Robust error calibration for serial crystallography
See `README.md` for more information.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
See `README.md` for more information.
Please check the README file for more details about the data
XFEL diffraction frames from batch-crystallized Soybean Lipoxygenase-1 (SLO-1), revealing two crystal polymorphs arising from differential hydration during sample delivery
CH4ESE is an EXI conversion tool developed in Python3 that utilizes the open-source EXIficient implementation of the W3C EXI format specification. CH4ESE can be used to translate to and from EXI format using the command line with input data or using the web server for live-translation.
The Reconfigurable Modular Manipulator System (RMMS) consists of modular links and joints that can be assembled into many manipulator configurations. This capability allows the RMMS to be rapidly reconfigured to custom tailor it to specific tasks. An important issue related to the RMMS is the determination of the optimal manipulator configuration for a specific task. This article addresses the problem of mapping kinematic task specifications into a kinematic manipulator configuration. For the design of two-degrees-of-freedom (2- DOF) planar manipulators, an analytical solution is derived. Because analytical solutions become impractical for problems with more than two design parameters, we have also developed a numerical approach for the design of 6-DOF manipulators. The numerical procedure determines the Denavit-Hartenberg (D-H) parameters of a nonredundant manipulator with joint limits that can reach a set of specified positions/orientations in an environment that may include parallelepiped-shaped obstacles. Finally, this approach is demonstrated with a three- dimensional example for a 6-DOF manipulator.
Baseline mapping in the two major population centers of Kiribati showed that trachoma was a public health problem in need of programmatic interventions. After conducting two annual rounds of antibiotic mass drug administration (MDA), Kiribati undertook trachoma impact surveys in 2019, using standardized two-stage cluster surveys in the evaluation units of Kiritimati Island and Tarawa. In Kiritimati, 516 households were visited and in Tarawa, 772 households were visited. Nearly all households had a drinking water source and access to an improved latrine. The prevalence of trachomatous trichiasis remained above the elimination threshold (0.2% in ≥15-year-olds) and was virtually unchanged from baseline. The prevalence of trachomatous inflammation—follicular (TF) in 1–9-year-olds decreased by approximately 40% from baseline in both evaluation units but remained above the 5% TF prevalence threshold for stopping MDA. TF prevalence at impact survey was 11.5% in Kiritimati and 17.9% in Tarawa. Infection prevalence in 1–9-year-olds by PCR was 0.96% in Kiritimati and 3.3% in Tarawa. Using a multiplex bead assay to measure antibodies to the C. trachomatis antigen Pgp3, seroprevalence in 1–9-year-olds was 30.2% in Kiritimati and 31.4% in Tarawa. The seroconversion rate, in seroconversion events/100 children/year, was 9.0 in Kiritimati and 9.2 in Tarawa. Seroprevalence and seroconversion rates were both assessed by four different assays, with strong agreement between tests. These results show that, despite decreases in indicators associated with infection at impact survey, trachoma remains a public health problem in Kiribati, and provide additional information about changes in serological indicators after MDA.
This report discusses the process used to prove in the SRNL-Rev.2 coulometer for isotopic data analysis used in the special plutonium material project. In May of 2012, the PAR 173 coulometer system that had been the workhorse of the Plutonium Assay team since the early 1970s became inoperable. A new coulometer system had been purchased from Savannah River National Laboratory (SRNL) and installed in August of 2011.
In August of 2011, C-AAC successfully installed a new coulometer. This system was only the third ever built of a newly redesigned system that SRNL had completed. The other two new systems reside at the IAEA in Vienna and at SRNL in South Carolina. The new system will replace an old PAR173 system that had been the workhorse of the Plutonium Assay team since the early 1970s. This 40+ year old system was not computer compatible and no longer had available spare parts. Upon the request of the IAEA and C-AAC personnel, the SRNL team undertook a project to modernize their systems and completely revamped the electronics and data acquisition system of their coulometry models (designed and built in the early 1990’s) by combining all electronics on a single, multilayer printed circuit board with individual isolated ground and power planes.
This report documents the initial testing of the subject IdentiFinder 2. The testing was performed by Philip Hypes, Scientist 3, at technical area 35 of Los Alamos National Laboratory on 14 May 2014. It appeared that these tests constituted the first use of the instrument, as the software asked for verification of the date/time immediately after the instrument was turned on. Except for the final self-calibration (noted below), all of the testing was performed with the instrument attached to AC power, as the battery was not charged.
This report documents the initial testing of the subject IdentiFinder 2. The testing was performed by Philip Hypes, Scientist 3, at technical area 35 of Los Alamos National Laboratory on 14 May 2014. It appeared that these tests constituted the first use of the instrument, as the software asked for verification of the date/time immediately after the instrument was turned on. Except for the final self-calibration (noted below), all of the testing was performed with the instrument attached to AC power, as the battery was not charged.
A team of engineers and contractors has developed a method to move offshore wind installation toward lower cost, faster deployment, and lower environmental impact. A combination of methods, some incremental and some breaks from past practice, interact to yield multiple improvements. Three designs were evaluated based on detailed engineering: 1) a 5 MW turbine on a jacket with pin piles (base case), 2) a 10 MW turbine on a conventional jacket with pin piles, assembled at sea, and 3) a 10 MW turbine on tripod jacket with suction buckets (caissons) and with complete turbine assembly on-shore. The larger turbine, assembly ashore, and the use of suction buckets together substantially reduce capital cost of offshore wind projects. Notable capital cost reductions are: changing from 5 MW to 10 MW turbine, a 31% capital cost reduction, and assembly on land then single-piece install at sea an additional 9% capital cost reduction. An estimated Design 4) estimates further cost reduction when equipment and processes of Design 3) are optimized, rather than adapted to existing equipment and process. Cost of energy for each of the four Designs are also calculated, yielding approximately the same percentage reductions. The methods of Design 3) analyzed here include accepted structures such as suction buckets used in new ways, innovations conceived but previously without engineering and economic validation, combined with new methods not previously proposed. Analysis of Designs 2) and 3) are based on extensive engineering calculations and detailed cost estimates. All design methods can be done with existing equipment, including lift equipment, ports and ships (except that design 4 assumes a more optimized ship). The design team consists of experienced offshore structure designers, heavy lift engineers, wind turbine designers, vessel operators, and marine construction contractors. Comparing the methods based on criteria of cost and deployment speed, the study selected the third design. That design is, in brief: a conventional turbine and tubular tower is mounted on a tripod jacket, in turn atop three suction buckets. Blades are mounted on the tower, not on the hub. The entire structure is built in port, from the bottom up, then assembled structures are queued in the port for deployment. During weather windows, the fully-assembled structures are lifted off the quay, lashed to the vessel, and transported to the deployment site. The vessel analyzed is a shear leg crane vessel with dynamic positioning like the existing Gulliver, or it could be a US-built crane barge. On site, the entire structure is lowered to the bottom by the crane vessel, then pumping of the suction buckets is managed by smaller service vessels. Blades are lifted into place by small winches operated by workers in the nacelle without lift vessel support. Advantages of the selected design include: cost and time at sea of the expensive lift vessel are significantly reduced; no jack up vessel is required; the weather window required for each installation is shorter; turbine structure construction is continuous with a queue feeding the weather-dependent installation process; pre-installation geotechnical work is faster and less expensive; there are no sound impacts on marine mammals, thus minimal spotting and no work stoppage Industrializing Offshore Wind Power 6 of 96 9 for mammal passage; the entire structure can be removed for decommissioning or major repairs; the method has been validated for current turbines up to 10 MW, and a calculation using simple scaling shows it usable up to 20 MW turbines.
Abstract not provided.
Abstract not provided.
An Alum-A-Lift A800CSPD-60 (Lift) was procured to support mechanical testing of programmatic equipment. This testing will take place within the Bldg. 131 Hi Bay. The design of the Lift procured for the purposes at LLNL was a modification of a machine that had previously been engineered and sold by Alum-a-Lift, see Fig. 1. The modification was to shorten the boom from a 56 in. length to a 28 in. length. The modified design is illustrated in Fig. 2. The Lift was fabricated and shipped to LLNL, received ~ June 2022. Upon arrival, it was successfully evaluated for “no-load” performance capability. Upon inspection of the documentation provided by Alum-a-Lift, it was noted that the load test was performed to qualify the machine for a lifting capacity of 200 lb. The LLNL requirement was that the capacity of the machine be 400 lb. Conversations with the vendor, Alum-A-Lift, followed this discovery. Rather than send the machine back to the vendor for load testing, discussions concurred that LLNL would load test the machine and Alum-A-Lift would provide the relevant load test placard to be placed on the machine subsequent to the successful load test. This MESN provides documentation of the load test to qualify the Alum-a-Lift to its’ rated capacity of 400 lb.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.