Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “key management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

2018 NISAR Applications Workshop: Forest and Disturbance; Workshop Report

Forest lands cover the globe and are important sources for providing ecosystem services including: carbon sequestration, biodiversity, timber, air and water quality. As such, counties around the world have dedicated programs for managing them. Accurate and timely information concerning the status of these forests (moisture, biomass, disturbance type, etc.) is essential to those Nations’ human and ecological health as well as economy. The joint NASA/US Forest Service workshop focused on arming forest land managers with observations and remote sensing information from the upcoming NASA-ISRO (Indian Space Research Organization) SAR (Synthetic Aperture Radar) (NISAR) satellite mission (expected to launch early 2022). Participants included representatives from different US Federal Agencies, private sector, and non-governmental organizations (NGO) that are key players in facilitating integration of Earth Observations (EO) into forest management and decision support workflows. They included scientists, technicians, and program managers with a responsibility for data acquisition and exploitation such as product development, delivery, and use, and capacity building. Discussions were held over two days to convey the broader forest and disturbance community information needs for various representative participants and programs and to facilitate the delivery of NISAR mission geospatial products and observational capabilities. Case studies were presented to demonstrate the current state of practice in the use of SAR remote sensing for applications of direct importance to forest and disturbance land management community. Eleven organizations presented their information requirements in response to a set of questions provided by the NASA team, then the NASA team responded by describing the degree to which NISAR could meet these requirements. Discussion ensued about needed data product specifications to increase utility (e.g., projection, latency, etc.), tools and capacity building. The general findings of this workshop were that (a) NISAR observations will be particularly useful to the global forest carbon and disturbance monitoring applications, but that certain data product design decisions (projections and radiometric and terrain corrections) need to be considered to increase utility; b) the biomass and disturbance detection algorithms meet many of the community needs, however there are other information products of value (e.g., soil moisture or disturbance classification, not just detection) and all products should be compliant with existing community standards for reporting uncertainty; c) providing SAR education to the community will be key specifically thinking about putting the information first and the SAR theory second, providing a simple guide of standard data processing steps (e.g., dB (decibel) to power conversion and speckle filtering); d) the community needs a user-friendly interface for finding free, archived data over their geographic regions of interest; e) user-friendly tools that connect to open-sources GIS (Global Information System) software (e.g., QGIS (Quantum GIS)) that include a graphical user interface (GUI) for SAR processing that enables both download and cloud processing. To integrate these findings and prepare the community before NISAR launches, it was suggested that there be a dedicated NISAR Forest and Disturbance Applications Working Group (as per the specifications in the NISAR Utilization Plan). After launch, it was decided that the community continue capacity building activities.

Stavros, Natasha↗

An Integrated Gate Turnaround Management Concept Leveraging Big Data Analytics for NAS Performance Improvements

"Gate Turnaround" plays a key role in the National Air Space (NAS) gate-to-gate performance by receiving aircraft when they reach their destination airport, and delivering aircraft into the NAS upon departing from the gate and subsequent takeoff. The time spent at the gate in meeting the planned departure time is influenced by many factors and often with considerable uncertainties. Uncertainties such as weather, early or late arrivals, disembarking and boarding passengers, unloading/reloading cargo, aircraft logistics/maintenance services and ground handling, traffic in ramp and movement areas for taxi-in and taxi-out, and departure queue management for takeoff are likely encountered on the daily basis. The Integrated Gate Turnaround Management (IGTM) concept is leveraging relevant historical data to support optimization of the gate operations, which include arrival, at the gate, departure based on constraints (e.g., available gates at the arrival, ground crew and equipment for the gate turnaround, and over capacity demand upon departure), and collaborative decision-making. The IGTM concept provides effective information services and decision tools to the stakeholders, such as airline dispatchers, gate agents, airport operators, ramp controllers, and air traffic control (ATC) traffic managers and ground controllers to mitigate uncertainties arising from both nominal and off-nominal airport gate operations. IGTM will provide NAS stakeholders customized decision making tools through a User Interface (UI) by leveraging historical data (Big Data), net-enabled Air Traffic Management (ATM) live data, and analytics according to dependencies among NAS parameters for the stakeholders to manage and optimize the NAS performance in the gate turnaround domain. The application will give stakeholders predictable results based on the past and current NAS performance according to selected decision trees through the UI. The predictable results are generated based on analysis of the unique airport attributes (e.g., runway, taxiway, terminal, and gate configurations and tenants), and combined statistics from past data and live data based on a specific set of ATM concept-of-operations (ConOps) and operational parameters via systems analysis using an analytic network learning model. The IGTM tool will then bound the uncertainties that arise from nominal and off-nominal operational conditions with direct assessment of the gate turnaround status and the impact of a certain operational decision on the NAS performance, and provide a set of recommended actions to optimize the NAS performance by allowing stakeholders to take mitigation actions to reduce uncertainty and time deviation of planned operational events. An IGTM prototype was developed at NASA Ames Simulation Laboratories (SimLabs) to demonstrate the benefits and applicability of the concept. A data network, using the System Wide Information Management (SWIM)-like messaging application using the ActiveMQ message service, was connected to the simulated data warehouse, scheduled flight plans, a fast-time airport simulator, and a graphic UI. A fast-time simulation was integrated with the data warehouse or Big Data/Analytics (BAI), scheduled flight plans from Aeronautical Operational Control AOC, IGTM Controller, and a UI via a SWIM-like data messaging network using the ActiveMQ message service, illustrated in Figure 1, to demonstrate selected use-cases showing the benefits of the IGTM concept on the NAS performance.

Efficent ATM systems↗

Assessing risk from a stakeholder perspective

Planetary exploration missions are subject to a vast array of interpretations of 'success' based on the concerns of multiple stakeholder groups. While project risk management generally focuses on issues of cost/schedule constraints or reliability issues, a broader interpretation of 'risk' as it applies to stakeholders such as sponsors (e.g., NASA), the public at large, the scientific community, the home organization, and the project team itself can provide important insights into the full spectrum of risk that needs to be managed. This paper presents a stakeholder view of risk which is divided into failure, not-a-failure, success, and stunning-success zones. Using the Mars Pathfinder mission as an example, an alternative interpretation of the risks to that mission is presented from the view of key stakeholders. The implications of the stakeholder perspective to project risk management are addressed.

risk management success/failure graph↗

Management of optics

American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.

Kirchner, T. E.↗

Ares Knowledge Capture: Summary and Key Themes Presentation

This report has been developed by the National Aeronautics and Space Administration (NASA) Human Exploration and Operations Mission Directorate (HEOMD) Risk Management team in close coordination with the MSFC Chief Engineers Office. This document provides a point-in-time, cumulative, summary of actionable key lessons learned derived from the design project. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.

Ares Knowledge↗

Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

Dunn, Steven C.↗

The NEEMO Project: A Report on how NASA Utilizes the "Aquarius" Undersea Habitat as an Analog for Long-Duration Space Flight

NEEMO is the NASA Extreme Environment Mission Operations, a cooperative project between NASA and the National Oceanic and Atmospheric Administration (NOAA). NEEMO was created and is managed by the Mission Operations Directorate at the Johnson Space Center in Houston, Texas. On the NOAA side, the National Undersea Research Center (NURC) in Key Largo, FL, with the help of the University of North Carolina at Wilmington, manages and operates the Aquarius Program. NEEMO was developed by astronaut training specialists to utilize an undersea research habitat as a multi-objective mission analog for long-duration space flight. Each mission was designed to expose astronauts to extreme environments for training purposes and to research crew behavior, habitability, and space analog life sciences. All of this was done much in the model of a space mission utilizing specific crew procedures, mission rules and timelines. Objectives of the missions were very diverse and contained many of the typical space mission type activities such as EV As (also known as extra vehicular activities), in-habitat science and research, and educational, public outreach, and media events. Five missions, dubbed NEEMO 1-5, were conducted between October 2001 and July 2003, the longest of which (NEEMO 5) lasted 14 days.

Reagan, Marc↗

A small missions program for investigation of near-earth asteroids

Current studies are examining the feasibility and possible content of the Discovery Program, a series of 'Explorer-class' missions to planetary targets. Organized as a multi-layer program with constant funding, the Discovery Program would support lower cost exploration opportunities that are missed in the new start procedure for larger missions. One approach to such a program is to focus on rendezvous missions to several near-Earth asteroids to characterize basic properties of this group of objects. A sample program is presented that visits six different targets over twelve years, using direct low energy trajectories; some of these are newly identified. Each flight in the program delivers a payload capable of addressing science objectives within the expected budget and programmatic constraints of small planetary missions. The key to satisfying the constraints is a disciplined program management philosophy, consistently applied over the entire program, that makes extensive use of hardware designs developed for other programs.

Stancati, M. L.↗

Large Scale Testing of a Foam/Multilayer Insulation Thermal Control System (TCS) for Cryogenic Upper Stages

The development of high energy cryogenic upper stages is essential for the efficient delivery of large payloads to various destinations envisioned in future programs. A key element in such upper stages is cryogenic fluid management (CFM) advanced development/technology. Due to the cost of and limited opportunities for orbital experiments, ground testing must be employed to the fullest extent possible. Therefore, a system level test bed termed the Multipurpose Hydrogen Test Bed (MHTB), which is representative in size and shape (3 meter diameter by 3 meter long with a volume of 18 cubic meters) of a fully integrated space transportation vehicle liquid hydrogen propellant tank has been established. To date, upper stage studies have often baselined the foam/multilayer insulation (FMLI) combination concept; however, hardware experience with the concept is minimal and was therefore selected for the MHTB. The foam element (isofoam SS-1 171 with an average thickness of 3.5 centimeters) is designed to protect against ground hold/ascent flight environments, and allows for the use of a dry nitrogen purge as opposed to the more complex/heavy helium purge subsystem normally required with MLI in cryogenic applications. The MLI (45 layers of Double Aluminized Mylar with Dacron spacers) provides protection in the vacuum environment of space and is designed for an on-orbit storage period of 45 days. Several unique features were incorporated in the MLI concept and included: variable density MLI (reduces weight and radiation losses by changing the layer density), larger but fewer DAM perforations for venting during ascent to orbit (reduces radiation losses), and roll wrap installation of the MLI with a commercially established process to lower assembly man-hours and reduce seam heat leak. Thermal performance testing of the MHTB TCS was conducted during three test series conducted between September 1995 and May 1996. Results for the ground hold portion of the tests were as expected producing an average heat leak of 63 WattS/M2 at an average foam surface temperature of 170 K. The results of the simulated orbit hold test interval produced heat leaks ranging from 0.085 to 0.22 Watts/squareM at warm boundary temperatures of 164K and 305K, respectively. When compared to the performance for a traditional MLI system, a 60% reduction in orbital heat leak or boiloff was measured. Overall, the MHTB TCS demonstrated satisfactory performance for all mission phases required of a cryogenic upper stage.

Hastings, Leon↗

Examples L-Band Interference will be Presented and Discussed, as well as the Importance of L-Band Soil Moisture Observations

Examples of L-band interference will be presented and discussed, as well as the importance of L-band soil moisture observations, as part of this one-day GEOSS workshop XXXVII on "Data Quality and Radio Spectrum Allocation Impact on Earth Observations" will address the broad challenges of data quality and the impact of generating reliable information for decision makers who are Earth data users but not necessarily experts in the Earth observation field. GEO has initiated a data quality assessment task (DA-09-01a) and workshop users will review and debate the directions and challenges of this effort. Radio spectrum allocation is an element of data availability and data quality, and is also associated with a GEO task (AR-06-11). A recent U.S. National Research Council report on spectrum management will be addressed as part of the workshop. Key representatives from industry, academia, and government will provide invited talks on these and related issues that impact GEOSS implementation.

Kim, Edward↗

Towards Requirements in Systems Engineering for Aerospace IVHM Design

Health management (HM) technologies have been employed for safety critical system for decades, but a coherent systematic process to integrate HM into the system design is not yet clear. Consequently, in most cases, health management resorts to be an after-thought or 'band-aid' solution. Moreover, limited guidance exists for carrying out systems engineering (SE) on the subject of writing requirements for designs with integrated vehicle health management (IVHM). It is well accepted that requirements are key to developing a successful IVHM system right from the concept stage to development, verification, utilization, and support. However, writing requirements for systems with IVHM capability have unique challenges that require the designers to look beyond their own domains and consider the constraints and specifications of other interlinked systems. In this paper we look at various stages in the SE process and identify activities specific to IVHM design and development. More importantly, several relevant questions are posed that system engineers must address at various design and development stages. Addressing these questions should provide some guidance to systems engineers towards writing IVHM related requirements to ensure that appropriate IVHM functions are built into the system design.

Requirements↗

Feeding Ten Billion People Is Possible Within Four Terrestrial Planetary Boundaries

Global agriculture puts heavy pressure on planetary boundaries, posing the challenge to achieve future food security without compromising Earth system resilience. On the basis of process-detailed, spatially explicit representation of four interlinked planetary boundaries (biosphere integrity, land-system change, freshwater use, nitrogen flows) and agricultural systems in an internally consistent model framework, we here show that almost half of current global food production depends on planetary boundary transgressions. Hotspot regions, mainly in Asia, even face simultaneous transgression of multiple underlying local boundaries. If these boundaries were strictly respected, the present food system could provide a balanced diet (2,355 kcal per capita per day) for 3.4 billion people only. However, as we also demonstrate, transformation towards more sustainable production and consumption patterns could support 10.2 billion people within the planetary boundaries analysed. Key prerequisites are spatially redistributed cropland, improved water–nutrient management, food waste reduction and dietary changes. Adoption of the Sustainable Development Goals by all nations in 2015 is the first ever commitment to a world development path that safeguards the stability of the Earth system as a prerequisite for meeting universal human standards1. The longstanding challenge of achieving food security through sustainable agriculture is particularly acute in this context as world agriculture is a leading cause for the current transgressions of multiple planetary boundaries (PBs) globally and regionally2–5. The PB framework is a comprehensive scientific attempt to synoptically define our planet’s biogeophysical limits to anthropogenic interference. It suggests bounds to nine interacting processes that together delineate a Holocene-like Earth system state. The Holocene is chosen as the reference state as it is the only period known to provide a safe operating space for a world population of several billion people, and according to a precautionary principle, the PBs are set in sufficient distance from processes that may critically undermine Earth system resilience and global sustainability. A challenging question, thus, is whether human development goals such as food security can be met while maintaining multiple PBs along with their subglobal manifestations. Further PB transgressions could jeopardize the chances of providing sufficient food for a world population projected to be wealthier and reach >9 billion by 2050. This conundrum portrays a tradeoff between Earth’s biophysical carrying capacity and humankind’s rising food demand, calling in response for radical rethinking of food production and consumption patterns6–9. Yield gap closures, avoidance of excessive input use, shifts towards less resource-demanding diets, food waste reductions and efficient international trade are crucial options for sustainably increasing the food supply10–15. For example, enhancing water-use efficiency on irrigated and rain-fed farms can triple or quadruple crop yields in low-performing systems, suggesting possible global gains of >20% (ref. 16). Even higher gains appear feasible through globally optimized configurations of the land-use pattern17, and cutting food losses by half could generate food for another billion people18. Thus, collective large-scale implementation of such options could sustain food for a further growing world population19. Yet achieving this within a safe operating space as defined by PBs requires not only a halt to but actually a reversal of existing PB transgressions. Previous studies suggest that such a reconciliation might be possible, but these were based on aggregate representations of PBs (not accounting for the spatial patterns of limits, transgressions and interactions) or considered only one boundary in isolation17,20–23. Here, we systematically quantify to what extent current food production depends on local to global transgressions of the PBs for biosphere integrity, land-system change, freshwater use and nitrogen (N) flows, along with the potential of a range of solutions to avoid these transgressions and still increase food supply (Table 1). To this end, we configured an internally consistent process-based model of the terrestrial biosphere including agriculture (LPJmL) with multiple spatially distributed PBs and their interactions. LPJmL is among the longest-established and best-evaluated biosphere models, showing robust performance regarding simulation of, for example, carbon, water and crop yield dynamics (Supplementary Figs. 1 and 2 and Supplementary Table 1; see ref. 24 for a comprehensive benchmarking and Supplementary Methods for more detail on model evaluations). In principle following established definitions4, we refine the computation of some PBs with respect to their regional patterns and interactions (Methods), providing globally gridded precautionary limits to human interference with the Earth system at a level of great detail. In particular, we account for the evidence that many PBs need to be represented spatially explicitly4 to cover their

Gerten, Dieter↗

Traffic Flow Analysis for Package Delivery Drones using a Queueing Model

A key component of the small unmanned aircraft systems traffic management ecosystem is the design of scalable algorithms for strategic deconfliction of drones prior to takeoff. In this work, we focus on efficient flow management of drones on a network of intersecting edges subject to two kinds of spacing constraints: 1) between any two adjacent vehicles on an edge and 2) between any two vehicles on two different edges arriving one after the other at an intersection. The spacing is designed to enable non-intersection of operational volumes corresponding to two different vehicles thereby properly separating the vehicles inside each volume. For simplicity, we assume a constant ground speed for the drones and fixed dimensions for the operational volume blocks. The deconfliction is managed by adjusting the takeoff time of the drones, thereby regulating their arrival time at various crossing waypoints in the network. This framework allows us to study the maximum flow (throughput) of vehicles on a network of edges connecting depots to drop off sites subject to the temporal spacing constraints. The departure scheduling of individual drones results in a combinatorial optimization problem. To alleviate this, we solve a max-flow formulation and use queueing theory to simplify the analysis and provide upper bounds to the underlying optimization problem for individual drone departure scheduling. Our results indicate that throughput drops rapidly after the density of drones in the network passes the max-flow limits.

Alexey A Munishkin↗

Preliminary Development of Multi-Vehicle (m:N) Operations with NASA Langley’s Remote Vehicle Operations Center

To achieve the vision of Advanced Air Mobility (AAM), a transition from localized operations of aircraft to remote operations is being pursued across many use cases. This transition will allow fewer human operators to manage more increasingly autonomous aircraft (i.e., m operators managing N vehicles, or m:N). To study this operational concept, the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) has developed a prototype remote vehicle operations center and ground control station (GCS) software to conduct research with simulated and real flight operations. To date, flight operations at LaRC have been limited to one vehicle per operator. However, the current paper describes initial development and considerations for enabling m:N flight operations at LaRC. Further, the research described in this paper provides the foundation for a concept of operations (ConOps) that will be developed to support remote operators managing multiple increasingly autonomous vehicles, with the goal of exploring human-autonomy teaming (HAT) concepts that enable more advanced m:N operations. Two key enablers have been identified to facilitate successful m:N operations: GCS software updates for multi-vehicle management and procedural updates for vehicle handoffs during off-nominal events. Additionally, specific modifications were identified across five key areas: technology and software, team structure, inter-team communication, contingency plans, and operator decision flows. Next steps in forming the LaRC m:N ConOps will include working with subject-matter experts to identify off-nominal scenarios, implementing the recommended GCS functionality for m:N operations, and performing integration testing of facility capabilities and new operational procedures. Although the future m:N ConOps will be tailored to the NASA LaRC remote operations facility and flight range, it is intended to be a transparent, accessible, and reality-based exemplar for external organizations seeking to create or evaluate their own m:N operational concepts.

m:N↗

Integrated Demand Management (IDM) Project Overview

Overview of NASA Integrated Demand Management (IDM) research into synchronized use of strategic and tactical air traffic management systems describes the initial motivation for the research, summary description of key experiments conducted between 2016 and the present, collaboration with outside partners and stakeholders, and the current status of the research.

Integrated Demand Management↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

Charting the Course: Life Cycle Management of Mars Mission Digital Information

This viewgraph presentation reviews the life cycle management of MER Project information. This process was an essential key to the successful launch of the MER Project rovers. Incorporating digital information archive requirements early in the project life cycle resulted in: Design of an information system that included archive metadata, Reduced the risk of information loss through in-process appraisal, Easier transfer of project information to institutional online archive and Project appreciation for preserving information for reuse by future projects

information life cycles↗

Accident Case Study of Organizational Silence Communication Breakdown: Shuttle Columbia, Mission STS-107

This report has been developed by the National Aeronautics and Space Administration (NASA) ESMD Risk and Knowledge Management team. This document provides a point-in-time, cumulative, summary of key lessons learned derived from the official Columbia Accident Investigation Board (CAIB). Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document. This report is accompanied by a video that will be sent at request

Lessons Learned↗