Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Decision Support Tool for Planning Neighborhood-Scale Deployment of Low-Speed Shared Automated Shuttles

Increasing interest and investment in connected, automated, and electric vehicles as well as mobility-as-a-service (MaaS) concepts are paving the way for the next major transformation in transportation through automated and shared mobility. The initial excitement toward rapid deployment and adoption of automated vehicles (AVs) has subsided, and low-speed automated shuttles are emerging as a more pragmatic pathway for introducing automated mobility in geofenced districts. Such shuttles hold the promise to provide a viable alternative for serving short trips in urban districts with high travel densities. As interest in low-speed automated shuttle systems (to improve urban mobility) increases, the need for tools that can inform communities in relation to benefits or disadvantages of automated shuttle deployments is imminent. However, most of the existing transportation planning and simulation tools are not capable of handling emerging shared automated mobility options. This paper presents a microscopic simulation toolkit that can be used by cities and communities to plan for the deployment of low-speed automated shuttles systems, as well as other shared mobility options. Labeled as the Automated Mobility District modeling and simulation toolkit, the proposed decision support tool intends to help cities evaluate the mobility and sustainability impacts of deploying shared automated vehicles (SAVs) in geofenced regions. This paper describes the toolkit, as well as a sample scenario analysis for the deployment of low-speed automated shuttles in Greenville, South Carolina, U.S. Results from the scenario study demonstrate the effectiveness of the proposed simulation toolkit in planning for advanced mobility systems.

47 OTHER INSTRUMENTATION↗

Design and execution of a verification, validation, and uncertainty quantification plan for a numerical model of left ventricular flow after LVAD implantation

Left ventricular assist devices (LVADs) are implantable pumps that act as a life support therapy for patients with severe heart failure. Despite improving the survival rate, LVAD therapy can carry major complications. Particularly, the flow distortion introduced by the LVAD in the left ventricle (LV) may induce thrombus formation. While previous works have used numerical models to study the impact of multiple variables in the intra-LV stagnation regions, a comprehensive validation analysis has never been executed. The main goal of this work is to present a model of the LV-LVAD system and to design and follow a verification, validation and uncertainty quantification (VVUQ) plan based on the ASME V&V40 and V&V20 standards to ensure credible predictions. The experiment used to validate the simulation is the SDSU cardiac simulator, a bench mock-up of the cardiovascular system that allows mimicking multiple operation conditions for the heart-LVAD system. The numerical model is based on Alya, the BSC’s in-house platform for numerical modelling. Alya solves the Navier-Stokes equation with an Arbitrary Lagrangian-Eulerian (ALE) formulation in a deformable ventricle and includes pressure-driven valves, a 0D Windkessel model for the arterial output and a LVAD boundary condition modeled through a dynamic pressure-flow performance curve. The designed VVUQ plan involves: (a) a risk analysis and the associated credibility goals; (b) a verification stage to ensure correctness in the numerical solution procedure; (c) a sensitivity analysis to quantify the impact of the inputs on the four quantities of interest (QoIs) (average aortic root flow $Q^{avg}_{Ao}$, maximum aortic root flow $Q^{max}_{Ao}$, average LVAD flow $Q^{avg}_{VAD}$, and maximum LVAD flow $Q^{max}_{VAD}$; (d) an uncertainty quantification using six validation experiments that include extreme operating conditions. Numerical code verification tests ensured correctness of the solution procedure and numerical calculation verification showed a grid convergence index (GCI)95% <3.3%. The total Sobol indices obtained during the sensitivity analysis demonstrated that the ejection fraction, the heart rate, and the pump performance curve coefficients are the most impactful inputs for the analysed QoIs. The Minkowski norm is used as validation metric for the uncertainty quantification. It shows that the midpoint cases have more accurate results when compared to the extreme cases. The total computational cost of the simulations was above 100 [core-years] executed in around three weeks time span in Marenostrum IV supercomputer. This work details a novel numerical model for the LV-LVAD system, that is supported by the design and execution of a VVUQ plan created following recognised international standards. We present a methodology demonstrating that stringent VVUQ according to ASME standards is feasible but computationally expensive.

59 BASIC BIOLOGICAL SCIENCES↗

2023 Risk Management Plan and Register for Low-Power WEC for Non-Grid Applications

This is an updated risk management plan and risk register for the design, build and test of a novel, remote, low-power wave energy converter (WEC) for non-grid applications. This Columbia Power Technologies project seeks to develop a prototype low-power WEC that lowers the total cost of ownership and provides robust, new capabilities for customers in the maritime environment. The testing location for this prototype is the U.S. Navy Wave Energy Test Site (WETS) in Kaneohe Bay, O'ahu, Hawai'i. Detailed in the Risk Management Plan document is a Failure Modes, Effects, and Criticality Analysis (FMEC) that systematically identifies all potential failure modes and their effects on the system. Risk registers for major subsystems were completed according to the methodology described in the Risk Management Plan and are also included here.

16 TIDAL AND WAVE POWER↗

Monitoring, Reporting, and Verification Plan (MRV)- Meeting EPA Guidelines for GHGRP and Subpart RR

This report summarizes the process and work completed to develop and successfully submit an MRV plan to EPA. This work used the lessons learned from various MRCSP tasks to demonstrate the geologic understanding of the Niagaran reefs, successful monitoring and accounting methodologies, understanding of potential risks and leakage pathways, and mass balance of CO2 baseline and net storage. The plan currently encompasses 10 reefs and also provides a reporting plan for future reef development.

accounting↗

CO2 Transport Planning Database

The CO2 Transport Planning Database v3.0 is a geospatial resource, containing over 70 gigabytes of data representing critical considerations for the spatial routing of pipelines and transport of CO2, from source to sink. Considerations include state-specific legislation, land use requirements, existing infrastructure, and hazard prevention areas. Built to support strategic domestic energy transport planning and development, more than 60 layers of this database have been weighted (Weight fields) according to current legislation and pipeline construction recommendations. Weighted values range from zero to one, where zero represents potentially more acceptable areas for transport based on the various considerations, and a value of one represents areas that should be avoided. This geospatial database provides a baseline for the Smart CO2 Transport Planning Tool.

Boundaries↗

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

Physics Division Strategic Plan Fiscal Years 2020-2024

The vision of the Physics Division (PHY) at Argonne National Laboratory is to continue enhancing its role as a world-leading institution in basic nuclear physics research and its applications. Key to this vision is for PHY to continue to safely and effectively operate and evolve the capabilities of the Argonne Tandem Linac Accelerator System (ATLAS) facility to best serve its users. ATLAS is the Department of Energy (DOE) accelerator facility for low-energy nuclear physics research. The research carried out by PHY covers many themes in contemporary science but can be distilled into five areas of focus. These themes are interconnected, with continuously evolving synergies between the various groups and facilities in PHY and the broader Laboratory. This five-year strategic plan serves to illustrate our current capabilities and new directions related to these five areas of focus (ATLAS also develops an independent strategic plan): Accelerator research and design. The goal of this theme is to design, fabricate, test, and implement novel accelerator systems, with a focus on high-intensity ion and electron systems. These R&D activities have led to enhancements in the ATLAS accelerator system. Among others, the division’s accelerator systems are in use or planned for use at Fermilab, the Advanced Photon Source, and in a broad variety of applications at the Facility for Rare Isotope Beams (FRIB). Atom trapping and fundamental symmetries. The goal of this theme is to explore and exploit the uses of advanced laser cooling and trapping techniques to manipulate atoms. There are three main areas of focus. First is in the application of the atom trap trace analysis (ATTA) technique for age determination of groundwater and ice by using radio-krypton dating. The next two trapping-based programs involve tests of fundamental symmetries in nature: the cooling and trapping of radium-225 with the aim of determining limits on an observation of its electric dipole moment and precision measurements of the beta decay properties of helium-6 to set limits on the tensor coupling constant. This is complemented by measurements of similar properties in lithium-8 and boron-8. Nuclear astrophysics. The goal of this theme is to enhance our understanding of how elements are created in the universe via explosive nucleosynthesis and how stars evolve. To meet the challenges of this theme, many of the capabilities of ATLAS are being enhanced, including the development of new beams through a new in-flight separator (RAISOR) and the anticipated neutron-generator upgrade of the Californium Rare Isotope Breeder Upgrade facility (nuCARIBU). These are coupled to state-of-the-art instruments such as the Canadian Penning Trap, Helical Orbit Spectrometer, Gammasphere, GRETINA, Multi-Sampling Ionization Chamber, the Fragment Mass Analyzer, and Argonne Gas-filled Fragment Analyzer, and a new low-background experimental area for decay studies. Nuclear structure. The goal of this theme is to understand the structure of nuclei, both stable and radioactive, in terms of single-particle properties, their shapes, and the dynamics governing reactions between them. These include questions such as what are the limits of nuclear stability and what are the properties of super heavy nuclei. As with the nuclear astrophysics theme, the capabilities of ATLAS, guided by the ATLAS user community, are continuously being enhanced to this end. The Division has strategic initiatives to play a leading role in the development of instrumentation and research programs at the FRIB. Quantum chromodynamics (QCD) and hadron physics. The goal of this theme is to lead major research programs focused on revealing the quark and gluon structure of protons, neutrons, nuclei, and short-lived mesons and baryons. These involve major programs at Jefferson Lab, Fermilab, and smaller facilities. They are complemented by theoretical endeavors centered on the question of how hadrons and their properties emerge from QCD. Out of these activities arise strategic initiatives to play a major role in the forthcoming Electron-Ion Collider (EIC).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Proposal for a Hagan Container Surveillance Plan

This white paper proposes a Hagan-specific surveillance plan. Currently, Hagan containers are examined on an ad hoc basis as part of the SAVY-4000 surveillance plan. Given the size, aging horizon, and unique potential failure mechanisms of the Hagan population, the authors believe there is a need to have a Hagan-specific surveillance plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Federal Energy Management Program’s Technical Resilience Navigator: Communications Plan

The Federal Energy Management Program is working to develop a standard, agency-neutral energy and water technical resilience navigator (TRN) to assist federal agencies with their resilience planning efforts, building on agency-expressed needs. The TRN Communications Plan defines how the project team and FEMP will generate awareness of the TRN, recruit validators, encourage its use across federal agencies, increase awareness among various audiences, and solicit user feedback on its usefulness including suggestions for improvement. In support of this purpose, the communications plan characterizes the key audiences, messages, communications channels, and activities needed to help ensure success. The role of communications is to define strategy and ensure leadership and consistency in messaging, writing, outreach, media relations, editing, and design related to the TRN.

99 GENERAL AND MISCELLANEOUS↗

Preliminary Plan for Evaluation of Reactor Pressure Vessel Surveillance Materials from Palisades Nuclear Generating Station

The Palisades Nuclear Generating Station (PNGS), located in Michigan, is owned and operated by Entergy. It is a Combustion Engineering 2-loop pressurized water reactor (PWR) producing 805 MWe (2,565 MWth). The PNGS was built between 1967 and 1970, with approval to operate at full power in 1973; the plant’s original license was due to expire on March 24, 2011. An application for 20-year extension was filed in 2005 with the Nuclear Regulatory Commission and was granted on January 18, 2007. Although the plant was scheduled for decommissioning by 2031, Entergy currently plans to close the PNGS in 2022. The PNGS included in its reactor pressure vessel (RPV) surveillance program a capsule, designated A-60, containing specimens of one of the vessel plates and a weld metal with nickel content of about 1.36 wt% and copper content of about 0.20 wt%. This capsule was irradiated to a fluence of 1.8 x 10 20 n/cm 2 . The capsule was removed from its surveillance position in 1995 and has been resident in the spent fuel pool since that time. The material is also of special interest because of its very high nickel content and because of the potential for development of NiMnSi (nickel-manganese-silicon) precipitates, dubbed “late blooming phases.” The surveillance program also includes a capsule, designated T-150, dedicated specifically for thermal aging, which would provide results for at least 33 effective full power years, which is beyond the current thermal-aging database for such materials. Given that license extensions to 60 years of operation have been approved by the US Nuclear Regulatory Commission for most of the currently operating light water reactors in the United States, and that the first extension to 80 years was recently approved, there exists the probability that some RPVs will reach and possibly exceed a fast neutron fluence (> 1 MeV) of 1 x 10 20 n/cm 2 . This is a fluence regime with no US surveillance data and very little test reactor data, except for the Light Water Reactor Sustainability Program–sponsored University of California Santa Barbara Advanced Test Reactor (ATR) ATR-2 project. Thus, the materials in the A-60 capsule represent a valuable resource for directly exploring the effects of commercial surveillance irradiation on a typical plate and a high-nickel weld with similar materials irradiated in the ATR-2 test reactor project. This report provides background information for the surveillance program, previous results of surveillance materials testing, the preliminary plan for capsule retrieval and disassembly, and the plan for testing and microstructural examination of the mechanical test specimens of these unique materials to assess the features induced by very high irradiation fluence or very long thermal aging time

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Monitoring, Reporting, and Verification (MRV) Plan - Meeting EPA Guidelines for GHGRP and Subpart RR

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership initiative. Since its founding, MRCSP has made significant strides toward making CCUS a viable option for states in the region. The public/private consortium, funded through the DOE Regional Carbon Sequestration Initiative, brings together nearly 40 industry partners and 10 states. Battelle, as the project lead, oversees research, development and operations and coordinates activities among the partners. The incremental, phased approach has built a valuable knowledge base for the industry and paved the way for commercial-scale adoption of CCUS technologies. From 2008 to 2020, MRCSP Phase III focused on the development of large-scale injection projects. This report is part of a series of reports prepared under the Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase). These reports summarize and detail the findings of the work conducted under the Phase III project. This report summarizes the steps for successfully submitting a Monitoring, Reporting and Verification (MRV) plan to the U.S. Environmental Protection Agency (EPA). This work used the lessons learned from various MRCSP tasks to demonstrate the geologic understanding of the reefs in Northern Niagaran Pinnacle Reef Trend (NNPRT), successful monitoring and accounting methodologies, understanding of potential risks and leakage pathways, and mass balance of CO2 baseline and net storage. The plan encompasses ten reefs and provides a reporting plan for future reef development.

01 COAL, LIGNITE, AND PEAT↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 14: Model Verification/Validation Test Plan (Deliverable D10))

This report summarizes the technical progress and validation plan for each of AGGREGATE project modules, and integrated modules. The overall validation plan can be divided into two major parts. Firstly, it provides offline validation results of each module using the IEEE-123 node distribution system with certain modifications to support individual module results verification. The offline validation plan tentatively validated the usability and practicability of developed AGGREGATE tools. Secondly, the realworld test system - Seattle City Light (SCL) test feeder for verifying each module and the integrated modules using GE advanced distribution management system (ADMS) software.

42 ENGINEERING↗

Natural Resource Management Plan for Brookhaven National Laboratory

The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory’s mission. The philosophy or guiding principles of the NRMP include stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is reviewed and updated every five years. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered species documented on site (Appendices A, B and C).

54 ENVIRONMENTAL SCIENCES↗

Radiation Hardened Foam Cold Test Plan – Phase-I: Foam Adhesion, Contamination Fixation, Moisture Stresses, Pipe Cutting, and Thermal Profile Testing

This document outlines the Phase-I test objectives and implementation plan for a down-selective foam fixative technology intended to facilitate activities in support of the Savannah River Site (SRS) F/H labs deactivation and decommissioning (D&D) efforts. It is a collaborative effort between Savannah River National Laboratory (SRNL), Florida International University (FIU), and the SRS F/H labs team intended to test and evaluate the potential of an intumescent, fire-retardant foam in mitigating the release of contamination during dismantling operations on radioactively contaminated piping in legacy facilities. The cold test plan addresses specific requirements highlighted by site and safety personnel and will be executed in FIU’s Outdoor Test and Evaluation Facility using a mock-up that replicates the operational conditions at the proposed hot test location at F/H labs. Results from the cold test plan will inform the hot test at F/H labs, which will use the foam fixative to confine and/or isolate residual contamination within a 3-dimensional void space of Hastelloy C-22 piping designated for removal from the site and transported to a proper disposal facility. Phase-I testing will address eight test objectives: (1) evaluation of the adhesion and bonding properties of foam fixative in piping, (2) evaluation of the adhesion of the foam fixative in piping under varying moisture conditions, (3) determination of the heat profile of the foam fixative during curing, (4) determination of the relationship between pipe diameter and foam fixative quantity, (5) determination of the internal pipe pressure after foam deployment and curing, (6) development of a leak test standard operating procedure to test for the effectiveness of the foam plug, (7) initiation of a literature review to determine if using a hot tap is a viable method to deliver foam into piping, and (8) initiation of a 10-foot mock up test that will be used in Phase-II cold testing. The cold test will be conducted at FIU and all testing activities will comply with SRNL Conduct of R&D Protocols (SRNL-IM-2020-00019).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Michigan Hydrogen and Fuel Cell Electric Vehicle Deployment Plan: H2 FCEV Roadmap 2022

This report describes a roadmap for hydrogen fuel cell electric vehicles in the state of Michigan. This plan provides links to relevant information to assess, plan, and initiate hydrogen and FCEV deployment to help meet the energy, economic, and environmental goals for the State of Michigan. Policies and incentives that support hydrogen and fuel cell technology will increase deployment, thus increasing production and creating jobs throughout the supply chain. As deployment increases, an economy of scale will develop and manufacturing costs will decline, positioning hydrogen and fuel cell technology to compete more effectively in a global market without incentives. Policies and incentives to purchase and support the deployment of FCEVs, FCEBs, and hydrogen refueling can be coordinated regionally to maintain this advanced clean transportation sector as a global exporter for long-term growth and economic development. Overall, the execution of this plan will maintain Michigan's role as a global showcase for regionally manufactured transportation technology while reducing NOx and CO 2 emissions and as new jobs are created for businesses and industry.

08 HYDROGEN↗

FY2023 Site Sustainability Plan

The Sandia National Laboratories site sustainability plan and its associated DOE Sustainability Dashboard data entries encompass Sandia National Laboratories contributions toward meeting the DOE sustainability goals. This site sustainability plan fulfills the contractual requirement for National Technology & Engineering Solutions of Sandia, LLC, the management and operating contractor for Sandia National Laboratories, to deliver an annual sustainability plan to the DOE National Nuclear Security Administration Sandia Field Office.

54 ENVIRONMENTAL SCIENCES↗

Florida Alternative Transportation Fuel Resilience Plan

Hurricanes are increasing in frequency, intensity, duration, and are projected to continue increasing. Many counties and cities in Florida are developing resilience plans to help them minimize damage from hurricanes and accelerate recovery. The transportation portion of these plans tend to focus on bolstering road infrastructure, stockpiling diesel for strategic fleets, purchasing high-water vehicles, and placing evacuation shelters in safe areas. An Achilles heel of these plans is their dependence on diesel fuel, which is particularly vulnerable to hurricane-related disruptions since 90% of petroleum in Florida needs to be imported via maritime tanker. These tankers are restricted from accessing Florida ports before and during hurricanes because the risks of damage to the port facilities and tanker are too high. Therefore, transportation resilience can be fortified by diversifying the transportation fuels utilized in a hurricane.

33 ADVANCED PROPULSION SYSTEMS↗

Long-Term Surveillance and Maintenance Plan for the Salmon, Mississippi, Site

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) prepared this Long-Term Surveillance and Maintenance Plan (LTS&M Plan) for the Salmon, Mississippi, Site (the Salmon site) to describe LM’s plan and policy for future site activities. The Salmon site consists of 1470 acres in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi. The site is located over a large subsurface salt formation referred to as the Tatum Salt Dome. Two nuclear tests (Project Dribble) and two gas explosive tests (Project Miracle Play) were conducted in the salt dome between 1964 and 1970. Salmon, the first nuclear test, was conducted on October 22, 1964, and created a cavity approximately 2700 feet (ft) below ground surface (bgs). The second nuclear test, Sterling, was conducted on December 3, 1966. The Sterling test and the two gas explosions—Diode Tube on February 2, 1969, and Humid Water on April 19, 1970—were all conducted in the cavity created by the Salmon test. The four explosions were conducted as part of the U.S. Atomic Energy Commission’s (AEC’s) Vela Uniform program. Testing at the site ended in 1970 after the second gas detonation. The tests resulted in residual contamination and postdetonation features that require long-term oversight.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗