Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “layout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Applications of Modeling and Simulation for Flight Hardware Processing at Kennedy Space Center

The Boeing Design Visualization Group (DVG) is responsible for the creation of highly-detailed representations of both on-site facilities and flight hardware using computer-aided design (CAD) software, with a focus on the ground support equipment (GSE) used to process and prepare the hardware for space. Throughout my ten weeks at this center, I have had the opportunity to work on several projects: the modification of the Multi-Payload Processing Facility (MPPF) High Bay, weekly mapping of the Space Station Processing Facility (SSPF) floor layout, kinematics applications for the Orion Command Module (CM) hatches, and the design modification of the Ares I Upper Stage hatch for maintenance purposes. The main goal of each of these projects was to generate an authentic simulation or representation using DELMIA V5 software. This allowed for evaluation of facility layouts, support equipment placement, and greater process understanding once it was used to demonstrate future processes to customers and other partners. As such, I have had the opportunity to contribute to a skilled team working on diverse projects with a central goal of providing essential planning resources for future center operations.

Marshall, Jennifer L.↗

In-Flight Validation of Mid and Thermal Infrared Remotely Sensed Data Using the Lake Tahoe and Salton Sea Automated Validation Sites

The presentation includes an introduction, Lake Tahoe site layout and measurements, Salton Sea site layout and measurements, field instrument calibration and cross-calculations, data reduction methodology and error budgets, and example results for MODIS. Summary and conclusions are: 1) Lake Tahoe CA/NV automated validation site was established in 1999 to assess radiometric accuracy of satellite and airborne mid and thermal infrared data and products. Water surface temperatures range from 4-25C.2) Salton Sea CA automated validation site was established in 2008 to broaden range of available water surface temperatures and atmospheric water vapor test cases. Water surface temperatures range from 15-35C. 3) Sites provide all information necessary for validation every 2 mins (bulk temperature, skin temperature, air temperature, wind speed, wind direction, net radiation, relative humidity). 4) Sites have been used to validate mid and thermal infrared data and products from: ASTER, AATSR, ATSR2, MODIS-Terra, MODIS-Aqua, Landsat 5, Landsat 7, MTI, TES, MASTER, MAS. 5) Approximately 10 years of data available to help validate AVHRR.

Lake Tahoe↗

ACCESS - A Science and Engineering Assessment of Space Coronagraph Concepts for the Direct Imaging and Spectroscopy of Exoplanetary Systems

Topics include and overview, science objectives, study objectives, coronagraph types, metrics, ACCESS observatory, laboratory validations, and summary. Individual slides examine ACCESS engineering approach, ACCESS gamut of coronagraph types, coronagraph metrics, ACCESS Discovery Space, coronagraph optical layout, wavefront control on the "level playing field", deformable mirror development for HCIT, laboratory testbed demonstrations, high contract imaging with the HCIT, laboratory coronagraph contrast and stability, model validation and performance predictions, HCIT coronagraph optical layout, Lyot coronagraph on the HCIT, pupil mapping (PIAA), shaped pupils, and vortex phase mask experiments on the HCIT.

exoplanets↗

TBCC TSTO Design for the NASA-AFRL Joint System Study

NASA and the Air Force Research Laboratory are involved in a Joint System Study (JSS) on Two-Stage-to-Orbit (TSTO) vehicles. The JSS will examine the performance, operability and uncertainty of unmanned, fully reusable, airbreathing-based TSTO launch vehicle concepts. NASA is providing a concept using turbine-based combined cycle (TBCC) propulsion on the booster stage and an all-rocket orbiter. The Air Force supplied two vehicle concepts, both utilizing an all-rocket booster; one with an all-rocket orbiter, the other using a rocket-based combined cycle orbiter. For NASA, this study is being used for tool assessment and development, and to identify generic technology gaps, not to choose vehicle types or concepts. This presentation starts with an overview of the major JSS ground rules and assumptions. Second, the NASA TSTO concept, Reusable Airbreathing Launch Vehicle - iteration B (RALV-B) is introduced, including its mission profile and, the vehicle (booster and orbiter) layout and packaging. The high speed propulsion concept is then briefly discussed, including the work performed and lessons learned. The low speed TBCC propulsion system is covered next in some detail. An overview for the low speed system is given; then its development is discussed (starting with initial layout and leading to more detailed analyses performed and results). The low speed system portion is wrapped up with lessons learned and summary. Finally, an overall summary and lessons learned so far for the JSS are given as well as work planned to complete the study.

Snyder, Christopher A.↗

An Independent Human Factors Analysis and Evaluation of the Emergency Medical Protocol Checklist for the International Space Station

Emergency medical capabilities aboard the ISS include a Crew Medical Officer (CMO) (not necessarily a physician), and back-up, resuscitation equipment, and a medical checklist. It is essential that CMOs have reliable, usable and informative medical protocols that can be carried out independently in flight. The study evaluates the existing ISS Medical Checklist layout against a checklist updated to reflect a human factors approach to structure and organization. Method: The ISS Medical checklist was divided into non-emergency and emergency sections, and re-organized based on alphabetical and a body systems approach. A desk-top evaluation examined the ability of subjects to navigate to specific medical problems identified as representative of likely non-emergency events. A second evaluation aims to focus on the emergency section of the Medical Checklist, based on the preliminary findings of the first. The final evaluation will use Astronaut CMOs as subjects comparing the original checklist against the updated layout in the task of caring for a "downed crewmember" using a Human Patient Simulator [Medical Education Technologies, Inc.]. Results: Initial results have demonstrated a clear improvement of the re-organized sections to determine the solution to the medical problems. There was no distinct advantage for either alternative, although subjects stated having a preference for the body systems approach. In the second evaluation, subjects will be asked to identify emergency medical conditions, with measures including correct diagnosis, time to completion and solution strategy. The third evaluation will compare the original and fully updated checklists in clinical situations. Conclusions: Initial findings indicate that the ISS Medical Checklist will benefit from a reorganization. The present structure of the checklist has evolved over recent years without systematic testing of crewmember ability to diagnose medical problems. The improvements are expected to enable ISS Crewmembers to more speedily and accurately respond to medical situations on the ISS.

Marshburn, Thomas↗

Electronic Absolute Cartesian Autocollimator

An electronic absolute Cartesian autocollimator performs the same basic optical function as does a conventional all-optical or a conventional electronic autocollimator but differs in the nature of its optical target and the manner in which the position of the image of the target is measured. The term absolute in the name of this apparatus reflects the nature of the position measurement, which, unlike in a conventional electronic autocollimator, is based absolutely on the position of the image rather than on an assumed proportionality between the position and the levels of processed analog electronic signals. The term Cartesian in the name of this apparatus reflects the nature of its optical target. Figure 1 depicts the electronic functional blocks of an electronic absolute Cartesian autocollimator along with its basic optical layout, which is the same as that of a conventional autocollimator. Referring first to the optical layout and functions only, this or any autocollimator is used to measure the compound angular deviation of a flat datum mirror with respect to the optical axis of the autocollimator itself. The optical components include an illuminated target, a beam splitter, an objective or collimating lens, and a viewer or detector (described in more detail below) at a viewing plane. The target and the viewing planes are focal planes of the lens. Target light reflected by the datum mirror is imaged on the viewing plane at unit magnification by the collimating lens. If the normal to the datum mirror is parallel to the optical axis of the autocollimator, then the target image is centered on the viewing plane. Any angular deviation of the normal from the optical axis manifests itself as a lateral displacement of the target image from the center. The magnitude of the displacement is proportional to the focal length and to the magnitude (assumed to be small) of the angular deviation. The direction of the displacement is perpendicular to the axis about which the mirror is slightly tilted. Hence, one can determine the amount and direction of tilt from the coordinates of the target image on the viewing plane.

Leviton, Douglas B.↗

Spacecraft Habitable Volume: Results of an Interdisciplinary Workshop

NASA's Human Exploration Framework Team posed the question: "Is 80 cubic meters per person of habitable volume acceptable for a proposed Deep Space Habitat?" The goal of the workshop was to address the "net habitable volume" necessary for long-duration human spaceflight missions and identify design and psychological issues and mitigations. The objectives were: (1) Identify psychological factors -- i.e., "stressors" -- that impact volume and layout specifications for long duration missions (2) Identify mitigation strategies for stressors, especially those that can be written as volume design specifications (3) Identify a forward research roadmap -- i.e., what future work is needed to define and validate objective design metrics? (4) Provide advisories on the human factors consequences of poor net habitable volume allocation and layout design.

Fitts, David J.↗

Flight Hardware Packaging Design for Stringent EMC Radiated Emission Requirements

This packaging design approach can help heritage hardware meet a flight project's stringent EMC radiated emissions requirement. The approach requires only minor modifications to a hardware's chassis and mainly concentrates on its connector interfaces. The solution is to raise the surface area where the connector is mounted by a few millimeters using a pedestal, and then wrapping with conductive tape from the cable backshell down to the surface-mounted connector. This design approach has been applied to JPL flight project subsystems. The EMC radiated emissions requirements for flight projects can vary from benign to mission critical. If the project's EMC requirements are stringent, the best approach to meet EMC requirements would be to design an EMC control program for the project early on and implement EMC design techniques starting with the circuit board layout. This is the ideal scenario for hardware that is built from scratch. Implementation of EMC radiated emissions mitigation techniques can mature as the design progresses, with minimal impact to the design cycle. The real challenge exists for hardware that is planned to be flown following a built-to-print approach, in which heritage hardware from a past project with a different set of requirements is expected to perform satisfactorily for a new project. With acceptance of heritage, the design would already be established (circuit board layout and components have already been pre-determined), and hence any radiated emissions mitigation techniques would only be applicable at the packaging level. The key is to take a heritage design with its known radiated emissions spectrum and repackage, or modify its chassis design so that it would have a better chance of meeting the new project s radiated emissions requirements.

Lortz, Charlene L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Master Console, SMC

The Master Console oversees the function of Computer Systems in Firing room 1 (FR1). Master Console Operators, MCOs' for short, are our customer. I was integrated into the System Monitoring and Control (SMC) software team that is under the guidance of David Slaiman, who is the product group lead. I have been brought up to speed with System Monitoring and Control. The initial time spent reading SMC software design description and understanding how it works. The current Firing Room 1 Console Display is a floor layout giving the MCO two essential pieces of information which are Health and Status. When an issue arises, the MCO has to look on the display to find which console is affected and then the MCO must use the Reference designator from the display to manually search for the Portal Workstation (PWS) installed in the console using the hardware map; which is a long process to lookup a PWS if an issue is present. My project is to make the FR1 Console Display easier for the MCO's to pinpoint PWS's without having to lookup additional resources in the process. My project also includes updating Firing Room 1 Console Display to include the F1R Non-Redundant Set. The display does not have good use of space and functionality. PWS numbers were not present in the previous design and are the critical component in efficient understanding and administration of the consoles. Part of the process includes getting feedback from the customer, instead of just emailing them with a question, we made a proposal with changes so they could respond and give us their input; which proved to be an effective method for engaging them. In order to do this I had to use the Display Editor (DE) tool developed by NASA, Paint.Net and Visio. The process I have been using has been Visio to alter the floor layout of Firing Room and take advantage of the white areas, and then I take the altered floor plan into Paint.Net. Once in Paint.Net I put the new floor plan as a background to the standard console display. Paint.Net also serves as a tool to create the new service state bars for the new background; finally I used the DE to assemble everything and setup the right CUI's for each PWS.

MCO↗

Arusha Rover Deployable Medical Workstation

The NSBE Arusha rover concept offers a means of human transport and habitation during long-term exploration missions on the moon. This conceptual rover calls for the availability of medical supplies and equipment for crew members in order to aid in mission success. This paper addresses the need for a dedicated medical work station aboard the Arusha rover. The project team investigated multiple options for implementing a feasible deployable station to address both the medical and workstation layout needs of the rover and crew. Based on layout specifications and medical workstation requirements, the team has proposed a deployable workstation concept that can be accommodated within the volumetric constraints of the Arusha rover spacecraft

Rover↗

SpaceCube v2.0 Space Flight Hybrid Reconfigurable Data Processing System

This paper details the design architecture, design methodology, and the advantages of the SpaceCube v2.0 high performance data processing system for space applications. The purpose in building the SpaceCube v2.0 system is to create a superior high performance, reconfigurable, hybrid data processing system that can be used in a multitude of applications including those that require a radiation hardened and reliable solution. The SpaceCube v2.0 system leverages seven years of board design, avionics systems design, and space flight application experiences. This paper shows how SpaceCube v2.0 solves the increasing computing demands of space data processing applications that cannot be attained with a standalone processor approach.The main objective during the design stage is to find a good system balance between power, size, reliability, cost, and data processing capability. These design variables directly impact each other, and it is important to understand how to achieve a suitable balance. This paper will detail how these critical design factors were managed including the construction of an Engineering Model for an experiment on the International Space Station to test out design concepts. We will describe the designs for the processor card, power card, backplane, and a mission unique interface card. The mechanical design for the box will also be detailed since it is critical in meeting the stringent thermal and structural requirements imposed by the processing system. In addition, the mechanical design uses advanced thermal conduction techniques to solve the internal thermal challenges.The SpaceCube v2.0 processing system is based on an extended version of the 3U cPCI standard form factor where each card is 190mm x 100mm in size The typical power draw of the processor card is 8 to 10W and scales with application complexity. The SpaceCube v2.0 data processing card features two Xilinx Virtex-5 QV Field Programmable Gate Arrays (FPGA), eight memory modules, a monitor FPGA with analog monitoring, Ethernet, configurable interconnect to the Xilinx FPGAs including gigabit transceivers, and the necessary voltage regulation. The processor board uses a back-to-back design methodology for common parts that maximizes the board real estate available. This paper will show how to meet the IPC 6012B Class 3A standard with a 22-layer board that has two column grid array devices with 1.0mm pitch. All layout trades such as stack-up options, via selection, and FPGA signal breakout will be discussed with feature size results. The overall board design process will be discussed including parts selection, circuit design, proper signal termination, layout placement and route planning, signal integrity design and verification, and power integrity results. The radiation mitigation techniques will also be detailed including configuration scrubbing options, Xilinx circuit mitigation and FPGA functional monitoring, and memory protection.Finally, this paper will describe how this system is being used to solve the extreme challenges of a robotic satellite servicing mission where typical space-rated processors are not sufficient enough to meet the intensive data processing requirements. The SpaceCube v2.0 is the main payload control computer and is required to control critical subsystems such as autonomous rendezvous and docking using a suite of vision sensors and object avoidance when controlling two robotic arms.

Xilinx FPGA↗

Physical Science Informatics: Providing Open Science Access to Microheater Array Boiling Experiment Data

The Physical Science Informatics (PSI) system is the next step in this an effort to make NASA sponsored flight data available to the scientific and engineering community, along with the general public. The experimental data, from six overall disciplines, Combustion Science, Fluid Physics, Complex Fluids, Fundamental Physics, and Materials Science, will present some unique challenges. Besides data in textual or numerical format, large portions of both the raw and analyzed data for many of these experiments are digital images and video, requiring large data storage requirements. In addition, the accessible data will include experiment design and engineering data (including applicable drawings), any analytical or numerical models, publications, reports, and patents, and any commercial products developed as a result of the research. This objective of paper includes the following: Present the preliminary layout (Figure 2) of MABE data within the PSI database. Obtain feedback on the layout. Present the procedure to obtain access to this database.

nucleate boiling↗

Random Access Frames (RAF): Alternative to Rack and Standoff for Deep Space Habitat Outfitting

A modular Random Access Frame (RAF) system is proposed as an alternative to the International Standard Payload Rack (ISPR) for internal module layout and outfitting in a Deep Space Habitat (DSH). The ISPR approach was designed to allow for efficient interchangeability of payload and experiments for the International Space Station (ISS) when frequent resupply missions were available (particularly the now-retired Space Shuttle). Though the standard interface approach to the ISPR system allowed integration of subsystems and hardware from a variety of sources and manufacturers, the heavy rack and standoff approach may not be appropriate when resupply or swap-out capabilities are not available, such as on deep space, long-duration missions. The lightweight RAF concept can allow a more dense packing of stowage and equipment, and may be easily broken down for repurposing or reuse. Several example layouts and workstations are presented.

Howe, A. Scott↗

Hercules Single-Stage Reusable Vehicle (HSRV) Operating Base

Conceptual design for the layout of lunar-planetary surface support systems remains an important area needing further master planning. This paper explores a structured approach to organize the layout of a Mars-based site equipped for routinely flying a human-scale reusable taxi system. The proposed Hercules Transportation System requires a surface support capability to sustain its routine, affordable, and dependable operation. The approach organizes a conceptual Hercules operating base through functional station sets. The station set approach will allow follow-on work to trade design approaches and consider technologies for more efficient flow of material, energy, and information at future Mars bases and settlements. The station set requirements at a Mars site point to specific capabilities needed. By drawing from specific Hercules design characteristics, the technology requirements for surface-based systems will come into greater focus. This paper begins a comprehensive process for documenting functional needs, architectural design methods, and analysis techniques necessary for follow-on concept studies.

Surface Support Architectur↗

Low-Mass Planar Photonic Imaging Sensor

Continuing on the successful progress of NIAC Phase I, this report summarizes the technical progress achieved under NIAC Phase II during the performance period September 19, 2014-June 18, 2017. During this period, the research team has made the following accomplishments: designed and layout a silica photonic integrated circuit (PIC) as a two baseline interferometric imager; constructed an experiment to utilize the two baselines for complex visibility measurement on a point source and a variable width slit; analyzed and studied the testbed results. (in collaboration with Lockheed Martin); designed and layout Si3N4 PICs for the low-resolution and high-resolution SPIDER telescope; fabricated the multi-layer Si3N4 PIC for low and high resolution SPIDER telescope; characterize the optical throughput and heater response for Si3N4 PIC for low and high resolution SPIDER telescopes; carried out imaging experiments using the Si3N4 PIC low-resolution version (in collaboration with Lockheed Martin); investigated signal-to-noise (SNR) ratio of SPIDER imager compared to the conventional panchromatic imager (in collaboration with Lockheed Martin); fulfilled the SNR simulation upon SPIDER imager (in collaboration with Lockheed Martin).

Yoo, S. J. Ben↗

Low-Mass Planar Photonic Imaging Sensor

Continuing on the successful progress of NIAC (NASA Innovative Advanced Concepts) Phase I, this report summarizes the technical progress achieved under NIAC Phase II during the performance period September 19, 2014 to June 18, 2017. During this period, the research team has made the following accomplishments: designed and layout a silica photonic integrated circuit (PIC) as a two baselineinterferometric imager; constructed an experiment to utilize the two baselines for complex visibility measurementon a point source and a variable width slit; analyzed and studied the testbed results (in collaboration with Lockheed Martin); designed and layout Si3N4 PICs for the low-resolution and high-resolution SPIDER (Segmented Planar Imaging Detector for Electro-Optical Reconnaissance) telescope; fabricated the multi-layer Si3N4 PIC for low and high resolution SPIDER telescope; characterized the optical throughput and heater response for Si3N4 PIC for low and highresolution SPIDER telescopes; carried out imaging experiments using the Si3N4 PIC low-resolution version (in collaboration with Lockheed Martin); investigated signal-to-noise (SNR) ratio of SPIDER imager compared to the conventional panchromatic imager (in collaboration with Lockheed Martin); fulfilled the SNR simulation upon SPIDER imager (in collaboration with Lockheed Martin).

Yoo, S. J. Ben↗