Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Appalachian Basin Play Fairway Analysis Thermal Risk Factor and Quality Analyses

*This submission revises the analysis and products for Thermal Quality Analysis for the northern half of the Appalachian Basin (https://gdr.openei.org/submissions/638)* This submission is one of five major parts of a Low Temperature Geothermal Play Fairway Analysis. Phase 1 of the project identified potential Geothermal Play Fairways within the Appalachian basin of Pennsylvania, West Virginia and New York. This submission includes a subset of the necessary shapefiles, rasters, datasets, code, and references to code repositories that were used to create the thermal resource and risk factor maps as part of the project. This subset is those contents that were improved upon during calendar year 2016. Figures are provided as examples of some shapefiles and rasters. See also: Final Report: Low Temperature Geothermal Play Fairway Analysis for the Appalachian Basin (https://gdr.openei.org/submissions/899). The 2015 data submission should be visited to obtain: 1) the regional standardized 1 square km grid used in the project as points (cell centers), polygons, and as a raster, 2) the raw well data for the state well temperature databases, 3) the COSUNA section shapefile and formation thermal conductivities by state as *.xlsx files, 4) the sediment thickness map and 30 m Digital Elevation Model for the Appalachian Basin as GeoTIFF raster files, 5) the BHT correction sections shapefile and drilling fluid databases as *.csv files, 6) the unbuffered interpolation regions as shapefiles, 7) several 50 km buffered interpolation regions as shapefiles, 8) several gridded interpolation regions as raster files, 9) an R script for organizing the thermal data and running the local spatial outlier analysis, 10) shapefiles and rasters for the prediction, uncertainty, and cross validation of the temperature at 1.5 km, 2.5 km, and 3.5 km depth, 11) shapefiles and rasters for the prediction, uncertainty, and cross validation depth to 100 degrees C, 12) an ArcGIS toolbox for thermal risk factor models, 13) an ArcGIS model for extracting results specific to each county of interest, 14) thermal resource cross section plots, 15) the geothermal Play Fairways.

15 GEOTHERMAL ENERGY↗

Milestone Report for MS8: Extend Quantitative Brine and CO 2 Leakage Calculations

This report summarizes results of the risk analysis and characterization of CO 2 and brine leakage potential of Farnsworth Unit (FWU) wells. U.S. DOE’s National Risk Assessment Partnership (NRAP) program works on quantitatively assess long-term environmental risks amidst significant geologic uncertainty and variability. NRAP risk assessment and computational tools are developed to quantify uncertainties and calculate risk associated with geologic sequestration of carbon dioxide (CO 2 ). For this study, we have developed a workflow from University of Utah’s physics-based reservoir simulators to performing leakage calculations using NRAP Tools. NRAP tools (NRAP-IAM-CS, RROM-Gen) are used to conduct leakage risk analysis based on Eclipse simulation results, and characterize wellbore leakage at the Farnworth Site. This report summarizes results of the risk analysis and characterization of CO 2 and brine leakage potential of Farnsworth Unit (FWU) wells.

54 ENVIRONMENTAL SCIENCES↗

NASA's Understanding of Risk in Apollo and Shuttle

Mathematical risk analysis was used in Apollo, but it gave unacceptably pessimistic resultsand was discontinued. Shuttle was designed without using risk analysis, under the assumptionthat good engineering would make it very safe. This approach led to an unnecessarily riskydesign, which directly led to the Shuttle tragedies. Although the Challenger disaster wasdirectly due to a mistaken launch decision, it might have been avoided by a safer design. Theultimate cause of the Shuttle tragedies was the Apollo era decision to abandon risk analysis.

Jones, Harry W.↗

Failure Analysis–Informed Risk Assessment Framework for Geological Carbon Storage Using Numerical Simulation and Machine Learning

Geological carbon storage (GCS) is recognized as a critical technology for achieving large-scale reductions in anthropogenic carbon dioxide (CO 2 ) emissions. Ensuring long-term containment and safety requires robust risk assessment frameworks that account for geological uncertainty and identify potential failure scenarios. Among various indicators, the area of review (AoR) serves as a key metric for evaluating storage performance, regulatory compliance, and monitoring design, as it delineates the spatial extent impacted by pressure buildup and plume migration. However, conventional AoR-based risk assessments typically perturb parameters within narrow uncertainty bounds, potentially overlooking rare but high-impact events arising from extreme geological conditions. In this study, we present a failure analysis–informed risk assessment framework for large-scale GCS projects to improve site prescreening and monitoring design. A suite of 300 numerical simulations was generated using stochastic geological models that vary five key parameters: net-to-gross ratio, anisotropy azimuth, porosity multiplier, permeability multiplier, and vertical-to-horizontal permeability ratio. Among these, 200 realizations represent normal geological uncertainty, while 100 additional cases explore extreme yet plausible conditions for failure-case analysis. The AoR was simulated and computed from pressure and CO 2 saturation fields, where the baseline AoR boundary, representing the extent predicted under typical geological uncertainty, was defined as the union of 200 normal-range simulations, and failure was identified when extreme-range cases exceeded this baseline. Results show that incorporating broader parameter uncertainty produces significantly larger AoR extents, underscoring the potential underestimation of risk under conventional uncertainty ranges. Furthermore, spatial probability maps derived from failure-induced AoR exceedance identify regions requiring enhanced monitoring attention. Various machine learning (ML)–based classifiers were developed to predict failure occurrence from geological parameters, with the random forest model achieving the highest performance (F1-score of 0.986). Consistent findings from correlation coefficient, feature importance, and Sobol sensitivity analyses reveal that low net-to-gross ratios and permeability multipliers are the dominant risk drivers, reflecting reduced reservoir connectivity and limited pressure dissipation. Altogether, these results provide a novel framework for risk-informed site prescreening and monitoring design that explicitly considers rare but high-impact geological scenarios in GCS projects.

25 ENERGY STORAGE↗

Constraint-Based Routing Models for the Transport of Radioactive Materials

The Department of Energy (DOE) has a historic programmatic interest in the safe and secure routing, tracking, and transportation risk analysis of radiological materials in the United States. In order to address these program goals, DOE has funded the development of several tools and related systems designed to provide insight to planners and other professionals handling radioactive materials shipments. These systems include the WebTRAGIS (Transportation Routing Analysis Geographic Information System) platform. WebTRAGIS is a browser-based routing application developed at Oak Ridge National Laboratory (ORNL) focused primarily on the safe transport of spent nuclear fuel from US nuclear reactors via railway, highway, or waterway. It is also used for the transport planning of low-level radiological waste to depositories such as the Waste Isolation Pilot Plant (WIPP) facility. One particular feature of WebTRAGIS is its coupling with high-resolution population data from ORNL s LandScan project. This allows users to obtain highly accurate population count and density information for use in route planning and risk analysis. To perform the routing and risk analysis WebTRAGIS incorporates a basic routing model methodology, with the additional application of various constraints designed to mimic US Department of Transportation (DOT), DOE, and Nuclear Regulatory Commission (NRC) regulations. Aside from the routing models available in WebTRAGIS, the system relies on detailed or specialized modal networks for the route solutions. These include a highly detailed network model of the US railroad system, the inland and coastal waterways, and a specialized highway network that focuses on the US interstate system and the designated hazardous materials and Highway Route Controlled Quantity (HRCQ) -designated roadways. The route constraints in WebTRAGIS rely upon a series of attributes assigned to the various components of the different modal networks. Routes are determined via a constrained shortest-path Dijkstra algorithm that has an assigned impedance factor. The route constraints modify the various impedance weights to bias or prefer particular network characteristics as desired by the user. Both the basic route model and the constrained impedance function calculations are determined by a series of network characteristics and shipment types. The study examines solutions under various constraints modeled by WebTRAGIS including possible routes from select shut-down reactor sites in the US to specific locations in the US. For purposes of illustration, the designated destinations are Oak Ridge National Laboratory in Tennessee and the Savannah River Site in South Carolina. To the degree that routes express sameness or variety under constraints serves to illustrate either a) the determinism of particular transport modes by either configuration or regulatory compliance, and/or b) the variety of constrained routes that are regulation compliant but may not be operationally feasible.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conceptual Launch Vehicle and Spacecraft Design for Risk Assessment

One of the most challenging aspects of developing human space launch and exploration systems is minimizing and mitigating the many potential risk factors to ensure the safest possible design while also meeting the required cost, weight, and performance criteria. In order to accomplish this, effective risk analyses and trade studies are needed to identify key risk drivers, dependencies, and sensitivities as the design evolves. The Engineering Risk Assessment (ERA) team at NASA Ames Research Center (ARC) develops advanced risk analysis approaches, models, and tools to provide such meaningful risk and reliability data throughout vehicle development. The goal of the project presented in this memorandum is to design a generic launch 7 vehicle and spacecraft architecture that can be used to develop and demonstrate these new risk analysis techniques without relying on other proprietary or sensitive vehicle designs. To accomplish this, initial spacecraft and launch vehicle (LV) designs were established using historical sizing relationships for a mission delivering four crewmembers and equipment to the International Space Station (ISS). Mass-estimating relationships (MERs) were used to size the crew capsule and launch vehicle, and a combination of optimization techniques and iterative design processes were employed to determine a possible two-stage-to-orbit (TSTO) launch trajectory into a 350-kilometer orbit. Primary subsystems were also designed for the crewed capsule architecture, based on a 24-hour on-orbit mission with a 7-day contingency. Safety analysis was also performed to identify major risks to crew survivability and assess the system's overall reliability. These procedures and analyses validate that the architecture's basic design and performance are reasonable to be used for risk trade studies. While the vehicle designs presented are not intended to represent a viable architecture, they will provide a valuable initial platform for developing and demonstrating innovative risk assessment capabilities.

Launch Vehicle↗

Risk-Informed Analysis for Enhanced Resilient Nuclear Power Plant with Initiatives including ATF, FLEX, and Advanced Battery Technology

This report documents the activities performed by the Idaho National Laboratory (INL) during fiscal year (FY) 2021 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk-Informed Systems Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. The purpose of the RISA Pathway research and development is to support plant owner-operator decisions with the aim to improve the economics, reliability, and maintain the high levels of safety of current nuclear power plants over periods of extended plant operations. The concept of ERP refers to the combinations of accident-tolerant fuel (ATF), optimal use of diverse and flexible coping strategy (FLEX), enhancements to plant components and systems, the incorporation of augmented or new passive cooling systems, the advanced battery technology with extended capacity, as well as improved fuel cycle efficiency. The objective of the ERP research effort is to use the RISA methods and toolkit in industry applications, including methods development and early demonstration of technologies, in order to enhance existing reactors? safety features and to substantially reduce operating costs through risk-informed approaches to plant design modifications to the plant and their characterization. The ERP R&D efforts in FY 2021 are focused on three industry initiatives, including accident-tolerant fuel (ATF), optimal use of diverse and flexible coping strategy (FLEX), and advanced battery technology with extended capacity.

99 GENERAL AND MISCELLANEOUS↗

Robotic Mars Sample Return: Risk Assessment and Analysis Report

A comparison of the risk associated with two alternative scenarios for a robotic Mars sample return mission was conducted. Two alternative mission scenarios were identified, the Jet Propulsion Lab (JPL) reference Mission and a mission proposed by Johnson Space Center (JSC). The JPL mission was characterized by two landers and an orbiter, and a Mars orbit rendezvous to retrieve the samples. The JSC mission (Direct/SEP) involves a solar electric propulsion (SEP) return to earth followed by a rendezvous with the space shuttle in earth orbit. A qualitative risk assessment to identify and characterize the risks, and a risk analysis to quantify the risks were conducted on these missions. Technical descriptions of the competing scenarios were developed in conjunction with NASA engineers and the sequence of events for each candidate mission was developed. Risk distributions associated with individual and combinations of events were consolidated using event tree analysis in conjunction with Monte Carlo techniques to develop probabilities of mission success for each of the various alternatives. The results were the probability of success of various end states for each candidate scenario. These end states ranged from complete success through various levels of partial success to complete failure. Overall probability of success for the Direct/SEP mission was determined to be 66% for the return of at least one sample and 58% for the JPL mission for the return of at least one sample cache. Values were also determined for intermediate events and end states as well as for the probability of violation of planetary protection. Overall mission planetary protection event probabilities of occurrence were determined to be 0.002% and 1.3% for the Direct/SEP and JPL Reference missions respectively.

Lalk, Thomas R.↗

Evaluation of Hybrid FPOG Applications in Regulated and Deregulated Markets Using HERON

Recent changes in the U.S. energy market, such as low natural gas prices and increased electricity production for variable renewable energy (VRE) sources, have led to an economic crisis for existing light-water reactor (LWR) nuclear power plants (NPP). Many owners and operators of LWRs have elected to decommission these plants rather than continue using them as consistent sources of clean baseload power. This has led to exploration of various possibilities to increase the economic viability of these units, including market restructuring to monetize benefits LWRs already provide to the grid through ancillary markets, load following and economic dispatch, and possible integration of secondary systems directly to the NPP for production of additional products through technologies such as hydrogen electrolysis or water desalination. Previous studies have considered the technologies associated with these Integrated Energy Systems (IES) activities, and the analysis of markets for these secondary products. To analyze the economic viability of various system configurations including IES, especially given the uncertainty surrounding load demand, electricity prices, and the availability of VRE resources, the stochastic technoeconomic analysis package HERON (Heuristic Energy Resource Optimization Network) was released earlier this year as an extension of the risk analysis framework RAVEN (Risk Analysis Virtual Environment). HERON focuses foremost on making the complex uncertainty quantification analysis tools approachable for energy systems analysts, also providing general dispatch optimization algorithms for those workflows. HERON continues to be improved and tested as a significant part of the IES viability analyses performed in this work. HERON is not a capacity expansion model. To consider market and grid energy system development in a variety of scenarios, HERON is best used in coupling with modelling tools such as US-REGEN, which sacrifice some of the uncertainty analysis and resolution of HERON's modelling for the ability to efficiently predict the change in the grid energy system's profile due to economic drivers over decades. HERON can then use this information to explore the economic viability of introducing changes to the predicted outcomes, such as the introduction of an IES. In this work, experts at EPRI using US-REGEN provide six projection scenarios for use in HERON stochastic technoeconomic analysis (STEA) in considering the options available for increasing LWR economic viability through introduction of a hydrogen-centric IES using a high-temperature steam electrolysis plant (HTSE), hydrogen storage, and a constant-rate contracted hydrogen consumer. The results obtained are differential in nature; they do not report expected profits for any configuration, but rather report on the possible increase in the NPV of a configuration with respect to a baseline no-IES configuration. Due to the uncertainty captured in the variable net load of the systems, there is likewise uncertainty in the mean values reported. We consider this viability both in terms of a regulated market, where the energy producers and IES are owned and operated by single entity, as well as a deregulated market, where the IES chooses its bid for electricity generation and is then dispatched by the grid system operator. Results indicate that for deregulated markets, the inclusion of the IES is often statistically beneficial. This is especially true in policies that are not favorable towards nuclear, as nuclear is less often dispatched and is forced to deal with frequent idle capacity. In the nominal case as well as the case of carbon tax policies, inclusion of the IES clearly benefited the economic performance of the NPP. In the regulated case, however, there was a trend towards minimizing the IES, likely due to the optimal sizing performed by US-REGEN of the NPP within the system as well as the lack of penalty for idle capacity at the NPP in the regulated market analyses.

99 GENERAL AND MISCELLANEOUS↗

Carbon Capture Simulation Initiative: A Case Study in Multi-Scale Modeling and New Challenges

Abstract: Advanced multi-scale modeling and simulation has the potential to dramatically reduce development time, resulting in considerable cost savings. The Carbon Capture Simulation Initiative is a partnership among national laboratories, industry and universities that is developing and deploying a suite of multi-scale modeling and simulation tools including basic data submodels, steady-state and dynamic process models, process optimization and uncertainty quantification tools, an advanced dynamic process control framework, high-resolution filtered computational-fluid-dynamic (CFD) submodels, validated high-fidelity device-scale CFD models with quantified uncertainty, and a risk analysis framework. These tools and models enable basic data submodels, including thermodynamics and kinetics, to be used within detailed process models to synthesize and optimize a process. The resulting process informs the development of process control systems and more detailed simulations of potential equipment to improve the design and reduce scale-up risk. Quantification and propagation of uncertainty across scales is an essential part of these tools and models.

42 ENGINEERING↗

Coupling RAVEN to SAPHIRE for Performing Time Dependent Probabilistic Risk Assessment

Cost Risk Analysis Framework Tool (CRAFT) was recently developed by Idaho National Laboratory (INL) to perform economical risk analysis by combining physics, risk and cost information of components in a Nuclear Power Plant (NPP) that can be quickly deployable through the nuclear industry to evaluate the risk associated to capital projects and asset management [1]. In this framework, RAVEN is coupled with SAPHIRE to perform the time dependent risk/safety assessment of NPPs. Traditionally, the risk associated to the NPPs can be determined by classical Probabilistic Risk Assessment (PRA) tools, such as SAPHIRE, under the assumption that all failure rates are constant over time. In some circumstances, however, the assumption is rendered invalid since that the failure rate of a component may gradually change in a systematic way, for example, because of aging and degradation. In addition, recent data analysis in [2] has suggested decreasing values of failure rates for several important components of NPPs. A PRA that includes these components should employ the time-dependent failure rates in order to accurately estimate the risk at any given time. This time-dependent PRA is achieved by the coupling between RAVEN and SAPHIRE.

42 ENGINEERING↗

Coupling RAVEN to SAPHIRE for Performing Time Dependent Probabilistic Risk Assessment

Cost Risk Analysis Framework Tool (CRAFT) was recently developed by Idaho National Laboratory (INL) to perform economical risk analysis by combining physics, risk and cost information of components in a Nuclear Power Plant (NPP) that can be quickly deployable through the nuclear industry to evaluate the risk associated to capital projects and asset management [1]. In this framework, RAVEN is coupled with SAPHIRE to perform the time dependent risk/safety assessment of NPPs. Traditionally, the risk associated to the NPPs can be determined by classical Probabilistic Risk Assessment (PRA) tools, such as SAPHIRE, under the assumption that all failure rates are constant over time. In some circumstances, however, the assumption is rendered invalid since that the failure rate of a component may gradually change in a systematic way, for example, because of aging and degradation. In addition, recent data analysis in [2] has suggested decreasing values of failure rates for several important components of NPPs. A PRA that includes these components should employ the time-dependent failure rates in order to accurately estimate the risk at any given time. This time-dependent PRA is achieved by the coupling between RAVEN and SAPHIRE.

42 ENGINEERING↗

Public Risk Assessment Program

The Public Entry Risk Assessment (PERA) program addresses risk to the public from shuttle or other spacecraft re-entry trajectories. Managing public risk to acceptable levels is a major component of safe spacecraft operation. PERA is given scenario inputs of vehicle trajectory, probability of failure along that trajectory, the resulting debris characteristics, and field size and distribution, and returns risk metrics that quantify the individual and collective risk posed by that scenario. Due to the large volume of data required to perform such a risk analysis, PERA was designed to streamline the analysis process by using innovative mathematical analysis of the risk assessment equations. Real-time analysis in the event of a shuttle contingency operation, such as damage to the Orbiter, is possible because PERA allows for a change to the probability of failure models, therefore providing a much quicker estimation of public risk. PERA also provides the ability to generate movie files showing how the entry risk changes as the entry develops. PERA was designed to streamline the computation of the enormous amounts of data needed for this type of risk assessment by using an average distribution of debris on the ground, rather than pinpointing the impact point of every piece of debris. This has reduced the amount of computational time significantly without reducing the accuracy of the results. PERA was written in MATLAB; a compiled version can run from a DOS or UNIX prompt.

Mendeck, Gavin↗

Program Promotion Can Distort Space Systems Engineering and Deny Risk

NASA's spectacular success in the Apollo moon landings was achieved against the odds by an obsessive dedication to reducing the great risk. But risk analysis predicted so many astronaut fatalities that it was thought to be unreasonably pessimistic and potentially damaging to the Apollo program. Risk analysis was discontinued, risk was neglected in space shuttle engineering, and so the space shuttle design was unnecessarily dangerous. Since the Apollo era it has been understood that long human space missions would recycle oxygen and water to avoid the very high launch cost of directly supplying them. The development of recycling systems was justified by the need to increase material closure and reduce launch mass. When it was recognized that increasing closure leads to rapidly diminishing returns, the program goal was changed to reducing launch mass and reliability, cost, and risk were considered irrelevant. Systems engineering and especially the discouraging problems of risk and cost have been deliberately ignored because they detract from program promotion, with unfortunate results. Current human launch system design does account for risk and the result strongly resembles Apollo. Current life support design continues to assume recycling, even though the recent great reduction in launch cost now allows direct supply of oxygen and water with significantly better quality, reliability, cost, and risk.

Advocacy↗

Risk-based analysis and decision making in multi-disciplinary environments

A risk-based decision-making process conceived of and developed at JPL and NASA, has been used to help plan and guide novel technology applications for use on spacecraft. These applications exemplify key challenges inherent in multi-disciplinary design of novel technologies deployed in mission-critical settings. 1) Cross-disciplinary concerns are numerous (e.g., spacecraft involve navigation, propulsion, telecommunications). These concems are cross-coupled and interact in multiple ways (e.g., electromagnetic interference, heat transfer). 2) Time and budget pressures constrain development, operational resources constrain the resulting system (e.g., mass, volume, power). 3) Spacecraft are critical systems that must operate correctly the first time in only partially understood environments, with no chance for repair. 4) Past experience provides only a partial guide: New mission concepts are enhanced and enabled by new technologies, for which past experience is lacking. The decision-making process rests on quantitative assessments of the relationships between three classes of information - objectives (the things the system is to accomplish and constraints on its operation and development), risks (whose occurrence detracts from objectives), and mitigations (options for reducing the likelihood and or severity of risks). The process successfully guides experts to pool their knowledge, using custom-built software to support information gathering and decision-making.

technology↗

Bridging the Engineering and Medicine Gap

A primary challenge NASA faces is communication between the disparate entities of engineers and human system experts in life sciences. Clear communication is critical for exploration mission success from the perspective of both risk analysis and data handling. The engineering community uses probabilistic risk assessment (PRA) models to inform their own risk analysis and has extensive experience managing mission data, but does not always fully consider human systems integration (HSI). The medical community, as a part of HSI, has been working 1) to develop a suite of tools to express medical risk in quantitative terms that are relatable to the engineering approaches commonly in use, and 2) to manage and integrate HSI data with engineering data. This talk will review the development of the Integrated Medical Model as an early attempt to bridge the communication gap between the medical and engineering communities in the language of PRA. This will also address data communication between the two entities in the context of data management considerations of the Medical Data Architecture. Lessons learned from these processes will help identify important elements to consider in future communication and integration of these two groups.

Walton, M.↗

Systems Safety Evaluation Based on System Thinking

Every engineer knows well and always considers about 'The local optimization makes the entire worst', and therefore well balanced design is required. Even the total safety has been assured by the safety design based on defense in depth concept, operational problem would occur by the chain of the fallacy of the defense in depth, then safety culture degradation, and finely organizational accident eventually happened. Probabilistic approach is required to the problem. We should answer to the question 'Safety Goal: How safe is safe enough?' for public acceptance. To respond to the operational problem and safety goal question, PRA, Probabilistic Risk Analysis is required. Further, Risk Communication should include comparison and selection among technical systems by risk and benefit analysis. Therefore, systems safety consideration is important based on systems thinking with considering following characteristics: - Goal-oriented- Optimization, Alternative proposals; - Global perspective- Bird's Eye; - Hierarchy- Isomorphism; - Life Cycle: Plan-Design-Construction-Use-Disposal; - Learning and Evolution. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Conversion of Questionnaire Data

During the survey, respondents are asked to provide qualitative answers (well, adequate, needs improvement) on how well material control and accountability (MC&A) functions are being performed. These responses can be used to develop failure probabilities for basic events performed during routine operation of the MC&A systems. The failure frequencies for individual events may be used to estimate total system effectiveness using a fault tree in a probabilistic risk analysis (PRA). Numeric risk values are required for the PRA fault tree calculations that are performed to evaluate system effectiveness. So, the performance ratings in the questionnaire must be converted to relative risk values for all of the basic MC&A tasks performed in the facility. If a specific material protection, control, and accountability (MPC&A) task is being performed at the 'perfect' level, the task is considered to have a near zero risk of failure. If the task is performed at a less than perfect level, the deficiency in performance represents some risk of failure for the event. As the degree of deficiency in performance increases, the risk of failure increases. If a task that should be performed is not being performed, that task is in a state of failure. The failure probabilities of all basic events contribute to the total system risk. Conversion of questionnaire MPC&A system performance data to numeric values is a separate function from the process of completing the questionnaire. When specific questions in the questionnaire are answered, the focus is on correctly assessing and reporting, in an adjectival manner, the actual performance of the related MC&A function. Prior to conversion, consideration should not be given to the numeric value that will be assigned during the conversion process. In the conversion process, adjectival responses to questions on system performance are quantified based on a log normal scale typically used in human error analysis (see A.D. Swain and H.E. Guttmann, 'Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications,' NUREG/CR-1278). This conversion produces the basic event risk of failure values required for the fault tree calculations. The fault tree is a deductive logic structure that corresponds to the operational nuclear MC&A system at a nuclear facility. The conventional Delphi process is a time-honored approach commonly used in the risk assessment field to extract numerical values for the failure rates of actions or activities when statistically significant data is absent.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗