Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “interconnect”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Improving Transient Stability of Interconnected Power Systems Through HVDE Controls

AC-DC corridors have been extensively used for bulk power transmission. In many of the cases, the power transfer through the parallel A C lines is restricted due to stability limits. Fast active power modulations of the HVDC link could enhance transient stability of interconnected power systems. This could be achieved by effectively utilizing the available headroom of the HVDC link, especially the transient overloading capability of classic HVDC link. In this paper, control schemes for HVDC power modulations are discussed. The effectiveness of HVDC link power modulations is demonstrated through the improved transient stability of the Pacific A C and DC Interties of North America under critical disturbances. System studies are performed using the detailed dynamic model of the Western Interconnection system.

Sundaresh, Lakshmi↗

Review—(Mn,Co) 3 O 4 -Based Spinels for SOFC Interconnect Coating Application

With the reduction of solid oxide fuel cell (SOFC) operating temperature to the range of 600 °C–800 °C, Cr-containing ferritic alloys have become the preferred interconnect material, which unfortunately are susceptible to continuous scale growth and Cr volatility at the SOFC operating temperatures. The (Mn,Co) 3 O 4 spinel system is widely regarded as the most effective coating for SOFC interconnect protection, due to its high thermal and electrical conductivity, adequate coefficient of thermal expansion, and excellent Cr blocking capability. This article reviews the physical and chemical properties of the (Mn,Co) 3 O 4 -based spinels; different types of coating precursors and deposition techniques; and the effects of spinel composition, quality and thickness on the coating performance. Furthermore, it is concluded that the spinel coating composition, quality, and thickness are more critical than the coating process in affecting the overall coating performance.

08 HYDROGEN↗

Developing Generic Dynamic Models for the 2030 Eastern Interconnection Grid

The Eastern Interconnection Planning Collaborative (EIPC) has built three major power flow cases for the 2030 Eastern Interconnection (EI) based on various levels of energy/environmental policy conditions, technology advances, and load growth. Using the power flow cases, this report documents the process of developing the generic 2030 dynamic models using typical dynamic parameters. The constructed model was validated indirectly using the synchronized phasor measurements by removing the wind generation temporarily.

54 ENVIRONMENTAL SCIENCES↗

Wind/PV Generation for Frequency Regulation and Oscillation Damping in the Eastern Interconnection

This report presents the control of renewable energy sources, including the variable-speed wind generators and solar photovoltaic (PV) generators, for frequency regulation and inter-area oscillation damping in the U.S. Eastern Interconnection (EI). In this report, based on the user-defined wind/PV generator electrical control model and the 16,000-bus Eastern Interconnection dynamic model, the additional controllers for frequency regulation and inter-area oscillation damping are developed and incorporated and the potential contributions of renewable energy sources to the EI system frequency regulation and inter-area oscillation damping are evaluated.

14 SOLAR ENERGY↗

National Offshore Wind Energy Grid Interconnection Study

The National Offshore Wind Energy Grid Interconnection Study (NOWEGIS) considers the availability and potential impacts of interconnecting large amounts of offshore wind energy into the transmission system of the lower 48 contiguous United States. A total of 54GW of offshore wind was assumed to be the target for the analyses conducted. A variety of issues are considered including: the anticipated staging of offshore wind; the offshore wind resource availability; offshore wind energy power production profiles; offshore wind variability; present and potential technologies for collection and delivery of offshore wind energy to the onshore grid; potential impacts to existing utility systems most likely to receive large amounts of offshore wind; and regulatory influences on offshore wind development. The technologies considered the reliability of various high-voltage ac (HVAC) and high-voltage dc (HVDC) technology options and configurations. The utility system impacts of GW-scale integration of offshore wind are considered from an operational steady-state perspective and from a regional and national production cost perspective.

17 WIND ENERGY↗

Development of Interconnect Technologies for Particle Detectors

This final report covers the three years of this grant, for the funding period 9/1/2010 - 8/31/2013. The project consisted of generic detector R&D work at UC Davis, with an emphasis on developing interconnect technologies for applications in HEP. Much of the work is done at our Facility for Interconnect Technologies (FIT) at UC Davis. FIT was established using ARRA funds, with further studies supported by this grant. Besides generic R&D work at UC Davis, FIT is engaged in providing bump bonding help to several DOE supported detector R&D efforts. Some of the developmental work was also supported by funding from other sources: continuing CMS project funds and the Linear Collider R&D funds. The latter program is now terminated. The three year program saw a good deal of progress on several fronts, which are reported here.

43 PARTICLE ACCELERATORS↗

Recovery Act - CAREER: Sustainable Silicon -- Energy-Efficient VLSI Interconnect for Extreme-Scale Computing

The research goal of this CAREER proposal is to develop energy-efficient, VLSI interconnect circuits and systems that will facilitate future massively-parallel, high-performance computing. Extreme-scale computing will exhibit massive parallelism on multiple vertical levels, from thou­ sands of computational units on a single processor to thousands of processors in a single data center. Unfortunately, the energy required to communicate between these units at every level (on­ chip, off-chip, off-rack) will be the critical limitation to energy efficiency. Therefore, the PI's career goal is to become a leading researcher in the design of energy-efficient VLSI interconnect for future computing systems.

97 MATHEMATICS AND COMPUTING↗

Renewable Electricity Futures: Operational Analysis of the Western Interconnection at Very High Renewable Penetrations

The goal of this work was to perform a detailed, sub-hourly analysis of very high penetration scenarios for a single interconnection (the Western Interconnection). The scenarios analyzed for this study included a variety of generation infrastructure buildouts and power system operational assumptions, with three different portfolios of renewable generators. The primary conclusion of this study is that sub-hourly operation of the grid is possible with renewable generation levels between 80% and 90%. Dynamic studies will need to be done to understand any impacts on reliability during contingencies and transient events.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Interconnection, Integration, and Interactive Impact Analysis of Microgrids and Distribution Systems

Distribution management systems (DMSs) are increasingly used by distribution system operators (DSOs) to manage the distribution grid and to monitor the status of both power imported from the transmission grid and power generated locally by a distributed energy resource (DER), to ensure that power flows and voltages along the feeders are maintained within designed limits and that appropriate measures are taken to guarantee service continuity and energy security. When microgrids are deployed and interconnected to the distribution grids, they will have an impact on the operation of the distribution grid. The challenge is to design this interconnection in such a way that it enhances the reliability and security of the distribution grid and the loads embedded in the microgrid, while providing economic benefits to all stakeholders, including the microgrid owner and operator and the distribution system operator.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Density Chip Interconnect Technology Using High Density Glass Interposers

Demands for high density and high speed interconnect solutions are not satisfied by current technology offerings. Platforms such as printed circuit boards (PCBs), ceramic substrates and silicon interposers don’t provide the small form factor nor the I/O density to support 5G or 1Tbps gigabit ethernet solutions. Current solutions also don’t support die to die assembly with integrated tiled solutions for wide area and fanout solutions for lager data and signal processing. A solution with through vias provides an order of magnitude or smaller density supporting much higher density attach and assembly By fabricating a very fine pitch metal filled through glass via solution it’s possible to deliver the necessary improvements in performance, reliability, even higher data speed rates with smaller area and much denser geometries. There are a number of opportunities across a wide variety of industries for through glass interposers as they become the replacement for printed circuit boards (PCBs) and ceramic substrates. The broad array of opportunities include renewable energy, medical electronics (ME), defense electronics (DE)/space and consumer electronics (CE), but likely will impact every industry and market segment. Compared to PCBs, through glass via (TGV) solutions provide the next generation platform for semiconductor assembly improvements. The ability to generate lines, spaces, trenches and vias similar to wafer level geometries delivers wired solutions one to two orders of magnitude smaller than traditional organic PCB and ceramic substrate offerings. Higher density connections also include the thru vias that connect multiple metal layers, fanout. It’s possible to deliver filled metal vias that are 20um diameter with much tighter pitch than can be offered with PCB. Our goal is to provide 20um diameter and smaller via, 50um and smaller pitch, and aspect ratios at 25:1 and greater with hermetically metal filled vias. The goal of CVI is to replace or eliminate PCBs, ceramic substrate and through silicon vias (TSV) providing a glass interposer with metal filled, fiber plugged and/or optional wireless interconnectivity. The end plan is to deliver a glass substrate platform that provides improved electrical performance, versatility, inertness, and much improved cost and cycle time (development, drawing, and delivery) to performance in the form of small millimeter sized substrates or full 8” wafer substrates. Glass delivers an improvement over silicon thru vias (TSV) in the number of processing steps, cost, reliability and cycle time. In addition to metal plugged vias, our glass interposers are capable of fiber and antennae solutions providing two additional very high density and ultra-high speed data transfer capabilities.

36 MATERIALS SCIENCE↗

Evaluating Trade-offs in Potential Exascale Interconnect Topologies

This study looks at the high-level trade-offs for interconnect architectures that are likely to be available in HPC machines in the 2021-2022 timeframe. The study uses multiple simulation models to look at the effects of varying machine size, injection bandwidth and topology for a selected set of benchmark communication patterns. The studies show the sensitivity of various applications to these network parameters. This study can help inform decisions on node size versus number of nodes, which topology is most efficient for our applications, how much injection bandwidth to provision, etc. These simulations only look at interconnects with maximally configured global bandwidth, and studies of networks configured with less will be the subject of future milestones.

97 MATHEMATICS AND COMPUTING↗

Supporting the Nation's Electric Interconnections through Integration of Water into their Long-Term Transmission Planning.

Water is a critical resource in the production of electric power. The purpose of this plan is to extend support to the nation's three electric interconnections toward integrating water issues into their long-range transmission planning. This continued support is at the request of the interconnections. The proposed program leverages prior support as well as that of other similarly focused efforts funded across the Department of Energy (DOE). The effort will utilize a project team lead by Sandia National Laboratories and supported by Argonne National Laboratory, National Renewable Energy Laboratory, and Pacific Northwest National Laboratory. The activities recorded here are meant to provide a menu of potential projects that could be implemented as available resources permit.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Coal Fleet Transition: Retirement Impacts in the Eastern Interconnection

This report examines the impact of announced retirements on the mix of available generating capacity, prices, resource availability, and air emissions in the Eastern Interconnection. The report uses a security constrained economic dispatch (SCED) model - Ventyx's PROMOD IV 11.1 - of the bulk electric system (BES) to model the interconnection.

01 COAL, LIGNITE, AND PEAT↗

Frequency Response Assessment and Improvement of Three Major North American Interconnections due to High Penetrations of Photovoltaic Generation

As photovoltaic (PV) generation penetration increases, the inertial and primary frequency response of North American electric grids after a generation loss disturbance will decrease. This change could negatively influence North American power grids frequency stability. This project produced a series of high PV penetration models from detailed, validated base models of all three U.S. interconnections (Eastern Interconnection, Western Electricity Coordinating Council, and Electric Reliability Council of Texas) so that the effects of increased PV generation on their frequency responses can be fully quantified. Mitigation strategies were also developed and validated using both software and hardware test beds.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Trade-offs in Potential Exascale Interconnect Technologies

This report details work to study trade-offs in topology and network bandwidth for potential interconnects in the exascale (2021-2022) timeframe. The work was done using multiple interconnect models across two parallel discrete event simulators. Results from each independent simulator are shown and discussed and the areas of agreement and disagreement are explored.

97 MATHEMATICS AND COMPUTING↗

Interconnections Seam Study [Slides]

The Interconnections Seam Study analyzes the grid impacts of increased connections between the Eastern and Western Interconnections in North America.

17 WIND ENERGY↗

An Overview of Inverter-based Resource Interconnection Standards

For the past century, electric power systems have primarily been bulk power systems consisting of generation, transmission, and distribution networks. Now the rapid expansion of distributed renewable power sources (RESs) and the shift from large, conventional synchronous machine resources to smaller-sized resources with diverse generation characteristics become the most significant change in modern power systems. With the increasing penetration of RESs, which are inverter-based resources (IBRs), it is important to develop interconnection standards that define performance and capability criteria for these IBRs. This is necessary to ensure the stable and reliable operation of power systems. This report summarizes the standards for IBRs interconnection in North America.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗