Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

The human role in space

Requirements for the future human role in space are considered. Human tasks were divided into normal scheduled activities, unscheduled activities, and contingency activities. A strawman mission model was developed. Projections were made of crew size, mission duration, pressurized spacecraft volume, and power requirements. Trends of human roles were likewise projected.

Hall, S. B.↗

New Direction of NASA Exploration Life Support

NASA's activities in life support Research and Technology Development (R&TD) have changed in both focus and scope following implementation of recommendations from the Exploration System Architecture Study (ESAS). The limited resources available and the compressed schedule to conduct life support R&TD have required that future efforts address the needs of the Crew Exploration Vehicle (CEV), the Lunar Surface Access Module (LSAM) and Lunar Outpost (LO). Advanced Life Support (ALS) efforts related to long duration planetary bases have been deferred or canceled. This paper describes the scope of the new Exploration Life Support (ELS) project; how it differs from ALS, and how it supports critical needs for the CEV, LSAM and LO. In addition, this paper provides rationale for changes in the scope and focus of technical content within ongoing life support R&TD activities.

Chambliss, Joe↗

Preparation for the Proof of Concept Flight of the Veggie Plant Growth Chamber

Veggie is a small plant growth chamber designed and built by ORBITEC that will fly to the International Space Station on SpaceX-3, scheduled for the summer of 2013. Ultimately Veggie will be used for research, education and outreach, and crew recreation. We want to demonstrate the functionality of this hardware by testing a scenario that could allow the crew to grow and consume fresh vegetables. Veggie will be collapsed and transported flat in a cargo transfer bag, and deployed on orbit, where it will be installed in an EXPRESS rack. The chamber consists of three subsystems: an LED light cap, a transparent bellows, and a root mat reservoir assembly. The bellows and flexible support arms allow the distance between plants and light cap to be adjusted for different ages and types of plants. Researchers at Kennedy Space Center and ORBITEC have been working to develop the plant growth interfaces for the proof of concept flight. We have developed a rooting pillow, consisting of a small bag containing media, time release fertilizer, seeds, and a wicking surface to conduct water from the root mat reservoir. Prototype pillows have been tested and results have influenced the design of flight pillows, which will be modified for microgravity from flight-approved materials. Several studies have been conducted selecting species and comparing media types in analog systems. Water content seems to be the most important factor differentiating media types in these small growth volumes (100 mL). Media type also influenced microbial levels on plants. Since produce sanitizing agents are not currently approved for growing food crops on orbit, plants and media types having very low microbial levels are being selected. Lettuce, mizuna, and other salad greens typically have microbial counts less than 10(exp 4) colony forming units and thus are good candidates for spaceflight. As we approach flight verification testing, we will finalize species, media selection, harvesting, and microbial sampling procedures. Next steps include testing of Veggie flight and ground hardware and associated equipment. This research was funded by NASA.

Massa, Gioia↗

Descent and Landing Triggers for the Orion Multi-Purpose Crew Vehicle Exploration Flight Test-1

The Orion Multi-Purpose Crew Vehicle (MPCV) will perform a flight test known as Exploration Flight Test-1 (EFT-1) currently scheduled for 2014. One of the primary functions of this test is to exercise all of the important Guidance, Navigation, Control (GN&C), and Propulsion systems, along with the flight software for future flights. The Descent and Landing segment of the flight is governed by the requirements levied on the GN&C system by the Landing and Recovery System (LRS). The LRS is a complex system of parachutes and flight control modes that ensure that the Orion MPCV safely lands at its designated target in the Pacific Ocean. The Descent and Landing segment begins with the jettisoning of the Forward Bay Cover and concludes with sensing touchdown. This paper discusses the requirements, design, testing, analysis and performance of the current EFT-1 Descent and Landing Triggers flight software.

Bihari, Brian D.↗

NASA Space Rocket Logistics Challenges

The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discreet programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as commonality especially problematic. Additionally, a very low manifest rate of one flight every four years makes logistics comparatively expensive. That, along with the SLS architecture being developed using a block upgrade evolutionary approach, exacerbates long-range planning for supportability considerations. These common and unique logistics challenges must be clearly identified and tackled to allow SLS to have a successful program. This paper will address the common and unique challenges facing the SLS programs, along with the analysis and decisions the NASA Logistics engineers are making to mitigate the threats posed by each.

Neeley, James R.↗

NASA Space Flight Vehicle Fault Isolation Challenges

The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discrete programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as testability of the integrated flight vehicle especially problematic. The cost of fully automated diagnostics can be completely justified for a large fleet, but not so for a single flight vehicle. Fault detection is mandatory to assure the vehicle is capable of a safe launch, but fault isolation is another issue. SLS has considered various methods for fault isolation which can provide a reasonable balance between adequacy, timeliness and cost. This paper will address the analyses and decisions the NASA Logistics engineers are making to mitigate risk while providing a reasonable testability solution for fault isolation.

Bramon, Christopher↗

Space processing in early Shuttle missions

The paper first reviews potential scientific and commercial benefits of space processing, and discusses roles of ground laboratory, sounding rocket, and Shuttle/Spacelab experimentation in carrying out space processing programs. Benefits which have been identified in such processes as containerless melting/solidification, electrophoresis, crystal growing, etc., and using such specific materials as tungsten, isoenzymes, single crystal silicon ribbon are utilized as specific examples in the above discussion. As a result, the paper identifies spectrum of specific objectives and implementation approaches for Shuttle/Spacelab experimentation. The paper then reviews currently planned Shuttle/Spacelab payload accommodations and traffic model. Finally, the paper matches experimentation approaches with Shuttle/Spacelab plans, and derives a possible schedule of missions in the 1979-1982 time frame using configurations with a high degree of automation where crew time for experiment involvement is limited.

Bloom, H. L.↗

Human factors issues in performing life science experiments in a 0-G environment

An overview of the environmental conditions within the Spacelab and the planned Space Station Freedom is presented. How this environment causes specific Human Factors problems and the nature of design solutions are described. The impact of these problems and solutions on the performance of life science activities onboard Spacelab (SL) and Space Station Freedom (SSF) is discussed. The first area highlighted is contamination. The permanence of SSF in contrast to the two-week mission of SL has significant impacts on crew and specimen protection requirements and, thus, resource utilization. These requirements, in turn impose restrictions on working volumes, scheduling, training, and scope of experimental procedures. A second area is microgravity. This means that all specimens, materials, and apparatus must be restrained and carefully controlled. Because so much of the scientific activity must occur within restricted enclosures (gloveboxes), the provisions for restraint and control are made more complex. The third topic is crewmember biomechanics and the problems of movement and task performance in microgravity. In addition to the need to stabilize the body for the performance of tasks, performance of very sensitive tasks such as dissection is difficult. The issue of space sickness and adaption is considered in this context.

Gonzalez, Wayne↗

Orion-CEV Project Overview To the NASA Sports and Exploration "Kick-Off" Meeting

This viewgraph presentation reviews the Orion Crew Exploration vehicle (CEV) and its usage in the exploration of the moon and subsequent travel to Mars. Schedules for development and testing of the CEV are shown. Also displayed are various high level design views of the CEV, the launch abort system, the Atlas Docking adapter, and the service module.

Marshall, Paul F.↗

Space Launch System Accelerated Booster Development Cycle

With the retirement of the Space Shuttle, NASA is seeking to reinvigorate the national space program and recapture the public s interest in human space exploration by developing missions to the Moon, near-earth asteroids, Lagrange points, Mars, and beyond. The would-be successor to the Space Shuttle, NASA s Constellation Program, planned to take humans back to the Moon by 2020, but due to budgetary constraints was cancelled in 2010 in search of a more "affordable, sustainable, and realistic" concept2. Following a number of studies, the much anticipated Space Launch System (SLS) was unveiled in September of 2011. The SLS core architecture consists of a cryogenic first stage with five Space Shuttle Main Engines (SSMEs), and a cryogenic second stage using a new J-2X engine3. The baseline configuration employs two 5-segment solid rocket boosters to achieve a 70 metric ton payload capability, but a new, more capable booster system will be required to attain the goal of 130 metric tons to orbit. To this end, NASA s Marshall Space Flight Center recently released a NASA Research Announcement (NRA) entitled "Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction." The increased emphasis on affordability is evident in the language used in the NRA, which is focused on risk reduction "leading to an affordable Advanced Booster that meets the evolved capabilities of SLS" and "enabling competition" to "enhance SLS affordability. The purpose of the work presented in this paper is to perform an independent assessment of the elements that make up an affordable and realistic path forward for the SLS booster system, utilizing advanced design methods and technology evaluation techniques. The goal is to identify elements that will enable a more sustainable development program by exploring the trade space of heavy lift booster systems and focusing on affordability, operability, and reliability at the system and subsystem levels5. For this study, affordability is defined as lifecycle cost, which includes design, development, test, and engineering (DDT&E), production and operational costs (P&O). For this study, the system objectives include reducing DDT&E schedule by a factor of three, showing 99.9% reliability, flying up to four times per year, serving both crew and cargo missions, and evolving to a lift capability of 130 metric tons.3 After identifying gaps in the current system s capabilities, this study seeks to identify non-traditional and innovative technologies and processes that may improve performance in these areas and assess their impacts on booster system development. The DDT&E phase may be improved by incorporating incremental development testing and integrated demonstrations to mitigate risk. To further reduce DDT&E, this study will also consider how aspects of the booster system may have commonality with other users, such as the Department of Defense, commercial applications, or international partners; by sharing some of the risk and investment, the overall development cost may be reduced. Consideration is not limited to solid and liquid rocket boosters. A set of functional performance characteristics, such as engine thrust, specific impulse (Isp), mixture ratio, and throttle range are identified and their impacts on the system are evaluated. This study also identifies how such characteristics affect overall life cycle cost, including DDT&E and fixed and variable P&O.

Arockiam, Nicole↗

On-orbit RNA Purification and qRT-PCR Capabilities of the WetLab-2 System

NASA Ames Research Center’s WetLab-2 system brings new capabilities to the ISS for researchers. The system can lyse cells and extract RNA on-orbit from different sample types ranging from microbial cultures to animal tissues. Our purification method has the advantage of using non-toxic chemicals and does not require alcohols or other organics. The purified RNA can then either be stabilized for return to Earth or can be used to conduct on-orbit quantitative Reverse Transcriptase PCR (qRT-PCR) analysis without the need for sample return. qRT-PCR reactions are performed by dispensing the RNA into reaction tubes that contain all lyophilized reagents needed to perform the analysis. The system uses a Cepheid® SmartCycler that allows for multiplexing of assays, this can be used to normalize for RNA concentration and integrity and to study multiple genes of interest in each tube. There are a total of 16 independent PCR modules each capable of detecting up to four fluorescent channels. The WetLab- 2 system can downlink data from the ISS to the ground after a completed run and uplink new thermal cycling programs. The ability to purify and stabilize RNA on-orbit can eliminate the confounding effects of reentry stresses and shock acting on live cells and organisms or the concern of RNA degradation of some samples. It also has the benefit of minimizing the needed downmass. Conducting qRT-PCR and generating results on-orbit is also an important step towards utilizing the ISS as a National Laboratory facility. Specifically, the ability to get on-orbit data will provide investigators with the opportunity to adjust experimental parameters in real time without the need for sample return and re-flight. On orbit gene expression analysis can also provide benchmarking prior to sample return. The system can also be used for analysis of air, surface, water, and clinical samples to monitor environmental pathogens and crew health. The validation flight of the WetLab-2 system using E. coli bacteria and mouse liver is scheduled to launch on SpaceX-8 this spring. Pending operations, the preliminary results from the validation flight will be presented. To support the needs of future researchers, we are adapting our system to purify RNA from two additional sample types: fibrous tissue such as muscle and mammalian adherent cells grown on alginate beads. Progress of this work will also be presented. The WetLab-2 Project is supported by the Research Integration Office in the ISS Program.

Parra, Macarena↗

Expedition 7 Crew Interview: Yuri Malenchenko

Cosmonaut Yuri Malenchenko of Expedition Seven is seen during a pre-launch interview. He begins by telling why he wanted to become a cosmonaut. Malenchenko expresses his reaction about the news of the Space Shuttle Columbia accident, and how this mission will be different from other missions. He also expresses the challenges that face Malenchenko and Ed Lu such as the crew reduction from three to two, less supplies and no space shuttle flights. Malenchenko says that he will have to work on a compressed schedule, which will make the mission even more challenging. A description of the handover of Expedition Six is given. Malenchenko and Ed Lu will be cramped in a confined space on the Soyuz Spacecraft for two days before docking, and he talks about this experience. Lastly, Malenchenko gives his thoughts on how it will be to work with Ed Lu in space, and tells of Lu's trustworthiness and reliability as a fellow crew member.

Source record↗

STS-106 Crew Activities Report/Flight Day 04 Highlights

On this fourth day of the STS-106 Atlantis mission, the flight crew, Commander Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov are seen preparing for the scheduled space walk. Lu and Malenchenko are seen coming through the hatch of the International Space Station (ISS). Also shown are Lu and Malenchenko attaching a magnetometer and boom to Zvezda. Mastracchio operates the robot arm moving the extravehicular activity (EVA) crew outside of the ISS.

Source record↗

Expert system for scheduling simulation lab sessions

Implementation and results of an expert system used for scheduling session requests for the Systems Engineering Simulator (SES) laboratory at the NASA Johnson Space Center (JSC) are discussed. Weekly session requests are received from astronaut crew trainers, procedures developers, engineering assessment personnel, software developers, and various others who wish to access the computers, scene generators, and other simulation equipment available to them in the SES lab. The expert system under discussion is comprised of a data acquisition portion - two Pascal programs run on a personal computer - and a CLIPS program installed on a minicomputer. A brief introduction to the SES lab and its scheduling background is given. A general overview of the system is provided, followed by a detailed description of the constraint-reduction process and of the scheduler itself. Results from a ten-week trial period using this approach are discussed. Finally, a summary of the expert system's strengths and shortcomings are provided.

Lund, Chet↗

Demonstration Assessment of Light-Emitting Diode (LED) Roadway Lighting at the I-35W Bridge, Minneapolis, MN

This report describes the process and results of a demonstration of solid-state lighting (SSL) technology conducted in 2009 at the recently reconstructed I-35W bridge in Minneapolis, MN. The project was supported under the U.S. Department of Energy (DOE) Solid-State Lighting GATEWAY Technology Demonstration Program. Other participants in the demonstration project included the Minnesota Department of Transportation (Mn/DOT), Federal Highways Administration (FHWA), and BetaLED™ (a division of Ruud Lighting). Pacific Northwest National Laboratory (PNNL) conducted the measurements and analysis of the results. DOE has implemented a three-year evaluation of the LED luminaires in this installation in order to develop new longitudinal field data on LED performance in a challenging, real-world environment. This document provides information through the initial phase of the I-35W bridge project, up to and including the opening of the bridge to the public and the initial feedback received on the LED lighting installation from bridge users. Initial findings of the evaluation are favorable, with minimum energy savings level of 13% for the LED installation relative to the simulated base case using 250W high-pressure sodium (HPS) fixtures. The LEDs had an average illuminance level of 0.91 foot candles compared to 1.29 fc for the HPS lamps. The LED luminaires cost $38,000 more than HPS lamps, yielding a lengthy payback period, however the bridge contractor had offered to include the LED luminaires as part of the construction package at no additional cost. One potentially significant benefit of the LEDs in this installation is avoiding rolling lane closures on the heavily-traveled interstate bridge for the purpose of relamping the HPS fixtures. Rolling lane closures involve multiple crew members and various maintenance and safety vehicles, diversion of traffic, as well as related administrative tasks (e.g., approvals, scheduling, etc.). Mn/DOT records show an average cost of relamping fixtures along interstate roadways of between $130-150 per pole. The previous bridge saw a lamp mortality rate of approximately 50% every two years, though the new bridge was designed to minimize many of the vibration issues. A voluntary Web-based feedback survey of nearly 500 self-described bridge users showed strong preference for the LED lighting - positive comments outnumbered negative ones by about five-to-one.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Planning and management of science programs on Skylab

Discussion of the experience gained in experiment operation planning during the Skylab mission. The Skylab flight planning activity allowed the experimenters to interact with the system and provided the flexibility to respond to contingencies both major and minor. Both these aspects contributed to make efficient use of crew time thus helping to increase the science return from the mission. Examples of the need for real time scheduling response and of the tradeoffs considered between conflicting experiment requirements are presented. General management principles derived from this experience are developed. The Skylab mission experiences, together with previous Apollo mission experiences, are shown to provide a good background for Shuttle flight planning.

Parker, R. A. R.↗

Task and work performance on Skylab missions 2, 3, and 4: Time and motion study: Experiment M151

Human task performance was evaluated under weightlessness conditions during long duration space flight in order to study the characteristics of the adaptation function. Results show that despite pronounced variability in training schedules and in initial reaction to the Skylab environment, in-flight task performance was relatively equivalent among Skylab crews, and behavioral performance continued to improve from beginning to end of all missions.

Kubis, J. F.↗

AVCOAT Density Characterization for Orion Multi-Purpose Crew Vehicle

The Orion Multi-Purpose Crew Vehicle (MPCV) will transport four crew members to and from lunar-class orbital destinations. The first orbital Exploration Flight Test (EFT-1) is scheduled for December 2014 and will provide valuable data on several systems, including the heat shield. The heat shield material is AvcoatTM, a mid-density ablator. Specifically, the heat shield contains a fiberglass-phenolic honeycomb structure filled with an ablative epoxy novolac resin. Post-flight characterization of the EFT-1 thermal protection system will be conducted in order to study the material response and measure the char front of the material. Avcoat density profiling will be conducted to study three critical material zones: char, pyrolysis, and virgin states as a function of material depth. As part of a ground test campaign, Avcoat coupons are tested at the NASA Ames Research Center Arc Jet Complex. The test campaign is set forth to study material response based on environments, perform Avcoat material density characterization, and compare the char depths from the HEAT sensor and density profiling studies. These investigations will then be compared to flight data in order to improve upon TPS material response models.

AVCOAT↗