Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Dangers on the Ramp: Aviation Safety Reporting System

The Aviation Safety Reporting System (ASRS) in a partnership between the National Aeronautics and Space Administration (NASA), the Federal Aviation Administration (FAA), participating carriers, and labor organizations. It is designed to improve the National Airspace System by collecting and studying reports detailing unsafe conditions and events in the aviation industry. Employees are able to report safety issues or concerns with confidentiality and without fear of discipline.

confidential reporting↗

Teleoperated Marsupial Mobile Sensor Platform Pair for Telepresence Insertion Into Challenging Structures

A platform has been developed for two or more vehicles with one or more residing within the other (a marsupial pair). This configuration consists of a large, versatile robot that is carrying a smaller, more specialized autonomous operating robot(s) and/or mobile repeaters for extended transmission. The larger vehicle, which is equipped with a ramp and/or a robotic arm, is used to operate over a more challenging topography than the smaller one(s) that may have a more limited inspection area to traverse. The intended use of this concept is to facilitate the insertion of a small video camera and sensor platform into a difficult entry area. In a terrestrial application, this may be a bus or a subway car with narrow aisles or steep stairs. The first field-tested configuration is a tracked vehicle bearing a rigid ramp of fixed length and width. A smaller six-wheeled vehicle approximately 10 in. (25 cm) wide by 12 in. (30 cm) long resides at the end of the ramp within the larger vehicle. The ramp extends from the larger vehicle and is tipped up into the air. Using video feedback from a camera atop the larger robot, the operator at a remote location can steer the larger vehicle to the bus door. Once positioned at the door, the operator can switch video feedback to a camera at the end of the ramp to facilitate the mating of the end of the ramp to the top landing at the upper terminus of the steps. The ramp can be lowered by remote control until its end is in contact with the top landing. At the same time, the end of the ramp bearing the smaller vehicle is raised to minimize the angle of the slope the smaller vehicle has to climb, and further gives the operator a better view of the entry to the bus from the smaller vehicle. Control is passed over to the smaller vehicle and, using video feedback from the camera, it is driven up the ramp, turned oblique into the bus, and then sent down the aisle for surveillance. The demonstrated vehicle was used to scale the steps leading to the interior of a bus whose landing is 44 in. (.1.1 m) from the road surface. This vehicle can position the end of its ramp to a surface over 50 in. (.1.3 m) above ground level and can drive over rail heights exceeding 6 in. (.15 cm). Thus configured, this vehicle can conceivably deliver the smaller robot to the end platform of New York City subway cars from between the rails. This innovation is scalable to other formulations for size, mobility, and surveillance functions. Conceivably the larger vehicle can be configured to traverse unstable rubble and debris to transport a smaller search and rescue vehicle as close as possible to the scene of a disaster such as a collapsed building. The smaller vehicle, tethered or otherwise, and capable of penetrating and traversing within the confined spaces in the collapsed structure, can transport imaging and other sensors to look for victims or other targets.

Krasowski, Michael J.↗

Aeroelastic Response and Protection of Space Shuttle External Tank Cable Trays

Sections of the Space Shuttle External Tank Liquid Oxygen (LO2) and Liquid Hydrogen (LH2) cable trays are shielded from potentially damaging airloads with foam Protuberance Aerodynamic Load (PAL) Ramps. Flight standard design LO2 and LH2 cable tray sections were tested with and without PAL Ramp models in the United States Air Force Arnold Engineering Development Center s (AEDC) 16T transonic wind tunnel to obtain experimental data on the aeroelastic stability and response characteristics of the trays and as part of the larger effort to determine whether the PAL ramps can be safely modified or removed. Computational Fluid Dynamic simulations of the full-stack shuttle launch configuration were used to investigate the flow characeristics around and under the cable trays without the protective PAL ramps and to define maximum crossflow Mach numbers and dynamic pressures experienced during launch. These crossflow conditions were used to establish wind tunnel test conditions which also included conservative margins. For all of the conditions and configurations tested, no aeroelastic instabilities or unacceptable dynamic response levels were encountered and no visible structural damage was experienced by any of the tested cable tray sections. Based upon this aeroelastic characterization test, three potentially acceptable alternatives are available for the LO2 cable tray PAL Ramps: Mini-Ramps, Tray Fences, or No Ramps. All configurations were tested to maximum conditions, except the LH2 trays at -15 deg. crossflow angle. This exception is the only caveat preventing the proposal of acceptable alternative configurations for the LH2 trays as well. Structural assessment of all tray loads and tray response measurements from launches following the Shuttle Return To Flight with the existing PAL Ramps will determine the acceptability of these PAL Ramp alternatives.

Edwards, John W.↗

Characterization of Space Shuttle Thermal Protection System (TPS) Materials for Return-to-Flight following the Shuttle Columbia Accident Investigation

During the Space Shuttle Columbia Accident Investigation, it was determined that a large chunk of polyurethane insulating foam (= 1.67 lbs) on the External Tank (ET) came loose during Columbia's ascent on 2-1-03. The foam piece struck some of the protective Reinforced Carbon-Carbon (RCC) panels on the leading edge of Columbia's left wing in the mid-wing area. This impact damaged Columbia to the extent that upon re-entry to Earth, superheGed air approaching 3,000 F caused the vehicle to break up, killing all seven astronauts on board. A paper after the Columbia Accident Investigation highlighted thermal analysis testing performed on External Tank TPS materials (1). These materials included BX-250 (now BX-265) rigid polyurethane foam and SLA-561 Super Lightweight Ablator (highly-filled silicone rubber). The large chunk of foam from Columbia originated fiom the left bipod ramp of the ET. The foam in this ramp area was hand-sprayed over the SLA material and various fittings, allowed to dry, and manually shaved into a ramp shape. In Return-to-Flight (RTF) efforts following Columbia, the decision was made to remove the foam in the bipod ramp areas. During RTF efforts, further thermal analysis testing was performed on BX-265 foam by DSC and DMA. Flat panels of foam about 2-in. thick were sprayed on ET tank material (aluminum alloys). The DSC testing showed that foam material very close to the metal substrate cured more slowly than bulk foam material. All of the foam used on the ET is considered fully cured about 21 days after it is sprayed. The RTF culminated in the successful launch of Space Shuttle Discovery on 7-26-05. Although the flight was a success, there was another serious incident of foam loss fiom the ET during Shuttle ascent. This time, a rather large chunk of BX-265 foam (= 0.9 lbs) came loose from the liquid hydrogen (LH2) PAL ramp, although the foam did not strike the Shuttle Orbiter containing the crew. DMA testing was performed on foam samples taken fiom a simulated PAL ramp panel. It was found that the smooth rind on the foam facing the cable tray did significantly affect the properties of foam at the PAL ramp surface. The smooth rind increased the storage modulus E' of the foam as much as 20- 40% over a temperature range of -145 to 95 C. Because of foam loss fiom the PAL ramp, future Shuttle flights were grounded indefinitely to allow further testing to better understand foam properties. The decision was also made to remove foam from the LH2 PAL, ramp. Other RTF efforts prior to the launch of Discovery included

Wingard, Doug↗

Vortex Generators to Control Boundary Layer Interactions

Devices for generating streamwise vorticity in a boundary includes various forms of vortex generators. One form of a split-ramp vortex generator includes a first ramp element and a second ramp element with front ends and back ends, ramp surfaces extending between the front ends and the back ends, and vertical surfaces extending between the front ends and the back ends adjacent the ramp surfaces. A flow channel is between the first ramp element and the second ramp element. The back ends of the ramp elements have a height greater than a height of the front ends, and the front ends of the ramp elements have a width greater than a width of the back ends.

Babinsky, Holger↗

Tactical Surface Metering Procedures for Charlotte Douglas International Airport

NASA has been collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for the Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. The primary goal of the ATD-2 project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments while maintaining or improving throughput by enhancing and integrating arrival, departure and surface prediction, scheduling, and management systems. In the Phase 1 Baseline IADS Demonstration, the tactical surface scheduling capability and the user interfaces for ramp controllers and ramp traffic managers were implemented for ramp operations. The purpose of the tactical surface scheduling capability is to provide the airline ramp controller with aircraft pushback advisories that prevent surface congestion and to respond to surface and airspace constraints that become known over relatively short time horizons. For this purpose, the tactical surface metering tool first estimates the capacity of current and near-future runway resources from flight schedule and surveillance data. With demand forecasts and predicted taxi trajectories, this tool computes an efficient runway schedule of aircraft in the planning horizon based on their readiness, Earliest Off-Block Times (EOBTs), and a ration by schedule (RBS) rule. Details on the implementation of the Tactical Surface Metering tool will be provided in the full paper. Both pushback and recommended hold times advisories provided by this surface metering tool are shown on the user interfaces for the ramp controller and the ramp traffic manager, called Ramp Traffic Console (RTC) and Ramp Manager Traffic Console (RMTC), respectively. There is excess queue time in the system due to demand capacity imbalance, this time can be taken as a hold on the runway queue or at the gate and was referred to as the Metering Value. This metering value can be adjusted by the Ramp Manager in collaboration with Air Traffic Controller-Tower Traffic Management Coordinator (TMC). They selected a set of metering values as default values for the tool during human-in-the-loop simulation. As the metering value increases, there is a decrease in the gate hold and increase in the queue time at the runway. Procedures and Information needs related to managing the surface metering procedures were researched in the simulated environment. These procedures will be compared to the procedures adopted at Charlotte Douglas International Airport when the tools were deployed and adopted in November 2017 for one departure push bank per day. Feedback regarding initial issues, information needs such as the need to see EOBTs on the flight data tags and how they compare to scheduled times will also be discussed in the full paper. Initial results will be provided regarding the choice of the metering value and how it was adjusted on a daily basis and what procedures evolved will also be presented in the paper.

surface metering↗

Flexible cryogenic air separation unit—An application for low-carbon fossil-fuel plants

In this study, the rapid integration of intermittent renewable sources into the electricity grid is driving the need for a flexible cryogenic air separation unit (ASU) coupled with a low-carbon fossil-fuel plant. However, the state-of-the-art ASU process is highly integrated and nonlinear, which can significantly restrict its ramping rate. In this work, we study the fundamental dynamics of a state-of-the-art double-column ASU, focusing on the dynamic characteristics of the highly integrated and nonlinear heat and mass transfers, and we propose basic control methods for achieving high process ramping rates. We found that the vapor–liquid countercurrent flows in the low-pressure column are critical to the cryogenic rectification of air, which governs the ramp rate of the ASU. This countercurrent flow structure is created through a complex heat integration process in the ASU. Here, this process is simplified as a countercurrent heat transfer to reduce the complexity of studying the ASU dynamics. To preserve this flow structure, the heat integration is maintained so that its heat duty follows the ASU load, using several basic controllers on the critical stream flowrates. A flow-driven dynamic ASU model is built in Aspen Plus Dynamics to capture the basic ramping dynamics. This model revealed a fundamental mismatch in the dynamics in the ASU column that causes a significant loss of O 2 product purity when ramping down the ASU and slightly increases the purity when ramping up. Based on these findings, we propose a basic control method for rapidly ramping down/up the ASU while maintaining O 2 product purity. Simulation results show the ASU basic dynamic process successfully ramps at a rate up to 10 %/min (40–100 % load) while maintaining the O 2 product purity at 95.2–95.6 mol%.

42 ENGINEERING↗

Parameter Study of the Running-In Process for the Generic Pebble Bed Reactor (GPBR200)

The run-in period of a pebble bed reactor is complex and difficult to model given significant heterogeneity in core composition, power, and temperature. While it is understood that the initial composition of the core should eventually result in the same equilibrium core composition, the approach to equilibrium can vary significantly depending on factors such as start-up fuel enrichment and power ramp rate. To explore this, a high-fidelity model of the General Pebble Bed Reactor was used to vary power ramp schemes and start-up core compositions. It was found that both the initial core composition and power ramp rate had a significant impact on the flow rate of pebbles during early time steps, with higher ramp rates and low enrichment resulting in non-physical flow rates. Power ramp rate alone was found to dictated maximum pebble power peaking observed during the run-in process, with higher ramp rates resulting in greater peak pebble powers. Start-up fuel enrichment and power ramp were found to both impact total fuel consumption, although the impact of start-up fuel enrichment was generally secondary to ramp rate.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Investigation of Aerodynamic and Icing Characteristics of Recessed Fuel-Vent Configurations

An investigation has been conducted in the NACA Cleveland icing research tunnel to determine the aerodynamic and icing characteristics of several recessed fuel-vent configurations. The vents were investigated aerodynamically to obtain vent-tube pressures and pressure distributions on the ramp surface as functions of tunnel-air velocity and angle of attack. Icing investigations were made to determine the vent-tube pressure losses for several icing conditions at tunnel-air velocities ranging from 220 to 440 feet per second. In general, under nonicing conditions, the configurations with diverging ramp walls maintained, vent-tube pressures greater than the required marginal value of 2 inches of water positive pressure differential between the fuel cell and the compartment containing the fuel cell for a range of angles of attack from 0 to 14deg at a tunnel-air velocity of approximately 240 feet per second. A configuration haying divergIng ramp sldewalls, a 7deg ramp angle; and vent tubes manifold,ed to a common plenum chamber opening through a slot In the ramp floor gave the greatest vent-tube pressures for all the configurations investigated. The use of the plenum chamber resulted in uniform pressures in all vent tubes. In a cloud-icing condition, roughness caused by ice formations on the airfoil surface ahead of the vent ramp, rather than icing of the vent configuration, caused a rapid loss in vent-tube pressures during the first few minutes of an icing period. Only the configuration having diverging ramp sidewalls, a 7 ramp angle, and a common plenum chamber maintained the required vent-tube pressures throughout a 60-minute icing period, although the ice formations on this configuration were more severe than those observed for the other configurations. No complete closure of vent-tube openings occurred for the configurations investigated. A simulated freezing-rain condition caused a greater and more rapid vent-tube pressure loss than was observed for a cloud-icing condition.

Ruggeri, Robert S.↗

Multiobjective Dynamic Optimization for Optimal Load-Following of Natural Gas Combined Cycle Power Plants under Stress Constraints

With the increasing penetration of intermittent renewable energy sources into the electric grid, there is an associated need for conventional thermal power plants that are designed to operate at base-load conditions to cycle their load rapidly and frequently and operate under low-load conditions. Fast load-following operations lead to plant efficiency loss and the reduction of equipment life. A high-fidelity dynamic model of a natural gas combined cycle power plant, with rigorous equipment level submodels, is developed to capture the plant transient performance and the thermomechanical stress evolution at the high-pressure drum is computed to assess the drum life consumption. Stress evolution is modeled for the location of the edge at the drum/downcomer junction that experiences high circumferential stress amplitude during the fast load-following operation, leading to higher fatigue damage than locations considered under existing design standards. A dynamic optimization problem is solved for optimal load-following operation. Depending on the value of the stress constraint and the desired ramp rate, satisfying the desired stress constraint may be infeasible without relaxing the ramp rate. A multiobjective dynamic optimization problem is solved using a lexicographic approach that minimizes ramp rate relaxation and maximizes efficiency while satisfying stress constraints, avoiding spraying to saturation, and maintaining main steam and reheat steam temperature within bounds. It was observed that the optimal ramp rate can be highly nonlinear as opposed to the industry-standard linear ramp rate. Nonlinear optimal ramp-rate profiles not only help to avoid stress constraints that may be unavoidable by using the linear profile but also result in higher efficiency than the linear profile. Furthermore, the study shows that there is a strong tradeoff between the relaxation in the plant ramp rate and the time-average thermal efficiency.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

High-compression implosions based on high density carbon ablator using modified drive and capsule dopant profiles

Laser-driven inertial fusion experiments have, for the first time, achieved a target gain greater than unity in a laboratory setting [Abu-Shawareb et al., Phys. Rev. Lett. 132, 065102 (2024)]. Despite this breakthrough, the burn-up fraction remains limited to about one-fourth of ideal estimates due to insufficient areal density, highlighting the potential for greater gains through enhanced compression. In our previous work, we demonstrated record-high compression of stagnated fuel in indirectly driven implosions using high-density carbon ablators. This was achieved by combining a continuous ramped pulse drive with a modified ablator dopant profile, which reduced mixing at the fuel–ablator interface and improved stability [Tommasini et al., Phys. Rev. Res. 5, L042034 (2023)]. Based on this foundation, the study presented here investigates the limits of compression achievable by combining the continuous ramped pulse drive with different dopant profiles to further minimize unstable interfaces and gradient discontinuities, thereby reducing fuel–ablator mixing. Our results demonstrate that the continuous ramped pulse consistently outperforms designs based on 3-shock drive pulses across all ablator profiles studied, with compression showing only a relatively modest dependence on dopant configurations that reduce the number of interfaces or eliminate discontinuities in the dopant gradient profile. Sub-scale experiments using the continuous ramped pulse achieved compression levels exceeding those of full-scale “HyE” implosions [Kritcher et al., Phys. Plasmas 28, 072706 (2021)] at similar adiabat, anticipating significant performance gains with increased scale, as supported by models and simulations. These findings underscore the critical role of the continuous ramped pulse in reducing mix and achieving improved compression. They also provide a foundation for future large-scale experiments to test the continuous ramped pulse design on deuterium–tritium fuel in the burn-wave propagation regime, leveraging the most effective combinations of continuous ramped pulse and dopant profiles identified in this study.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Effects of Step Shape on Transition over a Swept Backward-Facing Step

The effect of backward-facing step shape on stationary-crossflow growth was studied down-stream of a two-dimensional step in a swept-wing flow. The step height was set at 76% of the local unperturbed boundary-layer thickness at the step location, and the shape was varied by placing three ramps of differing slopes and shapes on the downstream face of the step, including a 30◦ramp, rounded ramp, and a 5◦ramp. In addition, the square step shape (with noramp) was studied. The 5◦ramp was the only one that was successful at substantially delaying transition downstream of the step. Even so, it did not completely mitigate the effect of the step. The 5◦ramp significantly altered the mean flow, significantly reducing the separation region downstream of the step. While this geometry still resulted in increased growth of the stationary crossflow instability, it substantially reduced the amplitude of the unsteady instabilities that grew downstream of the step. In particular, this ramp completely eliminated the low-frequency, traveling crossflow mode that was observed in the other cases.

Jenna L Eppink↗

OECD/NEA MPCMIV Benchmark - Preliminary fuel performance results

The on-going OECD/NEA Multi-physics Pellet Cladding Mechanical Interaction Validation (MPCMIV) benchmark aims to provide guidance on multi-physics validation through the modelling of two cold ramps. In this paper, the first results for the base irradiation of the father rod and fuel rodlet (refabricated from the father rod), and the first cold ramp are presented. The base irradiation consists of 3 years of irradiation in the Forsmark-2 reactor. The cold ramp encompasses a steady-state pre-ramp period of less than one hour at a low constant linear heat rate (LHR) followed by a ramp test (< 1 min) with a much higher maximal LHR. The base irradiation is modelled using the fuel performance codes FRAPCON and FAST, while the cold ramp modeling is using the fuel performance code FRAPTRAN. Several missing parameters for FRAPCON/FAST base irradiation models have been selected using multiple references such as the OECD/NEA light water reactor Uncertainty Analysis in Modelling (UAM) benchmark specifications and the FRAPCON Integral Assessment report. The obtained results for the base irradiation such as the cladding outer diameter show reasonable agreement with the experimental measurements. The results for the cold ramp show larger differences with the experimental measurements (e.g., cladding axial elongation). However, such differences have been observed as well in other studies involving pellet cladding mechanical interaction analyses and are attributed to the fuel performance modelling assumptions and to the tuned modelling parameters that were not covered by the specifications. Uncertainty and sensitivity analysis might allow a better quantification of these missing parameters. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗