Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reliability testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Using Facility Condition Assessments to Identify Actions Related to Infrastructure

To support cost effective, quality research it is essential that laboratory and testing facilities are maintained in a continuous and reliable state of availability at all times. NASA Langley Research Center (LaRC) and its maintenance contractor, Jacobs Technology, Inc. Research Operations, Maintenance, and Engineering (ROME) group, are in the process of implementing a combined Facility Condition Assessment (FCA) and Reliability Centered Maintenance (RCM) program to improve asset management and overall reliability of testing equipment in facilities such as wind tunnels. Specific areas are being identified for improvement, the deferred maintenance cost is being estimated, and priority is being assigned against facilities where conditions have been allowed to deteriorate. This assessment serves to assist in determining where to commit available funds on the Center. RCM methodologies are being reviewed and enhanced to assure that appropriate preventive, predictive, and facilities/equipment acceptance techniques are incorporated to prolong lifecycle availability and assure reliability at minimum cost. The results from the program have been favorable, better enabling LaRC to manage assets prudently.

Rubert, Kennedy F.↗

Hybrid Tandem Photovoltaics

Tandem solar cell structures are the only strategy demonstrated to surpass the detailed balance efficiency limit of high-quality single-junction solar cells. To continue to improve the efficiencies of cost-effective terrestrial solar power, hybrid tandems of dissimilar subcells are being considered by many around the world, especially designs that incorporate silicon solar cells as a bottom subcell. In this project, we studied a wide variety of tandem design possibilities including those with three-terminal (3T) and four-terminal (4T) configurations. The use of 3T and 4T designs could be useful for efficient and economical hybrid tandem designs that utilize the best available subcell materials such as emerging perovskite materials. Three-terminal configurations, in particular, have not been sufficiently studied previously. We have laid the foundational groundwork in this project for understanding the operation of 3T tandems: developing a taxonomy for naming, a methodology for measuring and interconnecting, and models for simply characterizing 3T tandems. Electrical and optical subcell coupling between the subcells was also measured and modeled. An important part of this work was the fabrication of novel example tandem structures, including 4T GaAs/Si, 3T GaInP/Si, 3T GaAs/Si, and 3T GaInP/GaAs devices. Using these high-quality tandem cells, we have been able to clearly demonstrate the achievability of high-efficiencies, and subtle physical effects such as photon recycling and luminescent coupling. We have developed and demonstrated essential building-block tools such as transparent conductive adhesives (TCA) and 3T silicon bottom cells with interdigitated back contacts (IBC) that can also be used in many other tandem designs. We have tested the reliability of these tools and devices under standardized testing and outdoor measurements. We have found 4T GaAs/Si tandems to be relatively straightforward to fabricate and robust in real-world outdoor conditions. While we have demonstrated working hybrid 3T III-V/TCA/Si IBC tandems, we experienced low yields even with our best process flows yet. Further work is still needed to improve the processing yield of these devices. We therefore also created tandem cells using an all-III-V 3T tandem process which was very robust with high yields, allowing for the creation of voltage-matched strings in many different configurations using 8 nearly identical 3T tandems. Using these robust 3T tandem examples, we were able measure and precisely characterize 3T tandem behaviors to predict their operation under changing spectrum and temperature. The optoelectronic equivalent-circuit model was shown to be very general and applicable to hybrid tandems, and encompassed the operation 3T Si IBC cells. This general model has been distributed to the public in as open-source Python-based software called PVcircuit. We have calculated the implications of these new tandem device designs on the real-world energy production and shown how the relative performance of different tandem configurations is situational and can be engineered using the tools developed here.

14 SOLAR ENERGY↗

Life-Prediction Parameters of Sapphire Determined for the Design of a Space Station Combustion Facility Window

To characterize the stress corrosion parameters and predict the life of a sapphire window being considered for use in the International Space Station's Fluids and Combustion Facility, researchers at the NASA Glenn Research Center conducted stress corrosion tests, fracture toughness tests, and reliability analyses, as shown in the figures. Standardized test methods, developed and updated by the author under the auspices of American Society for Testing and Materials, were employed. One interesting finding is that sapphire exhibits a susceptibility to stress corrosion in water similar to that of glass. In addition to generating the stress corrosion parameters and fracture toughness data, closed-form expressions for the variances of the crack growth parameters were derived. The expressions allow confidence bands to be easily placed on life predictions of ceramic components. Brittle materials such as sapphire and quartz are required for windows in a variety of applications such as the Fluids and Combustion Facility. To minimize the launch weight of such facilities, researchers must design the windows to be as lightweight as possible. The safe use of lightweight, brittle windows in structural applications is limited by two factors: low fracture toughness and slow crack growth, or stress corrosion. Stress corrosion of these and other optical materials can occur in relatively common environments, such as humid air. Access to the data has been requested by designers for use in the life prediction of a Northrop Grumman F16 instrument window and a Jet Propulsion Laboratory instrument window. One Space Act Agreement has been formed. Future work includes the measurement of the life of subscale windows.

Salem, Jonathan A.↗

The optimum cost-effective test time for redundant systems with specified reliability and confidence

This paper investigates the optimum test time to determine the number of redundant units needed to achieve high reliability with high confidence. Newly designed systems often have high initial failure rates which can be reduced by testing to find failure modes and remove them by redesign. To accurately estimate the required number of redundant units, the test time must be extended to accurately determine the failure rate. If the measured failure rate is used, there is a 50% chance that the actual hardware failure rate is higher. Using the measured failure rate gives only a 50% confidence that the failure rate and number of spares are not too low. After the test, given the measured failure rate and the desired reliability, the number of spares can be determined and the confidence in the reliability computed. Instead of accepting the reliability results of a fixed duration test, it is possible to set the requirements for both the redundant reliability and the confidence level and then compute the test time needed to minimize the total cost required to achieve these requirements. The confidence that the redundant reliability is not too low is increased by using a higher than measured failure rate to increase the number of spares. The higher number of spares increases cost. Longer test time reduces the variance in the failure rate and the increase in the number of spares, so that test cost increases and spares cost decreases. The total cost is the sum of the cost of the test time and the spares. The optimum test time produces the minimum total cost for the system failure rate, mission length, and required reliability and confidence level. Longer testing is justified by reduced cost. Some examples are given.

Harry W Jones↗

NASA reliability preferred practices for design and test

Given here is a manual that was produced to communicate within the aerospace community design practices that have contributed to NASA mission success. The information represents the best technical advice that NASA has to offer on reliability design and test practices. Topics covered include reliability practices, including design criteria, test procedures, and analytical techniques that have been applied to previous space flight programs; and reliability guidelines, including techniques currently applied to space flight projects, where sufficient information exists to certify that the technique will contribute to mission success.

Source record↗

The 5K70SK automatically tuned, high power, S-band klystron

Primary objectives include delivery of 44 5K70SK klystron amplifier tubes and 26 remote tuner assemblies with spare parts kits. Results of a reliability demonstration on a klystron test cavity are discussed, along with reliability tests performed on a remote tuning unit. Production problems and one design modification are reported and discussed. Results of PAT and DVT are included.

Goldfinger, A.↗

Validation of Cardiovascular Parameters During NASA's Functional Task Test

Microgravity-induced physiological changes, including cardiovascular deconditioning may impair crewmembers f capabilities during exploration missions on the Moon and Mars. The Functional Task Test (FTT), which will be used to assess task performance in short and long duration astronauts, consists of 7 functional tests to evaluate crewmembers f ability to perform activities to be conducted in a partial-gravity environment or following an emergency landing on Earth. The Recovery from Fall/Stand Test (RFST) tests both the subject fs ability to get up from a prone position and orthostatic intolerance. PURPOSE: Crewmembers have never become presyncopal in the first 3 min of quiet stand, yet it is unknown whether 3 min is long enough to cause similar heart rate fluctuations to a 5-min stand. The purpose of this study was to validate and test the reliability of heart rate variability (HRV) analysis of a 3-min quiet stand. METHODS: To determine the validity of using 3 vs. 5-min of standing to assess HRV, 7 healthy subjects remained in a prone position for 2 min, stood up quickly and stood quietly for 6 min. ECG and continuous blood pressure data were recorded. Mean R-R interval and spectral HRV were measured in minutes 0-3 and 0-5 following the heart rate transient due to standing. Significant differences between the segments were determined by a paired t-test. To determine the reliability of the 3-min stand test, 13 healthy subjects completed 3 trials of the complete FTT on separate days, including the RFST with a 3-min stand test. Analysis of variance (ANOVA) was performed on the HRV measures. RESULTS: Spectral HRV measures reflecting autonomic activity were not different (p>0.05) during the 0-3 and 0-5 min segment (mean R-R interval: 738+/-74 ms, 728+/-69 ms; low frequency to high frequency ratio: 6.5+/-2.2, 7.7+/-2.7; normalized high frequency: 0.19+/-0.03, 0.18+/-0.04). The average coefficient of variation for mean R-R interval, systolic and diastolic blood pressures in the prone position and stand test were less than 8% for the test sessions. ANOVA results yielded a greater inter-subject variability (p.0.006) than inter-session variability (p>0.05) for HRV in the stand test. CONCLUSION: These studies show that a 3 minute stand delivers repeatable cardiovascular heart rate and BP data in the context of this larger series of tests such as the FTT.

Arzeno, N. M.↗

Reliability Quantification of Advanced Stirling Convertor (ASC) Components

The Advanced Stirling Convertor, is intended to provide power for an unmanned planetary spacecraft and has an operational life requirement of 17 years. Over this 17 year mission, the ASC must provide power with desired performance and efficiency and require no corrective maintenance. Reliability demonstration testing for the ASC was found to be very limited due to schedule and resource constraints. Reliability demonstration must involve the application of analysis, system and component level testing, and simulation models, taken collectively. Therefore, computer simulation with limited test data verification is a viable approach to assess the reliability of ASC components. This approach is based on physics-of-failure mechanisms and involves the relationship among the design variables based on physics, mechanics, material behavior models, interaction of different components and their respective disciplines such as structures, materials, fluid, thermal, mechanical, electrical, etc. In addition, these models are based on the available test data, which can be updated, and analysis refined as more data and information becomes available. The failure mechanisms and causes of failure are included in the analysis, especially in light of the new information, in order to develop guidelines to improve design reliability and better operating controls to reduce the probability of failure. Quantified reliability assessment based on fundamental physical behavior of components and their relationship with other components has demonstrated itself to be a superior technique to conventional reliability approaches based on utilizing failure rates derived from similar equipment or simply expert judgment.

Shah, Ashwin R.↗

Accelerated test protocols to predict service life and durability of solid oxide fuel cells

Reliable accelerated test protocols are needed for solid oxide fuel cell research to facilitate rapid learning on key durability issues, identify potential modes of failure expeditiously, and eventually predict the calendar lifetime of an electrochemical cell. In this work, solid oxide fuel cells operated at a constant current density were compared to cells undergoing accelerated measurements, which are composed of intermittent current injection to the cell. A general accelerated test profile was developed by cycling a solid oxide fuel cell from open circuit to a predetermined operating current density that is the same as the current density during a steady-state operation, to accelerate the local redox environment. The following parameters were studied: current density, operation temperature, moist level, sintering temperature, cycling current, cycling frequency, and operation time. Up to 1,320,000 cycles were generated in this work. The cell degradation was accelerated by nearly 10 times, suggesting the feasibility of using this protocol for acceleration test to predict life performance and durability of solid oxide fuel cells.

08 HYDROGEN↗

Profile of a cell test database and a corresponding reliability database

The development of computerized control, and data retrieval for aerospace cell testing affords an excellent opportunity to incorporate three specific concepts to both manage the test area and to track product performance on a real-time basis. The adoption and incorporation of precepts fostered by this total quality management (TQM) initiative are critical to us for retaining control of our business while substantially reducing the separate quality control inspection activity. Test discrepancies are all 'equally bad' in cell acceptance testing because, for example, we presently do not discriminate between 1 or 25 mV for an overvoltage condition. We must take leadership in classifying such discrepancies in order to expedite their clearance and redirect our resources for prevention activities. The development and use of engineering alerts (or guardbanding) which more closely match our product capabilities and are toleranced tighter than the required customer specification are paramount to managing the test unit in order to remain both quality and cost effective.

Brearley, George R.↗

Short-Term Load Forecasting Considering EV Charging Loads with Prediction Interval Evaluation

Short-term load forecasting plays a critical role in power system planning and operation. Along with the electrification of various loads, electricity demands are becoming increasingly hard to predict. Notably, the recent rise in electric vehicles (EVs) has further contributed to this unpredictability. To address this issue, this paper proposes a probabilistic load forecasting strategy utilizing Gaussian process regression, structured in a day-ahead manner. While many works focus on deterministic prediction, probabilistic forecasting offers additional insights into variability and uncertainty, enabling more flexible and reliable operation for power systems. To enhance the accuracy of the load forecasting model, the inputs include features related to EV charging habits as well as commonly used weather information. The load forecasting results are evaluated using various metrics, including conventional ones that assess the accuracy of point forecasts, as well as additional metrics that test the reliability of prediction intervals. The proposed load forecasting method is finally tested on real residential power consumption data and EV charging data sampled from real-world sources. The results prove that the new features can greatly improve the performance of the load forecasting method.

electrical vehicle↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

A New Method for Evaluating Elastomeric Materials for Use in High Pressure Oxygen

The seal configuration tester (SCT) developed at the Stennis Space Center (SSC) was designed to replicate the intended application of different seat and seal materials in a high pressure oxygen system and assess the wearibility of those materials. Statistical models were used to test the reliability of the SCT in its intended application, and the tests showed very consistent measurements over time, indicating that the device was working as intended. Other statistical designs were used to test different O-ring materials in a high-pressure oxygen system. Those tests indicated that the SCT could be used to rank the performance of O-ring materials in certain environments. The results indicated that some cheaper materials performed as well as, if not better than, other more expensive materials. Different lubrications were integrated in the testing as well and had a significant impact on the performance of the materials. Testing of seat materials is the next stage of this project. An augmentation grant (JAG) was obtained to further this experimental testing at the Stennis Space Center. This part of the project is ongoing at this time and therefore there are no significant accomplishments with respect to seat materials as of yet.

Jordan, Scott M.↗