Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electrical distribution system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

4D Proxy Imaging of Fracture Dilation and Stress Shadowing Using Electrical Resistivity Tomography During High Pressure Injections into a Dense Rock Formation

Fluid flow through fractured rock systems is governed in large part by the distribution, interconnectivity, and size of fracture apertures. In-situ stress is one of the primary factors controlling fracture aperture, and one that is altered significantly during high-pressure fluid injections or extractions. Interactions between stress, pore pressure, aperture, and fluid flow can result in complex and evolving poroelastic behavior with significant implications regarding the predictability and risk of developing and managing deep subsurface reservoirs (geothermal, fossil energy, and geologic carbon sequestration). In saturated crystalline rocks, bulk electrical conductivity is highly sensitive to porosity, and therefore to fracture aperture size and distribution. We demonstrate the use of time-lapse 3D electrical resistivity tomography for remotely monitoring stress induced changes in aperture distribution during high pressure injections into a fractured rock system at a scale of tens of meters. Results reveal a complex and continuously evolving stress field involving aperture dilations in the natural fracture system and aperture contractions in adjacent zones of shadow stress. Results provide information about the spatiotemporal changes in the system behavior and point to the potential of electrical imaging for autonomously and remotely monitoring evolving stress conditions by proxy through changes in bulk electrical conductivity.

electrical resisitivity tomography, stress, 4D Tim↗

Surface Charge Distribution Mapping Using an Electrostatic Probe

Undesired accumulation of charge on dielectric materials causing electrostatic discharges can be an issue in pulsed power systems and electrical systems in general. As such, an understanding of surface charge distribution, charge accumulation, and decay is required. An in-house no-contact electrostatic probe designed with a 2 mm resolution was fabricated to measure and map surface charge distribution. Designed as a contactless instrument, the probe consisting of a metal rod and low leakage amplifier circuit probes the electric potential near the surface. A scan of the surface then provides the raw data, a potential distribution. The actual probe response - i.e., the surface charge to voltage transfer function, is accounted for in post-processing. This is accomplished via an Inverse Wien Filter - a technique often applied in image processing - to deconvolve the probe response from the measured data. A commercially available electrostatic probe, the Trek 341B meter with a 3455ET probe, capable of measuring +/- 20 kV was compared to the in- house probe that is designed to cover a wider range from +/- 35 kV. A resolution better than the simple probe resolution is achieved through the distribution’s scanning voltage method and deconvolution. Applying repeated scans, surface charge decay was tracked on various polymer materials to determine the material and environment dependence; materials included were PA6, PTFE, and others. As an example of material dependence, samples charged to 20 kV at 65% humidity experience full charge decay in approximately 45 seconds for PA5 (152 mm dia.), while it took about 100 times longer for PTFE (51 mm dia.) to observe the same decay/redistribution of charge.

36 MATERIALS SCIENCE↗

Impact of model predictive control-enabled home energy management on large-scale distribution systems with photovoltaics

Residential customers use more than one-quarter of the electricity in the world. Optimally managing home energy consumption is an effective way of easing the operational challenges facing the electric grid with increasing solar photovoltaics (PV). This paper studies the impact of the future proliferation of home energy management systems (HEMS) in the presence of PV on large-scale distribution systems. First, we present a stochastic HEMS model that minimizes residential customers' thermal discomfort and energy costs under uncertainty. The HEMS model schedules the optimal operations of residential appliances in the presence of PV within a mixed-integer linear programming-based model predictive control framework that links the proposed HEMS to a quasi-steady-state time-series simulation tool. Additionally, extensive simulations are conducted for a stand-alone residential home using two tariff structures and for 1977 homes on an 8,500-node distribution feeder. Simulation results quantify the impact of the future proliferation of HEMS on the large-scale distribution system with PV.

14 SOLAR ENERGY↗

Decarbonizing the U.S. Economy by 2050: A National Blueprint for the Buildings Sector

Residential and commercial buildings are among the largest sources of carbon dioxide and other greenhouse gas (GHG) emissions in the United States, responsible for more than one-third of total U.S. GHG emissions. There are nearly 130 million existing buildings in the United States, with 40 million new homes and 60 billion square feet of commercial floorspace expected to be constructed between now and 2050. Today, most buildings consume large amounts of energy and cause significant climate pollution to meet our basic needs. Buildings account for 74% of U.S. electricity use and building heating and cooling drives peak electricity demand. Moreover, buildings are where electric vehicles (EVs), solar, storage, heat pumps, water heaters, and other distributed energy resources integrate with the electricity system. Consequently, the buildings sector will play a key role in achieving economywide net-zero emissions by 2050.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ARC-SAFE: Accelerated Response semiconducting Contactors and Surge Attenuation For DC Electrical systems (Final Scientific/Technical Report)

The landscape of power transmission and distribution is quickly evolving as more power conversion is done through power electronics and transmitted or distributed at medium voltage direct current (MVDC). As power electronics tend to store less energy and be less resilient to faults than conventional power transformers, a reliable and fast protection against faults is critical to protect power electronics (PE) based infrastructure, especially for medium- and high-voltage applications. This motivates the development of PE based protection circuits to replace slower contemporary electromechanical breakers. In this project a novel PE based MVDC circuit breaker is developed; the new design is comprised of 1) a normally-on leg made of commercially-available, cascaded SiC junction field effect transistors (JFETs) with a passive balancing network, and 2) a normally-off leg based on an optically-triggered gallium nitride (GaN) photoconductive semiconductor switch (PCSS). The normally-off leg was designed to be quickly turned on, to divert current to an auxiliary dissipative circuit, as the normally-on leg is turned off. This approach, using solid-state devices, was selected for a high-performance, fast-switching operation for the DC circuit breaker as compared to approaches that use slower mechanical switches. To be practical, the circuit breaker must have low conduction loss (low Ron) in the normally-on leg and fast coordinated triggering of the normally-off leg to avoid damage from inductive flyback, which could be considerable for long lengths of cable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Incorporation of Thermal Hydraulic Models for Thermal Power Dispatch into a PWR Power Plant Simulator

This report describes the development, modeling, and results of a generic pressurized water reactor power plant simulator that incorporates coupled electrical and thermal power dispatch to an industrial process located approximately one kilometer from the nuclear power plant. The simulator is a commercial PWR simulator that has been modified to include thermal power dispatch as described in past milestone reports [ , ]. The commercial PWR simulator is a generic simulator available from GSE SYSTEMS® (Sykesville, MD, USA) that is built using RELAP5-HDTM Real-Time Solution and in-house software developed by GSE Systems. This generic PWR (GPWR) simulator performs real-time simulation of the complete power plant from the reactor neutronics to the electricity generation and distribution. All primary, secondary, and auxiliary systems are modeled including all control logic in order to provide the most accurate representation of actual nuclear power plant (NPP) operation, and the simulator results have been rigorously verified by an actual NPP operating at approximately 1 GWe. This report is a continuation of worked performed in previous years, and supplemental information from previous reports is included in the appendix for reference.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DSO+T: Integrated System Simulation (DSO+T Study: Volume 2)

This report summarizes an integrated co-simulation model used by the Distribution System Operator with Transactive (DSO+T) study to represent an electrical generation, delivery, and end-load systems for the purposes of assessing the viability and value proposition of transactive energy coordination of flexible assets versus a business-as-usual case. The integrated co-simulation model includes the bulk generation and transmission system, including the day-ahead and real-time scheduling and dispatch of thermal generators. Forty distribution system operators were modelled in detail, including tens of thousands of residential and commercial buildings and their flexible end-loads. These included HVAC systems, residential water heaters, electric vehicles, and stationary, behind-the-meter, batteries. Both wholesale market and end-load results for the business-as-usual case are presented and compared to actual ERCOT system data to assess the accuracy and representativeness of the resulting model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

U.S. Department of Energy Solar District Cup Collegiate Design Competition

The Solar District Cup is a multidisciplinary collegiate competition that challenges student teams to design and model standalone solar and solar-plus-storage systems for multiple buildings on a local electrical distribution network, such as a college campus, across a development, or in a district. Students learn cross-cutting skills that prepare them to become part of the next generation of the distributed energy workforce. Student teams act as renewable energy developers proposing to solar and solar-plus-storage system requests. Students, faculty, and prospective employers can benefit from knowing about this program and what students learn--either immediately as participants, mentors, or judges, or as potential employers of Solar District Cup alumni. RE+ is also one of our competition partners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Oak Ridge National Laboratory Pilot Demonstration of an Attestation and Anomaly Detection Framework using Distributed Ledger Technology for Power Grid Infrastructure

This report summarizes the design and pilot demonstration of a framework called Grid Guard that was created to provide increased data and device trustworthiness to electric grid devices by leveraging distributed ledger technology (DLT), specifically blockchain. Grid Guard contains a combination of core cryptographic methods such as the secure hash algorithm (SHA), and asymmetric cryptography, private permissioned blockchain, baselining configuration data, consensus algorithm (Raft) and the Hyperledger Fabric (HLF) framework. The system implements a low energy, fast, and robust enhancement to system trustworthiness within and across electric grid systems such as substations, control centers and metering infrastructures. Blockchain is a distributed database structured that provides a practically unalterable (immutable) timeline of stored transactions. By relying on hashing and the Raft consensus algorithm, if an entity tries to illegitimately alter a record at one instance of the database the other ledger nodes are not altered. They work to cross-reference each other and easily locate any incorrectly added data and remove it. The bulk raw data is stored in an off-chain storage (outside of the blockchain ledger) and a hash of this baseline data is stored in the Blockchain ledger via hashing windows of time-series and configuration data, after aggregation and filtering. The bulk off-chain data repository is then considered to be trust-anchored using the hashes stored in the blockchain. To secure the electric grid testbed devices and data, device configuration baselines were compared to those baselines that had been previously stored in the ledger. Statistical baselines for device configurations, network communication patterns, and high-speed sensor data are calculated and then stored off-chain and hashes stored in the ledger. Measurements such as three-phase voltage and current, frequency, breaker status, protection scheme settings, network configuration settings (and other device configuration artifacts) and network traffic features (packet interarrival times) are compared every minute or other selected time windows. During phase 1 of the Grid Guard DLT project different DLT technologies were studies, and an assessment was performed on DLT technology vulnerabilities, uses, and key characteristics. DLT consensus protocols were studies (e.g., RAFT, named after Reliable, Replicated, Redundant, And Fault-Tolerant). Also, cryptography, public, private and permissioned or permissionless systems were assessed. Grid Guard implements a permissioned private DLT. Consensus algorithm selection and choice of DLT implementation depended heavily on the use-case. For this use-case, parameters were selected to measure performance and existing tools for assessment. Benchmarking was performed theoretically and practically. During phase 2 hashed transactions/blocks were inserted into the ledger every second. During phase 2 of the Grid Guard DLT project, a prototype framework was developed and demonstrated for attestation of critical substation devices and data using precision timing systems that use PTP and IRIG-B protocols) on a testbed of operational devices that emulated a distribution substation, control center, and power metering infrastructure using real Operational Technology (OT). The testbed includes OT devices such as protective relays, human machine interfaces (HMI), and power meters. To determine when to collect and compare system and network baselines, an initial examination of an anomaly detection capability to identify malicious manipulation of data streams was conducted. The resulting anomaly detection was demonstrated in a set of experiments and leveraged to trigger device artifact attestation checks. Attestation checks occur against device configuration baselines when compared with the immutable blockchain-stored baselines, which provided a cryptographically supported means by which to store baselines. The electrical substation-grid testbed was created to test the Grid Guard framework. The testbed emulates the operations of a portion of a power grid and SCADA systems as closely as possible. The testbed integrates real protocols, mainly IEC 61850 standard protocols, such as the Sampled Value (SV) and the GOOSE protocols. The testbed also supports DNP3 and other layer 2 and layer 3 protocols such as Telnet, SSH, SFTP/FTP and other proprietary protocols needed to connect to industrial control system equipment. The testbed emulates real power conditions using the OpalRT hardware-in-the-loop (HIL) device which can create fault situations that cannot be easily tested on real systems. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that electrical utilities commonly use.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fermilab PIP-II CDS & CM Cryogenic Controls System

Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules. Design includes Siemens PCS7 Controls System with 26 Remote IO Rittal Cabinets and 48 Relay Racks for Temperature Readouts, Valve Positioners, Level, Heater Controls etc. Electrical Drawings and Design have been completed with focus now on fabrication of the 26 Rittal Cabinets and 48 Relay Racks. All materials have been procured. EPICS will be used as a SCADA system communicating to S7 Controllers via OPC UA.

Patel, Pratik [Fermilab]↗

Fermilab PIP-II CDS and CM Cryogenic Controls System

Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules. Design includes Siemens PCS7 Controls System with 26 Remote IO Rittal Cabinets and 48 Relay Racks for Temperature Readouts, Valve Positioners, Level, Heater Controls etc. Electrical Drawings and Design have been completed with focus now on fabrication of the 26 Rittal Cabinets and 48 Relay Racks. All materials have been procured. EPICS will be used as a SCADA system communicating to S7 Controllers via OPC UA.

Patel, Pratik [Fermilab]↗

Simulating noise on a quantum processor: interactions between a qubit and resonant two-level system bath

Material defects fundamentally limit the coherence times of superconducting qubits, and manufacturing completely defect-free devices is not yet possible. Therefore, understanding the interactions between defects and a qubit in a real quantum processor design is essential. We build a model that incorporates the standard tunneling model, the electric field distributions in the qubit, and open quantum system dynamics, and draws from the current understanding of two-level system (TLS) theory. Specifically, we start with one million TLSs distributed on the surface of a qubit and pick the 200 systems that are most strongly coupled to the qubit. We then perform a full Lindbladian simulation that explicitly includes the coherent coupling between the qubit and the TLS bath to model the time dependent density matrix of resonant TLS defects and the qubit. We find that the 200 most strongly coupled TLSs can accurately describe the qubit energy relaxation time. This work confirms that resonant TLSs located in areas where the electric field is strong can significantly affect the qubit relaxation time, even if they are located far from the Josephson junction (JJ). Similarly, a strongly-coupled resonant TLS located in the JJ does not guarantee a reduced qubit relaxation time if a more strongly coupled TLS is far from the JJ. In addition to the coupling strengths between TLSs and the qubit, the model predicts that the geometry of the device and the TLS relaxation time play a significant role in qubit dynamics. Our work can provide guidance for future quantum processor designs with improved qubit coherence times.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Real Time - Optimal Power Flow Based Distributed Energy Resources Management System (DERMS) (CRADA Number CRD-20-16909 Final Report)

The integration of behind-the-meter distributed energy resources (DERs) into distribution systems brings transformative changes to power systems. This requires operators and planners to find solutions to modernize electric grids and to effectively manage DERs for grid services. NREL developed novel DER management algorithms (referred to as Real-Time Optimal Power Flow, RT-OPF) through U.S. Department of Energy (DOE)-funded efforts, including Advanced Research Projects Agency–Energy (ARPA-E) Network Optimized Distributed Energy Systems (NODES) funding. This cutting-edge control technology aims to modernize distribution systems with large amounts of DER integration, which will help utilities solve issues brought by renewable integration and build resilient and renewable-based electric grids nationwide. Utilidata worked with NREL to investigate the commercialization opportunity of this RT-OPF-based distributed energy resource management system (DERMS). In this project, NREL performs the technology transfer of the RT-OPF to Utilidata to help them fully understand the RT-OPF solution, to identify potential engineering hurdles, and to assess the expected commercial value of various RT-OPF use cases and deployment. The technology transfer work includes two major tasks. First, NREL performs an in-depth knowledge transfer of the entire RT-OPF solution to Utilidata to help them gain an extensive and detailed understanding of the complete RT-OPF solution. In this task, NREL provides exhaustive information (e.g., documentation, code packages, laboratory and field trial data, performance results) while conducting in-depth training sessions to provide a thorough explanation of the entire solution. NREL hosts meetings to present different topics related to the RT-OPF solution, and question-and-answer sessions are included in each meeting to better explain the RT-OPF-related work. Second, the RT-OPF simulations are performed in a laboratory environment. The main objectives of this task are to walk through with Utilidata engineers how to set up a simulation of RT-OPF, identifying each RT-OPF code block/component in operation, learning how these components interact with each other, and eventually running RT-OPF simulations under various system conditions. This task helps Utilidata engineers understand performance limitations and constraints while also quantifying the commercial value of the RT-OPF for different use cases. Based on these two tasks, Utilidata engineers should be able to define and prioritize the next steps of RT-OPF implementation with an eye toward commercial success and scalability of the solution. The next steps are expected to be part of a new project following the conclusion of this project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Hierarchical Local Electricity Market for a DER-rich Grid Edge

We report with increasing penetration of distributed energy resources (DER) in the distribution system, it is critical to design market structures that enable smooth integration of DERs. A hierarchical local electricity market (LEM) structure is proposed in this paper with a secondary market (SM) at the lower level representing secondary feeders and a primary market (PM) at the upper level, representing primary feeders, in order to effectively use DERs to increase grid efficiency and resilience. The lower level SM enforces budget, power balance, and flexibility constraints and accounts for costs related to consumers, such as their disutility, flexibility limits, and commitment reliability, while the upper level PM enforces grid physics constraints such as power balance and capacity limits, and also minimizes line losses. The hierarchical LEM is extensively evaluated using a modified IEEE-123 bus with high DER penetration, with each primary feeder consisting of at least three secondary feeders. Data from a GridLAB-D model is used to emulate realistic power injections and load profiles over the course of 24 hours. The performance of the LEM is illustrated by delineating the family of power-injection profiles across the primary and secondary feeders as well as corresponding local electricity tariffs that vary across the distribution grid. Through numerical simulations, the hierarchical LEM is shown to improve the efficiency of the market in terms of lowering overall costs, including both the distribution-level locational marginal prices (d-LMP) as well as retail tariffs paid by customers. Together, it represents an overall framework for a Distribution System Operator (DSO) who can provide the oversight for the entire LEM.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Precursor Analysis Report: Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016

The Industroyer Targeting Ukraine Electric Power Transport Utility (Ukrenergo) 2016 Precursor Analysis Report leverages publicly available information about the December 2016 cyber attack against the Ukrainian Ukrenergo electric transmission utility and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. Industroyer is a modular malware framework designed to deploy several Industrial Control System (ICS) protocol-specific attack payloads to disrupt electricity distribution. Adversaries deployed Industroyer within the target network on a Microsoft Windows endpoint capable of directly manipulating or communicating with ICS. Industroyer abuses the functionality of a targeted ICS’s legitimate control system to achieve its intended impact. Adversaries likely first gained access to Ukrenergo enterprise networks in early 2016 after a successful spearphishing campaign against organizations in the electric power sector. Adversaries then began capturing credentials beginning on 1 December 2016. This allowed access to the ICS environment at the Pivnichna electric transmission substation outside Kyiv through a device dual-homed on the Information Technology (IT) and ICS networks. Adversaries conducted discovery, targeting, and access to this device using information and previously captured credentials from compromised enterprise IT machines. Finally, the adversaries deployed and launched the Industroyer malware just before midnight on 17 December. By midnight, Ukrenergo had lost control of a targeted substation, resulting in electric power outages for over an hour in the city of Kyiv and the Kyiv region. Researchers and analysts identified 31 unique techniques (used in a sequence of 33 steps) utilized during the attack with a total of 846 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Twenty-nine of the identified techniques used during the Industroyer cyber attack were precursors to the triggering event. Analysis identified 548 observables associated with these precursor techniques, 353 of which were assessed to have an increased likelihood of being perceived in the 300 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Integrated Transportation-Energy Systems Modeling

Transportation is currently the least-diversified energy demand sector, with over 90% of global transportation energy use coming from petroleum product. After over a century of petroleum dominance, however, many leading experts anticipate major electrification trends that could disrupt the transportation energy demand landscape. These changes in electricity demand complement profound changes happening within electric power supply systems, including integration of variable renewables, distributed generation and storage, and greater participation in power system planning and operations from traditionally passive consumers. This broader context underscores the importance of understanding how transportation electrification will impact electricity demand, including changes in the load shapes that characterize the system and the opportunity to leverage flexible EV charging to more cost-effectively balance demand and supply. This talk provides an overview of recent findings on infrastructure requirements to support EV adoption, integration challenges and the impact of EV on power systems, and opportunities to leverage flexible (or smart) EV charging to support power system planning and operations.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Volt-Var Curve Reactive Power Control Requirements and Risks for Feeders with Distributed Roof-Top Photovoltaic Systems

The benefits and risks associated with Volt-Var Curve (VVC) control for management of voltages in electric feeders with distributed, roof-top photovoltaic (PV) can be defined using a stochastic hosting capacity analysis methodology. Although past work showed that a PV inverter’s reactive power can improve grid voltages for large PV installations, this study adds to the past research by evaluating the control method’s impact (both good and bad) when deployed throughout the feeder within small, distributed PV systems. The stochastic hosting capacity simulation effort iterated through hundreds of load and PV generation scenarios and various control types. The simulations also tested the impact of VVCs with tampered settings to understand the potential risks associated with a cyber-attack on all of the PV inverters scattered throughout a feeder. The simulation effort found that the VVC can have an insignificant role in managing the voltage when deployed in distributed roof-top PV inverters. This type of integration strategy will result in little to no harm when subjected to a successful cyber-attack that alters the VVC settings.

24 POWER TRANSMISSION AND DISTRIBUTION↗