EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate Vulnerability Assessment and Resilience Planning for Idaho National Laboratory

Idaho National Laboratory’s (INL’s) mission is to discover, demonstrate, and secure innovative nuclear energy solutions, other clean energy options, and critical infrastructure. This INL’s Climate Vulnerability Assessment and Resilience Plan (VARP) was developed to enable and sustain that mission while ensuring the viability of operations considering expected climate change impacts. The VARP was developed according to the narrative requirements from the “Vulnerability Assessment and Resilience Planning Guidance, Version 1.2” document issued in February 2022. A prescribed process was used to identify mission-critical systems and components, determine historical and expected climate impacts, and develop resilient solutions. Experts from across INL, including operations staff, researchers, and climate scientists supplied input to the process. Analyses of climate modeling sources revealed that under scenarios of higher and lower greenhouse gas emissions (Representative Concentration Pathway (RCP) 4.5 and RCP 8.5), INL anticipates an increase in climate hazards, including drought, heat waves, wildfire, and precipitation. Increased frequency and duration of climatic hazards forecasts high impacts on certain mission-critical asset and infrastructure types. Utilizing the VARP Risk Assessment Tool, projected high climate hazard impacts across multiple asset and infrastructure types at the INL include energy generation and distribution systems, Site buildings, specialized or mission-critical equipment, and transportation and fleet infrastructure. Some of these mission-critical asset and infrastructure types maintain high adaptive capacity to climatic changes; however, others may need additional adaptive capacity to withstand increased frequency and duration of climate hazards. INL identified close to 300 resilient solutions that were consolidated into 11 solution categories to be tracked in the Department of Energy Sustainability Dashboard. The identified solutions are a starting point for future project development and analysis. These data are intended to inform decision makers on climate issues and potential solutions across INL and associated communities. The VARP is not intended to be a budget tool or project decision document on its own, but rather one of many tools used by decision makers to establish resilient priorities. This initial document provides the framework and foundation to resilient solutions. In the coming years, each solution needs to be fully developed, costed, and prioritized based on mission-critical risk and funding priorities.

54 ENVIRONMENTAL SCIENCES↗

Local Electricity Markets

This book provides a thorough, yet concise, review on the current status of LEM development all around the world, including the most promising research models and opportunities that are being proposed; an overview of the regulatory issues on the different Continents a discussion on the current infrastructure (both hardware and software) that is implemented and that is expected to facilitate the implementation and wide spread application of local energy markets (e.g., resulting from the investments already made in SG deployment); a review of current applications and practical implementations of LEMs; and a wrap-up and discussion on the most relevant paths for future research and development in this field of study.

day-ahead market, peer-to-peer, bilateral market, ↗

Connecting Electric Vehicle Charging Infrastructure to Commercial Buildings

Electric vehicles (EVs) are growing in popularity and gaining meaningful market share with record sales year over year in the last decade. EV charging equipment, also known as EV chargers (EVC) or EV supply equipment (EVSE), must proportionally match the growing number of new EVs on the road for a comparable experience to gas-powered vehicles. The majority of EV charging currently happens at residential buildings. However, demand for EV charging at commercial buildings will significantly increase with wider mainstream EV adoption and as businesses return to more normal operation following COVID-19 pandemic disruptions. Charging equipment can include various sub-systems like power conditioning module, control software, safety devices, metering, communication, cooling, connectors, and its wiring. EV charging at commercial buildings could be used for public, workplace, and commercial fleet charging. This document aims to describe how EVC can be connected to commercial buildings, including considerations for facility managers, and the effects that charging will have on the buildings electrical distribution system. More specifically, this resource provides an overview of: understanding EV charging basics: how charging equipment connects to the building and to EVs; required infrastructure updates needed at the building site to connect EVC to existing distribution systems; network strategies for cost-effective operation; metering and utility considerations for billing and incentives; charging equipment ownership options; future trends in EVC connection to buildings.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Estimating National-Scale Wind Potential Using Spatially Explicit Turbine Layout Optimization

National renewable energy potential assessments play a broad and critical role in analysis of the clean energy transition by providing foundational estimates of developable clean resources. Common to all past wind potential assessments is an assumption that wraps the complexity of wind plant layout (arrangement of turbines) into a single metric known as capacity density, or rated power capacity per unit of land area. Quite often, a singular capacity density or rotor-diameter driven capacity density is used in wind potential assessments across broad geographies despite the complexities of local drivers. Here, we present a new wind technical potential assessment for the United States, leveraging a spatial optimization approach in lieu of the traditional uniform capacity density. The optimization approach is a spatially explicit method for determining the potential locations of individual wind turbines-taking into account the turbine configuration, plant economics and losses, wind resource, and siting considerations. Our approach accounts for the interactions between wind technology design, wind plant layout, and the vast array of regulatory, land use and infrastructure conflicts with wind development. Our results highlight the potential ability of larger turbines to enable increased wind capacity, up to a point, and increased generation when siting turbines in and around spatial constraints; moreover, they demonstrate and capture the LCOE benefit of relatively lower capacity densities and reduced wake losses when land is relatively abundant. These insights provide foundational knowledge for the wind sector as it develops and pursues future turbine models and as wind energy markets expand in zero-carbon futures. Further, when applied in capacity expansion models, supply curves developed by these methods can provide detailed local insights about where wind turbines might be deployed in and among known siting constraints for those regions where wind energy is determined to be economic, providing critical nuance to local decision-makers and stakeholders.

17 WIND ENERGY↗

Recapitalizing Aging Infrastructure for a Net-Zero Future

The Chemistry and Metallurgy Research Facility (CMR) was built in 1952. The original structure consisted of five laboratory wings and office and administration wings. Wing 9 was added in 1959 to house unique equipment and capabilities for the national security mission of the United States. At the time, a centralized heat and power (CHP) plant was the best and most efficient option for serving large campuses, as was the use of fossil fuels, so CMR was put on LANL’s utility steam loop. Given the magnitude of heating energy requirements for the facility, it is a substantial greenhouse gas (GHG) contributor at Los Alamos National Laboratory (LANL) and has been for over 70 years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Cloud Cybersecurity: Prescriptive Controls for Operational Technology

This whitepaper provides strategic insights and recommendations into security cloud-based solutions for electric utilities, encompassing operational technology (OT), virtual power plants (VPP), distributed energy resources (DERs), applications, networks, and data storage as they transition to and leverage cloud infrastructure through managed service providers (MSPs) and cloud service providers (CSPs). Principles derived from established frameworks serve as a foundation for best practices across cybersecurity projects and remove the constraints of settling on a single framework. For organizations that prefer not to integrate a specific framework altogether, elements of the proposed approach could be adopted or tailored to best fit defined requirements and expected functionalities. The Cirrus assessment, a utility cloud feasibility tool, and the roadmap it provides serve as a precursor to this paper, which seeks to be a valuable resource for defining next steps following cloud technology integration feasibility appraisal. With its comprehensive approach to adoption, the Cirrus framework offers strategic guidance on responsibly preparing for or deploying a utility cloud solution. The previously published whitepaper, “Use Case-Informed Framework for Utility Cloud Migration,” details the guiding strategy, research, and deployment of cloud solutions within electric and interconnected grid systems. Before implementing the controls suggested in this document, it is recommended that stakeholders complete Cirrus's cloud integration assessment and pair the results with their unique cybersecurity controls to form a comprehensive cloud-based utility cybersecurity plan. The Cirrus outcome will consider a series of future architectures for the grid before and after the energy transition and evaluate the arguments for and against cloud applications for each electric and interconnected grid layer. This document is a companion to the original whitepaper, "Use Case-Informed Framework for Utility Cloud Migration" to further identify and recommend security controls based on Cirrus’s cloud integration assessment output. The following whitepaper outlines the cybersecurity controls that secure cloud-service models pertinent to the electric sector using the predefined categories identify, protect, detect, and respond and recover. The objective is to outline prescriptive security controls based on the type of architecture and data stored in the cloud. The focus includes dissecting the shared responsibility model and elucidating what on-premises Infrastructure as a Service (IaaS), Platform as a Service (PaaS), and Software as a Service (SaaS) entail. A pivotal consideration in this context is allocating responsibility for foundational cybersecurity aspects—having used Cirrus for the cloud integration assessment. The ensuing controls detailed herein also represent a checklist of controls necessary for a secure cloud transition, equipping utilities with the knowledge to navigate this digital transformation with confidence and strategic foresight in a safe and responsible manner.

42 ENGINEERING↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

Measuring Societal Infrastructure Service Burden

Social Infrastructure Service Burden (abbr. Social Burden) is defined as the burden to a population for attaining services needed from infrastructure. Infrastructure services represent opportunities to acquire things that people need, such as food, water, healthcare, financial services, etc. Accessing services requires effort, disruption to schedules, expenditure of money, etc. Social Burden represents the relative hardship people experience in the process of acquiring needed services. Social Burden is comprised of several components. One component is the effort associated with travel to a facility that provides a needed service. Another component of burden is the financial impact of acquiring resources once at the providing location. We are applying Social Burden as a resilience metric by quantifying it following a major disruption to infrastructure. Specifically, we are most interested in quantifying this metric for events in which energy systems are a major component of the disruption. We do not believe this is the only such use of the Social Burden metric, and therefore we will also be exploring its use to describe blue-sky conditions of a society in the future. Furthermore, while the construct can be applied to a dynamically changing situation, we are applying it statically, directly following a disruption. This notably ignores recovery dynamics that are a key capability of resilient systems. This too will be explored in future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unseen Winds: Harnessing High-Altitude Winds in the Southeast USA

This project aims to identify potential sites in the United States for further testing and development of airborne wind energy systems (AWES). Through industry questionnaires and interviews with AWES companies, the study assesses existing test sites' capabilities and gaps, leading to a three-tiered test site strategy: short-duration prototype demonstrations, long-duration technical assessments and power validations, and airspace interaction and deconfliction studies. Notably, the southeastern United States presents significant potential for AWES due to its lack of traditional wind turbines, which is attributed to low wind speeds at lower altitudes. However, wind conditions improve significantly at higher altitudes, making this region a promising candidate for AWES deployment. The project considers factors such as wind resources, infrastructure proximity, social acceptance, and environmental impacts to recommend sites that can support the unique needs of AWES manufacturers and facilitate their commercialization. Early findings suggest rural communities with low grid resiliency could benefit economically and technologically from hosting AWES test sites, especially with operator training centers and potential for long-term skilled employment in future disaster relief and other applications.

17 WIND ENERGY↗

SIBatt-3D: In-Space/On-Surface 3D Printing of Sodium Ion Batteries from ISRU Materials

Constructed more than 20 years ago, the International Space Station’s primary power system originally used nickel-hydrogen batteries with a lifetime of 6.5 years, until NASA began the process of replacing them in 2016 with lithium-ion batteries with a lifetime of 10 years. The demanding and costly process was accomplished after four flights of the Japanese H-II Transfer Vehicle cargo spacecraft (with a cost of about $10,000 per pound of payload), and 13 different astronauts conducting 14 spacewalks. Besides utilization in the ISS, rechargeable batteries are present in many space applications: they are installed in exploration robots, life support systems and in portable communication devices, to mention some. In this context, this project is focused on the in-space manufacturing of shape-conformable batteries using in-situ resources, and aims to address the NASA’s gaps related to the development of next generation of energy storage devices (TX03), as well as in-space manufacturing and in-situ resource utilization (TX07). The proposed work also tackles the HEOMD’s objectives targeting the in-space additive manufacturing (AM) from Lunar/Martian materials (regolith as AM feedstock) to reinvigorate America’s Human Space Exploration Program (SPD-1). This project is in direct alignment with the STMD’s objectives to demonstrate in-space autonomous manufacturing and assembly of complete systems by 2030, and to enable humans to live and explore in space and on planetary surfaces by 2040 thanks to in-space habitation, infrastructure development and in-situ resource utilization (ST1 and ST5). Manufacturing of shape conformable batteries directly in-space and using in-situ resources would also contribute to reducing the payload weight and volume (TX12) for future missions, thus reducing risk for long term Mars missions where rapid resupply is logistically infeasible. Nowadays, commercial batteries consist of stacked two-dimensional (2D) sheets, which are only manufactured in restricted geometries (cylindrical and coin cell). Evolving from conventional 2D, complex 3D battery architectures have been proven to increase the electrochemical active surface area and ion diffusion path, leading to improved areal energy density and power performance. This tendency was illustrated in our recent in-depth modeling studies by simulating a classical Ragone plot exhibiting the energy-power relationship. Our team demonstrated through modeling that a complex gyroidal 3D printed battery architecture exhibits significantly improved power performances (>150% at the current density of 6C; full discharge in 10 minutes) in comparison to a traditional 3D printed planar geometry. Motivated by these results and as the fabrication of intricate 3D battery design is only possible experimentally thanks to the geometric freedom offered by additive manufacturing (AM), our team has already initiated leveraging thermoplastic material extrusion at the laboratory scale. While 3D printing of batteries is relatively recent (2013), it has witnessed a growing interest during the last recent years, as next-generation shape-conformable 3D batteries can be co-designed with the system. Consequently, dead-volume and mass brought from Earth are minimized, in addition to improved battery performance, in alignment with the aforementioned NASA’s objectives. Further, while this project is specifically dedicated to batteries, it lends itself towards the maturation of in-space manufacturing via 3D printing using in-situ resources, stated in HEOMD and STMD goals.

In-Space Manufacturing↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Clean energy technology pathways from research to commercialization: Policy and practice case studies

Clean energy research and development (R and D) leading to commercial technologies is vital to economic development, technology competitiveness, and reduced environmental impact. Over the past 30 years, such efforts have advanced technology performance and reduced cost by leveraging network effects and economies of scale. After demonstrating promise in applied R and D, successful clean energy and energy efficiency technologies are incorporated into an initial product sold by the private sector. Despite its importance, processes by which first commercialization occurs are difficult to generalize while capturing specific insights from practitioners in markets and technologies. This paper presents a policy-focused qualitative assessment of the first commercialization of four diverse energy technologies: thin film photovoltaics, wind turbine blades, dual-stage refrigeration evaporators, and fuel cells for material handling equipment. Each technology presents distinct value propositions, markets, and regulatory drivers. The case studies indicate three common characteristics of successful first commercialization for new energy technologies: 1) good fit between the technology, R&D infrastructure, and public-private partnership models; 2) high degree of alignment of government regulations and R&D priorities with market forces; and 3) compatibility between time scales required for R&D, product development, and opportunities. These findings may inform energy investment decision-making, maximize benefits from R&D, and advance the transition to a low-emission future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nuclear Criticality Experiments Research Center Futures: A Report of a Workshop held September 6-9, 2022, Los Alamos, NM, November, 2022

Experiments and training with critical assemblies and fissionable material (at or near the critical state) that explore reactivity phenomena are central to a number of national security challenges. From fission energy to nuclear weapons to a broad suite of scientific challenges, it is clear that additional capacity and capability are needed. The National Criticality Experiments Research Center (NCERC) marked 10 years of operations in 2021. This anniversary was an opportune time to celebrate our successes and progress, and to evaluate the remaining and emergent challenges. Against this backdrop, a workshop of approximately 140 national and international leaders in nuclear research was convened in Los Alamos, New Mexico to explore “NCERC Futures.” Therefore, the present workshop focused specifically on needed capabilities and tools to meet the research challenges in eight topical mission areas served by NCERC. As each Topical Group summarized their discussions in the out brief, it was recognized that key challenges could be met through enabling infrastructure investments and new critical assemblies. Enabling infrastructure includes staffing, additional space/buildings, developing an agile bounding safety basis, the ability to keep pace with technological advances in detectors and data acquisition systems (allowing use of those with Bluetooth™ and similar technologies), an expanded set of materials options (especially plutonium), a “Plug and Play” design and implementation mindset, and a facility that enabled free-field measurements. The new critical assemblies that were identified as having the most impact were a bare plutonium (Pu) Critical Assembly, a Horizontal Split Table (HST), a Super Comet, and a Uranium Solution Burst Assembly. NECRC is a unique, one-of-a-kind facility in the United States. If all the improvements were to be made, NCERC would enable the United States and its partners to address many important research questions related to criticality. These include but are not limited to: (1) Covering the entire neutron energy spectrum for both highly enriched uranium (HEU) and Pu in configurations for virtually all conceivable applications; (2) Performing multi-physics solution experiments and irradiations with a Uranium Solution Burst Assembly, which more closely resembles actual criticality accidents; (3) Conducting free-field experiments to make basic fission physics measurements and much cleaner benchmarks with various experimental observables; and (4) Providing more training classes and more experiments annually at greater cost efficiency enabled by additional buildings and machines and an agile, bounding, risk-balanced Safety Basis. In the end, workshop attendees enthusiastically concluded that NCERC Futures are bright and the workshop helped to identify a roadmap of capability gaps that need to be addressed. This report documents the results of those efforts.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Report for ARPA-E LOCOMOTIVES Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) Project

The Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) is a unique, fully integrated, open-source software tool used to evaluate strategies for cost-effectively deploying advanced locomotive technologies and associated infrastructure. ALTRIOS simulates freight-demand-driven train scheduling, mainline meet-pass planning, locomotive dynamics, train dynamics, energy conversion efficiencies, and energy storage dynamics of line-haul train operations. Because new locomotives represent a significant long-term capital investment and new technologies must be thoroughly demonstrated before deployment, this tool provides guidance on the risk/reward trade-offs and operation integration of different technology rollout strategies. An open, integrated simulation tool is valuable for identifying future research needs and making decisions on technology development, routes, and train selection. This final report details the ALTRIOS software architecture, major modules and components, and data validation process. It demonstrates the software's utility through a 30-year rollout case study targeting high penetration of advanced powertrain technologies by 2050 for two BNSF Railway routes: loaded taconite ore trains from Hibbing, Minnesota, to Superior, Wisconsin, and mixed-freight trains from Superior to Minneapolis, Minnesota.

33 ADVANCED PROPULSION SYSTEMS↗

Artificial Intelligence and Machine Learning for Bioenergy Research: Opportunities and Challenges

The integration of artificial intelligence and machine learning (AI/ML) with automated experimentation, genomics, biosystems design, and bioprocessing technologies is poised to revolutionize scientific investigation and, particularly, bioenergy research. To identify the opportunities and challenges in this emerging research area, the U.S. Department of Energy’s (DOE) Biological and Environmental Research program (BER) and Bioenergy Technologies Office (BETO) held a joint virtual workshop on AI/ML for Bioenergy Research (AMBER) on August 23–25, 2022. These interests have since been amplified in a September 2022 Executive Order, “Advancing Biotechnology and Biomanufacturing Innovation for a Sustainable, Safe, and Secure U.S. Bioeconomy,” to promote a whole-of government approach to biotechnology development (White House 2022). Approximately 50 scientists with various backgrounds and expertise from academia, industry, and DOE national laboratories met to discuss the opportunities and challenges of AI/ML for bioenergy research. Workshop participants were tasked with assessing the potential for AI/ML and laboratory automation to advance biological understanding and engineering in general. They particularly examined how integrating AI/ML tools with laboratory automation could accelerate biosystems design and optimize biomanufacturing. Discussions included the data and computational infrastructure needed to augment biosystems design applications and the expertise and workforce development efforts urgently required to shift integrated systems toward bioenergy research more broadly. Participants discussed many existing and future applications of AI/ML for biosystems design ranging from enzymes to plants and microbes, microbiomes, and bioprocess development. They also identified three key categories of scientific and technical opportunities and challenges: high-quality data, AI/ML algorithms, and laboratory automation. Several main takeaways emerged from the workshop: 1. Numerous AI/ML and automated experimentation applications exist for a variety of DOE mission needs in energy and the environment; 2. Exemplary research grand challenges for which AI/ML could provide solutions include: building microbes and microbial communities to specifications, developing closed-loop autonomous design and control for biosystems design, and advancing scale-up and automation; 3. Lack of sufficient high-quality, annotated data hinders the development of AI/ML applications; 4. New and improved AI/ML tools are needed, particularly those meeting the specific needs of the BER and BETO research communities; 5. Trade-offs in performance, cost, and reliability exist between deploying commercially available versus building custom-developed instrumentation and software for automated or autonomous experimentation; translation of manual to automated or autonomous methods is often a nontrivial endeavor; 6. Training a new generation of young scientists who can develop and apply AI/ML tools is needed to solve long-standing scientific challenges in bioenergy research. The integration of AI/ML tools and automated experimentation represents a new data-driven research paradigm complementary to the traditional hypothesis-driven research paradigm. This paradigm accelerates design and optimization of biological systems and processes for a variety of DOE mission needs in energy and the environment. The AMBER workshop broadly explored the potential of this new paradigm for bioenergy research, of particular interest to BER and BETO, and identified key challenges and opportunities that DOE can address in the coming years by leveraging its unique capabilities and resources.

59 BASIC BIOLOGICAL SCIENCES↗

Ecosystem-Level Biomimicry for the Built Environment: Adopting Systems Ecology Principles for the Control of Heterogeneous Energy Systems

This paper presents, to our knowledge, the first system-level engineering study to bio-mimic the cybernetics and flow dynamics of energy resources in natural ecosystems for the control of heterogeneous energy infrastructures in the built environment. To this end, we introduce a novel Biomimetic Pulsing State (BPS) control that functionally mimics mature ecosystems. A preliminary Modelica-based case study features a single-family residential building with electrical and HVAC subsystems. The BPS control objective is to minimize the energy exchange between the building and the grid for the purposes of future self-supporting buildings and grid stability. The building contains PV, a wind turbine, a battery storage system, and a fan coil/heat pump HVAC system served by an ambient district energy network. Evaluating the control performance (BPS vs. constant setpoint) over several renewable energy scenarios (net importer, net zero, net exporter), simulation results show how the building's HVAC system can dynamically adjust its electrical load and temperatures to the electrical system's net energy status in real-time with BPS control. As a net importer, the heat pump consumed 29% less energy and its peak power reduced by 15% with BPS control compared to the constant setpoint case, with the zone air temperature 1 degree C lower on average. As a net exporter, the heat pump effectively consumed the same energy, but the peak power increased by 34% with BPS control, while the zone air temperature was 1 degree C higher when renewable energy was abundant, preheating the home. BPS and constant setpoint control produced comparable results under a net zero scenario. While further evaluation is essential, BPS control may help communities meet their sustainability and resiliency targets as they transition towards fully distributed and renewable energy grids.

biomimicry↗

Planning for a Sustainable and Resilient Energy Future on Beaver Island, Michigan

Beaver Island formed the Smart Energy Team to identify and seek solutions to existing energy challenges on the island. The Smart Energy Team applied and was selected as one of the communities in the Transitions Initiative Partnership Project (ETIPP), sponsored by the U.S. Department of Energy. The focus of ETIPP is to provide strategic energy planning for remote and island communities to address local energy and infrastructure challenges and enhance the long-term resilience of their energy systems. Through ETIPP, the community received technical assistance from Pacific Northwest National Laboratory (PNNL). This report is the culmination of the technical assistance provided to Beaver Island which includes understanding how energy is used on the island, exploring opportunities to lower energy demand and potential energy generation avenues for the island, as well as stakeholder engagement with the local community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗