those created for space systems using the Space Reference Federation Object Model (SpaceFOM). Time Management can be used to insure data coherence and execution repeatability in distributed simulations. When combined with real time execution policies, Time Management is being used to support real time execution of mixed software and hardware in the loop integration, verification, and validation simulations for active space systems development. This paper starts by providing an overview of the HLA Time Management Services. This provides the background to discuss the challenges associated with Time Management and its use, starting with simple common rate frame scheduled simulations, then simple multi-rate simulations, and ending with complex mixed rate simulations. The authors then formulate the significant time constraint relationships between identified frame scheduling parameters. The intent of the paper is to provide a concise discussion of how to use Time Management in both simple cases and in more complex mixed frame rate federation executions.

Simulation Interoperability↗

A review of satellite time transfer technology - Accomplishments and future applications

A brief review of the research accomplishments by NASA in meeting the needs of the space program for precise time in satellite tracking is presented. As a major user of precise time signals for clock synchronization of NASA's worldwide satellite tracking networks, the agency provided much of the necessary impetus for the development of stable frequency sources and time synchronization technology. The precision in time required for both satellite tracking and space science experiments has increased at a rate of about 1 order of magnitude per decade from 1 ms in the 1950's to 100 microsec during the Apollo era in the 1960's to 10 microsec in the 1970's. In the 1980's, when the Tracking and Data Relay Satellite System (TDRSS) comes into operation, satellite timing requirements will be extended to 1 microsec and below. These requirements are needed for spacecraft autonomy and data packeting which are now in active planning stages.

Cooper, R. S.↗

An extension to Schneider's general paradigm for fault-tolerant clock synchronization

In 1987, Schneider presented a general paradigm that provides a single proof of a number of fault tolerant clock synchronization algorithms. His proof was subsequently subjected to the rigor of mechanical verification by Shankar. However, both Schneider and Shankar assumed a condition Shankar refers to as a bounded delay. This condition states that the elapsed time between synchronization events (i.e., the time that the local process applies an adjustment to its logical clock) is bounded. This property is really a result of the algorithm and should not be assumed in a proof of correctness. This paper remedies this by providing a proof of this property in the context of the general paradigm proposed by Schneider. The argument given is a generalization of Welch and Lynch's proof of a related property for their algorithm.

Miner, Paul S.↗

High Speed Digitizer Firmware (HSD) v1.0

The High Speed Digitizer firmware is an FPGA gateware and embedded firmware that run on evaluation kits (either Xilinx ZCU111 or Xilinx ZCU208 ) that digitizes signals up to 4GSPS and 4GHz analog bandwidth, which can be synchronized to the accelerator timing system, providing synchronous sampling frequency/phase digitization. In addition to these capabilities, a proof of concept for a beam position monitor is also present, providing an envelope detection algorithm capable of determining the transverse beam position for an electron circular accelerator, such as ALS/ALS-U.

Norum, William↗

Direct-Sampling Beam Position Monitor (dsbpm) v1.0

Direct-Sampling Beam Position Monitor is an FPGA gateware and embedded firmware that run on evaluation kits (either Xilinx ZCU111 or Xilinx ZCU208 ) that digitizes signals up to 4GSPS and 4GHz analog bandwidth, which can be synchronized to the accelerator timing system, providing synchronous sampling frequency/phase digitization. In addition to these capabilities, a proof of concept for a beam position monitor is also present, providing an envelope detection algorithm capable of determining the transverse beam position for an electron circular accelerator, such as ALS/ALS-U.

Norum, William↗

Using GPS and VLBI technology to maintain 14 digit synchronization

To facilitate the navigation of spacecraft to the outer planets, Jupiter and beyond, the JPL-NASA Deep Space Network (DSN) has implemented three ensembles of atomic clocks at widely separated locations. These clocks must be maintained, synchronized, to with a few parts in 10 to the 13th power of each other and, the entire group must be maintained, to a lesser degree, in synchronism with Coordinated Universal Time (UTC)NBS/USNO. Over the last 1 1/2 years the DSN has been using Global Positioning Satellites (GPS) and Very Long Baseline Interferometry (VLBI) technology to perform these critical Frequency and Time (F&T) synchronization tasks. A year of F&T synchronization data collected from the intercomparison of 3 sets of cesium and hydrogen maser driven clock ensembles through the use of GPS and VLBI techniques are covered. Also covered, are some of the problems met and limitations of these two techniques at their present level of technology.

Ward, S. C.↗

In-orbit operation of Resolve Filter Wheel and modulated X-ray source

The Resolve soft X-ray spectrometer is a high spectral resolution microcalorimeter spectrometer for the X-ray Imaging and Spectroscopy Mission. In the beam of Resolve, there is a filter wheel containing X-ray filters. In the beam, there is also an active calibration source, the modulated X-ray source (MXS), which can provide pulsed X-rays to facilitate gain calibration. The filter wheel consists of six filter positions. Two open positions, one 55 Fe source to aid in spectrometer characterization during the commissioning phase, and three transmission filters: a neutral density filter, an optical blocking filter, and a beryllium filter. The X-ray intensity, pulse period, and pulse separation of an MXS are highly configurable. Furthermore, the switch-on time is synchronized with the spacecraft’s internal clock to give accurate start and end times of the pulses. One of the issues raised during ground testing was the susceptibility of an MXS at high voltage to ambient light. Although measures were taken to mitigate the light leak, the efficacy of those measures must be verified in orbit. Along with an overview of issues raised during ground testing, we will discuss the calibration source and the filter performance in-flight and compare with the transmission curves present in the Resolve calibration database.

X-ray Imaging and Spectroscopy Mission/Resolve↗

Cyber Resilience in the Cast Timing System

Our task within the DarkNet project was to test the cyber resiliency of the Center for Alternate Synchronization and Timing’s (CAST) framework. We focused our testing on two of the core pieces of CAST’s implementation, a Juniper MX204 router and the Precision Time Protocol (PTP). In this report, we cover the following attempted methods of attack on our targets: ping flood, fork bomb, network protocol fuzzing, ARP poisoning, and IGMP spoofing. We found that delaying certain packets, specifically Delay Request, had a significant impact on the Offset from Master and Observed Drift timing statistics.

97 MATHEMATICS AND COMPUTING↗

Efficient implementation of real-time programs under the VAX/VMS operating system

Techniques for writing efficient real-time programs under the VAX/VMS oprating system are presented. Basic operations are presented for executing at real-time priority and for avoiding needlless processing delays. A highly efficient technique for accessing physical devices by mapping to the input/output space and accessing the device registrs directly is described. To illustrate the application of the technique, examples are included of different uses of the technique on three devices in the Langley Avionics Integration Research Lab (AIRLAB): the KW11-K dual programmable real-time clock, the Parallel Communications Link (PCL11-B) communication system, and the Datacom Synchronization Network. Timing data are included to demonstrate the performance improvements realized with these applications of the technique.

Johnson, S. C.↗

Optimal space communications techniques

The design, development, and analysis are reported of a digital phase-locked loop (DPLL) for FM demodulation and threshold extension. One of the features of the developed DPLL is its synchronous, real time operation. The sampling frequency is constant and all the required arithmetic and logic operations are performed within one sampling period, generating an output sequence which is converted to analog form and filtered. An equation relating the sampling frequency to the carrier frequency must be satisfied to guarantee proper DPLL operation. The synchronous operation enables a time-shared operation of one DPLL to demodulate several FM signals simultaneously. In order to obtain information about the DPLL performance at low input signal-to-noise ratios, a model of an input noise spike was introduced, and the DPLL equation was solved using a digital computer. The spike model was successful in finding a second order DPLL which yielded a five db threshold extension beyond that of a first order DPLL.

Schilling, D. L.↗

Synchronization and fault-masking in redundant real-time systems

A real time computer may fail because of massive component failures or not responding quickly enough to satisfy real time requirements. An increase in redundancy - a conventional means of improving reliability - can improve the former but can - in some cases - degrade the latter considerably due to the overhead associated with redundancy management, namely the time delay resulting from synchronization and voting/interactive consistency techniques. The implications of synchronization and voting/interactive consistency algorithms in N-modular clusters on reliability are considered. All these studies were carried out in the context of real time applications. As a demonstrative example, we have analyzed results from experiments conducted at the NASA Airlab on the Software Implemented Fault Tolerance (SIFT) computer. This analysis has indeed indicated that in most real time applications, it is better to employ hardware synchronization instead of software synchronization and not allow reconfiguration.

Krishna, C. M.↗

Dynamic consensus and extended high gain observers as a tool to achieve practical frequency synchronization in power systems under unknown time-varying power demand

In this paper, we consider the frequency synchronization problem in a network of lossless, connected, and network-reduced power system. Frequency synchronization is an important problem in power systems as frequency deviation can lead to degraded power quality, tripping of generators, etc. We present a load-estimator-based consensus algorithm in a network of fourth-order generator models that achieves practical frequency synchronization in the presence of unknown time-varying power demand. We do not assume that the demand is generated by a known model. We follow a multiple time-scale approach for the stability analysis. It is shown that synchronization is achieved for the case of constant power demand, by showing that the system is exponentially stable. Furthermore, for the case of time-varying power demand, we show the error trajectories are ultimately bounded, and the synchronization error is proportional to an upper bound on the derivative of the time-varying power demand. We simulate the controller performance on a four area network which is equivalent to the IEEE New England 39-Bus system.

42 ENGINEERING↗

Parallel Processing of Broad-Band PPM Signals

A parallel-processing algorithm and a hardware architecture to implement the algorithm have been devised for timeslot synchronization in the reception of pulse-position-modulated (PPM) optical or radio signals. As in the cases of some prior algorithms and architectures for parallel, discrete-time, digital processing of signals other than PPM, an incoming broadband signal is divided into multiple parallel narrower-band signals by means of sub-sampling and filtering. The number of parallel streams is chosen so that the frequency content of the narrower-band signals is low enough to enable processing by relatively-low speed complementary metal oxide semiconductor (CMOS) electronic circuitry. The algorithm and architecture are intended to satisfy requirements for time-varying time-slot synchronization and post-detection filtering, with correction of timing errors independent of estimation of timing errors. They are also intended to afford flexibility for dynamic reconfiguration and upgrading. The architecture is implemented in a reconfigurable CMOS processor in the form of a field-programmable gate array. The algorithm and its hardware implementation incorporate three separate time-varying filter banks for three distinct functions: correction of sub-sample timing errors, post-detection filtering, and post-detection estimation of timing errors. The design of the filter bank for correction of timing errors, the method of estimating timing errors, and the design of a feedback-loop filter are governed by a host of parameters, the most critical one, with regard to processing very broadband signals with CMOS hardware, being the number of parallel streams (equivalently, the rate-reduction parameter).

Gray, Andrew↗