Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “negotiation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

NASA Small Business Innovation Research Program. Composite List of Projects, 1983 to 1989

The NASA SBIR Composite List of Projects, 1983 to 1989, includes all projects that have been selected for support by the Small Business Innovation Research (SBIR) Program of NASA. The list describes 1232 Phase 1 and 510 Phase 2 contracts that had been awarded or were in negotiation for award in August 1990. The main body is organized alphabetically by name of the small businesses. Four indexes cross-reference the list. The objective of this listing is to provide information about the SBIR program to anyone concerned with NASA research and development activities.

Source record↗

How to compete for NASA contracts

Various studies and NASA experience have found that business concerns can provide a vital and significant impetus to technological innovation, not only in the fields of space and aeronautics, but also in national technological growth. NASA personnel are determined to foster the development of small business capabilities in technical areas that will support future projects and establish a small business base for the development and production of flight hardware for future missions. The solicitation process for Federal contracts has grown quite complex over the years. Where possible, we continue to try to simplify and streamline procedures for obtaining and performing these contracts. This booklet is designed to help understand NASA solicitations, find the information needed in deciding whether to respond, and improve chances for success. The first section of this booklet will answer general questions concerning the various types of NASA solicitations. Your specific questions on how to prepare bids will be answered in the second section, which is followed by a third section on the unique features of construction contracting. A fourth section describes how to submit technical and cost proposals for the negotiated procurement process. Some tips or suggestions, called DO's and DONT's, are placed at the end of the second, third, and fourth sections. Then, in the fifth section, ways to seek business as a subcontractor are identified.

Source record↗

Analyzing the path of responding in maze-solving and other tasks

Response time and accuracy are sensitive measures of overall performance but may mask underlying response strategies. For example, analysis of latency and accuracy measures produced in a computerized-maze task does not reveal whether rhesus monkeys really 'solve a maze' or simply move as much as is possible toward the target, negotiating barriers through trial and error as they encounter them. Regression procedures are described for analyzing response path against several hypothetical response curves, and analyses of response path for rhesus monkeys' performance on the computerized MAZE task are presented as an illustration. The data suggest that rhesus monkeys do invoke a response strategy of solving the maze, because the observed response topography is significantly associated with the optimal path of responding. Many experimental paradigms should similarly benefit from analysis of the response paths that subjects exhibit.

Washburn, David A.↗

Improved All-Terrain Suspension System

Redesigned suspension system for all-terrain vehicle exhibits enhanced ability to negotiate sand and rocks. Improved six-wheel suspension system includes only two links on each side. Bogie tends to pull rear wheels with it as it climbs. Designed for rover vehicle for exploration of Mars, also has potential application in off-road vehicles, military scout vehicles, robotic emergency vehicles, and toys. Predecessors of suspension system described in "Articulated Suspension Without Springs" (NPO-17354), "Four-Wheel Vehicle Suspension System" (NPO-17407), and "High-Clearance Six-Wheel Suspension" (NPO-17821).

Bickler, Donald B.↗

Balloon Catheter Prevents Contamination

Balloon catheter similar to that used in such medical procedures as angioplasty and heart surgery protects small orifices against contamination and blockage by chips generated in machining operations. Includes small, inflatable balloon at end of thin, flexible tube. Contains additional features adapting it to anticontamination service: balloon larger to fit wider channel it must block; made of polyurethane (rather than latex), which does not fragment if bursts; material made thicker to resist abrasion better; and kink-resistant axial wire helps catheter negotiate tight bends.

Higginson, Gregory A.↗

Safety, reliability, maintainability and quality provisions for the Space Shuttle program

This publication establishes common safety, reliability, maintainability and quality provisions for the Space Shuttle Program. NASA Centers shall use this publication both as the basis for negotiating safety, reliability, maintainability and quality requirements with Shuttle Program contractors and as the guideline for conduct of program safety, reliability, maintainability and quality activities at the Centers. Centers shall assure that applicable provisions of the publication are imposed in lower tier contracts. Centers shall give due regard to other Space Shuttle Program planning in order to provide an integrated total Space Shuttle Program activity. In the implementation of safety, reliability, maintainability and quality activities, consideration shall be given to hardware complexity, supplier experience, state of hardware development, unit cost, and hardware use. The approach and methods for contractor implementation shall be described in the contractors safety, reliability, maintainability and quality plans. This publication incorporates provisions of NASA documents: NHB 1700.1 'NASA Safety Manual, Vol. 1'; NHB 5300.4(IA), 'Reliability Program Provisions for Aeronautical and Space System Contractors'; and NHB 5300.4(1B), 'Quality Program Provisions for Aeronautical and Space System Contractors'. It has been tailored from the above documents based on experience in other programs. It is intended that this publication be reviewed and revised, as appropriate, to reflect new experience and to assure continuing viability.

M S Malkin↗

EOS workstation

This final report summarizes the work done from mid-1989 until January 1992 to develop a prototype set of tools for the analysis of EOS-type images. Such images are characterized by great multiplicity and quantity. A single 'snapshot' of EOS-type imagery may contain several hundred component images so that on a particular pixel, one finds multiple gray values. A prototype EOS-sensor, AVIRIS, has 224 gray values at each pixel. The work focused on the ability to utilize very large images and continuously roam through those images, zoom and be able to hold more than one black and white or color image, for example for stereo viewing or for image comparisons. A second focus was the utilization of so-called 'image cubes', where multiple images need to be co-registered and then jointly analyzed, viewed, and manipulated. The target computer platform that was selected was a high-performance graphics superworkstation, Stardent 3000. This particular platform offered many particular graphics tools such as the Application Visualization System (AVS) or Dore, but it missed availability of commercial third-party software for relational data bases, image processing, etc. The project was able to cope with these limitations and a phase-3 activity is currently being negotiated to port the software and enhance it for use with a novel graphics superworkstation to be introduced into the market in the Spring of 1993.

Leberl, Franz↗

Matera Laser Ranging Observatory (MLRO): An overview

The Agenzia Spaziale Italiana (ASI) is currently under negotiation with the Bendix Field Engineering Corporation (BFEC) of the Allied Signal Aerospace Company (ASAC) to build a state-of-the-art laser ranging observatory for the Centro di Geodesia Spaziale, in Matera, Italy. The contract calls for the delivery of a system based on a 1.5 meter afocal Cassegrain astronomical quality telescope with multiple ports to support a variety of experiments for the future, with primary emphasis on laser ranging. Three focal planes, viz. Cassegrain, Coude, and Nasmyth will be available for these experiments. The open telescope system will be protected from dust and turbulence using a specialized dome which will be part of the building facilities to be provided by ASI. The fixed observatory facility will be partitioned into four areas for locating the following: laser, transmit/receive optics, telescope/dome enclosure, and the operations console. The optical tables and mount rest on a common concrete pad for added mechanical stability. Provisions will be in place for minimizing the effects of EMI, for obtaining maximum cleanliness for high power laser and transmit optics, and for providing an ergonomic environment fitting to a state-of-the-art multipurpose laboratory. The system is currently designed to be highly modular and adaptable for scaling or changes in technology. It is conceived to be a highly automated system with superior performance specifications to any currently operational system. Provisions are also made to adapt and accommodate changes that are of significance during the course of design and integration.

Varghese, Thomas K.↗

Specialized data analysis for the Space Shuttle Main Engine and diagnostic evaluation of advanced propulsion system components

The Marshall Space Flight Center is responsible for the development and management of advanced launch vehicle propulsion systems, including the Space Shuttle Main Engine (SSME), which is presently operational, and the Space Transportation Main Engine (STME) under development. The SSME's provide high performance within stringent constraints on size, weight, and reliability. Based on operational experience, continuous design improvement is in progress to enhance system durability and reliability. Specialized data analysis and interpretation is required in support of SSME and advanced propulsion system diagnostic evaluations. Comprehensive evaluation of the dynamic measurements obtained from test and flight operations is necessary to provide timely assessment of the vibrational characteristics indicating the operational status of turbomachinery and other critical engine components. Efficient performance of this effort is critical due to the significant impact of dynamic evaluation results on ground test and launch schedules, and requires direct familiarity with SSME and derivative systems, test data acquisition, and diagnostic software. Detailed analysis and evaluation of dynamic measurements obtained during SSME and advanced system ground test and flight operations was performed including analytical/statistical assessment of component dynamic behavior, and the development and implementation of analytical/statistical models to efficiently define nominal component dynamic characteristics, detect anomalous behavior, and assess machinery operational condition. In addition, the SSME and J-2 data will be applied to develop vibroacoustic environments for advanced propulsion system components, as required. This study will provide timely assessment of engine component operational status, identify probable causes of malfunction, and indicate feasible engineering solutions. This contract will be performed through accomplishment of negotiated task orders.

Source record↗

How to handle 6GBytes a night and not get swamped

The Macho Project has undertaken a 5 year effort to search for dark matter in the halo of the Galaxy by scanning the Magellanic Clouds for micro-lensing events. Each evening's raw image data will be reduced in real-time into the observed stars' photometric measurements. The actual search for micro-lensing events will be a post-processing operation. The theoretical prediction of the rate of such events necessitates the collection of a large number of repeated exposures. The project designed camera subsystem delivers 64 Mbytes per exposure with exposures typically occurring every 500 seconds. An ideal evening's observing will provide 6 Gbytes of raw image data and 40 Mbytes of reduced photometric measurements. Recognizing the difficulty of digging out from a snowballing cascade of raw data, the project requires the real-time reduction of each evening's data. The software team's implementation strategy centered on this non-negotiable mandate. Accepting the reality that 2 full time people needed to implement the core real-time control and data management system within 6 months, off-the-shelf vendor components were explored to provide quick solutions to the classic needs for file management, data management, and process control. Where vendor solutions were lacking, state-of-the-art models were used for hand tailored subsystems. In particular, petri nets manage process control, memory mapped bulletin boards provide interprocess communication between the multi-tasked processes, and C++ class libraries provide memory mapped, disk resident databases. The differences between the implementation strategy and the final implementation reality are presented. The necessity of validating vendor product claims are explored. Both the successful and hindsight decisions enabling the collection and processing of the nightly data barrage are reviewed.

Allsman, R.↗

US domestic and international regulatory issues

The U.S. domestic and international regulatory and policy milestones since 1982, when NASA filed its petition with the Federal Communications Commission (FCC) to establish the U.S. domestic Mobile Satellite Service (MSS), are described. In 1985, the FCC proposed to establish MSS services and allocate spectrum for such service. In 1986, the FCC allocated L-band spectrum for MSS. In 1987, at the Mobile World Administrative Radio Conference (MOB WARC-87), despite U.S., Canadian, and Mexican efforts, the WARC did not adopt a multi-service, generic MSS allocation. In 1989, the FCC licensed the first MSS system. After two decisions by the U.S. Court of Appeals, the FCC's licensing actions remain intact. The FCC also has permitted Comsat to provide international aeronautical and land MSS via the Inmarsat system. Inmarsat, however, may not serve the domestic U.S. market. In 1991, the FCC accepted applications for MSS systems, most of which were non-geostationary proposals, for operation in the Radiodetermination Satellite Service (RDSS) bands, and the VHF and UHF bands. In 1992, the FCC proposed rules for non-geostationary MSS systems and applied a negotiated rulemaking procedure to each. Also in 1992, the U.S. position for flexibility in existing MSS bands and for additional worldwide MSS allocations was adopted in large part at the 1992 World Administrative Radio Conference (WARC-92).

Levin, Lon C.↗

Planetary surface exploration MESUR/autonomous lunar rover

Planetary surface exploration micro-rovers for collecting data about the Moon and Mars have been designed by the Department of Mechanical Engineering at the University of Idaho. The goal of both projects was to design a rover concept that best satisfied the project objectives for NASA/Ames. A second goal was to facilitate student learning about the process of design. The first micro-rover is a deployment mechanism for the Mars Environmental Survey (MESUR) Alpha Particle/Proton/X-ray (APX) Instrument. The system is to be launched with the 16 MESUR landers around the turn of the century. A Tubular Deployment System and a spiked-legged walker have been developed to deploy the APX from the lander to the Martian Surface. While on Mars, the walker is designed to take the APX to rocks to obtain elemental composition data of the surface. The second micro-rover is an autonomous, roving vehicle to transport a sensor package over the surface of the moon. The vehicle must negotiate the lunar terrain for a minimum of one year by surviving impacts and withstanding the environmental extremes. The rover is a reliable track-driven unit that operates regardless of orientation that NASA can use for future lunar exploratory missions. This report includes a detailed description of the designs and the methods and procedures which the University of Idaho design teams followed to arrive at the final designs.

Stauffer, Larry↗

Experimental and theoretical study of aerodynamic characteristics of some lifting bodies at angles of attack from -10 degrees to 53 degrees at Mach numbers from 2.30 to 4.62

Lifting bodies are of interest for possible use as space transportation vehicles because they have the volume required for significant payloads and the aerodynamic capability to negotiate the transition from high angles of attack to lower angles of attack (for cruise flight) and thus safely reenter the atmosphere and perform conventional horizontal landings. Results are presented for an experimental and theoretical study of the aerodynamic characteristics at supersonic speeds for a series of lifting bodies with 75 deg delta planforms, rounded noses, and various upper and lower surface cambers. The camber shapes varied in thickness and in maximum thickness location, and hence in body volume. The experimental results were obtained in the Langley Unitary Plan Wind Tunnel for both the longitudinal and the lateral aerodynamic characteristics. Selected experimental results are compared with calculated results obtained through the use of the Hypersonic Arbitrary-Body Aerodynamic Computer Program.

Spearman, M. Leroy↗

Site comparison for optical visibility statistics in southern California

Negotiations are under way to locate an atmospheric visibility monitoring (AVM) observatory at Mount Lemmon, just north of Tucson, Arizona. Two more observatories will be located in the southwestern U.S. The observatories are being employed to improve a weather model for deep-space-to-ground optical communications. This article explains the factors considered in choosing a location and recommends Table Mountain Observatory as the location for another AVM facility.

Cowles, K.↗

A genetic technique for planning a control sequence to navigate the state space with a quasi-minimum-cost output trajectory for a non-linear multi-dimnensional system

There are many multi-stage optimization problems that are not easily solved through any known direct method when the stages are coupled. For instance, we have investigated the problem of planning a vehicle's control sequence to negotiate obstacles and reach a goal in minimum time. The vehicle has a known mass, and the controlling forces have finite limits. We have developed a technique that finds admissible control trajectories which tend to minimize the vehicle's transit time through the obstacle field. The immediate applications is that of a space robot which must rapidly traverse around 2-or-3 dimensional structures via application of a rotating thruster or non-rotating on-off for such vehicles is located at the Marshall Space Flight Center in Huntsville Alabama. However, it appears that the development method is applicable to a general set of optimization problems in which the cost function and the multi-dimensional multi-state system can be any nonlinear functions, which are continuous in the operating regions. Other applications included the planning of optimal navigation pathways through a transversability graph; the planning of control input for under-water maneuvering vehicles which have complex control state-space relationships; the planning of control sequences for milling and manufacturing robots; the planning of control and trajectories for automated delivery vehicles; and the optimization and athletic training in slalom sports.

Hein, C.↗

EOS distributed planning and scheduling prototype

Some of the more significant lessons learned during the development of the Earth Observing System (EOS) Distributed Planning and Scheduling Prototype are presented. The need for a central scheduler is not demonstrated. A mapping of scheduling and conflict-resolution responsibility across the nodes of the EOS distributed scheduling system is developed and shown to be both feasible and appropriate. Complex instrument scheduling is mostly accomplished at the ICC/IST (instrument control center/instrumental support terminal) with 'slidable' flexibility for slews and some kinds of calibrations resolved at the EOS Operations Center (EOC). All nodes have full visibility interinstrument contention for resource and environmental rights, e.g., vibration, thermal, and electromagnetic. The EOC assigns, by activity, initial action responsibility for conflict resolution to a node which is party to the conflict. Most interinstrument conflicts are resolved by the ICCs and ISTs during an intermediate scheduling phase while the EOC is negotiating a TDRS schedule with the NCC.

Hull, Larry G.↗

Accuracy analysis of TDRSS demand forecasts

This paper reviews Space Network (SN) demand forecasting experience over the past 16 years and describes methods used in the forecasts. The paper focuses on the Single Access (SA) service, the most sought-after resource in the Space Network. Of the ten years of actual demand data available, only the last five years (1989 to 1993) were considered predictive due to the extensive impact of the Challenger accident of 1986. NASA's Space Network provides tracking and communications services to user spacecraft such as the Shuttle and the Hubble Space Telescope. Forecasting the customer requirements is essential to planning network resources and to establishing service commitments to future customers. The lead time to procure Tracking and Data Relay Satellites (TDRS's) requires demand forecasts ten years in the future a planning horizon beyond the funding commitments for missions to be supported. The long range forecasts are shown to have had a bias toward underestimation in the 1991 -1992 period. The trend of underestimation can be expected to be replaced by overestimation for a number of years starting with 1998. At that time demand from new missions slated for launch will be larger than the demand from ongoing missions, making the potential for delay the dominant factor. If the new missions appear as scheduled, the forecasts are likely to be moderately underestimated. The SN commitment to meet the negotiated customer's requirements calls for conservatism in the forecasting. Modification of the forecasting procedure to account for a delay bias is, therefore, not advised. Fine tuning the mission model to more accurately reflect the current actual demand is recommended as it may marginally improve the first year forecasting.

Stern, Daniel C.↗

Navigational demands of low-level helicopter flight

The present study was designed to assess the verbal references to map, terrain, direction, and position, that navigators and pilots communicate during a simulated low-level flight. Two-person crews were asked to communicate normally while negotiating six short flight missions that varied widely in regard to map-terrain characteristics. Half of the crews performed the exercises with fixed, north-up maps and the other half used movable maps that were adjusted to maintain a track-up correspondence to the flight route. An analysis was performed to compare differences in crew communication patterns between map orientations, characteristics, and navigation tasks. The results showed differences in the frequency of communication across categories for map characteristics but not for map orientations or tasks. A difference in the proportion of communications between pilot and navigator occurred when crew were lost. Pilots communicated more than navigators when crews were lost and the reverse was true when crews were not lost. The results support and extend findings from a distance error performance analysis performed on the same flight missions.

Delzell, Susanne↗