Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “telemetry systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Spacecraft systems design trade-offs for the Earth Resources Technology Satellite.

The Earth Resources Technology Satellite Program's use of flight proven hardware in the design of a satellite for earth sensor payload support and data handling is discussed. The use of an existing satellite as the building block around which additional support systems such as the orbit adjust system, the redundant wideband telemetry systems, the second regulated power system, and the quad redundant command system is analyzed. System performance seen in orbit vs design objectives are discussed to point up the success of the design approach chosen. Also discussed are the schedule and cost benefits derived from the use of previously developed hardware with additional subsystems as required to meet program requirements.

Branchflower, G. A.↗

The effects of Viterbi decoder node synchronization losses on the telemetry receiving system

The Viterbi decoders currently used by the Deep space Network (DSN) use an algorithm for maintaining node synchronization that breaks down at bit signal-to-noise ratios (SNRs) of about 2.0 dB. It is shown that this can become an important consideration when the effects of noisy carrier referencing are combined with the lower SNRs that are expected at Voyager 2 Uranus and Neptune encounters. Depending on the available carrier power, node synchronization losses of between 0.85 and 1.25 dB can be expected in addition to the radio loss.

Deutsch, L. J.↗

Aircraft lightning-induced voltage test technique developments

High voltage safety, fuels safety, simulation, and response/measurement techniques are discussed. Travelling wave transit times, return circuit conductor configurations, LC ladder network generators, and repetitive pulse techniques are also discussed. Differential conductive coaxial cable, analog fiber optic link, repetitive pulse sampled data instrumentation system, flash A/D optic link system, and an FM telemetry system are considered.

Crouch, K. E.↗

Phobos lander coding system: Software and analysis

The software developed for the decoding system used in the telemetry link of the Phobos Lander mission is described. Encoders and decoders are provided to cover the three possible telemetry configurations. The software can be used to decode actual data or to simulate the performance of the telemetry system. The theoretical properties of the codes chosen for this mission are analyzed and discussed.

Cheung, K.-M.↗

Case for Deploying Complex Systems Utilizing Commodity Components

When the International Space Station (ISS) finally reached an operational state, many of the Payload Operations and Integration Facility (POIF) hardware components were reaching end of life, COTS product costs were soaring, and the ISS budget was becoming severely constrained. However, most requirement development was complete. In addition, the ISS program is a fully functioning program with at least fifteen years of operational life remaining. Therefore it is critical that any upgrades, refurbishments, or enhancements be accomplished in realtime with minimal disruptions to service. For these and other reasons, it was necessary to ensure the viability of the POIF. Due to the to the breadth of capability of the POIF (a NASA ground station), it is believed that the lessons to be learned by other complex systems are applicable and any solutions garnered by the POIF are applicable to other complex systems as well. With that in mind, a number of new approaches have been investigated to increase the portability of the POIF and reduce the cost of refurbishment, operations, and maintenance. These new approaches were directed at the Total Cost of Ownership (TCO); not only the refurbishment but also current operational difficulties, licensing, and anticipation of the next refurbishment. Our basic premise is that technology had evolved dramatically since the concept of the POIF ground system and we should leverage our experience on this new technological landscape. Fortunately, Moore's law and market forces have changed the landscape considerably. These changes are manifest in five (5) ways that are particularly relevant to POIF: 1. Complex Instruction Set Computing (CISC) processors have advanced to unprecedented levels of compute capacity with a dramatic cost break, 2. Linux has become a major operating system supported by most vendors on a broad range of platforms, 3. Windows(TradeMark) based desktops are pervasive in the office environment, 4. Stable and affordable WindowsTM development environments and tools are available and offer a rich set of capabilities, 5. The WindowsTM 2000 provides a stable client platform, Therefore, five studies were proposed, developed, and are in the current process of deployment which dramatically reduces the cost of operations, maintenance, refurbishment, and deployment of a ground system. Restating and refining the basic premise stated earlier, it is possible to enhance operations through the replacement of hardware and software components with commodity based items wherever applicable. This will dramatically reduce the overall lifecycle cost of the project. The first study leveraged the POIF S secure, three-tier, web architecture to replace the client workstations with lower cost PC platforms. A second study initiated a review of COTS products to examine the level of added value of each product. This study included replacement of some COTS products with custom code, deletions, substitutions, and consolidation of COTS products. Studies three and four reviewed the server architectures of the data distribution systems and Enhanced HOSC System (EHS) command and telemetry system to propose migration to new platforms, both software and hardware. The final study reviewed current IP communication technologies, developed an operational model for flight operations, and demonstrated that voice over IP was practical and could be integrated into operations.

Bryant, Barry S.↗

Force Measurements in Magnetic Suspension and Balance System

The description of an infrared telemetry system for measurement of drag forces in Magnetic Suspension and Balance Systems (MSBS) is presented. This system includes a drag force sensor, electronic pack and transmitter placed in the model which is of special construction, and receiver with a microprocessor-based measuring device, placed outside of the test section. Piezosensitive resonators as sensitive elements and non-magnetic steel as the material for the force sensor are used. The main features of the proposed system for load measurements are discussed and the main characteristics are presented.

Kuzin, Alexander↗

New Los Alamos space instrument goes for a spin

Scientists and engineers at Los Alamos National Laboratory are using a unique centrifuge facility to evaluate a flight-ready telemetry system for evaluating a nuclear weapons test missile launch. "The telemetry unit was designed and manufactured by Los Alamos' Intelligence and Space Research Division," said Telemetry Program Manager Myles Fitzgerald. "Telemetry is a data stream of information on temperature, acceleration, vibration, strain, all the conditions a system encounters during a test flight." Because a test missile flight ultimately ends with the test system completely destroyed, telemetry data from the flight must be collected by receiving stations along the flight path. "The purpose of the centrifuge test is to subject the electronics to a high gravitational load (G-load) that's representative of what the system will experience when re-entering the Earth's atmosphere," said weapons test engineer Alex Cusick.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

High-Rate Digital Receiver Board

A high-rate digital receiver (HRDR) implemented as a peripheral component interface (PCI) board has been developed as a prototype of compact, general-purpose, inexpensive, potentially mass-producible data-acquisition interfaces between telemetry systems and personal computers. The installation of this board in a personal computer together with an analog preprocessor enables the computer to function as a versatile, highrate telemetry-data-acquisition and demodulator system. The prototype HRDR PCI board can handle data at rates as high as 600 megabits per second, in a variety of telemetry formats, transmitted by diverse phase-modulation schemes that include binary phase-shift keying and various forms of quadrature phaseshift keying. Costing less than $25,000 (as of year 2003), the prototype HRDR PCI board supplants multiple racks of older equipment that, when new, cost over $500,000. Just as the development of standard network-interface chips has contributed to the proliferation of networked computers, it is anticipated that the development of standard chips based on the HRDR could contribute to reductions in size and cost and increases in performance of telemetry systems.

Ghuman, Parminder↗

New Los Alamos space instrument goes for a spin

Scientists and engineers at Los Alamos National Laboratory are using a unique centrifuge facility to evaluate a flight-ready telemetry system for evaluating a nuclear weapons test missile launch. "The telemetry unit was designed and manufactured by Los Alamos' Intelligence and Space Research Division," said Telemetry Program Manager Myles Fitzgerald. "Telemetry is a data stream of information on temperature, acceleration, vibration, strain, all the conditions a system encounters during a test flight." Because a test missile flight ultimately ends with the test system completely destroyed, telemetry data from the flight must be collected by receiving stations along the flight path. "The purpose of the centrifuge test is to subject the electronics to a high gravitational load (G-load) that's representative of what the system will experience when re-entering the Earth's atmosphere," said weapons test engineer Alex Cusick.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Design of a Solar Sail Mission to Mars

An evaluation of the design of the solar sail includes key areas such as structures, sail deployment, space environmental effects, materials, power systems, telemetry, communications, attitude control, thermal control, and trajectory analysis. Deployment and material constraints determine the basic structure of the sail, while the trajectory of the sail influences the choice of telemetry, communications, and attitude control systems. The thermal control system of the sail for the structures and electronics takes into account the effects of the space environment. Included also are a cost and weight estimate for the sail.

Eastridge, Richard↗

Payload accommodations: Avionics payload support architecture

Technology issues/trade studies; candidate programs; key contacts/facilities: milestones; accomplishments; and major objectives of the payload accommodation are outlined. Topics covered include: avionics payload support architecture; satellite serving; P/L deploy systems and advanced manipulators; advanced telemetry systems; and on-board abort planning. This presentation is represented by viewgraphs only.

Source record↗

UWB Two-Cluster AOA Tracking Prototype System Design

This presentation discusses a design effort for a prototype ultra-wideband (UWB) tracking system that is currently under development at NASA Johnson Space Center (JSC). The system is being studied for use in tracking of lunar/Mars rovers during early exploration missions when satellite navigation systems are not available. The UWB technology is exploited to implement the tracking system due to its properties such as fine time resolution, low power spectral density and multipath immunity. A two cluster prototype design using commercially available UWB radios is employed to implement the Angle of Arrival (AOA) tracking methodology in this design effort. In order to increase the tracking range, low noise amplifiers (LNA) and high gain horns are used at the receiving sides. Field tests were conducted jointly with the Science and Crew Operation Utility Testbed (SCOUT) vehicle near the Meteor Crater in Arizona to test the tracking capability for a moving target in an operational environment. These tests demonstrate that the UWB tracking system can co-exist with other on-board radio frequency (RF) communication systems (such as Global Positioning System (GPS), video, voice and telemetry systems), and that a tracking resolution less than 1% of the range can be achieved.

Ngo, Phong H.↗

Telemetry Design

The basic telemetry-system concept for Explorer XI11 was selected primarily on the basis of demonstrated performance (ref. IV-1). The successful orbiting of Vanguard I1 (1939 Alpha) and Vanguard I11 (1959 Eta) had proven the basic design of the tracking and telemetry concepts which were compatible with mini- track network. It was necessary for the NASA Langley Research Center (LRC) to expand the system to provide a 48-channel telemetry system. Two of these sys- tems were used in the Explorer XI11 in order to provide the required channel capacity.

TELEMETRY↗

System for Configuring Modular Telemetry Transponders

A system for configuring telemetry transponder cards uses a database of error checking protocol data structures, each containing data to implement at least one CCSDS protocol algorithm. Using a user interface, a user selects at least one telemetry specific error checking protocol from the database. A compiler configures an FPGA with the data from the data structures to implement the error checking protocol.

Varnavas, Kosta A.↗