Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

U.S. Climate Change Science Program. Vision for the Program and Highlights of the Scientific Strategic Plan

The vision document provides an overview of the Climate Change Science Program (CCSP) long-term strategic plan to enhance scientific understanding of global climate change.This document is a companion to the comprehensive Strategic Plan for the Climate Change Science Program. The report responds to the Presidents direction that climate change research activities be accelerated to provide the best possible scientific information to support public discussion and decisionmaking on climate-related issues.The plan also responds to Section 104 of the Global Change Research Act of 1990, which mandates the development and periodic updating of a long-term national global change research plan coordinated through the National Science and Technology Council.This is the first comprehensive update of a strategic plan for U.S. global change and climate change research since the origal plan for the U.S. Global Change Research Program was adopted at the inception of the program in 1989.

Climate change↗

Science opportunity analyzer - a multi-mission tool for planning

For many years the diverse scientific community that supports JPL's wide variety ofinterplanetary space missions has needed a tool in order to plan and develop their experiments. The tool needs to be easily adapted to various mission types and portable to the user community. The Science Opportunity Analyzer, SOA, now in its third year of development, is intended to meet this need. SOA is a java-based application that is designed to enable scientists to identify and analyze opportunities for science observations from spacecraft. It differs from other planning tools in that it does not require an in-depth knowledge of the spacecraft command system or operation modes to begin high level planning. Users can, however, develop increasingly detailed levels of design. SOA consists of six major functions: Opportunity Search, Visualization, Observation Design, Constraint Checking, Data Output and Communications. Opportunity Search is a GUI driven interface to existing search engines that can be used to identify times when a spacecraft is in a specific geometrical relationship with other bodies in the solar system. This function can be used for advanced mission planning as well as for making last minute adjustments to mission sequences in response to trajectory modifications. Visualization is a key aspect of SOA. The user can view observation opportunities in either a 3D representation or as a 2D map projection. The user is given extensive flexibility to customize what is displayed in the view. Observation Design allows the user to orient the spacecraft and visualize the projection of the instrument field of view for that orientation using the same views as Opportunity Search. Constraint Checking is provided to validate various geometrical and physical aspects of an observation design. The user has the ability to easily create custom rules or to use official project-generated flight rules. This capability may also allow scientists to easily impact the cost to science if flight rule changes occur. Data Output generates information based on the spacecraft's trajectory, opportunity search results or based on a created observation. The data can be viewed either in tabular format or as a graph. Finally, SOA is unique in that it is designed to be able to communicate with a variety of existing planning and sequencing tools. From the very beginning SOA was designed with the user in mind. Extensive surveys of the potential user community were conducted in order to develop the software requirements. Throughout the development period, close ties have been maintained with the science community to insure that the tool maintains its user focus. Although development is still in its early stages, SOA is already developing a user community on the Cassini project, which is depending on this tool for their science planning. There are other tools at JPL that do various pieces of what SOA can do; however, there is no other tool which combines all these functions and presents them to the user in such a convenient, cohesive, and easy to use fashion.

SOA science planning mission operations sequence s↗

Spatial Coverage Planning and Optimization for Planetary Exploration

We are developing onboard planning and scheduling technology to enable in situ robotic explorers, such as rovers and aerobots, to more effectively assist scientists in planetary exploration. In our current work, we are focusing on situations in which the robot is exploring large geographical features such as craters, channels or regional boundaries. In to develop valid and high quality plans, the robot must take into account a range of scientific and engineering constraints and preferences. We have developed a system that incorporates multiobjective optimization and planning allowing the robot to generate high quality mission operations plans that respect resource limitations and mission constraints while attempting to maximize science and engineering objectives. An important scientific objective for the exploration of geological features is selecting observations that spatially cover an area of interest. We have developed a metric to enable an in situ explorer to reason about and track the spatial coverage quality of a plan. We describe this technique and show how it is combined in the overall multiobjective optimization and planning algorithm.

autonomy↗

Mission Planning for Robotic and Human Exploration

Mission planning for spaceflight is a complex challenge for ground operators managing robotic or human missions. It requires integrating the needs of various disciplines and creating an effective, efficient, and safe plan to execute. NASA uses specialized tools to meet planning requirements and constraints. This talk will provide an overview of spaceflight mission planning as well as the software tools the Human-Computer Interaction Group has built to support scheduling and planning. Also, it identifies the future scheduling and planning challenges for human Mars missions and how we leverage Earth Analogs to learn about Mars operations.

Scheduling and planning↗

Decision Support Tool for Risk Assessment & Maneuver Planning in Collision Avoidance

As the quantity of orbital debris continues to grow, so too does the rate of conjunction messages that suggest possible collisions between high value payloads and debris. The abundance of these conjunction messages, and eventual misses, has led to a culture of ignored alerts, and an increase in satellite operation costs as a result of the frequent need to plan resources for maneuver planning and execution. The loss of “trust” in conjunction alerts is due to the poorly characterized evolution in probability of collision (Pc) as time approaches the time of closest approach (TCA) between two objects, as well as the interpretation of Pc in the context of maneuver planning. To address these problems, and in collaboration with the NASA Conjunction Assessment Risk Analysis (CARA) program, the Industrial Sciences Group has developed a novel Maneuver Decision Support System (MDSS) to assist satellite operations in conjunction assessment and Maneuver planning. It provides a meaningful and intuitive Urgency metric for actionable maneuver decisions, based on the physical dynamics of conjunctions. It is based on a forecast of the evolution of Pc over time and represents an advance over current methods that are in use for satellite conjunction monitoring and planning. The result is to give satellite operators a validated decision support systems to plan for maneuver execution or mitigation or monitoring up to 3 days before TCA.

Decision Support Tool↗

Facilitating Crew-Computer Collaboration During Mixed-Initiative Space Mission Planning

As NASA looks toward longer duration missions, there will inevitably be a stronger emphasis on crew autonomy, particularly in the domains of mission planning. Ensuring that astronauts, while subject to lengthy periods of communication delay with Earth-based mission support personnel, are able to independently adapt their schedules to rapidly changing environments is a critical aspect of deep-space exploration. This task will likely require the assistance of computer support systems, as the task of mission planning is complex and currently requires dedicated console operators. A mixed-initiative approach can help alleviate some of the more workload-heavy aspects of planning by offloading the intricate task of constraint management to a computer, while still allowing the crew member to maintain overall control of the plan. Playbook is a mission planning tool that has been developed specifically to support this type of mixed-initiative scheduling. This paper examines: 1) the operational evidence of the challenges and viability of autonomous crew planning, and 2) the novel scheduling capabilities in Playbook that are meant to address those findings.

human-computer interaction↗

Monitoring, Evaluating, and Updating Your Community Solar Action Plan

The Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. This fact sheet describes some things to consider when implementing, monitoring, evaluating, and updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

Integrated energy-water-land nexus planning to guide national policy: an example from Uruguay

Despite broad consensus on the benefits of a nexus approach to multi-sector planning, actual implementation in government and other decision-making institutions is still rare. This study presents an approach to conducting integrated energy-water-land (EWL) planning, using Uruguay as an example. This stakeholder-driven study focuses on assessing the EWL nexus implications of actual planned policies aimed at strengthening three of Uruguay's key exports (beef, soy, and rice), which account for more than 40% of total national export revenue. Five scenarios are analyzed in the study: a reference scenario, a climate impacts scenario, and three policy scenarios. The three policy scenarios include measures such as increasing the intensity of beef production while simultaneously decreasing emissions, increasing irrigated soybean production, and improving rice yields. This study supplements previous sector-specific planning efforts in Uruguay by conducting the first stakeholder-driven integrated multi-sector assessment of planned policies in Uruguay using a suite of integrated modeling tools. Key insights from the study are: as compared to a reference scenario, improving beef productivity could lead to cropland expansion (+30%) and significant indirect increases in water requirements (+20%); improving rice yields could lead to increases in total emissions (+3%), which may partially offset emissions reductions from other policies; expanding irrigated soy could have the least EWL impacts amongst the policies studied; and climate-driven changes could have significantly less impact on EWL systems as compared to human actions. The generalizable insights derived from this analysis are readily applicable to other countries facing similar multi-sector planning challenges. In particular, the study's results reinforce the fact that policies often have multi-sector consequences, and thus policies can impact one another's efficacy. Thus, policy design and implementation can benefit from coordination across sectors and decision-making institutions.

54 ENVIRONMENTAL SCIENCES↗

MRI-Based Radiotherapy Planning to Reduce Rectal Dose in Excess of Tolerance

Background and Purpose. Chronic rectal toxicity significantly decreases the quality of life for men who receive radiotherapy for prostate cancer. The most significant predictor of rectal toxicity is rectal dose-volume exceeding tolerance. To minimize the volume of rectum in the high dose field, it is essential to accurately define the prostate-rectum interface. This can be challenging to do by computed tomography (CT) imaging alone. The current study was undertaken to formally demonstrate in a clinical trial setting that image-guided intensity-modulated radiation therapy (IG-IMRT) planning using magnetic resonance imaging (MRI) can reduce the volume of rectum exceeding 70 Gy, a validated metric that predicts the risk of late rectal toxicity. Materials and Methods. This prospective single-arm study enrolled 15 men treated with IG-IMRT for localized prostate cancer. All participants received a dedicated 3 Tesla MRI examination of the prostate in addition to a pelvic CT examination for treatment planning. Two volumetric modulated arc therapy (VMAT) plans with a prescription dose of 79.2 Gy were designed using identical constraints based on CT- and MRI-defined consensus volumes. The volume of rectum exposed to 70 Gy or more was compared using the Wilcoxon paired signed rank test. Results. For CT-based treatment plans, the median volume of rectum receiving 70 Gy or more was 9.3 cubic centimeters (cc) (IQR 7.0 to 10.2) compared with 4.9 cc (IQR 4.1 to 7.8) for MRI-based plans. This resulted in a median volume reduction of 2.1 cc (IQR 0.5 to 5.3, P < .001). Conclusions. Using MRI to plan prostate IG-IMRT to a dose of 79.2 Gy reduces the volume of rectum receiving radiation dose in excess of tolerance (70 Gy or more) and should be considered in men who are at high risk for late rectal toxicity and are not good candidates for other rectal sparing techniques such as hydrogel spacer. This trial is registered with NCT02470910.

Schmidt, Daniel R.↗

Distribution Substation Planning Toolkit (dsp-toolkit) v1.0

The Distribution Substation Planning Toolkit (DSP Toolkit) is a software suite designed to streamline the planning and optimization of distribution substations. This toolkit offers a comprehensive set of tools and APIs for data curation, short-term electric load forecasting, and weather-sensitive load adjustment, making it an essential resource for utility companies, engineers, and researchers. Features • Data Preprocessing and Curation: Efficiently manage and preprocess large datasets to ensure high-quality input for analysis. • Short-Term Load Forecasting: Utilize data-driven models to predict short-term electric loads accurately. • Weather-Sensitive Modeling: Automatically adjust load forecasts based on weather data to predict future peak demands more precisely. Uses The DSP Toolkit is ideal for planning and optimizing distribution substations, providing a user-friendly interface and comprehensive documentation. It is suitable for both novice and experienced users, facilitating efficient and accurate planning processes. Advantages • Efficiency: Automates complex planning tasks, reducing manual effort and minimizing errors. • Scalability: Handles large datasets and complex models, making it suitable for large-scale projects. • Community and Support: Open-source with active community contributions, ensuring continuous improvement and support. • Extensibility: Easily extendable with custom modules and plugins, allowing users to tailor the toolkit to their specific needs. The DSP Toolkit stands out by offering a robust, flexible, and user-friendly solution for distribution substation planning. Public Abstract

Li, Han [Lawrence Berkeley National Laboratory (LB↗

Incorporating adaptation and resilience into an integrated watershed and coral reef management plan

Changing environmental conditions are forcing natural resource managers and communities to adapt their strategies to account for global shifts in precipitation, temperature, sea level and more, all of which are occurring in addition to local human impacts. Adapting to threats from climate change requires a fundamental shift in the practice of natural resource management through the development of forward-looking “climate-smart” goals and strategies. Here we present a proof-of-concept application of a decision-support tool to help design climate-smart management actions for the watershed and coral reef management plan for Guánica Bay watershed in southwest Puerto Rico. We also explore the connection between adaptation planning and coral reef resilience, using a recently developed Puerto Rico-wide reef resilience assessment. In the first phase of the study, we used the publicly available Adaptation Design Tool to draft initial climate-smart versions of twelve proposed management actions. In the second phase, two actions (dirt road management on steep slopes, and coral reef restoration) were further refined through consultations with local experts to make more detailed design adjustments; this included the option to use information from the coral reef resilience assessment to inform design improvements. The first phase resulted in moderately detailed assessments that broadly accounted for anticipated direct and indirect effects of climate change on the planned management actions. The second phase resulted in more site-specific technical assessments and additional important design details. The expert panel charged with discussing climate-smart reef restoration around Guánica used the reef resilience assessment to guide discussion of reef restoration, highlighting the importance of having such information available for adaptation planning. This study demonstrates how climate change impacts can be effectively incorporated into a management plan at the most granular level of planning and how a structured, formalized process can be as valuable as the resulting adaptation information.

Gibbs, David A. (ORCID:0000000173898569)↗

Los Alamos National Laboratory SAVY-4000 Field Surveillance Plan Update for 2020

The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” The Los Alamos National Laboratory (LANL) SAVY-4000 Field Surveillance Plan was first issued in fiscal year (FY) 2013. The surveillance plan is reviewed annually and updated as necessary based on SAVY-4000 surveillance findings, as well as results of the lifetime extension studies. Five surveillance plan updates have been issued, one in 2014, one in 2016, one in 2017, one in 2018, and one in 2019. This 2020 update documents what was actually done in 2019 and what is planned for 2020. Deviations from the 2019 surveillance plan were necessary because some of the planned surveillance containers were not available for examination. The goal of the surveillance program is to provide data to: evaluate container component performance over time against the initial baseline qualification; validate the current SAVY container design life; provide data for future design life extensions of components as indicated; identify indications of container degradation early and identify similar containers and/or contents that may need remediation; maintain and continuously improve the surveillance information system that documents the complete life cycle of the containers including the initial production baseline, usage history, surveillance, and disposition; identify container issues related to wear and tear that could indicate the need for a maintenance program for in-service containers prior to the end of the design life.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements:(1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan Middle DP Road Recovery Effort, June 26, 2020 (Copy for Informational Puproses Only)

The United States Environmental Protection Agency (EPA) has issued a final 2017 Construction General Permit (CGP) that covers discharges of stormwater from construction sites. The 2017 National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges from Construction Activity (Appendix D) includes the following requirements: (1) conduct a critical habitat and threatened/endangered species study; (2) develop and implement a Storm Water Pollution Prevention Plan (SWPPP) in accordance with good engineering practices; (3) submit a Notice of Intent (NOI); (4) install and maintain erosion and stormwater controls; (5) perform and document storm water inspections during construction and site stabilization; (6) amend the SWPPP as necessary; and (7) submit a Notice of Termination (NOT) following project completion and final stabilization of disturbed areas. Authorization to discharge storm water is required under this Permit for both large and small construction projects disturbing more than one (1) acre or part of a larger common plan of development that collectively disturbs more than one (1) acre. All parties that meet the definition of Operator must be permitted. Each permittee is not required to develop and implement a separate SWPP Plan. It is required that there be at least one SWPP Plan for a site that incorporates the required elements for all Operators. The 2017 CGP number for New Mexico (Region 6) is NMR100000. This Plan, which has been developed for Triad National Security, LLC (Triad), describes the nature and sequencing of construction activities, potential sources of pollution, and identifies the Best Management Practices (BMPs) to minimize the potential for erosion and storm water pollution. The Plan was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. § §1251 et seq., as amended by the Water Quality Act of 1987, P.L. 100-4), and the regulations established by the U.S. Environmental Protection Agency (EPA) for National Pollutant Discharge Elimination System (NPDES) General Permits for Storm Water Discharges From Construction Activities.

54 ENVIRONMENTAL SCIENCES↗

Guidance on Including Social, Organizational and Technical Influences in Nuclear Utility and Plant Modernization Plans

The objective of this report is to provide the nuclear power industry with guidance on including socio-technical issues in plans developed for current and future modernization efforts. Socio-technical issues of concern include social, organizational and related technical aspects of modernized systems. These can be addressed using a set of systematic analysis and design methods developed to address socio-technical issues of the sort facing the nuclear power industry. The next phase of this work will involve developing and implementing a modernization plan that includes socio-technical tools and methods identified and discussed in a report by Dainoff and colleagues (2020). The plan is expected to be developed and implemented in cooperation with a nuclear utility that has expressed interest in participating. The Dainoff et al report provides the foundation for the present effort and presents a methodological tool set for analyzing socio-technical issues applicable to many modernization efforts. The tools described by Dainoff et al are based on principles of human factors engineering, safety engineering, and systems engineering and are discussed within the specific context of nuclear utility modernization and transformation efforts. It is expected that the plan and the concepts described in the current report will be developed and implemented with a nuclear utility partner. The plan developed with the nuclear utility partner will have a substantially higher level of detail than the guidance provided in this report, particularly with regard to details of plan logistics, etc.

99 GENERAL AND MISCELLANEOUS↗

Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan (CY 2021)

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2021 at the U.S. Department of Energy Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring is performed by the GWPP. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12. Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. The following sections of this report provide details regarding the CY 2021 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2021) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F. Modifications to the CY 2021 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, that is, the “proactive stewardship of the extensive monitoring well network at Y-12" (Consolidated Nuclear Security, L.L.C. [CNS], 2018). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality samples and hydrologic data are obtained from the well network and protects the subsurface environment. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (CNS, 2017), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data, and for that reason the GWPP inspects and performs maintenance on the wells sampled by the GWPP. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses the section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV west of Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bounded to the west by a surface drainage feature (Dunaway Branch, located immediately west of Industrial Landfill II) and by Scarboro Road to the east. The GWPP maintains an extensive database of geographic and construction details and related information for the monitoring wells in each hydrogeologic regime in the Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and Parts of Bethel Valley on the U.S. DOE Oak Ridge Reservation (CNS, 2019). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (CNS, 2018).

54 ENVIRONMENTAL SCIENCES↗

Los Alamos National Laboratory SAVY-4000 Field Surveillance Plan (Update for 2021)

The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1- 1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” The Los Alamos National Laboratory (LANL) SAVY-4000 Field Surveillance Plan was first issued in fiscal year (FY) 2013. The surveillance plan is reviewed annually and updated as necessary based on SAVY-4000 surveillance findings, as well as results of the lifetime extension studies. Six surveillance plan updates have been issued, one in 2014, one in 2016, one in 2017, one in 2018 one in 2019 and one in 2020. This 2021 update documents what was actually done in 2020 and what is planned for 2021. Deviations from the 2020 surveillance plan were necessary because some of the planned surveillance containers were not available for examination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗