Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “positive train control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Task Order 22 – Engineering and Technical Support, Deep Borehole Field Test. AREVA Summary Review Report

Under Task Order 22 of the industry Advisory and Assistance Services (A&AS) Contract to the Department of Energy (DOE) DE-NE0000291, AREVA has been tasked with providing assistance with engineering, analysis, cost estimating, and design support of a system for disposal of radioactive wastes in deep boreholes (without the use of radioactive waste). As part of this task order, AREVA was requested, through a letter of technical direction, to evaluate Sandia National Laboratory’s (SNL’s) waste package borehole emplacement system concept recommendation using input from DOE and SNL. This summary review report (SRR) documents this evaluation, with its focus on the primary input document titled: “Deep Borehole Field Test Specifications/M2FT-15SN0817091” Rev. 1 [1], hereafter referred to as the “M2 report.” The M2 report focuses on the conceptual design development for the Deep Borehole Field Test (DBFT), mainly the test waste packages (WPs) and the system for demonstrating emplacement and retrieval of those packages in the Field Test Borehole (FTB). This SRR follows the same outline as the M2 report, which allows for easy correlation between AREVA’s review comments, discussion, potential proposed alternatives, and path forward with information established in the M2 report. AREVA’s assessment focused on three primary elements of the M2 report: the conceptual design of the WPs proposed for deep borehole disposal (DBD), the mode of emplacement of the WP into DBD, and the conceptual design of the DBFT. AREVA concurs with the M2 report’s selection of the wireline emplacement mode specifically over the drill-string emplacement mode and generically over alternative emplacement modes. Table 5-1 of this SRR compares the pros and cons of each emplacement mode considered viable for DBD. The primary positive characteristics of the wireline emplacement mode include: (1) considered a mature technology; (2) operations are relatively simple; (3) probability of a radiological release due to off-normal events are relatively low; (4) costs are relatively low; and (5) maintenance activities are relatively simple. The primary drawback associated with the wireline emplacement mode for DBD is the number of emplacement trips-in to the borehole, which results in a relatively higher probability for a drop event. Fortunately, the WPs can be engineered with impact limiters that will minimize the likelihood of a breach of the WP due to a drop. The WP designs presented in the M2 report appear to be focused on compatibility with the drill-string emplacement mode (e.g., the threaded connections). With the recommendation that the wireline emplacement mode be utilized for the DBFT, some changes may be warranted to these WPs. For example, the development of a WP release connection that is more reliable than the currently credited connection, which is considered to have a high failure probability, and the integration of an impact limiter into its design. The M2 report states the engineering demonstration of the DBFT will occur in the FTB over a 4-year period. AREVA recommends development and testing of the WP emplacement handling equipment occur separately (but concurrently, if not earlier) from the FTB at a mock-up facility. The separation of this activity would prevent schedule interference between the science and engineering thrusts of the project. Performing tests in a mock-up facility would allow additional control and observation compared to the FTB. The mock-up facility could also be utilized as a training facility for future operations. Terminal velocity and impact limiter testing would require the FTB for testing, since these areas would be difficult to reproduce in a limited depth mock-up. Although only at the end of the conceptual stage of design development, DBD appears to be a viable solution for some waste forms produced by the nuclear industry. However, regulatory requirements have yet to be established for pre- and post-closure performance of DBD and should be established as soon as possible. Some of the main areas of focus from a regulatory perspective include: (1) establishing acceptable performance requirements for the long-term behavior of DBD; (2) determining acceptable borehole abandonment criteria; (3) establishing retrievability requirements; (4) developing a consensus on the factor of safety (FoS) for the emplacement mode and WP; and (5) establishing safety and safeguards performance requirements for DBD. Although conservative requirements have been utilized to provide the foundation for the conceptual design of DBD, regulatory requirements and feedback are necessary to confirm recommendations made herein and to ensure the long-term performance of DBD is acceptable. The combination of the M2 report and this SRR is intended to facilitate the completion of the conceptual design for DBD for the Cs and Sr capsules and calcined waste forms. Using the conceptual design, preliminary design activities (the second stage of a three-stage process described in the M2 report) can proceed and the DBFT utilized to support, demonstrate, and confirm engineering elements of this design.

42 ENGINEERING↗

Use of Machine Learning on PMU Data for Transmission System Fault Analysis

Synchrophasor technology has been used for monitoring, control, and protection of bulk power system for over 10 years. Deployment of phasor measurement units (PMUs) in the USA power system has surpassed 3000 units installed in the transmission substations as stand-alone intelligent electronic devices (IEDs) or as a software add-on to other devices such as digital protective relays (DPRs) or digital fault recorders (DFRs). By now, thousands of terabytes of PMU data may have been captured and stored by various transmission system operators (TSOs) and independent system operators (ISOs). This creates an opportunity to deploy advanced machine learning (ML) techniques to detect and classify faults recorded by PMUs automatically to be used by the system operators for rapid, critical decision-making when manual analysis of the past or unfolding events is not feasible. In this paper we offer a brief background on how the automated fault analysis may be done using DPR and/or DFR data, and compare some of the legacy approaches to the new ML approaches in the context of the system-wide PMU recordings. We then offer insights from developing practical ML solutions that have been applied on field recordings captured by close to 450 PMUs from all three US interconnections (Western, Eastern and ERCOT) over two years (2016-2017). We identify and illustrate ML challenges we addressed: inaccurate data, data with scarce and temporally imprecise fault labels, data recorded by PMUs sparsely located at substations resulting in the fault records taken afar from the ends of the faulted lines, data containing only positive sequence values, and data taken at different voltage levels. We then illustrate the ML model results for fault analysis under different application scenarios. The novelty of this study is not only in the design, implementation, and performance analysis of the ML algorithms, but also in the use of advanced fault modelling and simulation approaches to improve the training results when developing supervised ML models for fault detection and classification. Extensive simulations of faults were conducted on a 14-bus power system to create a training dataset with over 1400 accurately labelled faults. This dataset was applied to enhance the accuracy of fault detection and classification of machine learning-based models trained with small number of labelled faults in large datasets recorded in the grid interconnections ranging from 5,000 to 70,000 buses.

Synchrophasors, Machine Learning, Fault Analysis, ↗

Spacecraft Software Maintenance: An Effective Approach to Reducing Costs and Increasing Science Return

Flight software is a mission critical element of spacecraft functionality and performance. When ground operations personnel interface to a spacecraft, they are typically dealing almost entirely with the capabilities of onboard software. This software, even more than critical ground/flight communications systems, is expected to perform perfectly during all phases of spacecraft life. Due to the fact that it can be reprogrammed on-orbit to accommodate degradations or failures in flight hardware, new insights into spacecraft characteristics, new control options which permit enhanced science options, etc., the on- orbit flight software maintenance team is usually significantly responsible for the long term success of a science mission. Failure of flight software to perform as needed can result in very expensive operations work-around costs and lost science opportunities. There are three basic approaches to maintaining spacecraft software--namely using the original developers, using the mission operations personnel, or assembling a center of excellence for multi-spacecraft software maintenance. Not planning properly for flight software maintenance can lead to unnecessarily high on-orbit costs and/or unacceptably long delays, or errors, in patch installations. A common approach for flight software maintenance is to access the original development staff. The argument for utilizing the development staff is that the people who developed the software will be the best people to modify the software on-orbit. However, it can quickly becomes a challenge to obtain the services of these key people. They may no longer be available to the organization. They may have a more urgent job to perform, quite likely on another project under different project management. If they havn't worked on the software for a long time, they may need precious time for refamiliarization to the software, testbeds and tools. Further, a lack of insight into issues related to flight software in its on-orbit environment, may find the developer unprepared for the challenges. The second approach is to train a member of the flight operations team to maintain the spacecraft software. This can prove to be a costly and inflexible solution. The person assigned to this duty may not have enough work to do during a problem free period and may have too much to do when a problem arises. If the person is a talented software engineer, he/she may not enjoy the limited software opportunities available in this position; and may eventually leave for newer technology computer science opportunities. Training replacement flight software personnel can be a difficult and lengthy process. The third approach is to assemble a center of excellence for on-orbit spacecraft software maintenance. Personnel in this specialty center can be managed to support flight software of multiple missions at once. The variety of challenges among a set of on-orbit missions, can result in a dedicated, talented staff which is fully trained and available to support each mission's needs. Such staff are not software developers but are rather spacecraft software systems engineers. The cost to any one mission is extremely low because the software staff works and charges, minimally on missions with no current operations issues; and their professional insight into on-orbit software troubleshooting and maintenance methods ensures low risk, effective and minimal-cost solutions to on-orbit issues.

Shell, Elaine M.↗

Resistance exercise prevents plantar flexor deconditioning during bed rest

Because resistance exercise (REX) and unloading induce opposing neuromuscular adaptations, we tested the efficacy of REX against the effects of 14 d of bed rest unloading (BRU) on the plantar flexor muscle group. Sixteen men were randomly assigned to no exercise (NOE, N = 8) or REX (N = 8). REX performed 5 sets x 6-10 repetitions to failure of constant resistance concentric/eccentric plantar flexion every other day during BRU. One-repetition maximum (1RM) strength was tested on the training device. The angle-specific torque-velocity relationship across 5 velocities (0, 0.52, 1.05, 1.75, and 2.97 rad.s-1) and the full range-of-motion power-velocity relationship were assessed on a dynamometer. Torque-position analyses identified strength changes at shortened, neutral, and stretched muscle lengths. Concentric and eccentric contractile work were measured across ten repetitions at 1.05 rad.s-1. Maximal neural activation was measured by surface electromyography (EMG). 1RM decreased 9% in NOE and improved 11% in REX (P < 0.05). Concentric (0.52 and 1.05 rad.s-1), eccentric (0.52 and 2.97 rad.s-1), and isometric angle-specific torques decreased (P < 0.05) in NOE, averaging 18%, 17%, and 13%, respectively. Power dropped (P < 0.05) in NOE at three eccentric (21%) and two concentric (14%) velocities. REX protected angle-specific torque and average power at all velocities. Concentric and eccentric strength decreased at stretched (16%) and neutral (17%) muscle lengths (P < 0.05) in NOE while REX maintained or improved strength at all joint positions. Concentric (15%) and eccentric (11%) contractile work fell in NOE (P < 0.05) but not in REX. Maximal plantar flexor EMG did not change in either group. In summary, constant resistance concentric/eccentric REX completely prevented plantar flexor performance deconditioning induced by BRU. The reported benefits of REX should prove useful in prescribing exercise for astronauts in microgravity and for patients susceptible to functional decline during bed- or chair-bound hospital stays.

NASA Discipline Musculoskeletal↗

An Aerial Radiological Survey of Selected Areas of Area 18 - Nevada Test Site

As part of the proficiency training for the Radiological Mapping mission of the Aerial Measuring System (AMS), a survey team from the Remote Sensing Laboratory-Nellis (RSL-Nellis) conducted an aerial radiological survey of selected areas of Area 18 of the Nevada Test Site (NTS) for the purpose of mapping man-made radiation deposited as a result of the Johnnie Boy and Little Feller I tests. The survey area centered over the Johnnie Boy ground zero but also included the ground zero and deposition area of the Little Feller I test, approximately 7,000 feet (2133 meters) southeast of the Johnnie Boy site. The survey was conducted in one flight. The completed survey covered a total of 4.0 square miles. The flight lines (with the turns) over the surveyed areas are presented in Figure 1. One 2.5-hour-long flight was performed at an altitude of 100 ft above ground level (AGL) with 200 foot flight-line spacing. A test-line flight was conducted near the Desert Rock Airstrip to ensure quality control of the data. The test line is not shown in Figure 1. However, Figure 1 does include the flight lines for a ''perimeter'' flight. The path traced by the helicopter flying over distinct roads within the survey area can be used to overlay the survey data on a base map or image. The flight survey lines were flown in an east-west orientation perpendicular to the deposition patterns for both sites. This technique provides better spatial resolution when contouring the data. The data were collected by the AMS data acquisition system (REDAR V) using an array of twelve 2-inch x 4-inch x 16-inch sodium iodide (NaI) detectors flown on-board a twin-engine Bell 412 helicopter. Data, in the form of gamma energy spectra, were collected every second over the course of the survey and were geo-referenced using a differential Global Positioning System. Spectral data allows the system to distinguish between ordinary fluctuations in natural background radiation levels and the signature produced by man-made radioisotopes. Spectral data can also identify specific radioactive isotopes. Based on the results of the RSL NTS 1994 surveys, this area was chosen for a resurvey to improve the spatial resolution of the reported depositions for the Johnnie Boy and Little Feller I events. In addition, the survey was expected to confirm the absence of detectable concentrations of Americium-241 (Am-241) at the Johnnie Boy site and attempt to confirm the presence of Uranium-235 (U-235).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Real-Time Traffic Information for Emergency Evacuation Operations: Phase A Final Report

There are many instances in which it is possible to plan ahead for an emergency evacuation (e.g., an explosion at a chemical processing facility). For those cases, if an accident (or an attack) were to happen, then the best evacuation plan for the prevailing network and weather conditions would be deployed. In other cases (e.g., the derailment of a train transporting hazardous materials), there may not be any previously developed plan to be implemented and decisions must be made ad-hoc on how to proceed with an emergency evacuation. In both situations, the availability of real-time traffic information plays a critical role in the management of the evacuation operations. To improve public safety during a vehicular emergency evacuation it is necessary to detect losses of road capacity (due to incidents, for example) as early as possible. Once these bottlenecks are identified, re-routing strategies must be determined in real-time and deployed in the field to help dissipate the congestion and increase the efficiency of the evacuation. Due to cost constraints, only large urban areas have traffic sensor deployments that permit access to some sort of real-time traffic information; any evacuation taking place in any other areas of the country would have to proceed without real-time traffic information. The latter was the focus of this SERRI/DHS (Southeast Region Research Initiative/Department of Homeland Security) sponsored project. That is, the main objective on the project was to improve the operations during a vehicular emergency evacuation anywhere by using newly developed real-time traffic-information-gathering technologies to assess traffic conditions and therefore to potentially detect incidents on the main evacuation routes. Phase A of the project consisted in the development and testing of a prototype system composed of sensors that are engineered in such a way that they can be rapidly deployed in the field where and when they are needed. Each one of these sensors is also equipped with their own power supply and a GPS (Global Positioning System) device to auto-determine its spatial location on the transportation network under surveillance. The system is capable of assessing traffic parameters by identifying and re-identifying vehicles in the traffic stream as those vehicles pass over the sensors. The system of sensors transmits, through wireless communication, real-time traffic information (travel time and other parameters) to a command and control center via an NTCIP (National Transportation Communication for ITS Protocol) -compatible interface. As an alternative, an existing NTCIP-compatible system accepts the real-time traffic information mentioned and broadcasts the traffic information to emergency managers, the media and the public via the existing channels. A series of tests, both in a controlled environment and on the field, were conducted to study the feasibility of rapidly deploying the system of traffic sensors and to assess its ability to provide real-time traffic information during an emergency evacuation. The results of these tests indicated that the prototype sensors are reliable and accurate for the type of application that is the focus of this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Role of orientation reference selection in motion sickness

The overall objective of this proposal is to understand the relationship between human orientation control and motion sickness susceptibility. Three areas related to orientation control will be investigated. These three areas are (1) reflexes associated with the control of eye movements and posture, (2) the perception of body rotation and position with respect to gravity, and (3) the strategies used to resolve sensory conflict situations which arise when different sensory systems provide orientation cues which are not consistent with one another or with previous experience. Of particular interest is the possibility that a subject may be able to ignore an inaccurate sensory modality in favor of one or more other sensory modalities which do provide accurate orientation reference information. We refer to this process as sensory selection. This proposal will attempt to quantify subjects' sensory selection abilities and determine if this ability confers some immunity to the development of motion sickness symptoms. Measurements of reflexes, motion perception, sensory selection abilities, and motion sickness susceptibility will concentrate on pitch and roll motions since these seem most relevant to the space motion sickness problem. Vestibulo-ocular (VOR) and oculomotor reflexes will be measured using a unique two-axis rotation device developed in our laboratory over the last seven years. Posture control reflexes will be measured using a movable posture platform capable of independently altering proprioceptive and visual orientation cues. Motion perception will be quantified using closed loop feedback technique developed by Zacharias and Young (Exp Brain Res, 1981). This technique requires a subject to null out motions induced by the experimenter while being exposed to various confounding sensory orientation cues. A subject's sensory selection abilities will be measured by the magnitude and timing of his reactions to changes in sensory environments. Motion sickness susceptibility will be measured by the time required to induce characteristic changes in the pattern of electrogastrogram recordings while exposed to various sensory environments during posture and motion perception tests. The results of this work are relevant to NASA's interest in understanding the etiology of space motion sickness. If any of the reflex, perceptual, or sensory selection abilities of subjects are found to correlate with motion sickness susceptibility, this work may be an important step in suggesting a method of predicting motion sickness susceptibility. If sensory selection can provide a means to avoid sensory conflict, then further work may lead to training programs which could enhance a subject's sensory selection ability and therefore minimize motion sickness susceptibility.

Peterka, Robert J.↗

Cross-Cultural Barriers to Effective Communication in Aviation

Communication is essential to safe flight, as evidenced by several accidents in which crew communicates was found to have contributed to the accidents. This chapter documents the essential role of explicit efficient communication to flight safety with a global context. It addresses communication between flight crews and air traffic controllers in regions a the world where pilots and controllers speak different native languages, as well as cases in which crew members within the flight deck represent different native languages and cultures. It also addresses problems associated with "exporting" crew resource management training programs to parts of the world which values and norms differ from those of the United States, where these programs were initially developed. This chapter is organized around several central questions: (1) What are various kinds of communication failures and what are their consequences; (2) What are the causes of communication failure; (3) What are features of effective crew communication; (4) What can be done to enhance communication success? To explore a wider range of communication failures than available from accident reports, we examined a set of incident reports from the Aviation Safety Reporting System. These could be classified into three major categories: those in which language actually interfered with transmission of a message; those in which transmission was adequate but the context was not expressed unambiguously and thus the message received was not the same as the message intended; and those in which the message was received as intended, but was not adequately understood or acted upon, mainly because of cultural factors. The consequences of failed communication can be flight errors (such as when a clearance is not received correctly), loss of situation awareness, or failure of crew members (or ATC and pilots) to build a shared understanding of a situation. Causes of misunderstanding can be traced to a number of sources, often grounded in faulty assumptions held by one or both parties to a conversation. Speakers and listeners often experience "illusionary understanding" in which they think they understand each other, but in fact do not. While this problem can exist within a single culture, it is much more serious across cultures. Training in effective explicit communication is a component of Crew Resource Management training programs developed in the U.S. These programs are being adopted by airlines around the world, with varying degrees of success. The level of success in part depends on how similar the conversational and social styles of those cultures are to those of the U.S. A factor that influences conversational style is a culture's relative positioned on two major dimensions that distinguish national cultural groups: individualism vs. collectivism and degree of power distance. The chapter concludes with a discussion of techniques for overcoming the various classes of communication failures and for effectively adapting training programs to fit the values and norms of cultures around the globe.

Fischer, U.↗

Formative and summative evaluation efforts for the Teacher Enhancement Institute conducted at the NASA Langley Research Center, summer 1994

The Teacher Enhancement Institute (TEI) at NASA Langley Research Center was developed in response to Executive Order 12821 which mandates national laboratories to 'assist in the mathematics and science education of our Nation's students, teachers, parents, and the public by establishing programs at their agency to provide for training elementary and secondary school teachers to improve their knowledge of mathematics and science. Such programs, to the maximum extent possible, shall involve partnerships with universities, state and local elementary and secondary school authorities, corporations and community based organizations'. The faculty worked closely with one another and the invited speakers to insure that the sessions supported the objectives. Speakers were informed of the objectives and given guidance concerning form and function for the session. Faculty members monitored sessions to assist speakers and to provide a quality control function. Faculty provided feedback to speakers concerning general objective accomplishment. Participant comments were also provided when applicable. Post TEI surveys asked for specific comments about each TEI session. During the second of the two, two week institutes, daily critiques were provided to the participants for their reflection. This seemed to provide much improved feedback to speakers and faculty because the sessions were fresh in each participant's mind. Between sessions one and two, some changes were made to the program as a result of the formative evaluation process. Those changes, though, were minor in nature and comprised what may be called 'fine tuning' a well conceived and implemented program. After the objectives were written, an assessment instrument was developed to test the accomplishment of the objectives. This instrument was actually two surveys, one given before the TEI and one given after the TEI. In using such a series, it was expected that changes in the participants induced by attendance at TEI may be discovered. Because the institute was limited in time and depth of exposure, attitudinal changes (self-assessment of ability and confidence) were chosen to be surveyed. On the pre-survey, seven general categories of questions were asked. The post-survey repeated three of these categories, providing a pre and post evaluation of the same questions and added a fourth category which asked the participant to self-assess objective accomplishment. The assessment process for TEI was valuable when one looks at the final accomplishments of the TEI. A number of aspects stand out: (1) formative evaluation during project development allowed the goals and objectives to guide the development of the institute; (2) formative evaluation provided positive guidance to presenters in developing and implementing their session; (3) formative evaluation helped presenters to improve or focus their sessions; (4) summative evaluation provided managers a way to gauge the success of the institute; (5) summative evaluation provided a benchmark for future programs to be measured against.

Carlson, Randal D.↗

Investigation of Hardware and Instrumentation to Measure Hand Grasp Activity with the Spacesuit Gloves

Introduction: During the 2022 suited injury summit, it was hypothesized that there will be concerns for hand and glove injuries for future exploration space missions, especially given the fact that the “total number of Extravehicular activity (EVA) hours and frequency” for lunar surface missions is expected to vastly increase [1]. It has been reported that the hands experienced the greatest “absolute numbers” of reported injuries and far exceeds other injuries during EVA [1, 2]. It was reported that the most fatiguing part of the surface EVA was the repetitive gripping tasks [3]. It was recommended that a “glove sub-team” be created to look at possible injury mechanism and mitigation strategies. Some of the recommendations that were suggested [1] are as follows: examine hand fatigue, utilize motion capture, examine the duration and frequency of hand movements, and identify frequent hand motions. We started assessing hardware and instrumentation to measure hand grasp activity in the pressurized glove environment. The purpose of this test was to perform a hardware evaluation for motion capture (MoCap) gloves obtained from StretchSense (Auckland, New Zealand). The specific gloves used were the Pro Fidelity and SuperSplay to determine the repeatability, reliability, feasibility, and useability inside of a pressurized gloved environment. Methods: The MoCap gloves were customized (e.g., battery/Bluetooth pack relocated to upper arm) to better suit the pressurized testing environment and protect the subject from unintentional injury (Fig. 1). Fourteen total subjects from different demographics (i.e., gender and pressurized glove experience level) participated in this test series. Testing included one session each of a baseline data collection (NASA Johnson Space Center (JSC) building 21) and a spacesuit glove box (Fig. 2 at JSC building 7 room 2027) data collection (under vacuum down to 4.3 psid), where each session lasted 3-5 hours. Controlled and reproducible tasks to systematically evaluate the repeatability and reliability of the hardware were performed during baseline data collection. Additionally, subjects performed simulated EVA-like tasks in a pressurized gloved environment. For all sessions, MoCap gloves were placed on each of the subjects’ hands and the signal from it, or the raw capacitance (Fig. 3), was analysed. The raw capacitance was used to estimate the open and closed hand states between the testing conditions and allow us to provide an offset caused by the pressurized environment. Results & Discussion: Initial observation with the bare hands (baseline) condition showed that the MoCap gloves appeared to track grasping and releasing of the fingers (opening and closing fist) with both high- and low-speed conditions, while adduction and abduction of the fingers were not relatively tracked. A hardware evaluation was done outside of the glove box to assess the reliability and repeatability of the MoCap glove. In one task, a point force was applied to various locations on the back of the hand. When the point force was applied to the space between the 1st digit and the pointer finger, there was a noticeable distortion to the MoCap data. Another task examining an increasing force from a 10 lb. sandbag applied to the back of the hand while lying flat on a table, showed a constant flat line with only a distortion when the weight was increased or added to the back of the hand. Fig. 3 shows an object relocation task where you can see when each individual finger “opened” and “closed” (changed position) when picking up and setting down the dumbbell. When the fingers were stationary, the signal remained relatively flat compared to the peaks and valleys that can be observed in Fig. 3. This study showed promising results and imperative input into an attempt to discriminate between hand states across various functional tasks and should be evaluated with context to the repeatability and reliability outcomes. Depending on the task done inside of the pressurized glove box environment and outside, the results appear to be affected by many different factors (i.e., drift, pressure, hand size, etc.). Significance: If this hardware proves to be reliable and repeatable in determining the open and closed hand states then this may provide critical insight into assisting in the characterization of the pressurized gloved environment and the effect on crew member exertion level. Ultimately, this tool will provide useful data for quantifying the repetitive nature of EVA training and tasks. Acknowledgments: The authors would like to acknowledge the NASA Mars Campaign Office for providing funding for this research. Lastly, thanks to all the engineers and technicians at NASA JSC who helped with this data collection. References: [1] Reiber, et al. (2022), NASA/TM-20220007605; [2] Scheuring, et al. (2009), Av., Sp., and Envir. Med. 80(2). [3] Scheuring, et al. (2007), NASA/TM–2007–214755.

Rachel L Thompson↗

Looking to the Future: A Call to Action for Advanced GNC Algorithm Verification and Validation

Future space systems will rely on autonomous Guidance, Navigation, and Control (GNC) functions to efficiently manage safe and precise self-directed operations in uncertain complex environments. Fundamentally, the GNC system plays a key role in mission performance and safety because it computes the ideal trajectory (Guidance), determines the actual trajectory (Navigation), and executes the ideal trajectory (Control) of a vehicle’s position and attitude. Our current GNC systems are highly automated and already have a high degree of complexity. As missions become more ambitious, GNC systems for launch vehicles and space platforms (e.g., spacecraft, probes, and landers) will require higher levels of performance and autonomous operation than previously encountered, for example, this includes GNC for optimizing aerodynamic and/or propulsion performance during planetary entry. This GNC Verification and Validation (V&V) paper highlights concerns with what undoubtedly will be a trend towards increased complexity as fully autonomous GNC systems are developed for future space missions. Clearly, complex GNC systems pose challenges in the prelaunch V&V phase, which is a relatively expensive part of a mission’s life cycle. Essentially the V&V phase is focused on checking that the system effectively meets all the design and operational requirements for the mission. The authors of this paper (i.e., the Inter-Agency Working Group of GNC subject matter experts) focused on this fundamental question over the past few years: Will the GNC engineering community of practice be sufficiently prepared to perform the necessary V&V on evolving GNC architectures that are driven by very demanding requirements for autonomy, resiliency, reconfigurability, adaptability, and mission cost-benefit balance? It is the viewpoint of our Inter-Agency team that the GNC V&V approaches and processes needed to address the next generation of complex GNC systems, which likely will employ various forms of modern GNC technology, are not currently established to the level the community will need in the future. While researchers and practitioners have made some progress in developing new GNC V&V methods for modern GNC systems, a good deal of work remains to be done to codify such methods in a comprehensive and systematic manner. Thus, the Inter-Agency team’s partner organizations [the National Aeronautics and Space Administration (NASA), the European Space Agency (ESA), the National Centre for Space Studies (CNES), the German Aerospace Center (DLR), the French Aerospace Lab (ONERA), and ISAE-SUPAERO] have conducted preliminary investigations into advancing GNC V&V techniques, which resulted in the identification of the need for education, new V&V tools, and benchmark problems for the GNC community. The necessary proactive steps to be taken to meet the challenges and fill the gaps in GNC V&V are summarized in this paper. The first steps include identifying advanced analysis tools, developing a GNC V&V roadmap, and expanding education and training programs for GNC practitioners. This paper is a call to action and proposes a comprehensive set of recommended actions for all our stakeholders: space agencies, researchers, and industry.

Samir Bennani↗

Explainable Artificial Intelligence Technology for Predictive Maintenance

The domestic nuclear power plant fleet has relied on labor-intensive and time-consuming preventive maintenance programs, thus driving up operation and maintenance costs to achieve high-capacity factors. Artificial intelligence and machine learning can help simplify complex problems, such as diagnosing equipment degradation, to enable more effective decision-making. Benefits will be felt not only within existing analog and digital instrumentation and control, but also work processes, the integration of people with technology, and most importantly, the business case. Together, these hold promise to make nuclear power more efficient and reduce costs associated with operation and maintenance. While the artificial intelligence and machine learning technologies hold significant promise in the nuclear industry, there are challenges or barriers to their adoption. This report outlines the those different machine learning adoption barriers (categorized as historical, technical, economic, regulatory, and user) that the industry must overcome to realize the full benefits of artificial intelligence and machine learning capabilities for long-term economic sustainability. This report also provides solutions for some of these barriers by focusing on improving the explainability of machine learning to encourage trust from the end-user. Trust and explainability are essential to machine learning adoption. This report focuses on research-developed solutions to some of these barriers while analyzing a non-safety-related system, namely the circulating water system. This system frequently experiences waterbox fouling which our models preemptively diagnoses then explains to the operator how those conclusions were reached. This report presents and discusses the inherent trade-off between machine learning performance (in terms of accuracy) and explainability, where highly accurate machine learning methods (such as deep-learning) are the least explainable, and the most explainable methods (such as decision trees) are the least accurate. In addition, explainability of artificial intelligence techniques in terms of transparency and post-hoc metrics are discussed. This report outlines the importance of data novelty and value of new information in evaluating both the explainability and trustworthiness. Novelty detection helps to establish consistency or inconsistency of the new data with respect to the training data. On the other hand, value of information could be a part of the user-centric visualization recommendation system that request additional information to be collected, thereby strengthening the machine learning outcomes. During this project, a copyrighted user-centric visualization that aligns with a human-in-the-loop approach was developed. The user-centric visualization presents different levels of information and can be tailored as per user credentials to gain user confidence. One of the salient features of the user-centric visualization is it presents machine learning methods with explainability metrics. A simplified version of the user-centric visualization was presented to 32 users with varying levels of machine learning expertise. Feedback was solicited to test the hypothesis that the app contained sufficient explainability and that the users would trust the algorithm. Overall, the app was positively received, and the hypothesis was supported. This report discusses the trust-but-verify framework – a potential approach to build user trust artificial intelligence. The framework discusses trust from the human level to artificial intelligence level. The fundamental premise of the trust but verify framework is derived from an observation of nuclear safety culture (i.e., nuclear power plant personnel do not rely on a singular source of data to make a decision). This also ties back to the user-centric visualization that presents different levels of information to achieve both explainability and trustworthiness of artificial intelligence. Even so, the adoption of artificial intelligence and machine learning in the nuclear industry faces additional barriers, namely regulatory and stakeholder readiness. To overcome these challenges, new solutions must gain regulatory approval and cater to stakeholder needs. The Nuclear Regulatory Committee has a 5-year strategic plan which prepares them for reviewing artificial intelligence technologies in licensee submissions. Early and frequent engagement with the regulator is encouraged. Additionally, artificial intelligence solutions should incorporate human-in-the-loop considerations and offer explainability. Stakeholders must prepare by hiring or training staff to adapt to advancing technology in everyday plant tasks.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Additive Manufacturing, Design, Testing, and Fabrication: A Full Engineering Experience at JSC

I worked on several projects this term. While most projects involved additive manufacturing, I was also involved with two design projects, two testing projects, and a fabrication project. The primary mentor for these was Richard Hagen. Secondary mentors were Hai Nguyen, Khadijah Shariff, and fabrication training from James Brown. Overall, my experience at JSC has been successful and what I have learned will continue to help me in my engineering education and profession long after I leave. My 3D printing projects ranged from less than a 1 cubic centimeter to about 1 cubic foot and involved several printers using different printing technologies. It was exciting to become familiar with printing technologies such as industrial grade FDM (Fused Deposition Modeling), the relatively new SLA (Stereolithography), and PolyJet. My primary duty with the FDM printers was to model parts that came in from various sources to print effectively and efficiently. Using methods my mentor taught me and the Stratasys Insight software, I was able to minimize imperfections, hasten build time, improve strength for specific forces (tensile, shear, etc...), and reduce likelihood of a print-failure. Also using FDM, I learned how to repair a part after it was printed. This is done by using a special kind of glue that chemically melts the two faces of plastic parts together to form a fused interface. My first goal with SLA technology was to bring the printer back to operational readiness. In becoming familiar with the Pegasus SLA printer, I researched the leveling, laser settings, and different vats to hold liquid material. With this research, I was successfully able to bring the Pegasus back online and have successfully printed multiple sample parts as well as functional parts. My experience with PolyJet technology has been focused on an understanding of the abilities/limits, costs, and the maintenance for daily use. Still upcoming will be experience with using a composite printer that uses FDM technology to print plastic while laying an internal filament of Kevlar or carbon-fiber inside the printed material. It has been incredible being exposed to this range of technologies and I feel very fortunate to be ready for virtually any kind of printing technology I come across in the future. Design work played a part in my internship this term as well. Working with Hai Nguyen, I was able to design a set of testing tips and a test frame for use with an Arcjet. The testing tips will be made of several different materials that will possibly be used in the heat shield of the Orion space craft. These designs included technical drawings that were presented to the fabrication shop. The frame design was created from 80/20 (a popular brand of frame construction equipment) and included an order form with pricing for fabrication. An independent design was also done for the virtual reality lab. This design was to create a hand-controller based on a previous design. This final design was sent directly to a 3D printer without technical drawings. Overall, my design work has given me experience with using 80/20, helped improve my CAD (Computer Aided Design) proficiency, and increased my knowledge of how to set up technical drawings for fabrication. The final role I have played in this internship has been to assist with testing of the inflatable technology materials working Khadijah Shariff. I began the internship assisting with permeability testing with the initial plan to continue the testing independently after training. Unfortunately, the testing apparatus suffered a technical failure and had funding pulled which cancelled that portion of the project. Further testing with inflatable technology continued with tensile testing of various stitching methods. This testing took place over a two-days and concluded successfully. Final testing was to be more tensile testing but of straps used to connect various inflatable sections. Unfortunately, the needed grips for the tensile tests could not be located and put the testing on hold. It is possible this round of testing will still take place by the end of the internship if the grips can be found. Overall, this portion of the internship has helped me become familiar with one kind of permeability test as well as a popular tensile/compression testing machine. Finally, I also had the chance to be trained using a metal lathe for making very small tips for a soldering iron. These tips will be used to melt threaded brass inserts into 3D printed plastic. Working with James Brown, I was able to successfully machine a brass rod down to as little as 0.064 inches plus or minus 0.001 inches. It was very rewarding to learn how to best use the machine and become familiar with a skill that will undoubtedly be used again in the future. I have been told by several professional engineers that learning to use a lathe and mill will be invaluable skills in the field. This knocks 50 percent of that goal off and I look forward to learning the mill at some point in the future. As is apparent with this list of projects, my internship was not focused on a single over-arching goal. Instead, I was able to gain experience in a myriad of very different areas. I feel like my time here was spent bouncing from one project to the next. Though sometimes difficult to switch gears, it was very rewarding to be a part of so much in so little time. My career and education will be positively impacted by what I have learned at JSC. My experience with 3D printing has improved my ability to handle many issues that may come up in the future with multiple different technologies. The design work I took part in, especially creating technical drawings, will help me better present designs to any engineer or shop I will encounter. My testing experience has helped me become familiar with a popular kind of tensile test machine that will likely be similar to the kinds I will encounter in the future. Finally, my experience with fabrication has given me a rare opportunity, as an engineer, to take part in the fabrication of a part. This experience will help me better tailor my future designs for the manufacturing process and has given me an appreciation for detailed/delicate machining work. My experience at JSC has been successful and will continue to assist me for a long time within the engineering field.

Zusack, Steven↗

Final Report for the project titled "Enabling Supernova Computations by Integrated Transport and Provisioning Methods Optimized for Dedicated Channels"

A high-speed optical circuit network is one that offers users rate-guaranteed connectivity between two endpoints, unlike today’s IP-routed Internet in which the rate available to a pair of users fluctuates based on the volume of competing traffic. This particular research project advanced our understanding of circuit networks in two ways. First, transport protocols were developed for circuit networks. In a circuit network, since bandwidth resources are reserved for each circuit on an end-to-end basis (much like how a person reserves a seat on every leg of a multi-segment flight), and the sender is limited to send at the rate of the circuit, there is no possibility of congestion during data transfer. Therefore, no congestion control functions are necessary in a transport protocol designed for circuits. However, error control and flow control are still required because bits can become errored due to noise and interference even on highly reliable optical links, and receivers can, due to multitasking or other reasons, not deplete the receive buffer fast enough to keep up with the sending rate (e.g., if the receiving host is multitasking between receiving a file transfer and some other computation). In this work, we developed two transport protocols for circuits, both of which are described below. Second, this project developed techniques for internetworking different types of connection-oriented networks, which are of two types: circuit-switched or packet-switched. In circuit-switched networks, multiplexing on links is “position based,” where “position” refers to the frequency, time slot, and port (fiber), while connection-oriented packet-switched networks use packet header information to demultiplex packets and switch them from node to node. The latter are commonly referred to as virtual circuit networks. Examples of circuit networks are time-division multiplexed Synchronous Optical Network/Synchronous Digital Hierarchy (SONET/SDH) and Wavelength Division Multiplexing (WDM) networks, while examples of virtual-circuit networks are MultiProtocol Label Switched (MPLS) networks and Ethernet Virtual Local Area Network (VLAN) networks. A series of new technologies have been developed to carry Ethernet VLAN tagged frames on SONET/SDH and WDM networks, such as Generic Framing Procedure (GFP) and ITU G.709, respectively. These technologies form the basis of our solution for connection-oriented internetworking. The benefit of developing such an architecture is that it allows different providers to choose different connection-oriented networking technologies for their networks, and yet be able to allow their customers to connect to those of other providers. As Metcalfe, the inventor of Ethernet, noted, the value of a network service grows exponentially with the number of endpoints to which any single endpoint can connect. Therefore internetworking solutions are key to commercial success. The technical effectiveness of our solutions was measured with proof-of-concept prototypes and experiments. These solutions were shown to be highly effective. Economic feasibility requires business case analyses that were beyond the scope of this project. The project results are beneficial to the public as they demonstrate the viability of simultaneously supporting different types of networks and data communication services much like the variety of services available for the transportation of people and goods. For example, Fedex service offers a deadline based delivery while the USPS offers basic package delivery service. Similarly, a circuit network can offer a deadline based delivery of a data file while the IP-routed network offers only basic delivery service with no guarantees. Two project Web sites, 13 publications, 7 software programs, 21 presentations resulted from this work. This report provides the complete list of publications, software programs and presentations. As for student education and training (human resources), this DOE project, along with an NSF project, jointly supported two postdoctoral fellowships, three PhDs, three Masters, and two undergraduate students. Specifically, two of the Masters students were directly funded on this DOE project.

99 GENERAL AND MISCELLANEOUS↗

A New Plasma Radar Concept for Simultaneous Magnetic and Density Measurements

An innovative, compact 288GHz interferometer has been fabricated, tested, installed and successfully demonstrated on the LAPD-U magnetized plasma at UCLA. The system takes advantage of frequency modulated (FM) radar techniques to deliver a compact heterodyne system. In addition, the reflected power from the source is taken advantage of to eliminate the need for additional quasi-optical components. Electron density in LAPD-U plasma has recently been increased substantially thereby requiring a higher frequency/shorter wavelength interferometer to avoid deleterious refractive effects. This system satisfies those needs. The system uses a 96GHz varactor tuned Gunn oscillator which passes to a passive tripler. This tripler has ~3% conversion efficiency. The 288GHz radiation is then coupled to free space using a so-called dual-mode or Pickett horn. The output 288GHz beam is then coupled to an aspheric lens manufactured from low-loss, high-density polyethylene. This lens is employed to collimate the emerging beam. Small axial adjustment of the lens position can also be used to create a slowly focusing beam so as to optimize the measured signal. In addition, up-down or side-to-side adjustment of the lens can be utilized to steer the beam vertically or horizontally – again to optimize alignment. The propagating beam passes through a beam splitter and then through a water-free, bubble-free fused quartz window into the LAPD-U vacuum vessel. The beam-splitter is a thin sheet of G10 which reflects a small fraction of the incident power (~5 %) towards a zero-bias detector optimized for the frequency range from 220 to 300GHz. Note that waveguides at this frequency have dimensions of ~0.9mm x 0.45mm and so have very large conductive losses. This drives the use of quasi-optical propagation. The detector requires no DC bias and is very responsive (> 1V/mW into 1MΩ). Radiation is coupled to the detector via a similar lens-horn arrangement used for the launch. This reflected beam acts as the local oscillator or reference millimeter-wave beam for the detector. The remainder of the launched source beam then enters the LAPD-U vacuum vessel and passes through the plasma at the mid-plane until reaching the opposing port which is closed off with an aluminum flange. This flange is used as a mirror to retroreflect the incident 288GHz beam back along its path. The retroreflected beam exits the input port but does NOT couple directly into the zero-bias detector. Instead, the majority of the return power continues towards the 288GHz source. As mentioned above the transmitted beam enters the source a second time. This would appear undesirable. However, at these frequencies multipliers are highly non-linear elements which results in a significant portion of the return beam (~20%) re-emerging from the multiplier and horn and then coupling via the G10 beam-splitter to the zero-bias detector. This approach eliminated the need for a second quasi-optical beam-splitter. The system is extremely compact measuring approximately 28 inches x 20 inches. The above did not explain how heterodyne operation was achieved. As mentioned above the Gunn oscillator is able to be varactor tuned. This allows a low voltage to be applied to control the operating frequency of the Gunn oscillator. During heterodyne operation a sawtooth shaped voltage is applied to the varactor at 750kHz using an 80MHz Arbitrary Waveform Generator (AWG). This voltage changes the Gunn frequency linearly during the up-sweep which is then reset abruptly at the sawtooth crash to be immediately followed by another linear sweep. Passage through the 288GHz multiplier triples the frequency change experienced by the electromagnetic wave. These frequency changes are small – tens of megahertz. This FM radar approach results in the launched electromagnetic wave frequencies at the detector for the reference and plasma wave to be different. The approximately 10 ns delay propagation delay for the plasma beam results in the local oscillator and plasma beams NOT having an identical frequency – there is in fact a fixed difference frequency. The frequency tuning level of the Gunn oscillator is then adjusted so that there is ONE cycle of this difference frequency during each linear ramp. During the sawtooth crash or downward re-sweep this one cycle replays in reverse but on a very fast timescale. The process then repeats. Low-pass filtering eliminates the fast re-sweep to leave a pure sine wave heterodyne signal. When the plasma is present it introduces a phase delay in the sine wave (caused by the extremely small Doppler shift resulting from the optical path length change). Of course, to measure this phase change we need a reference. This is simply obtained from an arbitrary waveform generator which provides a synchronized output pulse train which again is low pass filtered to obtain a 750kHz sinusoidal voltage reference for the interferometer. The interferometer was installed on LAPD-U where it has worked reliably and has established that electron densities exceeding 1x10 13 cm -3 are routinely achieved. In addition, the system sensitivity was able to easily observe density fluctuation at frequencies up to 50kHz. FM Radar techniques have enabled a full demonstration of a compact, sensitive, high frequency (288GHz/1mm) heterodyne interferometer.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Pre-Mission Input Requirements to Enable Successful Sample Collection by a Remote Field/EVA Team

This paper is intended to evaluate the sample collection process with respect to sample characterization and decision making. In some cases, it may be sufficient to know whether a given outcrop or hand sample is the same as or different from previous sampling localities or samples. In other cases, it may be important to have more in-depth characterization of the sample, such as basic composition, mineralogy, and petrology, in order to effectively identify the best sample. Contextual field observations, in situ/handheld analysis, and backroom evaluation may all play a role in understanding field lithologies and their importance for return. For example, whether a rock is a breccia or a clast-laden impact melt may be difficult based on a single sample, but becomes clear as exploration of a field site puts it into context. The FINESSE (Field Investigations to Enable Solar System Science and Exploration) team is a new activity focused on a science and exploration field based research program aimed at generating strategic knowledge in preparation for the human and robotic exploration of the Moon, near-Earth asteroids (NEAs) and Phobos and Deimos. We used the FINESSE field excursion to the West Clearwater Lake Impact structure (WCIS) as an opportunity to test factors related to sampling decisions. In contract to other technology-driven NASA analog studies, The FINESSE WCIS activity is science-focused, and moreover, is sampling-focused, with the explicit intent to return the best samples for geochronology studies in the laboratory. This specific objective effectively reduces the number of variables in the goals of the field test and enables a more controlled investigation of the role of the crewmember in selecting samples. We formulated one hypothesis to test: that providing details regarding the analytical fate of the samples (e.g. geochronology, XRF/XRD, etc.) to the crew prior to their traverse will result in samples that are more likely to meet specific analytical objectives than samples collected in the absence of this premission information. We conducted three tests of this hypothesis. Our investigation was designed to document processes, tools and procedures for crew sampling of planetary targets. This is not meant to be a blind, controlled test of crew efficacy, but rather an effort to recognize the relevant variables that enter into sampling protocol and to develop recommendations for crew and backroom training in future endeavors. Methods: One of the primary FINESSE field deployment objectives was to collect impact melt rocks and impact melt-bearing breccias from a number of locations around the WCIS structure to enable high precision geochronology of the crater to be performed [1]. We conducted three tests at WCIS after two full days of team participation in field site activities, including using remote sensing data and geologic maps, hiking overland to become familiar with the terrain, and examining previously-collected samples from other islands. In addition, the team members shared their projects and techniques with the entire team. We chose our "crew members" as volunteers from the team, all of whom had had moderate training in geologic fieldwork and became familiar with the general field setting. The first two tests were short, focused tests of our hypothesis. Test A was to obtain hydrothermal vugs; Test B was to obtain impact melt and intrusive rock as well as the contact between the two to check for contact metamorphism and age differences. In both cases, the test director had prior knowledge of the site geology and had developed a study-specific objective for sampling prior to deployment. Prior to the field deployment, the crewmember was briefed on the sampling objective and the laboratory techniques that would be used on the samples. At the field sites (Fig. 2), the crewmember was given 30 minutes to survey a small section of outcrop (10-15 m) and acquire a suite of three samples. The crewmember talked through his process and the test director kept track of the timeline in verbal cues to the crewmember. At the conclusion, the team member conducting the scientific study appraised the samples and train of thought. Test C was a 90-minute EVA simulation using two crewmembers working out of line-of-sight in communication with a science backroom. The science objectives were determined by the science backroom team in advance using a Gigapan image of the outcrop (Fig. 1). The science team formulated hypotheses for the outcrop units and created sampling objectives for impact-melt lithologies; the science team turned these into a science plan, which they communicated to the crew in camp prior to crew deployment. As part of the science plan, the science team also discussed their sample needs in depth with the crewmembers, including laboratory methods, objectives, and samples sizes needed. During the deployment, the two crewmembers relayed real-time information to the science backroom by radio with no time delay. Both the crew and science team re-evaluated their hypotheses and science plans in real-time. Discussion: Upon evaluation, we found that the focused tests (Tests A and B) were successful in meeting their scientific objectives. The crewmember used their knowledge of how the samples were to be used in further study (technique, sample size, and scientific need) to focus on the sampling task. The crewmember was comfortable spending minimal time describing and mapping the outcrop. The crewmember used all available time to get a good sample. The larger test was unsuccessful in meeting the sampling objectives. When the crewmembers began describing the lithologies, it was quickly apparent that the lithologies were not as the backroom expected and had communicated to the crew. When the outcrop wasn't as expected, the crew members instinctively switched to field characterization mode, taking significant time to characterize and map the outcrop. One crew member admitted that he "kind of lost track" of the sampling strategy as he focused on the basic outcrop characterization. This is the logical first step in a field geology campaign, that a significant amount of time must be spent by the crew and backroom to understand the outcrop and its significance. Basic field characterization of an outcrop is a focused activity that takes significant time and training [2, 3]. Sampling of representational lithologies can be added to this activity for little cost [4]. However, we have shown that identification of unusual or specific samples for laboratory study also takes significant time and knowledge. We suggest that sampling of this type be considered a separate activity from field characterization, and that crewmembers be trained in sampling needs for different kinds of studies (representative lithologies vs. specialized samples) to acquire a mindset for sampling similar to field mapping. Sampling activities should be given a significant amount of specifically allocated time in scheduling EVA activities; and in the better case, that sampling be done as a second activity to a previously studied outcrop where both crew and backroom are comfortable with its context and characteristics. Our hypothesis posited that crewmember knowledge of how the samples would be used upon return would aid them in choosing relevant samples. Our testing bore this hypothesis out to some extent. We therefore recommend that crewmember training should include exposure to the laboratory techniques and analyses that will be used on the samples to foster this knowledge. There is also the potential for increasing crewmember contextual knowledge real-time in the field through the introduction of in situ geochemical technologies such as field portable XRF. The presence of field portable geochemical technology could enable the astronauts to interrogate the samples for K abundance real-time, ensuring they could collect valuable and dateable samples [5]. Though simulations such as these can teach us a fair bit about decision making processes and timeline building, one EVA participant noted that when he wasn't collecting "real" samples, he wasn't at his best. This effect suggests that higher-fidelity studies involving truly remote participants conducting actual scientific studies merit further attention to capture lessons for application to future crew situations.

sample collection↗

Collaborative Research: Natural Organic Matter and Microbial Controls on Mobilization/Immobilization of I and Pu in Soils and Waters Affected by Radionuclide Releases in USA and Japan

In this project, the relationship between natural organic matter (NOM) and two radioactive elements that are relevant to nuclear waste disposal were studied: Plutonium (Pu) and Iodine. The human and environmental risks associated with Pu stem mainly from the very long half-lives of several of its isotopes ( 238 Pu, 88 yr; 239 Pu, 24,100 yr; 240 Pu, 6560 yr) and its radiotoxicity. Understanding Pu biogeochemical behavior in both near-field (>10-11M) and far-field scales (<10-11M) is imperative to the development of approaches for reprocessing Pu, remediation of Pu contamination and accurate assessment of risks posed by disposal practices for Pu-bearing wastes. The environmental mobility of Pu can be affected by redox potential, pH, adsorption, precipitation, complexation, colloid formation, and microbial activity, of which the first characteristic has the most profound influence. Numerous studies have shown high affinity of Pu towards NOM, as well as to mineral phases. NOM is ubiquitous in the environment, e.g., both fulvic and humic acids are able to reduce Pu(V,VI) to Pu(IV) and the redox potential of NOM is positively related to the abundance of phenolic/acidic OH groups. NOM can either facilitate or limit actinide migration, depending on specific biogeochemical conditions including pH, mineral and organic matter characteristics, etc. The other radionuclide of interest is radioiodine ( 129 I). 129I is a major by-product of nuclear fission and of serious concern to the Department of Energy (DOE) as it is among the top risk drivers at existing and potential radiowaste-contaminated sites. The risk of 129 I stems largely from its high bioconcentration factor (90% of the body’s iodine is accumulated in the thyroid), a high inventory at source terms, a very long-half life (16M years), and rapid mobility in the subsurface environment. As a consequence, 129 I has the lowest drinking water standard (1 pCi/L) among all radionuclides in the Federal Register. With a novel and sensitive gas chromatography-mass spectrometry (GC-MS) method developed in our lab, it is possible to quickly and simultaneously determine the distribution of 129 I and stable 127 I forms in environments, as low as 2 pCi/L for 129 I. This method was subsequently validated using accelerator mass spectroscopy, AMS. IO 3 - and organo-I were determined as major species in the groundwater of SRS and the Hanford Site, contrary to thermodynamic predictions that I- should be the dominant species at these sites. Mobility of 129 I was also demonstrated to depend greatly on the I species and its concentration, sediment pH, and redox state, with times to achieve equilibrium taking up to 12 weeks. Along the groundwater pathway in the F-Area of SRS, 129 I- supplied from the seepage basins was transformed to 129 IO 3 - and organo- 129 I with increasing iodine sediment sorption, causing the lower total 127 I and 129 I concentrations along the gradient transect of the waste plume. By contrast, groundwater 129 I concentrations in the wetlands (as high as 1617.3 pCi/L) were greatly elevated with respect to the source term (159.3 pCi/L). While the NOM promoted the uptake of 129 I to the wetland sediment, it also promoted the formation of soluble organic fraction. A small fraction of NOM that is bound to iodine can behave as a mobile organo-I source. Iodide was enzymatically incorporated into NOM, whereas both iodide and iodate were abiotically bound to NOM, under certain conditions. Iodate removal from the mobile aqueous phase can also occur through incorporation into carbonate (e.g., at the Hanford Site, USA). Thus immobilization and re-mobilization of iodine species were influenced by pH, Eh and the presence of NOM and metal oxides, which adds to the complexity of site remediation action. A ground-breaking result was to elucidate the products (i.e. organo-iodine moieties formed via enzymatic and non-enzymatic processes) at the molecular level by nuclear magnetic resonance (NMR) and electrospray ionization Fourier transform ion cyclotron resonance mass spectrometry (ESI-FTICRMS). We found that iodine-NOM interactions may be influenced by NOM hydrophobic aliphatic moieties. From the perspective of ESI-FTICRMS, organo-iodine formulas were ascribed to the groups of unsaturated hydrocarbons, lignins and proteins. Iodate is likely abiotically reduced to reactive iodine species by lignin- and tannin-like compounds or carboxylic-rich alicyclic molecules (CRAM). We also investigated microbial mechanisms in iodine incorporation into NOM. We established that soil bacteria isolated from F-Area of SRS did not accumulate significant amounts of I- (0.2-2%). Intracellular uptake of I- decreases with increasing pH when pH ranged from 4 to 6. In contrast, 44 out of 84 strains isolated from the F-Area of SRS can transform I- to IO 3 - and organo-iodine. In some cases, oxidation was facilitated in the presence of H 2 O 2 . Microbes can also excrete organic acids that enhance I- oxidation by lowering the ambient pH and reacting with H 2 O 2 to form peroxy carboxylic acids. At lower pH values (≤5), H 2 O 2 hydrolysis was the driving force for iodide-oxidation; whereas, at pH ≥ 6, spontaneous decomposition of peroxy carboxylic acids, originating from H 2 O 2 and organic acids were the primary cause of iodide oxidation. Lastly, it was determined that microbial processes involved in Mn (II) are capable of directly oxidizing I- via enzymatic catalysis (i.e., multicopper oxidases), or indirectly through the formation of reactive oxygen species (ROS) and/or biogenic manganese oxides. ROS-mediated oxidation of I- was found to predominate at pH >5, whereas the enzymatic and Mn oxide pathways were more active at pH < 5. Together, this project has resulted in 9 publications in high-impact journals, and the training of 1 Ph.D and 4 undergraduate students.

54 ENVIRONMENTAL SCIENCES↗

A Machine Learning Approach to Improve Air Traffic Management Initiatives

Collaborating closely with commercial air carriers and related organizations, the Federal Aviation Administration(FAA) regulates air traffic and ensures the safety and efficiency of air operations. Air traffic controllers make strategic decisions, such as delaying, rerouting, or canceling flights, partly based on guidance provided by the FAA’s Air TrafficControl System Command Center (ATCSCC). The guidance includes, among other things, control measures known asTraffic Management Initiatives (TMIs) designed to enhance safety and improve operational efficiency. TMIs play a crucial role in managing the demand and capacity within the U.S. National Airspace System (NAS). Two major TMIs that are routinely used (primarily to mitigate the adverse effects of bad weather) are Ground Delay Programs (GDPs) andGround Stops (GSs). In a GDP, flights destined for airports facing thunderstorm activity experience delays at their origin airports. This proactive approach minimizes the risk of routing aircraft through hazardous weather conditions and also replaces (fuel burning) airborne delays with ground delays. In a GS, a temporary restriction is imposed on the departure or arrival of aircraft at a specific airport or within a designated airspace. Although other TMIs (e.g., miles-in-trail) are also implemented as part of (air) traffic flow management in the NAS, the focus of this work is on GDPs and GSs. Since TMIs, by design, lead to flight delays or cancellations, it is crucial to put in place the right set of parameters(e.g., scope and duration of the GDP). For example, when the end time of a GDP extends beyond what is necessary, it imposes unnecessary delays on departing flights. This situation could occur as a result of inaccurate prediction of the(required) duration of the GDP based on the weather forecast. On the other hand, if a GDP ends prematurely before the underlying capacity constraints are resolved at the destination airport, it may result in airborne holding. The delicate balance lies in matching the termination of the GDP precisely with the resolution of capacity constraints, avoiding both the imposition of unnecessary ground delays and the need for airborne holding due to premature program termination.Failing to specify the right parameters for TMIs also leads to flight delays, creating a significant obstacle in managing the increasing traffic volumes causing increased work load for the controllers. To address this issue, we propose the integration of Machine Learning (ML) models in the traffic flow management(TFM) pipeline. In current operations, decisions are made by human experts based on extensive training, historical patterns, available traffic and weather data. Since we have an abundance of data from past events that tell us the likely impact of various TMIs, by ingesting historical data, properly trained ML models can offer valuable insights and aid human decision-making. With the FAA increasingly exploring advanced analytics, ML emerges as a focal point for enhancing TFM within the National Airspace System (NAS). As a first step, this study aims to provide traffic controllers with decision-making support for the issuance and adjustment of TMIs. Data analytics and machine learning have been previously employed to address some of the challenges associated with TMIs. Numerous studies have concentrated on various facets of TMI issuance, exploring factors influencing TMI parameters, including arrival rate, airport capacity, and delay prediction. For example, using weather forecasts, several statistical methods were used to produce probabilistic capacity profiles which in conjunction with deterministic models provided insights into the GDP planning process [1–4]. The downside of using deterministic models is that they rely on fixed inputs and predetermined rules, which lack the ability to account for the inherent uncertainty and variability present in real-world scenarios. In a separate series of studies, researchers aimed to predict the occurrences of GDPs and GSs. The majority of these studies utilized various supervised learning methods, including Decision Trees, Naive Bayes, Support VectorMachines, and Random Forests to analyze the influence of weather conditions and arrival demand on TMI incidents[5–8]. However, these studies primarily focused on predicting the incidence of TMIs without explicitly addressing the scope of TMIs, including their duration and their geographical coverage. Furthermore, the emphasis of these studies was largely on GDPs, given their higher frequency and longer duration when compared to GSs. A limited number of studies focused on predicting the parameters of TMIs, specifically addressing their duration and extent. In one such study focusing on optimizing the TMI parameters at San Francisco International Airport (SFO),the authors utilized a probabilistic forecast of fog [9]. They simulated various capacity scenarios based on the (fog)burn-off forecasts, selecting GDP parameters that minimized airborne and overall ground delays. However, this approach exclusively emphasizes stratus (fog) burn-off as the primary determinant of GDP and GS, neglecting other influential factors like severe weather events, runway closures, lower capacity than traffic demand, and other important variables. Given the complexity of predicting the TMI and determining its scope, we seek a more holistic approach. We aim to consider all significant factors that could impact TMIs and their parameters. What sets this research apart is the fusion of all data sources relevant to the issuance and adjustment of TMIs and it represents the first comprehensive attempt to optimize TMIs in this manner. Since this comprehensive solution involves various aspects, we break down the problem into smaller components and input all parameters into a unified model called the “TMI Adjuster”. Figure 1 shows the overall framework and the list of datasets used in each model. The objective of the TMI Adjuster module is to deliver reliable, consistent and expedited recommendations for the progression, adjustment, and termination of TMIs. The ML solution entails developing a pipeline capable of predicting the necessity of a TMI (e.g., GS or GDP) along with its various parameters. For example, in the case of a GS, this includes the scope of the GS either in terms of distance from the destination airport or based on pre-defined airspace sectors. Here, scope refers to those regions and departing airports that are subject to the GS. In this paper, we concentrate on the issuance of GSs in the three major airports in the New York area — LaGuardia(LGA), John F. Kennedy International (JFK), and Newark Liberty International (EWR). We fuse traffic, weather and other relevant aviation data from years 2017 to 2019 to train and validate the ML models. In particular, we use the following datasets: •Terminal Aerodrome Forecast (TAF): meteorological forecasts specific to each airport, issued four times a day, covering predefined time periods. •TMI data: includes all GSs and GDPs along with their respective parameters. •Aviation System Performance Metrics (ASPM): includes traffic related data such as aircraft delays, arrival, and departure rates. •Notices to Airmen (NOTAMs): utilized to extract runway closure data and manage interdependencies between terminals in close proximity. •Flight cancellation data •Airspace Flow Programs (AFP): includes information on flight airborne holdings caused by TMIs. The data preprocessing entails transforming ASPM, TMI, AFP, NOTAMs, and weather data into an hourly format and consolidating all datasets by merging them based on date and time as the primary key. The TMI Adjuster framework comprises two parallel models: one dedicated to GS and a second model focused on GDP. As previously mentioned, our specific focus is on the GS model as a multi-classification problem. In this framework, each data point of the GS model input summarizes ten hours of data. Specifically, the data loader for the GS model generates the input and output of the model as follows: at a given time step, the input includes the actual traffic, weather, and TMI data from the two-hour window before the time step, alongside the weather forecast and scheduled traffic for the next 8 hours starting from the time step. Based on this information, the output of the GS model for each time interval consists of three dimensions. The first dimension represents a binary decision on whether there should be a GS in place for the next hour or not. The second dimension is related to the scope of the GS in the United States, and the third dimension is related to the scope of the GS in Canada (i.e., to determine if the GS impacts airports in Canada).One of the challenges with TMI modeling is the sparsity of TMI events, particularly regarding its scope. To address this challenge in the scope of the GS model output, we implement grouping. The GS scope for the US region is defined based on a list of centers that should be included when the GS is in place. With 20 centers in the US, we utilized historical data to group them into 4 categories. In particular, we summarized our historical data in a graph format where nodes represent centers, and link weights are defined based on the co-occurrence of centers in the scope parameter ofTMIs. By identified strongly connected components in this graph, we were able to partition the centers into four groups. We consider two model structures for the GS Model. Firstly, a hierarchical classification model [10], where the human decision-making for a GS is of hierarchical nature. The decision-maker first decides whether there is a need fora GS, and if the answer is yes, determines the scope. A hierarchical classification model organizes the problem into a class hierarchy, typically a tree or a Directed Acyclic Graph (DAG) structure, and considers the dependency of the decision in the previous step to the next component [10]. Here, we employ the local classifier per level approach, which involves training one multi-class classifier for each level of the class hierarchy. The second structure is the independent structure. In this setting, as the name suggests, we do not consider the dependency of the decisions in the different dimensions of the output of the model. Instead, for each dimension, we train a multi-class classifier independently. Table 1 summarizes GS model statistics for training, validation and testing. The table documents the effect of limiting data to the time steps when there was actually a TMI in place or when a TMI had just terminated. This resulted in a more balanced distribution of the GS class(GS positive class)versus “No GS”(GS negative class), which might help the training process. While JFK and LGA follow very similar distributions, with 40% and 42% GS positive class respectively, EWR has proportionally fewer GS incidents at 28%. Our subsequent phase involves evaluating the performance of both hierarchical structure and independent structure using different state-of-the-art multi-class classifier models such as Random Forest, Decision Trees, K-nearest Neighbors, and Logistic Regression and forecast the duration and scope of the GSs.

Farzan Masrour Shalmani↗