Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Management experience of an international venture in space The Ulysses mission

The management of the Ulysses project, a probe which will fly a solar polar orbit, is described. The 5-yr mission will feature a flyby of Jupiter to deflect the spacecraft into a high-inclination orbit. Data on the solar corona, solar wind, the sun-wind interface, the heliospheric magnetic field, solar and nonsolar cosmic rays, etc., will be gathered as a function of the solar latitude. NASA will track and control the probe with the Deep Space Network. JPL provides project management for NASA while the Directorate of Scientific Programs performs ESA management functions. The DOE will provide a radioisotope thermoelectric generator while NASA and ESA each supply half the scientific payload. A NASA-ESA Joint Working Group meets about twice per year to monitor the project and discuss the technical and scientific requirements. Safety issues and measures which are being addressed due to the presence of the Pu-238 heat source for the RTG are discussed.

Yoshida, Ronald Y.↗

Performance Evaluation of Distributed Energy Resource Management Algorithm in Large Distribution Networks

This paper presents performance evaluation of hierarchical optimization and control for distributed energy resource management system (DERMS) in large distribution networks via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of a full-scale distribution system of 11,000 nodes, the DERMS software controller, and 90 power hardware photovoltaics (PVs) and battery inverters. The applied DERMS algorithm is designed based on a realtime optimal power flow algorithm and implemented with acceleration design that performs fast dispatch of simulated PVs and real physical hardware DER devices every 4 seconds.

DERMS↗

Performance Evaluation of Distributed Energy Resource Management Algorithm in Large Distribution Networks

This paper presents performance evaluation of hierarchical optimization and control for distributed energy resource management system (DERMS) in large distribution networks via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory envi-ronment, including the accurate modeling of a full-scale dis-tribution system of 11,000 nodes, the DERMS software con-troller, and 90 power hardware photovoltaics (PVs) and bat-tery inverters. The applied DERMS algorithm is designed based on a real-time optimal power flow algorithm and im-plemented with acceleration design that performs fast dis-patch of simulated PVs and real physical hardware DER devices every 4 seconds.

distributed energy management system (DERMS)↗

Thermal Management and Reliability of Automotive Power Electronics and Electric Machines

Low-cost, high-performance thermal management technologies are helping meet aggressive power density, specific power, cost, and reliability targets for power electronics and electric machines. The National Renewable Energy Laboratory is working closely with numerous industry and research partners to help influence development of components that meet aggressive performance and cost targets through development and characterization of cooling technologies, and thermal characterization and improvements of passive stack materials and interfaces. Thermomechanical reliability and lifetime estimation models are important enablers for industry in cost-and time-effective design.

30 DIRECT ENERGY CONVERSION↗

Evaluating adaptive and predictive power management strategies for optimizing visualization performance on supercomputers

Power is becoming an increasingly scarce resource on the next generation of supercomputers, and should be used wisely to improve overall performance. One strategy for improving power usage is hardware overprovisioning, i.e., systems with more nodes than can be run at full power simultaneously without exceeding the system-wide power limit. With this study, we compare two strategies for allocating power throughout an overprovisioned system – adaptation and prediction – in the context of visualization workloads. While adaptation has been suitable for workloads with more regular execution behaviors, it may not be as suitable on visualization workloads, since they can have variable execution behaviors. This study considers a total of 104 experiments, which vary the rendering workload, power budget, allocation strategy, and node concurrency, including tests processing data sets up to 1 billion cells and using up to 18,432 cores across 512 nodes. Overall, we find that prediction is a superior strategy for this use case, improving performance up to 27% compared to an adaptive strategy.

97 MATHEMATICS AND COMPUTING↗

Managing code transformations for better performance portability

Code optimization is an intricate task that is getting more complex as computing systems evolve. Managing the program optimization process, including the implementation and evaluation of code variants, is tedious, inefficient, and errors are likely to be introduced in the process. Moreover, because each platform typically requires a different sequence of transformations to fully harness its computing power, the optimization process complexity grows as new platforms are adopted. To address these issues, systems and frameworks have been proposed to automate the code optimization process. They, however, have not been widely adopted and are primarily used by experts with deep knowledge about underlying architecture and compiler intricacies. This article describes the requirements that we believe necessary for making automatic performance tuning more broadly used, especially in complex, long-lived high-performance computing applications. Besides discussing limitations of current systems and strategies to overcome these, we describe the design of a system that is able to semi-automatically generate efficient platform-specific code. In the proposed system, the code optimization is programmer-guided, separately from application code, on an external file in what we call optimization programming. The language to program the optimization process is able to represent complex collections of transformations and, as a result, generate efficient platform-specific code. A database manages different optimized versions of code regions, providing a pragmatic approach to performance portability, and the framework itself has separate components, allowing the optimized code to be used on systems without installing all of the modules required for the code generation. We present experiments on two different platforms to illustrate the generation of efficient platform-specific code that performs comparable to hand-optimized, vendor-provided code.

Computer Science↗

Department of Energy’s ARM Climate Research Facility External Data Center Operations Plan Located At Brookhaven National Laboratory

The External Data Center (XDC) Operations Plan describes the activities performed to manage the XDC, located at Brookhaven National Laboratory (BNL), for the Department of Energy’s Atmospheric Radiation Measurement (ARM) Climate Research Facility. It includes all ARM infrastructure activities performed by the Data Management and Software Engineering Group (DMSE) at BNL. This plan establishes a baseline of expectation within the ARM Operations Management for the group managing the XDC.

54 ENVIRONMENTAL SCIENCES↗

Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant

The U.S. Department of Energy (DOE) has completed an Operational Readiness Review (ORR) for the restart of Contact Handled (CH) waste emplacement at the Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico. The ORR team assessed the readiness of Nuclear Waste Partnership, LLC (NWP) to manage and perform receipt through CH waste emplacement, and associated waste handling and management activities, including the ability of the National TRU Program (NTP) to evaluate the waste currently stored at the WIPP site against the revised and enhanced Waste Acceptance Criteria (WAC). Field work for this review began on November 14, 2015 and was completed on November 30, 2016. The DOE ORR was conducted in accordance with the Department of Energy Operational Readiness Review Implementation Plan for the Waste Isolation Pilot Plant, dated November 8, 2016, and DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review activities included personnel interviews, record reviews, direct observation of operations and maintenance demonstrations, and observation of multiple operational and emergency drills/exercises. The DOE ORR also evaluated the adequacy of the contractor’s ORR (CORR) and the readiness of the DOE Carlsbad field Office (CBFO) to oversee the startup and execution of CH waste emplacement activities at the WIPP facility. The WIPP facility is categorized as a Hazard Category 2 DOE Nonreactor Nuclear Facility for all surface and Underground (UG) operations per DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports. In addition, the WIPP experienced two events in February, 2014 that resulted in Accident Investigations being performed in accordance with the requirements of DOE Order 225.1B, Accident Investigations. Based upon the results of the accident investigations and hazard categorization of the facility, the team placed significant emphasis on the following areas: fire protection, emergency preparedness, radiological protection, nuclear safety, and operations. The identification of specific focus areas was not intended to diminish the importance of other areas of the review, but to ensure that these areas received a particularly thorough and in-depth evaluation due to their significance with respect to the safe operation of the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A comparison of Nannochloropsis salina growth performance in two outdoor pond designs: conventional raceways versus the ARID pond with superior temperature management

The present study examines how climatic conditions and pond design affect the growth performance of microalgae. From January to April of 2011, outdoor batch cultures of Nannochloropsis salina were grown in three replicate 780 L conventional raceways, as well as in an experimental 7500 L ARID (Algae Raceway Integrated Design) pond. The ARID culture system utilizes a series of 8 to 20 cm deep basins and a 1.5 m deep canal to enhance light exposure and mitigate temperature variations and extremes. The ARID culture reached the stationary phase 27 days earlier than the conventional raceways, which can be attributed to its superior temperature management and shallower basins. On a night when the air temperature dropped to -9 °C, the water temperature was 18 °C higher in the ARID pond than in the conventional raceways. Lipid and fatty acid content ranged from 16 - 25 % and 5 - 15 %, respectively, as a percentage of AFDW. Palmitic, palmitoleic, and eicosapentaenoic acid comprised the majority of fatty acids. While the ARID culture system achieved nearly double the volumetric productivity relative to the conventional raceways (0.023 vs 0.013 g L-1day-1), areal biomass productivities were of similar magnitude in both pond systems (3.34 vs. 3.47 g m-2day-1), suggesting that the ARID pond design has to be further optimized, most likely by increasing the culture depth or operating at higher cell densities while maintaining adequate mixing.

Crowe, Braden J↗

Bristol Ridge: A 28-nm $\times$ 86 Performance-Enhanced Microprocessor Through System Power Management

Power management techniques can be effective at extracting more performance and energy efficiency out of mature systems on chip (SoCs). For instance, the peak performance of microprocessors is often limited by worst case technology (Vmax), infrastructure (thermal/electrical), and microprocessor usage assumptions. Performance/watt of microprocessors also typically suffers from guard bands associated with the test and binning processes as well as worst case aging/lifetime degradation. Similarly, on multicore processors, shared voltage rails tend to limit the peak performance achievable in low thread count workloads. In this paper, we describe five power management techniques that maximize the per-part performance under the before-mentioned constraints. Using these techniques, we demonstrate a net performance increase of up to 15% depending on the application and TDP of the SoC, implemented on 'Bristol Ridge,' a 28-nm CMOS, dual-core x 86 accelerated processing unit.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Guide to Operating and Maintaining EnergySmart Schools

Through a commitment to high performance, school districts are discovering that smart energy choices can create lasting benefits for students, communities, and the environment. For example, an energy efficient school district with 4,000 students can save as much as $160,000 a year in energy costs. Over 10 years, those savings can reach $1.6 million, translating into the ability to hire more teachers, purchase more textbooks and computers, or invest in additional high performance facilities. Beyond these bottomline benefits, schools can better foster student health, decrease absenteeism, and serve as centers of community life. The U.S. Department of Energy's EnergySmart Schools Program promotes a 30 percent improvement in existing school energy use. It also encourages the building of new schools that exceed code (ASHRAE 90.11999) by 50 percent or more. The program provides resources like this Guide to Operating and Maintaining EnergySmart Schools to assist school decisionmakers in planning, financing, operating, and maintaining energy efficient, high performance schools. It also offers education and training for building industry professionals. Operations and maintenance refer to all scheduled and unscheduled actions for preventing equipment failure or decline with the goal of increasing efficiency, reliability, and safety. A preventative maintenance program is the organized and planned performance of maintenance activities in order to prevent system or production problems or failures from occurring. In contrast, deferred maintenance or reactive maintenance (also called diagnostic or corrective maintenance) is conducted to address an existing problem. This guide is a primary resource for developing and implementing a districtor schoolwide operations and maintenance (O&M) program that focuses on energy efficiency. The EnergySmart Schools Solutions companion CD contains additional supporting information for design, renovation, and retrofit projects. The objective of this guide is to provide organizational and technical information for integrating energy and high performance facility management into existing O&M practices. The guide allows users to adapt and implement suggested O&M strategies to address specific energy efficiency goals. It recognizes and expands on existing tools and resources that are widely used throughout the high performance school industry. External resources are referenced throughout the guide and are also listed within the EnergySmart Schools O&M Resource List (Appendix J). While this guide emphasizes the impact of the energy efficiency component of O&M, it encourages taking a holistic approach to maintaining a high-performance school. This includes considering various environmental factors where energy plays an indirect or direct role. For example, indoor air quality, site selection, building orientation, and water efficiency should be considered. Resources to support these overlapping aspects will be cited throughout the guide.

54 ENVIRONMENTAL SCIENCES↗

Study of toluene rotary fluid management device and shear flow condenser performance for a space-based organic Rankine power system

Management of two-phase fluid and control of the heat transfer process in microgravity is a technical challenge that must be addressed for an orbital Organic Rankine Cycle (ORC) application. A test program was performed in 1-g that satisfactorily demonstrated the two-phase management capability of the rotating fluid management device (RFMD) and shear-flow condenser. Operational tests of the RFMD and shear flow condenser in adverse gravity orientations, confirmed that the centrifugal forces in the RFMD and the shear forces in the condenser were capable of overcoming gravity forces. In a microgravity environment, these same forces would not have to compete against gravity and would therefore be dominant. The specific test program covered the required operating range of the Space Station Solar Dynamic Rankine Cycle power system. Review of the test data verified that: fluid was pumped from the RFMD in all attitudes; subcooled states in the condenser were achieved; condensate was pushed uphill against gravity; and noncondensible gases were swept through the condenser.

Havens, Vance↗

The Demonstration of Power over Ethernet (PoE) Technologies in Commercial and Institutional Buildings

Power over Ethernet (PoE) technologies are currently ubiquitous in offices in the form of phones, access points, and IP security cameras. They are systems that are familiar to and managed by on-site IT staff. As low voltage DC-power capabilities have increased with the advancement of IT network switches within offices, PoE devices are now being integrated across additional building systems, including lighting, computers, and HVAC controls. The connection of PoE devices to network switches offers the opportunity for energy monitoring and management to be performed through IT network management software. Data and results from technology validations of PoE equipment remain very limited. This lack of information hinders expansion of PoE as an energy management strategy as its benefits and challenges have been insufficiently quantified in real-world scenarios. This final report presents the findings of a DOE/State of Minnesota-funded project that demonstrated and assessed the energy and non-energy benefits of Power over Ethernet (PoE) technologies at six sites: two offices, three schools, and a hotel. The goals of the demonstrations were to: (1) assess the receptiveness of commercial and institutional markets to these new technologies, (2) demonstrate the feasibility of PoE technologies within standard design/construction practices and commercial codes, (3) assess the energy and cost savings opportunities of these technologies, (4) provide energy management opportunities where not typically available, and (5) formulate approaches to spur adoption of these technologies in the marketplace.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Managing Research in a Risk World

The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.

Anton, W.↗