Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “function as a service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Attribution of global lake systems change to anthropogenic forcing

Lake ecosystems are jeopardized by the impacts of climate change on ice seasonality and water temperatures. Yet historical simulations have not been used to formally attribute changes in lake ice and temperature to anthropogenic drivers. In addition, future projections of these properties are limited to individual lakes or global simulations from single lake models. Here we uncover the human imprint on lakes worldwide using hindcasts and projections from five lake models. Reanalysed trends in lake temperature and ice cover in recent decades are extremely unlikely to be explained by pre-industrial climate variability alone. Ice-cover trends in reanalysis are consistent with lake model simulations under historical conditions, providing attribution of lake changes to anthropogenic climate change. Moreover, lake temperature, ice thickness and duration scale robustly with global mean air temperature across future climate scenarios (+0.9 °C °C air –1 , –0.033 m °C air –1 and –9.7 d °C air –1 , respectively). Furthermore, these impacts would profoundly alter the functioning of lake ecosystems and the services they provide.

54 ENVIRONMENTAL SCIENCES↗

Modeling Grid Data Flows for Transmission and Distribution Operations: Review, Design, Next Steps

Operational scenarios of the power grids grow multifold to accommodate the diverse needs of both the utilities and end consumers, and the various other stakeholders in-between. To comprehensively model and apply analytics to support objectives and business functions of grid sectors, a reliable approach to characterize and design data flows is crucial. The flows bridge business functions with communications protocols, stakeholders such as the grid actors, and data interfaces comprising different data objects. Additionally, constraints applied to the flow such as cybersecurity, trust, privacy, and ownership among others intersect these entities, requiring the delineation of their interactions under different scenarios. This paper aims to not only highlight relevant research in the space of grid data flows, but also proposes, for the transmission-distribution sector, a novel modeling approach that marries the aforementioned entities: objectives, business functions, data interfaces, communication protocols, data stakeholders, and flow constraints. It elaborates on the design philosophy and the significance of each entity within the model and applies it to an example function of fault location, isolation and service restoration (FLISR). Finally, the next steps to extend the application of this data flow model for other practical operational scenarios are discussed.

Sundararajan, Aditya [ORNL] (ORCID:000000033577854↗

Asynchronous Grid Connections Providing Fast-Frequency Response: System Integration Study

This paper presents an integration study for the recent power electronic-based fast-frequency response technology, "asynchronous grid connection" which operates as an aggregator for behind-the-meter resources and distributed generators. Both technical feasibility and techno-economic viability studies are presented. The fast-frequency response characteristics, validated against Power Hardware-in-the-Loop experiments, are integrated into an IEEE 9- bus system in DigSilent PowerFactory for system-level dynamic analysis. It demonstrates that droop-based control enhancements to local distributed generators allow their aggregation to provide grid-supporting functionalities and participate in the ancillary service markets. To this end, a long-term simulation embedding the system within the ancillary service market framework of PJM has been performed. The fast-frequency response regulation is subsequently used to calculate the potential revenue and project the results on a 15-year investment horizon. Finally, the techno-economic analysis provides recommendations for enhancements to access the full potential of distributed generators on a technical and regulatory level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ChargeX OCPI Recommendations

The Open Charge Point Interface (OCPI) is an open protocol that enables electric vehicle (EV) charging systems to work together across networks. It supports communication and data sharing between Charge Point Operators (CPOs), who manage charging stations, and e-Mobility Service Providers (eMSPs), who provide charging services to EV drivers. OCPI facilitates functions like user authorization, remote charge point control, charging session data exchange, and billing through Charge Detail Records (CDRs). This allows EV roaming, so drivers can charge at different networks without multiple accounts. As the EV market grows due to increased adoption and technological advancements, OCPI faces higher demands. This has revealed issues with CDR format consistency, timestamp standardization across regions, transmission of EV-side error codes for troubleshooting, and support for new use cases. These challenges can affect operations and user experience, particularly as the industry starts considering Vehicle-to-Grid (V2G) systems, where EVs supply energy to the grid, and Vehicle-to-Everything (V2X) technologies for broader energy interactions. Using feedback from the ChargeX Diagnostics taskforce discussions, industry 1-on-1 meetings, technical standards, and OCPI’s evolution through versions (e.g., OCPI 2.1.1, 2.2, and 2.2.1), this report identifies these issues and suggests practical recommendations. These aim to improve interoperability, streamline operations, and prepare OCPI for future trends in the EV charging ecosystem.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Technology utilization in a non-urban region: Further impact and technique of the Technology Use Studies Center, 2

The clientele served by the Technology Use Studies Center (TUSC) is updated. Manufacturing leads the list of client firms. The standard industrial classification (SIC) range of these firms is broad. Substantial numbers of college and university faculties are using TUSC services. Field operations inherent in the functions of dissemination and assistance are reviewed. Increasing emphasis among clientele is on environmental concerns and management. A record is provided of the institutions contacted and the extent of TUSC involvement with them, as well as TUSC's cooperation with agencies and organizations. The impact of TUSC and the NASA-sponsored Technology Utilization Program on other public agencies is discussed.

Gold, H. C.↗

Computing and information services at the Jet Propulsion Laboratory - A management approach to a diversity of needs

The Jet Propulsion Laboratory, a research and development organization with about 5,000 employees, presents a complicated set of requirements for an institutional system of computing and informational services. The approach taken by JPL in meeting this challenge is one of controlled flexibility. A central communications network is provided, together with selected computing facilities for common use. At the same time, staff members are given considerable discretion in choosing the mini- and microcomputers that they believe will best serve their needs. Consultation services, computer education, and other support functions are also provided.

Felberg, F. H.↗

Advanced systems engineering and network planning support

The objective of this task was to take a fresh look at the NASA Space Network Control (SNC) element for the Advanced Tracking and Data Relay Satellite System (ATDRSS) such that it can be made more efficient and responsive to the user by introducing new concepts and technologies appropriate for the 1997 timeframe. In particular, it was desired to investigate the technologies and concepts employed in similar systems that may be applicable to the SNC. The recommendations resulting from this study include resource partitioning, on-line access to subsets of the SN schedule, fluid scheduling, increased use of demand access on the MA service, automating Inter-System Control functions using monitor by exception, increase automation for distributed data management and distributed work management, viewing SN operational control in terms of the OSI Management framework, and the introduction of automated interface management.

Walters, David H.↗

Space Station Furnace Facility. Volume 2: Summary of technical reports

The Space Station Furnace Facility (SSFF) is a modular facility for materials research in the microgravity environment of the Space Station Freedom (SSF). The SSFF is designed for crystal growth and solidification research in the fields of electronic and photonic materials, metals and alloys, and glasses and ceramics, and will allow for experimental determination of the role of gravitational forces in the solidification process. The facility will provide a capability for basic scientific research and will evaluate the commercial viability of low-gravity processing of selected technologically important materials. In order to accommodate the furnace modules with the resources required to operate, SSFF developed a design that meets the needs of the wide range of furnaces that are planned for the SSFF. The system design is divided into subsystems which provide the functions of interfacing to the SSF services, conditioning and control for furnace module use, providing the controlled services to the furnace modules, and interfacing to and acquiring data from the furnace modules. The subsystems, described in detail, are as follows: Power Conditioning and Distribution Subsystem; Data Management Subsystem; Software; Gas Distribution Subsystem; Thermal Control Subsystem; and Mechanical Structures Subsystem.

Source record↗

ACTS Aeronautical Terminal Experiment System Description and Link Analysis

During the summer of 1994, the performance of an experimental mobile satellite communication system was demonstrated to industry and government representatives by the NASA Lewis Research Center (LeRC) and the Jet Propulsion Laboratory (JPL). The system was based on the advanced communications technology satellite (ACTS) and consisted of a K-/Ka-band active monolithic microwave integrated circuit (MMIC) phased array antenna system, ACTS mobile terminal (AMT) and link evaluation terminal (LET). A LeRC research aircraft, Learjet model 25, was outfitted with the active MMIC phased array antenna system and AMT and served as the experimental 20/30 Ghz aeronautical terminal. The LET at LeRC in Cleveland, OH, was interfaced with portions of fixed-AMT equipment and together provided the gateway station functions including ACTS interface and public service telephone network (PSTN) interface. The ACTS was operated in its microwave switch matrix (MSM) mode with a spot beam for the Learjet and another spot beam dedicated to the LET. The Learjet was flown over several major cities across the US and demonstrated the feasibility of a full-duplex compressed voice links for an aeronautical terminal through the 20/30 Ghz ACTS channel. This paper presents a technical description of the system including the MMIC phased array antenna system, AMT, Learjet, LET, and ACTS. The array antenna system consists of a 30 Ghz transmit array (LeRc/Texas Instruments) and two 20 Ghz receive arrays (USAF Rome Lab., Boeing, and Martin Marietta), each one very small with sufficient performance for a satellite voice link. The AMT consists of 2.4/4.8/9.6 Kbps voice coder/decoder, modem, PSTN interface and RF/IF converters. Link analysis is presented and compared to the actual performance data collected during the demonstration flights.

Sohn, Philip↗

Technology Directions for the 21st Century

New technologies will unleash the huge capacity of fiber-optic cable to meet growing demands for bandwidth. Companies will continue to replace private networks with public network bandwidth-on-demand. Although asynchronous transfer mode (ATM) is the transmission technology favored by many, its penetration will be slower than anticipated. Hybrid networks - e.g., a mix of ATM, frame relay, and fast Ethernet - may predominate, both as interim and long-term solutions, based on factors such as availability, interoperability, and cost. Telecommunications equipment and services prices will decrease further due to increased supply and more competition. Explosive Internet growth will continue, requiring additional backbone transmission capacity and enhanced protocols, but it is not clear who will fund the upgrade. Within ten years, space-based constellations of satellites in Low Earth orbit (LEO) will serve mobile users employing small, low-power terminals. 'Little LEO's' will provide packet transmission services and geo-position determination. 'Big LEO's' will function as global cellular telephone networks, with some planning to offer video and interactive multimedia services. Geosynchronous satellites also are proposed for mobile voice grade links and high-bandwidth services. NASA may benefit from resulting cost reductions in components, space hardware, launch services, and telecommunications services.

Crimi, Giles F.↗

Methods and apparatus for constructing and implementing a universal extension module for processing objects in a database

Methods and apparatus for providing a multi-tier object-relational database architecture are disclosed. In one illustrative embodiment of the present invention, a multi-tier database architecture comprises an object-relational database engine as a top tier, one or more domain-specific extension modules as a bottom tier, and one or more universal extension modules as a middle tier. The individual extension modules of the bottom tier operationally connect with the one or more universal extension modules which, themselves, operationally connect with the database engine. The domain-specific extension modules preferably provide such functions as search, index, and retrieval services of images, video, audio, time series, web pages, text, XML, spatial data, etc. The domain-specific extension modules may include one or more IBM DB2 extenders, Oracle data cartridges and/or Informix datablades, although other domain-specific extension modules may be used.

Li, Chung-Sheng↗

Launch and Landing Effects Ground Operations (LLEGO) Model

LLEGO is a model for understanding recurring launch and landing operations costs at Kennedy Space Center for human space flight. Launch and landing operations are often referred to as ground processing, or ground operations. Currently, this function is specific to the ground operations for the Space Shuttle Space Transportation System within the Space Shuttle Program. The Constellation system to follow the Space Shuttle consists of the crewed Orion spacecraft atop an Ares I launch vehicle and the uncrewed Ares V cargo launch vehicle. The Constellation flight and ground systems build upon many elements of the existing Shuttle flight and ground hardware, as well as upon existing organizations and processes. In turn, the LLEGO model builds upon past ground operations research, modeling, data, and experience in estimating for future programs. Rather than to simply provide estimates, the LLEGO model s main purpose is to improve expenses by relating complex relationships among functions (ground operations contractor, subcontractors, civil service technical, center management, operations, etc.) to tangible drivers. Drivers include flight system complexity and reliability, as well as operations and supply chain management processes and technology. Together these factors define the operability and potential improvements for any future system, from the most direct to the least direct expenses.

Source record↗

Part II: FY20 CIF Annual Report - LAPS: Lunar Autonomous Positioning System

This project concerns construction of an orbital and ground resource network that provides Position, Navigation, and Timing (PNT) services for lunar surface operations. While functionally similar to Global Navigation Satellite Systems (GNSS) for Earth, this system will instead build an automated PNT framework utilizing limited infrastructure on board orbiting assets along with a controlled number of highly accurate assets, or anchor nodes. The goal is to use advanced algorithms to autonomously coordinate on demand or as needed asset participation to achieve orbit determination and time synchronization of accuracy sufficient for end-user localization. Other proposed lunar PNT solutions, such as weak signal GPS, will not meet many mission localization requirements without additional user INS augmentation and a dedicated GNSS constellation would require prohibitive infrastructure development. This proposed effort, the Lunar Autonomous Positioning System (LAPS), instead offers a design that could be deployed in the near term and is facilitated by accessible hardware technology.

Kelley Hashemi↗

Technical Aspects of the Space Telescope Imaging Spectrograph Repair (STIS-R)

In August 2004, the Hubble Space Telescope (HST) Space Telescope Imaging Spectrograph (STIS) ceased operation, due to a failure in the Side 2 Low Voltage Power Supply (LVPS2). LVPS2 provided power to the entire instrument, including all detectors and mechanisms. Following the LVPS2 failure, a team was assembled to analyze the fault and to determine if STIS repair (STIS-R) was feasible. The team concluded that by replacing a power supply board within LVPS2, STIS could be brought back to full functionality. STIS-R will be conducted during Servicing Mission 4 (SM4), and will consist of replacing the power supply board and a new passive cooling system. STIS-R will restore full function of the instrument with one of the two redundant sides of the instrument. In this presentation, we focus on the technical aspects associated with STISR.

Rinehart, Stephen↗

Definition of technology development missions for early space stations orbit transfer vehicle serving. Phase 2, task 1: Space station support of operational OTV servicing

Representative space based orbital transfer vehicles (OTV), ground based vehicle turnaround assessment, functional operational requirements and facilities, mission turnaround operations, a comparison of ground based versus space based tasks, activation of servicing facilities prior to IOC, fleet operations requirements, maintenance facilities, OTV servicing facilities, space station support requirements, and packaging for delivery are discussed.

Source record↗

System requirements

Requirements of future space systems, including large space systems, that operate beyond the space shuttle are discussed. Typical functions required of propulsion systems in this operational regime include payload placement, retrieval, observation, servicing, space debris control and support to large space systems. These functional requirements are discussed in conjunction with two classes of propulsion systems: (1) primary or orbit transfer vehicle (OTV) and (2) secondary or systems that generally operate within or relatively near an operational base orbit. Three propulsion system types are described in relation to these requirements: cryogenic OTV, teleoperator maneuvering system and a solar electric OTV.

Austin, R. E.↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Reliability of Open Public Electric Vehicle Direct Current Fast Chargers

The aim was to systematically evaluate the usability of all public electric vehicles (EV) direct current fast chargers (DCFC) in the San Francisco region. To achieve a rapid transition to EVs, a highly reliable and easy to use charging infrastructure is critical to building confidence among consumers. The functionality and usability of all 182 open, public DCFC charging stations with CCS connectors (combined charging system) in the 9 counties of the Bay Area were tested (655 electric vehicle service equipment (EVSE) ports). An EVSE was classified as functional if it charged an EV for 2 minutes. Overall, 73.3% of the 655 EVSEs were functional. The causes of the nonfunctioning EVSEs (23.5%) were blank or unresponsive screens or error messages; payment system failures; charge initiation failures; network failures; or broken connectors. In addition, the cable was too short to reach the EV inlet for 3.2% of the EVSEs. A random sampling of 10% of the EVSEs, approximately 8 days after the first evaluation, found no overall change in functionality. The level of functionality found with field testing conflicts with the 95–98% uptime reported by the EV service providers (EVSPs) who operate the EV charging stations. There is a need for precise and verifiable definitions of uptime, downtime, and excluded time, as applied to public EV chargers. In conclusion, the level of failure of the existing public EV DCFC charge infrastructure highlights the importance of improving the system design and maintenance to improve adoption of EVs.

33 ADVANCED PROPULSION SYSTEMS↗