Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reasoning about programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

A Photovoltaic System Payback Calculator

The Roof Asset Management Program (RAMP) is a DOE NNSA initiative to manage roof repairs and replacement at NNSA facilities. In some cases, installation of a photovoltaic system on new roofs may be possible and desired for financial reasons and to meet federal renewable energy goals. One method to quantify the financial benefits of PV systems is the payback period, or the length of time required for a PV system to generate energy value equivalent to the system's cost. Sandia Laboratories created a simple spreadsheet-based solar energy valuation tool for use by RAMP personnel to quickly evaluate the estimated payback period of prospective or installed photovoltaic systems.

14 SOLAR ENERGY↗

Defining Wind Energy Experience

Since 2015, the U.S. wind installed capacity has grown from 73 to over 120 gigawatts, creating jobs across many sectors and educational levels. The growth of the wind workforce will need to continue to meet the goal of 20% wind by 2030, as well as the Biden administration's goals to reduce greenhouse gas pollution by 2030, reach 100% carbon-free electricity by 2035, and achieve net-zero greenhouse gas emissions no later than 2050. Despite the needed and anticipated growth, there are challenges to meeting this demand. Research has consistently shown that it has been a challenge finding qualified applicants for open wind industry jobs. Between 2012 and 2018, the difficulty of finding qualified applicants increased from 62% to 68% according to industry respondents. In 2017, educational institutions and training programs reported that 67% of their students did not enter the wind energy industry. Research conducted in 2020 showed that 83% of interested workers had some or great difficulty finding job opportunities. In exploring reasons for this gap, the researchers found that challenges were primarily influenced by education, experience, and geography. This difficulty for wind industry employers, educational institutions, and the potential workforce is known as the "wind energy workforce gap." This report further investigates the experience aspect of this gap.

17 WIND ENERGY↗

EM Program Expectations on Implementation of DOE O 458: Radiation Protection of Public/Environment - 19553

DOE Order 458.1, Radiation Protection of the Public and Environment, was issued in 2011. DOE sites were given 18 months to implement. The revised Order promulgates requirements for property clearance actions and independent verification. DOE Order 458.1 allows for preapproved authorized limits for the clearance of property. However, when property with the potential to contain residual radioactive material does not meet preapproved authorized limits, an authorized limits package must be developed. The Order contains a range of requirements for demonstrating with reasonable assurance that dose constraints are met for any actual or likely future use of the property to be released. EM has developed a draft guidance document that provides the elements of an authorized limits package. These elements are used to review all authorized limits packages that are submitted to EM. Expected elements include property description and process knowledge documentation, current and likely future use, the conceptual site model, dose modeling methodologies, specific authorized limits, dose- or concentration-based constraints, collective dose estimate to the potentially exposed population, stakeholder communications, description of the As Low As Reasonably Achievable (ALARA) analysis, implementation plan, evaluation of difficult to assess surfaces, and independent verification plan. The draft guidance document also provides further explanation of the desired elements of an independent verification (IV) plan. An IV plan should describe the planning phase, implementation phase, assessment phase, and decision phase of an activity. The planning phase includes scope and cost, concurrent with cleanup contractor procurement, and review and approval of site radiological survey clearance program and IV program plans. The implementation phase assures sufficient collection of data and adjustment can be made as necessary. During the assessment phase, data and reports are reviewed, and coordination between the clean-up contractor and IV personnel occurs. A decision of whether or not the clearance actions need to be altered occurs during the decision phase. IV certification that the clearance action is complete also occurs during the decision phase. Issuance of the final guidance document is meant to improve the consultation process and minimize iterative interactions with EM. Standardizing and formalizing property clearance and IV actions also helps assure that cleanup actions are transparent and sustainable for future scrutiny. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Local Impacts of Mercury Emissions from the Three Pennsylvania Coal Fired Power Plants.

The Clean Air Interstate Rule (CAIR) and the Clean Air Mercury Rule (CAMR) as proposed by the U.S. Environmental Protection Agency (EPA) when fully implemented will lead to reduction in mercury emissions from coal-fired power plants by 70 percent to fifteen tons per year by 2018. The EPA estimates that mercury deposition would be reduced 8 percent on average in the Eastern United States. The CAMR permits cap-and-trade approach that requires the nationwide emissions to meet the prescribed level, but do not require controls on each individual power plant. This has led to concerns that there may be hot-spots of mercury contamination near power plants. Partially because of this concern, many states including Pennsylvania have implemented, or are considering, state regulations that are stricter on mercury emissions than those in the CAMR. This study examined the possibility that coal-fired power plants act as local sources leading to mercury 'hot spots'. Soil and oak leaf samples from around three large U.S. coal-fired power plants in Western Pennsylvania were collected and analyzed for evidence of 'hot spots'. These three plants (Conemaugh, Homer City, and Keystone) are separated by a total distance of approximately 30 miles. Each emits over 500 pounds of mercury per year which is well above average for mercury emissions from coal plants in the U.S. Soil and oak leaf sampling programs were performed around each power plant. Sampling rings one-mile apart were used with eight or nine locations on each ring. The prevailing winds in the region are from the west. For this reason, sampling was conducted out to 10 miles from the Conemaugh plant which is southeast of the others. The other plants were sampled to a distance of five miles. The objectives were to determine if local mercury hot spots exist, to determine if they could be attributed to deposition of coal-fired power plant emissions, and to determine if they correlated with wind patterns. The study found the following: (1) There was some correlation between the prevailing wind direction and measured soil and oak leaf concentrations. This correlation was not statistically significant, but higher soil concentrations were generally found in the east and southeast from the plants and lower soil concentrations were found west/southwest from the plants. The prevailing winds are to the east. The Conemaugh plant which was the most southeast of the three plants did have the highest average oak leaf and soil mercury concentrations. Based on emissions, the Keystone plant would be expected to see the highest concentrations as it emitted about 25% more mercury than the other two plants. (2) The results of this study did not turn up strong evidence for large areas (several square miles) of elevated mercury concentrations around the three coal-fired power plants that were tested. This does not mean that there is no effect, there was some evidence of increasing mercury content to the east and south of these plants, however, the trends were not statistically significant suggesting that if the effects exist, they are small.

01 COAL, LIGNITE, AND PEAT↗

Historical Perspective on How and Why Switchgrass was Selected as a "Model" High-Potential Energy Crop

A review of several publications of the Biofuels Feedstock Development Program, and final reports from the herbaceous crop screening trials suggests that there were several technical and non-technical factors that influenced the decision to focus on one herbaceous "model" crop species. The screening trials funded by the U.S. Department of Energy in the late 1980's to early 1990's assessed a wide range of about 34 species with trials being conducted on a wide range of soil types in 31 different sites spread over seven states in crop producing regions of the U.S. While several species, including sorghums, reed canarygrass and other crops, were identified as having merit for further development, the majority of institutions involved in the herbaceous species screening studies identified switchgrass as having high priority for further development. Six of the seven institutions included switchgrass among the species recommended for further development in their region and all institutions recommended that perennial grasses be given high research priority. Reasons for the selection of switchgrass included the demonstration of relatively high, reliable productivity across a wide geographical range, suitability for marginal quality land, low water and nutrient requirements, and positive environmental attributes. Economic and environmental assessments by Oak Ridge National Laboratory's Biofuels Feedstock Development Program staff together with the screening project results, and funding limitations lead to making the decision to further develop only switchgrass as a "model" or "prototype" species in about 1990. This paper describes the conditions under which the herbaceous species were screened, summarizes results from those trials, discusses the various factors which influenced the selection of switchgrass, and provides a brief evaluation of switchgrass with respect to criteria that should be considered when selecting and developing a crop for biofuels and bioproducts.

54 ENVIRONMENTAL SCIENCES↗

Cataloging the visible universe through Bayesian inference in Julia at petascale

A key task in astronomy is to locate astronomical objects in images and to characterize them according to physical parameters such as brightness, color, and morphology. This task, known as cataloging, is challenging for several reasons: many astronomical objects are much dimmer than the sky background, labeled data is generally unavailable, overlapping astronomical objects must be resolved collectively, and the datasets are enormous – terabytes now, petabytes soon. In this work, we infer an astronomical catalog from 55 TB of imaging data using Celeste, a Bayesian variational inference code written entirely in the high-productivity programming language Julia. Using over 1.3 million threads on 650,000 Intel Xeon Phi cores of the Cori Phase II supercomputer, Celeste achieves a peak rate of 1.54 DP PFLOP/s. Celeste is able to jointly optimize parameters for 188 M stars and galaxies, loading and processing 178 TB across 8192 nodes in 14.6 min. To achieve this, Celeste exploits parallelism at multiple levels (cluster, node, and thread) and accelerates I/O through Cori’s burst buffer. Julia’s native performance enables Celeste to employ high-level constructs without resorting to hand-written or generated low-level code (C/C++/Fortran) while still achieving petascale performance.

Regier, Jeffrey↗

Large-scale parametric modeling of spent nuclear fuel dynamics in the 30 cm package drop scenario

Packages used to transport spent nuclear fuel (SNF) are required by the U.S. Code of Federal Regulations 10 CFR 71.71 to demonstrate satisfactory performance during a drop scenario. While the CFR is meant to ensure safe package function, it does not evaluate survival of the SNF within. The U.S. Department of Energy Spent Fuel and Waste Science and Technology program is working on closing the knowledge gap related to the response of SNF to external mechanical loads, including the hypothetical 30 cm package drop scenario in the CFR. In support of this effort, LS-DYNA finite element simulations were developed by Pacific Northwest National Laboratory (PNNL) to model generic drop scenarios at both the package and fuel assembly level. The models were validated against one-third scale package and full scale fuel assembly drop test data and were exercised to predict fuel cladding strains in a narrow range of model configurations. This work describes a large-scale parametric study conducted by PNNL using the previously developed and validated PWR finite element model, with the addition of a new generic BWR assembly model. The motivation for the parametric study was to characterize the broad range of SNF responses in the 30 cm package drop scenario. This was accomplished by varying the drop orientation, fuel assembly type (17x17 PWR and 10x10 BWR), burnup, cladding temperature, spacer grid buckling load, package mass, impact limiter stiffness, and mechanical gap conditions within the basket. A MATLAB framework was developed to automate LS-DYNA model generation and execution on PNNL institutional computing resources. In total, over 2000 simulations were performed. For each simulation, the SNF response was quantified in terms of permanent grid deformation, fuel rod contact pressure, and strains within the fuel rods, guide tubes, and water rods. The results provide valuable insight into the range of responses that could be reasonably expected from SNF in the hypothetical drop scenario, as well as the sensitivity to each input parameter. The results of this parametric study are a key component of the testing and modeling strategy the Spent Fuel and Waste Science and Technology program is using to close the external loads knowledge gap.

Kadooka, Kevin↗

Design-time performance modeling of compositional parallel programs

Performance models are powerful instruments for understanding the performance of parallel systems and uncovering their bottlenecks. Already during system design, performance models can help ponder alternative development options. However, creating a performance model – whether theoretically or empirically – for an entire application that does not exist yet is challenging. In this paper, we propose to generate performance models of full programs from performance models of their components using formal composition operators derived from parallel design patterns. As long as the design of the overall system follows such a pattern, its performance model can be predicted with reasonable accuracy without an actual implementation. In conclusion, we demonstrate our approach with design patterns of varying complexity, including pipeline, task pool, and eventually MapReduce, which is representative of a broad class of data-analytics applications.

97 MATHEMATICS AND COMPUTING↗

A Two-Stage Decomposition Approach for AC Optimal Power Flow

The alternating current optimal power flow (AC-OPF) problem is critical to power system operations and planning, but it is generally hard to solve due to its nonconvex and large-scale nature. Furthermore, this paper proposes a scalable decomposition approach in which the power network is decomposed into a master network and a number of subnetworks, where each network has its own AC-OPF subproblem. This formulates a two-stage optimization problem and requires only a small amount of communication between the master and subnetworks. The key contribution is a smoothing technique that renders the response of a subnetwork differentiable with respect to the input from the master problem, utilizing properties of the barrier problem formulation that naturally arises when subproblems are solved by a primal-dual interior-point algorithm. Consequently, existing efficient nonlinear programming solvers can be used for both the master problem and the subproblems. The advantage of this framework is that speedup can be obtained by processing the subnetworks in parallel, and it has convergence guarantees under reasonable assumptions. The formulation is readily extended to instances with stochastic subnetwork loads. Numerical results show favorable performance and illustrate the scalability of the algorithm which is able to solve instances with more than 11 million buses.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tri-Level Scheduling Model Considering Residential Demand Flexibility of Aggregated HVACs and EVs Under Distribution LMP

Residential loads, especially heating, ventilation and air conditioners (HVACs) and electric vehicles (EVs), have great potentials to provide demand flexibility which is an attribute of grid-interactive efficient buildings (GEB). Under this new paradigm, first, EV and HVAC aggregator models are developed in this paper to represent the fleet of GEBs, in which the aggregated parameters are obtained based on a new approach of data generation and least squares parameter estimation (DG-LSPE), which can deal with heterogeneous HVACs. Then, a tri-level bidding and dispatching framework is established based on competitive distribution operation with distribution locational marginal price (DLMP). Furthermore, the first two levels form a bilevel model to optimize the aggregators’ payment and to represent the interdependency between load aggregators and the distribution system operator (DSO) using DLMP, and the third level is to dispatch the optimal load aggregation to all residents by the proposed priority list-based demand dispatching algorithm. Finally, case studies on a modified IEEE 33-Bus system illustrate three main technical reasons of payment reduction due to demand flexibility: load shift, DLMP step changes, and power losses. They can be used as general guidelines for better decision-making for future planning and operation of demand response programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MicrobesFlux: a web platform for drafting metabolic models from the KEGG database

Concurrent with the efforts currently underway in mapping microbial genomes using high-throughput sequencing methods, systems biologists are building metabolic models to characterize and predict cell metabolisms. One of the key steps in building a metabolic model is using multiple databases to collect and assemble essential information about genome-annotations and the architecture of the metabolic network for a specific organism. To speed up metabolic model development for a large number of microorganisms, we need a user-friendly platform to construct metabolic networks and to perform constraint-based flux balance analysis based on genome databases and experimental results. We have developed a semi-automatic, web-based platform (MicrobesFlux) for generating and reconstructing metabolic models for annotated microorganisms. MicrobesFlux is able to automatically download the metabolic network (including enzymatic reactions and metabolites) of ~1,200 species from the KEGG database (Kyoto Encyclopedia of Genes and Genomes) and then convert it to a metabolic model draft. The platform also provides diverse customized tools, such as gene knockouts and the introduction of heterologous pathways, for users to reconstruct the model network. The reconstructed metabolic network can be formulated to a constraint-based flux model to predict and analyze the carbon fluxes in microbial metabolisms. The simulation results can be exported in the SBML format (The Systems Biology Markup Language). Furthermore, we also demonstrated the platform functionalities by developing an FBA model (including 229 reactions) for a recent annotated bioethanol producer, Thermoanaerobacter sp. strain X514, to predict its biomass growth and ethanol production. MicrobesFlux is an installation-free and open-source platform that enables biologists without prior programming knowledge to develop metabolic models for annotated microorganisms in the KEGG database. Our system facilitates users to reconstruct metabolic networks of organisms based on experimental information. Through human-computer interaction, MicrobesFlux provides users with reasonable predictions of microbial metabolism via flux balance analysis. This prototype platform can be a springboard for advanced and broad-scope modeling of complex biological systems by integrating other “omics” data or 13 C- metabolic flux analysis results.

97 MATHEMATICS AND COMPUTING↗

Post-Fire Safe Shutdown Capability. An Inspector's Handbook. Draft Report

The Nuclear Regulatory Commission's (NRC) current fire protection regulatory framework was initiated in response to a cable fire that occurred at the Browns Ferry Nuclear Power Station in 1975. Following the issuance of several guidance documents, in 1981 the Commission codified deterministic requirements to provide reasonable assurance that fire would not jeopardize reactor safety (10 CFR 50.48 "Fire Protection" and Appendix R to 10 CFR 50). Since then, the results of plant operating experience, NRC inspection activities and cable fire testing programs have served to clarify the application of these requirements. In 2004, the NRC amended 10 CFR Part 50.48 to add a new subsection, 10 CFR 50.48(c), that endorses, with exceptions, the National Fire Protection Association's 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants — 2001 Edition," as a voluntary alternative for demonstrating compliance with Appendix R. To date, approximately half of all operating plants have transitioned to a risk-informed approach under 10 CFR 50.48(c). Regardless of the selected approach, each operating nuclear power plant should establish a comprehensive fire protection program that includes features needed to minimize the likelihood and consequence of firesl. To achieve this objective, fire protection programs integrate the NRC's long-held safety concept of defense-in-depth (DID) by providing multiple barriers against potentially unacceptable consequences of fire. To minimize the frequency and size of fires, the first lines of defense include controls for fire prevention, such as controlling combustibles and ignition sources and fire mitigation features, such as fire detection and suppression systems. In the unlikely event that a fire should start and continue to grow in spite of these features, appropriate fire protection features, such as fire-rated barriers are provided as necessary to ensure the accomplishment of essential shutdown functions. This handbook was specifically developed for NRC inspectors that may be assigned to perform elements of Inspection Procedure (IP) 71111.05T, "Fire Protection (Triennial)," including, (a) "Protection of Safe Shutdown Capabilities," (e) "Alternative Shutdown Capability," and (f) "Circuit Analyses." Thus, the document concentrates solely on the final element of defense-in-depth— ensuring reactor safety will not be compromised in the event of a serious fire. In addition to describing how the NRC's regulatory framework has evolved since the Browns Ferry Fire, the handbook illustrates the content and scope of various analyses typically referenced in a plant's fire protection licensing basis and includes techniques and insights for assessing the plant's conformance to those criteria.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

RELAP5-3D Simulation of PG-27 Test at the HTTF Facility

The High Temperature Test Facility (HTTF) at Oregon State University (OSU) is a quarter scaled integral-effect test facility designed to examine the transient phenomena occurring in a Modular Hight Temperature Gas-cooled Reactor (MHTGR). It is specifically designed to handle the pressurized and depressurized conduction cooldown (PCC and DCC) events. The PCC event is an accident scenario in which there is a loss of forced convection of the coolant through the system. However, the pressure boundary remains intact. This study focuses on the Reactor Excursions and Leak Analysis Program (RELAP)5-3D simulation of the PG-27 test (PCC phenomena) and the sensitivity of those simulations from the material properties and primary helium mass flow rate standpoint. The aim is to capture a reasonable one-dimensional picture of a three dimensional phenomena. The simulation will help in the code assessment and in understanding the various unknown parameters involved. The presented results will demonstrate the code is able to capture the detailed one-dimensional physics accurately. However, input parameters to the code (i.e., the primary mass flow rate, refractory material thermal conductivity, and heat capacity at elevated temperatures) impact the fuel temperature the most. This work will discuss the sensitivity of simulations to the identified input parameters.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Radiochemistry Lab Decommissioning and Dismantlement. AECL, Chalk River Labs, Ontario, Canada

Atomic Energy of Canada (AECL) was originally founded in the mid 1940's to perform research in radiation and nuclear areas under the Canadian Defense Department. In the mid 50's The Canadian government embarked on several research and development programs for the development of the Candu Reactor. AECL was initially built as a temporary site and is now faced with many redundant buildings. Prior to 2004 small amounts of Decommissioning work was in progress. Many reasons for deferring decommissioning activities were used with the predominant ones being: 1. Reduction in radiation doses to workers during the final dismantlement, 2. Development of a long-term solution for the management of radioactive wastes in Canada, 3. Financial constraints presented by the number of facilities shutdown that would require decommissioning funds and the absence of an approved funding strategy. This has led to the development of a comprehensive decommissioning plan that is all inclusive of AECL's current and legacy liabilities. Canada does not have a long-term disposal site; therefore waste minimization becomes the driving factor behind decontamination for decommissioning before and during dismantlement. This decommissioning job was a great learning experience for decommissioning and the associated contractors who worked on this project. Throughout the life of the project there was a constant focus on waste minimization. This focus was constantly in conflict with regulatory compliance primarily with respect to fire regulations and protecting the facility along with adjacent facilities during the decommissioning activities. Discrepancies in historical documents forced the project to treat every space as a contaminated space until proven differently. Decommissioning and dismantlement within an operating site adds to the complexity of the tasks especially when it is being conducted in the heart of the plant. This project was very successful with no lost time accidents in over one hundred thousand hours worked, on schedule and under budget despite some significant changes throughout the decommissioning phases. The actual cost to decommission this building will come in under 9 million dollars vs. an estimated 14.5 million dollars. This paper will cover some of the unique aspects of dismantling a radioactive building that has seen pretty much every element of the periodic table pass through it with the client requirement focused on minimization of radioactive waste volumes.

42 ENGINEERING↗

Establishing the isolated standard model

The goal of this article is to initiate a discussion on what it takes to claim “there is no new physics at the weak scale,” namely that the Standard Model (SM) is “isolated.” The lack of discovery of beyond the SM (BSM) physics suggests that this may be the case. But to truly establish this statement requires proving all “connected” BSM theories are false, which presents a significant challenge. We propose a general approach to quantitatively assess the current status and future prospects of establishing the isolated SM (ISM), which we give a reasonable definition of. We consider broad elements of BSM theories, and show many examples where current experimental results are not sufficient to verify the ISM. In some cases, there is a clear roadmap for the future experimental program, which we outline, while in other cases, further efforts—both theoretical and experimental—are needed in order to robustly claim the establishment of the ISM in the absence of new physics discoveries.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Dawn Usage, Scheduling, and Governance Model

This document describes Dawn use, scheduling, and governance concerns. Users started running full-machine science runs in early April 2009 during the initial open shakedown period. Scheduling Dawn while in the Open Computing Facility (OCF) was controlled and coordinated via phone calls, emails, and a small number of controlled banks. With Dawn moving to the Secure Computing Facility (SCF) in fall of 2009, a more detailed scheduling and governance model is required. The three major objectives are: (1) Ensure Dawn resources are allocated on a program priority-driven basis; (2) Utilize Dawn resources on the job mixes for which they were intended; and (3) Minimize idle cycles through use of partitions, banks and proper job mix. The SCF workload for Dawn will be inherently different than Purple or BG/L, and therefore needs a different approach. Dawn's primary function is to permit adequate access for tri-lab code development in preparation for Sequoia, and in particular for weapons multi-physics codes in support of UQ. A second purpose is to provide time allocations for large-scale science runs and for UQ suite calculations to advance SSP program priorities. This proposed governance model will be the basis for initial time allocation of Dawn computing resources for the science and UQ workloads that merit priority on this class of resource, either because they cannot be reasonably attempted on any other resources due to size of problem, or because of the unavailability of sizable allocations on other ASC capability or capacity platforms. This proposed model intends to make the most effective use of Dawn as possible, but without being overly constrained by more formal proposal processes such as those now used for Purple CCCs.

99 GENERAL AND MISCELLANEOUS↗

Preliminary Evaluation of the Impact of the Section 1603 Treasury Grant Program on Renewable Energy Deployment in 2009

Federal support for renewable energy deployment in the United States has traditionally been delivered primarily through tax benefits, including the production tax credit ('PTC') in Section 45 of the U.S. tax code, investment tax credits ('ITC') in Sections 25D and 48, and accelerated tax depreciation in Section 168. Many renewable power project developers are unable to use the majority of these tax benefits directly or immediately, however, and have therefore often relied on third-party 'tax equity' investors for the necessary investment capital in order to monetize the available tax benefits. As has been well-publicized, most of these tax equity investors were hit hard by the global financial crisis that unfolded in the last months of 2008 and, as a result, most either withdrew from the renewable power market at that time or reduced their available investment capital. This left a significant financing gap beginning in late 2008, and placed at some risk the continued near-term growth of renewable energy supply in the U.S. In recognition of these developments, the U.S. Congress passed two stimulus bills - The Energy Improvement and Extension Act ('the Extension Act') in October 2008 and The American Recovery and Reinvestment Act ('the Recovery Act') in February 2009 - parts of which were intended to address the growing shortage of finance for renewable power projects. Most notably, Section 1603 of the Recovery Act enables qualifying commercial renewable energy projects to choose between the Section 45 PTC, the Section 48 ITC, or a cash grant of equal value to the Section 48 ITC (i.e., 30% of the project's eligible basis in most cases). By giving developers the option to receive a 30% cash grant (administered by the U.S. Department of the Treasury) in lieu of either the ITC or the PTC, Congress hoped to 'temporarily fill the gap created by the diminished investor demand for tax credits,' and thereby achieve 'the near term goal of creating and retaining jobs - as well as the long-term benefit of expanding the use of clean and renewable energy and decreasing our dependency on non-renewable energy sources' (U.S. Department of the Treasury 2009). More than a year has now passed since the Recovery Act became law. Although the Section 1603 program has been operational for only part of that time - roughly eight months - the program faces a looming milestone in just another nine months. Specifically, in order to qualify for the Section 1603 grant, eligible projects must have commenced construction by the end of 2010. With this deadline approaching, the Committee on Ways and Means of the U.S. House of Representatives requested that Lawrence Berkeley National Laboratory evaluate the effectiveness of the Section 1603 grant program to date (see Attachment 1), focusing on specific elements of the program that were subsequently agreed upon by Committee staff, the U.S. Department of Energy, and Berkeley Lab. This report responds to the Committee's request. The evaluation focuses primarily on the commercial wind power sector, for two reasons: (1) commercial wind power projects had received nearly 86% of all grant money awarded as of March 1, 2010; and (2) there is substantially more market-related information available for the commercial wind power sector than there is for other renewable power sectors, thereby facilitating analysis. Despite the focus on wind power, this initial analysis does endeavor to provide relevant information on other technologies, and in particular geothermal (the second-largest recipient of grant money), where possible.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

HEP Community White Paper on Software Trigger and Event Reconstruction

Realizing the physics programs of the planned and upgraded high-energy physics (HEP) experiments over the next 10 years will require the HEP community to address a number of challenges in the area of software and computing. For this reason, the HEP software community has engaged in a planning process over the past two years, with the objective of identifying and prioritizing the research and development required to enable the next generation of HEP detectors to fulfill their full physics potential. The aim is to produce a Community White Paper which will describe the community strategy and a roadmap for software and computing research and development in HEP for the 2020s. The topics of event reconstruction and software triggers were considered by a joint working group and are summarized together in this document.

Albrecht, Johannes↗