Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance contracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Color Helmet Mounted Display System with Real Time Computer Generated and Video Imagery for In-Flight Simulation

NASA Ames Research Center and the US Army are developing the Rotorcraft Aircrew Systems Concepts Airborne Laboratory (RASCAL) using a Sikorsky UH-60 helicopter for the purpose of flight systems research. A primary use of the RASCAL is in-flight simulation for which the visual scene will use computer generated imagery and synthetic vision. This research is made possible in part to a full color wide field of view Helmet Mounted Display (HMD) system that provides high performance color imagery suitable for daytime operations in a flight-rated package. This paper describes the design and performance characteristics of the HMD system. Emphasis is placed on the design specifications, testing, and integration into the aircraft of Kaiser Electronics' RASCAL HMD system that was designed and built under contract for NASA. The optical performance and design of the Helmet mounted display unit will be discussed as well as the unique capabilities provided by the system's Programmable Display Generator (PDG).

Sawyer, Kevin↗

Computational parametric study of sidewall-compression scramjet inlet performance at Mach 10

A computational parametric study of three-dimensional, sidewall-compression scramjet inlets was performed to identify the effects of geometric parameters on inlet performance. The parameters were the leading-edge sweep angle, varied between 30 and 60 deg, and the leading-edge position of the cowl, located at the throat and at two forward positions. A laminar boundary layer with cold-wall (T(sub wall) = 300 K (540 R)) boundary conditions was imposed. The parametric study was performed for a Mach number of 10 and a unit free-stream Reynolds number of 7.06 x 10(exp 6) per meter (2.15 x 10(exp 6) per foot) at a geometric contraction ratio of 5. The performance of each configuration was evaluated in terms of the mass capture, throat Mach number, total pressure recovery, kinetic energy efficiency, and internal compression. One computation of an unswept configuration was included as a baseline to determine the effects of introducing leading-edge sweep on the flow-field parameters. The purpose of the computational parametric study was to perform a trade-off of the effects of various parameters on the global performance of the inlet. Although no single optimal configuration emerged, trade-offs among the stated performance parameters identified a leading-edge sweep angle of 45 deg as possessing the most attractive performance characteristics.

Holland, Scott D.↗

Rapid prototype fabrication processes for high-performance thrust cells

The Thrust Cell Technologies Program (Air Force Phillips Laboratory Contract No. F04611-92-C-0050) is currently being performed by Rocketdyne to demonstrate advanced materials and fabrication technologies which can be utilized to produce low-cost, high-performance thrust cells for launch and space transportation rocket engines. Under Phase 2 of the Thrust Cell Technologies Program (TCTP), rapid prototyping and investment casting techniques are being employed to fabricate a 12,000-lbf thrust class combustion chamber for delivery and hot-fire testing at Phillips Lab. The integrated process of investment casting directly from rapid prototype patterns dramatically reduces design-to-delivery cycle time, and greatly enhances design flexibility over conventionally processed cast or machined parts.

Hunt, K.↗

Small gas turbine engine technology

Performance of small gas turbine engines in the 250 to 1,000 horsepower size range is significantly lower than that of large engines. Engines of this size are typically used in rotorcraft, commutercraft, general aviation, and cruise missile applications. Principal reasons for the lower efficiencies of a smaller engine are well known: component efficients are lower by as much as 8 to 10 percentage points because of size effects. Small engines are designed for lower cycle pressures and temperatures because of smaller blading and cooling limitations. The highly developed analytical and manufacturing techniques evolved for large engines are not directly transferrable to small engines. Thus, it was recognized that a focused effort addressing technologies for small engies was needed and could significantly impact their performance. Recently, in-house and contract studies were undertaken at the NASA Lewis Research Center to identify advanced engine cycle and component requirements for substantial performance improvement of small gas turbines for projected year 2000 applications. The results of both in-house research and contract studies are presented. In summary, projected fuel savings of 22 to 42 percent could be obtained. Accompanying direct operating cost reductions of 11 to 17 percent, depending on fuel cost, were also estimated. High payoff technologies are identified for all engine applications, and recent results of experimental research to evolve the high payoff technologies are described.

Niedzwiecki, Richard W.↗

Experimental and Computational Sonic Boom Assessment of Boeing N+2 Low Boom Models

Near-field pressure signatures were measured and computational predictions made for several sonic boom models representing Boeing’s Quiet Experimental Validation Concept (QEVC) supersonic transport, as well as for three axisymmetric calibration models. The concept was designed under a NASA Research Announcement (NRA) contract to address environmental and performance goals, specifically for low sonic boom loudness levels and high cruise efficiency, for an aircraft anticipated to enter service in the 2020-timeframe. Wind tunnel tests were conducted on the aircraft and calibration models during Phases I and II of the NRA contract from 2011 to 2013 in the NASA Ames 9- by 7-Foot and NASA Glenn 8- by 6-Foot Supersonic Wind Tunnels. Sonic boom pressure signatures were acquired primarily at Mach 1.6 and 1.8, and force and moment data were acquired from Mach 0.8 to 1.8. The sonic boom test data were obtained using a 2-in. flat-top pressure rail and a 14-in. tapered “reflection factor 1” (RF1) pressure rail. Both rails capture an entire pressure signature in one data point, and successive signatures at varying positions along or above the rail were used to improve data quality through spatial averaging. The sonic boom data obtained by the rails were validated with high-fidelity numerical simulations of offbody pressures. The test results showed good agreement between the computational and experimental data when a variety of testing techniques including spatial averaging of a series of pressure signatures were employed. The two wind tunnels generally produced comparable data.

Durston, Donald A.↗

Maintaining the program balance, volumes 1 and 2

In March of 1990, the NASA Administrator asked the Academy to perform a study to address the following questions: (1) has NASA contracted too much of its technical work; (2) has NASA's in-house technical capability eroded over time; (3) is in-house engineering and scientific work important to the development of scientists and engineers; and (4) is NASA still able to attract quality scientists and engineers. A panel from the Academy addressed each question separately and came up with the following recommendations: (1) prepare and issue guidance on technical functional areas reserved for in-house performance; (2) convert contracted technical functions to in-house performance if critical to agency programs; (3) provide policy guidance to the centers to retain in-house projects; (4) examine the project mix at each center against agency goals and objectives; (5) institute an annual critical review for all technical disciplines; (6) modify the agency's contractor accountability process; and (7) seek opportunities for greater delegation of resources and technical decision making.

Finger, Harold↗

An experimental study of high contraction ratio, subsonic wind tunnel inlets

The inlet or contraction section has significant impact on the performance and operating characteristics of any subsonic wind tunnel. Previous experimental studies have been conducted to examine specific aspects of inlet performance and design. This work builds on this earlier experience by performing a comprehensive experimental analysis of a member of a family of high contraction ratio inlets used on indraft type wind tunnels. Quantitative flow field measurements were made using wall static ports, a five-hole pressure probe, and a hot wire anemometry system. Smoke flow visualization techniques were used to examine the inlet flow in a more qualitative manner and to correlate with quantitative measurements. This experimental investigation has provided insight into some of the many problems associated with inlet flows.

Caylor, M. J.↗

Flight motor set 360L006 (STS-34). Volume 1: System overview

Flight motor set 360L006 was launched at approximately 11:54 a.m. Central Daylight Time (CDT) on 18 October 1989 as part of NASA space shuttle mission STS-34. As with all previous redesigned solid rocket motor launches, overall motor performance was excellent. All ballistic contract end item (CEI) specification parameters were verified with the exceptions of ignition interval and rise rates. Ignition interval and rise rates could not be verified due to the elimination of developmental flight instrumentation from fourth flight and subsequent, but the low sample rate data that were available showed nominal propulsion performance. All ballistic and mass property parameters closely matched the predicted values and were well within the required CEI specification levels that could be assessed, with the exception of the RH-motor vacuum-delivered specific impulse. It exceeds the upper-limit CEI specification due to a bias imposed on the raw data by the OPT/Taber gage measurement differences. Evaluation of the ground environment instrumentation measurements again verified thermal model analysis data and showed agreement with predicted environmental effects. No launch commit criteria thermal violations occurred. Postflight inspection again verified superior performance of the insulation, phenolics, metal parts, and seals. Postflight evaluation indicated both nozzles performed as expected during flight, although splashdown loads tore the left-hand, 45-deg actuator bracket from the nozzle. All combustion gas was contained by insulation in the field and nozzle-to-case joints. Recommendations were made concerning improved thermal modeling and measurements. The rationale for these recommendations, the disposition of all anomalies, and complete result details are contained.

Garecht, Diane M.↗

Goddard High Resolution Spectrograph SV/GTO Project

Contract number NAS5-30433, known at Ball Aerospace as the GHRS SV/GTO project, supported our participation in the post-launch activities of the Goddard High Resolution Spectrograph aboard the Hubble Space Telescope. The period of performance was December 1988 through December 1998. The contract supported the involvement of Dr Dennis Ebbets in the work of the GHRS Investigation Definition Team, and several of the Ball people in the documentation and publication of results. Three main categories of tasks were covered by this contract; in-orbit calibration of the GHRS, guaranteed time observations, and education and public outreach. The nature and accomplishments of these tasks are described in the report. This summary makes many references to publications in the scientific and technical literature. Appendix A is extracted from a complete bibliography, and lists those papers that are directly related to work performed under this GHRS contract. The tasks related to the in-orbit calibration of the GHRS were by far the largest responsibility during the first six years of the project. During this period Dr. Ebbets was responsible for the definition of calibration requirements, design of experiments, preparation of observing proposals, tracking their implementation and execution, and coordinating the analysis and publication of the results. Prior to the launch of HST in 1990 the observing proposals were developed in cooperation with the scientists on the GHRS DDT, engineers at Ball Aerospace, the operations staff at the STScI, and project coordinators at GSFC.

Ebbets, Dennis↗

Engine Power Turbine and Propulsion Pod Arrangement Study

A study has been conducted for NASA Glenn Research Center under contract NNC10BA05B, Task NNC11TA80T to identify beneficial arrangements of the turboshaft engine, transmissions and related systems within the propulsion pod nacelle of NASA's Large Civil Tilt-Rotor 2nd iteration (LCTR2) vehicle. Propulsion pod layouts were used to investigate potential advantages, disadvantages, as well as constraints of various arrangements assuming front or aft shafted engines. Results from previous NASA LCTR2 propulsion system studies and tasks performed by Boeing under NASA contracts are used as the basis for this study. This configuration consists of two Fixed Geometry Variable Speed Power Turbine Engines and related drive and rotor systems (per nacelle) arranged in tilting nacelles near the wing tip. Entry-into-service (EIS) 2035 technology is assumed for both the engine and drive systems. The variable speed rotor system changes from 100 percent speed for hover to 54 percent speed for cruise by the means of a two speed gearbox concept developed under previous NASA contracts. Propulsion and drive system configurations that resulted in minimum vehicle gross weight were identified in previous work and used here. Results reported in this study illustrate that a forward shafted engine has a slight weight benefit over an aft shafted engine for the LCTR2 vehicle. Although the aft shafted engines provide a more controlled and centered CG (between hover and cruise), the length of the long rotor shaft and complicated engine exhaust arrangement outweighed the potential benefits. A Multi-Disciplinary Analysis and Optimization (MDAO) approach for transmission sizing was also explored for this study. This tool offers quick analysis of gear loads, bearing lives, efficiencies, etc., through use of commercially available RomaxDESIGNER software. The goal was to create quick methods to explore various concept models. The output results from RomaxDESIGNER have been successfully linked to Boeing spreadsheets that generate gear tooth geometry in Catia 3D environment. Another initial goal was to link information from RomaxDESIGNER (such as hp, rpm, gear ratio) to populate Boeing's parametric weight spreadsheet and create an automated method to estimate drive system weight. This was only partially achieved due to the variety of weight models, number of manual inputs, and qualitative assessments required. A simplified weight spreadsheet was used with data inputs from RomaxDESIGNER along with manual inputs to perform rough weight calculations.

Robuck, Mark↗

Northwest Combined Heat and Power Technical Assistance Partnership: Final Scientific/Technical Report

During the years of 2018 through 2023, The Washington State University Energy Program (WSU EP) operated the Northwest Combined Heat and Power Technical Assistance Partnership under contract to the US Department of Energy’s Advanced Manufacturing Office (AMO), a part of DOE’s larger Office of Energy Efficiency and Renewable Energy. This contract provided direction and funding for providing technical outreach, information and technical/economic analysis services in support of expanding development of Combined Heat and Power (CHP) over a four state region in the Pacific Northwest. The states served included Alaska, Idaho, Oregon and Washington. During the duration of this contract, the WSU EP delivered performed specific assigned tasks and provided services of various generally prescribed types, with the overall goal of increasing adoption of CHP as an efficient heat and power supply in the region. Indications – though not formally evaluated to our knowledge – are that this goal was achieved. Over many years, the WSU team has provided support for CHP developments in these states under similar previous Department of Energy contracts, and many such projects have been built. While the early-phase outreach, education and techno-economic assessments that the NW CHP TAP provides rarely immediately result in project construction, there is no doubt that the WSU EP team has had substantial influence in the construction of a number of important CHP projects in the region. Examples of projects implemented directly under the current team’s guidance and services during this contract cycle include an 875 kilowatt biomass fueled CHP system installed at the University of Idaho, and 5 megawatt natural gas fueled CHP system at the University of Montana ( UM Breaks Ground on New Power Facility, Slashes Emissions 30% (umt.edu) ). Many other CHP systems recently installed are also either directly or at least partially the result of information and technical services provided by the team. Finally, though much more difficult to quantify and less glamorous, the team has helped countless organizations to understand CHP and determine whether and how CHP may be a fit for them, before they consider paying for engineering services. Whether the ultimate outcome has been to include CHP or not, the expert skills provided by the NW CHP TAP team have provided real value to these organizations considering this relatively complex technology. Over the duration of the contract our team provided 71 Initial Technical Assessments and 17 Advanced Technical Assessments; 53 End-User Engagements and 33 Stakeholder Engagements of various types; 42 Technical Profiles (Project Profiles, Program Profiles and Policy Profiles), and produced 14 technical articles for the Department of Energy. Unfortunately, these quantities provide no measure of the value that the team has provided. Only our clients can judge that, and we are confident that they are pleased with the benefits we have offered them.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Transportation System Studies Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development Contract: Technical Results - Volume 2

The purpose of the Advanced Transportation System Studies (ATSS) Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is Volume 2 of the final report for the contract. It provides documentation of selected technical results from various TA-2 analysis activities, including a detailed narrative description of the SSTO concept assessment results, a user's guide for the associated SSTO sizing tools, an SSTO turnaround assessment report, an executive summary of the ground operations assessments performed during the first year of the contract, a configuration-independent vehicle health management system requirements report, a copy of all major TA-2 contract presentations, a copy of the FLO launch vehicle final report, and references to Pratt & Whitney's TA-2 sponsored final reports regarding the identification of Russian main propulsion technologies.

Source record↗

Control mechanisms of circadian rhythms in body composition: Implications for manned spaceflight

The mechanisms underlying the internal synchronization of the circadian variations in electrolyte content in body compartments were investigated, and the significance of these oscillations for manned spaceflight were examined. The experiments were performed with a chair-acclimatized squirrel monkey system, in which the animal sits in a chair, restrained only around the waist. The following information was given: (1) experimental methodology description, (2) summary of results obtained during the first contract year, and (3) discussion of the research performed during the second contract year. This included the following topics: physiological mechanisms promoting normal circadian internal synchronization, factors precipitating internal desynchronization, pathophysiological consequences of internal desynchronization of particular relevance to spaceflight, and validation of a chair-acclimatized system.

Moore-Ede, M. C.↗

Cost and Schedule Analytical Techniques Development

This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.

Source record↗

Performance of five 30 GHz satellite receivers

Technology development contracts funded by NASA have resulted in five 30 GHz satellite receivers of various design. The results of tests performed at NASA-Lewis to determine the operating characteristics of the receivers and their ability to perform in a digital satellite link are presented and discussed.

Kerczewski, Robert J.↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Computational Study for the Utilization of Jet Pulsations in Gas Turbine Film Cooling and Flow Control

This report is the second part of a three-part final report of research performed under an NRA cooperative Agreement contract. The first part is NASA/CR-2012-217415. The third part is NASA/CR-2012-217417. Jets have been utilized in various turbomachinery applications in order to improve gas turbines performance. Jet pulsation is a promising technique because of the reduction in the amount of air removed from compressor. In this work two areas of pulsed jets applications were computationally investigated using the commercial code Fluent (ANSYS, Inc.); the first one is film cooling of High Pressure Turbine (HPT) blades and second one is flow separation control over Low Pressure Turbine (LPT) airfoil using Vortex Generator Jets (VGJ). Using pulsed jets for film cooling purposes can help to improve the effectiveness and thus allow higher turbine inlet temperature. Effects of the film hole geometry, blowing ratio and density ratio of the jet, pulsation frequency and duty cycle of blowing on the film cooling effectiveness were investigated. As for the low-pressure turbine (LPT) stages, the boundary layer separation on the suction side of airfoils can occur due to strong adverse pressure gradients. The problem is exacerbated as airfoil loading is increased. Active flow control could provide a means for minimizing separation under conditions where it is most severe (low Reynolds number), without causing additional losses under other conditions (high Reynolds number). The effects of the jet geometry, blowing ratio, density ratio, pulsation frequency and duty cycle on the size of the separated region were examined in this work. The results from Reynolds Averaged Navier-Stokes and Large Eddy Simulation computational approaches were compared with the experimental data.

Kartuzova, Olga V.↗