Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Integration Process for the Habitat Demonstration Unit

The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities. The HDU previously served as a test bed for testing technologies and sub-systems in a terrestrial surface environment. in 2010 in the Pressurized Excursion Module (PEM) configuration. Due to the amount of work involved to make the HDU project successful, the HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators The size of the team and number of systems involved With the HDU makes Integration a complicated process. However, because the HDU shell manufacturing is complete, the team has a head start on FY--11 integration activities and can focus on integrating upgrades to existing systems as well as integrating new additions. To complete the development of the FY-11 HDU from conception to rollout for operations in July 2011, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads. The highlighted HDU work for FY-11 will focus on performing upgrades to the PEM configuration, adding the X-Hab as a second level, adding a new porch providing the astronauts a larger work area outside the HDU for EVA preparations, and adding a Hygiene module. Together these upgrades result in a prototype configuration of the Deep Space Habitat (DSH), an element under evaluation by NASA's Human Exploration Framework Team (HEFT) Scheduled activates include early fit-checks and the utilization of a Habitat avionics test bed prior to installation into HDU. A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development. Modeling tools have been effective in hardware systems layout, cable routing, sub-system interface length estimation and human factors analysis. Decision processes on integration and use of all new subsystems will be defined early in the project to maximize the efficiency of both integration and field operations. In addition a series of tailored design reviews are utilized to quickly define the systems and their integration into the DSH configuration. These processes are necessary to ensure activities, such as partially reversing integration of the X-Hab second story of the HDU and deploying and stowing the new work porch for transportation to the JSC Rock Yard and to the Arizona Black Point Lava Flow Site are performed with minimal or no complications. In addition, incremental test operations leading up to an Integrated systems test allows for an orderly systems test program. For FY-11 activities, the HDU DSH will act as a laboratory utilizing a new X-Hab inflatable second floor with crew habitation features. In addition to the day to day operations involving maintenance of the HDU and exploring the surrounding terrain, testing and optimizing the use of the new X-Hab, work porch, Hygiene Module, and other sub-system enhancements will be the focus of the FY-11 test objectives. The HDU team requires a successful integration strategy using a variety of tools and approaches to prepare the DSH for these test objectives. In a challenging environment where the prototyping influences the system design, as well as Vice versa, results of the HDU DSH field tests will influence future designs of habitat systems.

Gill, Tracy↗

One System Overview - 16579

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for managing and completing the River Protection Project mission, which is to 'safeguard the nuclear waste stored in Hanford's 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and Immobilization Plant for final disposition'. The Office of River Protection's work scope is currently performed through two primary contracts: - The Tank Operations Contract, held by Washington River Protection Solutions LLC, (WRPS) includes the construction, operation, and maintenance activities necessary to safely store, retrieve, and transfer tank wastes; provide supplemental tank waste treatment; provide storage and/or disposal of primary and secondary waste streams; design, construction and commissioning of the Low-Activity Waste Pretreatment System; and support ORP to integrate Hanford Tank Waste Treatment and Immobilization Plant (WTP) completion and startup with Tank Farms operations. - The WTP Contract, held by Bechtel National, Inc. (BNI), includes the design, construction, and commissioning of a Pretreatment Facility, two vitrification facilities (one for high-level waste and one for low-activity waste), a dedicated analytical laboratory, and supporting facilities to treat radioactive tank wastes by immobilizing them into a stable glass waste form. One System was established as a means to improve the integration between the tank farms and the WTP project to support its safe and successful startup. One System's scope and purpose focus on mission integration consistent with DOE's plans to treat tank waste in phases, starting with direct feed of the low-activity waste stream to the WTP's Low-Activity Waste (LAW) Vitrification Facility (referred to as DFLAW). The One System organization now has four major focus areas: - Flowsheet Integration? Integrated River Protection Project (RPP) flowsheet development and management; developing a gaps, risks, and opportunities management plan and technical roadmap; and waste feed qualification. - Mission Analysis and Planning? Strategic planning, system planning, and modeling integration. - WTP Startup, Commissioning, and Operations Integration? Interface Control Document (ICD) management, coordinating facilities startup-to-commissioning-to-operations, contract directives and standards identification, and DFLAW program integration. - Project Integration and Controls? Integrated schedule, metrics/dashboards monitoring, and One System risk register. ORP established the DFLAW Program Office in February 2015 as one of its key performance goals. ORP staff, along with contractor managers, have identified roles and responsibilities for the each of the four major focus areas. One System has established an Executive Council and Governance Board to drive program progress and make decisions on DFLAW. This approach allows appropriate government and contractor senior management involvement in the DFLAW Program. Monthly critical path analysis on the integrated DFLAW schedule is being performed. Interface control documents specific to DFLAW have been developed, and system planning and modeling tools are being used to help define the DFLAW flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vehicle Localization in 3D World Coordinates Using Single Camera at Traffic Intersection

Optimizing traffic control systems at traffic intersections can reduce the network-wide fuel consumption, as well as emissions of conventional fuel-powered vehicles. While traffic signals have been controlled based on predetermined schedules, various adaptive signal control systems have recently been developed using advanced sensors such as cameras, radars, and LiDARs. Among these sensors, cameras can provide a cost-effective way to determine the number, location, type, and speed of the vehicles for better-informed decision-making at traffic intersections. In this research, a new approach for accurately determining vehicle locations near traffic intersections using a single camera is presented. For that purpose, a well-known object detection algorithm called YOLO is used to determine vehicle locations in video images captured by a traffic camera. YOLO draws a bounding box around each detected vehicle, and the vehicle location in the image coordinates is converted to the world coordinates using camera calibration data. During this process, a significant error between the center of a vehicle’s bounding box and the real center of the vehicle in the world coordinates is generated due to the angled view of the vehicles by a camera installed on a traffic light pole. As a means of mitigating this vehicle localization error, two different types of regression models are trained and applied to the centers of the bounding boxes of the camera-detected vehicles. The accuracy of the proposed approach is validated using both static camera images and live-streamed traffic video. Based on the improved vehicle localization, it is expected that more accurate traffic signal control can be made to improve the overall network-wide energy efficiency and traffic flow at traffic intersections.

47 OTHER INSTRUMENTATION↗

Mission Data System Java Edition Version 7

The Mission Data System framework defines closed-loop control system abstractions from State Analysis including interfaces for state variables, goals, estimators, and controllers that can be adapted to implement a goal-oriented control system. The framework further provides an execution environment that includes a goal scheduler, execution engine, and fault monitor that support the expression of goal network activity plans. Using these frameworks, adapters can build a goal-oriented control system where activity coordination is verified before execution begins (plan time), and continually during execution. Plan failures including violations of safety constraints expressed in the plan can be handled through automatic re-planning. This version optimizes a number of key interfaces and features to minimize dependencies, performance overhead, and improve reliability. Fault diagnosis and real-time projection capabilities are incorporated. This version enhances earlier versions primarily through optimizations and quality improvements that raise the technology readiness level. Goals explicitly constrain system states over explicit time intervals to eliminate ambiguity about intent, as compared to command-oriented control that only implies persistent intent until another command is sent. A goal network scheduling and verification process ensures that all goals in the plan are achievable before starting execution. Goal failures at runtime can be detected (including predicted failures) and handled by adapted response logic. Responses can include plan repairs (try an alternate tactic to achieve the same goal), goal shedding, ignoring the fault, cancelling the plan, or safing the system.

Reinholtz, William K.↗

Requirements Doc for Refurb of JASPER Facility in B131HB

The Joint Actinide Shock Physics Experimental Research (JASPER) Program target fabrication facility is currently located in building 131 (B131) of the Lawrence Livermore National Laboratory (LLNL). A portion of this current facility has been committed to another program as part of a larger effort to consolidate LLNL capabilities into newer facilities. This facility assembles precision targets for scientific studies at the Nevada National Security Site (NNSS). B131 is also going through a modernization project to upgrade the infrastructure and abate asbestos. These activities will interrupt the continuous target fabrication efforts for the JASPER Program. Several options are explored to meet the above conflicting requirements, with the final recommendation to prepare a new facility for JASPER target fabrication operations before modernization efforts begin in the current facility assigned to JASPER. This recommendation fits within all schedule constraints and minimizes the disruption to the JASPER Program. This option is not without risk, as it requires moving an aged, precision coordinate measuring machine, which is essential to the JASPER Program’s success. The selected option balances the risk to the machine with continuity of operations.

42 ENGINEERING↗

Maintenance and operations tasks accomplished at DSS 12 during the antenna panel replacement downtime

The heavy schedule of tracking activities at the Echo Deep Space Station (DSS 12) prevents some time-consuming maintenance tasks from being performed. Careful coordination prior to and during a mandatory task (antenna panel replacement) made it possible to do a large number of unrelated tasks that ordinarily would have to be deferred. The maintenance and operations tasks accomplished during the downtime are described.

Butcher, L.↗

Implementation of a standard format for GPS common view data

A new format for standardizing common view time transfer data, recommended by the Consultative Committee for the Definition of the Second, is being implemented in receivers commonly used for contributing data for the generation of International Atomic Time. We discuss three aspects of this new format that potentially improve GPS common-view time transfer: (1) the standard specifies the method for treating short term data, (2) it presents data in consistent formats including needed terms not previously available, and (3) the standard includes a header of parameters important for the GPS common-view process. In coordination with the release of firmware conforming to this new format the Bureau International des Poids et Mesures will release future international track schedules consistent with the new standard.

Weiss, Marc A.↗

Integration Process for the Habitat Demonstration Unit

The Habitat Demonstration Unit (HDU) is an experimental exploration habitat technology and architecture test platform designed for analog demonstration activities The HDU project has required a team to integrate a variety of contributions from NASA centers and outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture To complete the development of the HDU from conception in June 2009 to rollout for operations in July 2010, a cohesive integration strategy has been developed to integrate the various systems of HDU and the payloads, such as the Geology Lab, that those systems will support The utilization of interface design standards and uniquely tailored reviews have allowed for an accelerated design process Scheduled activities include early fit-checks and the utilization of a Habitat avionics test bed prior to equipment installation into HDU A coordinated effort to utilize modeling and simulation systems has aided in design and integration concept development Modeling tools have been effective in hardware systems layout, cable routing and length estimation, and human factors analysis Decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU to maximize the efficiency of both integration and field operations Incremental test operations leading up to an integrated systems test allows for an orderly systems test program The HDU will begin its journey as an emulation of a Pressurized Excursion Module (PEM) for 2010 field testing and then may evolve to a Pressurized Core Module (PCM) for 2011 and later field tests, depending on agency architecture decisions The HDU deployment will vary slightly from current lunar architecture plans to include developmental hardware and software items and additional systems called opportunities for technology demonstration One of the HDU challenges has been designing to be prepared for the integration of presently unanticipated systems Results of the HDU field tests will influence future designs of habitat systems.

Gill, Tracy↗

Reinforcement Learning to Enhance Optimal Operation of Resilient Community Energy Systems

This paper presents a novel model-free multi-agent Reinforcement Learning (RL) control method to enhance the resilience of community energy systems in island mode, which coordinates multiple objectives without the necessity of identifying system models that require expert knowledge. Specifically, a community-level coordinator agent is designed to allocate renewable energy resources among different buildings, and multiple building-level agents are developed to optimize load schedules based on limited energy resources and requirements of building loads and occupants’ comfort. In a two-day evaluation, our RL approach demonstrated a similar performance against MPC without requiring system models and formulation of optimization problems as required in MPC.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

A Task Based Approach for Co-Scheduling Ensemble Workloads on Heterogeneous Nodes

Scientific workflows consist of multiple, connected applications, with data and results flowing from one to another in a pipeline. Traditionally, such workflows are executed in sequential order, storing intermediate data in storage disks. Co-scheduling application workflows concurrently on the same compute nodes would greatly reduce the cost of moving data to/from storage and allow real-time analysis of intermediate results. Nevertheless, most parallel programming runtimes do not allow seamless integration of various applications in a scientific workflow, in part due to the complexity of managing data and resources. The situation is even more complicated for heterogeneous systems. In this work we extend the Minos Computing Library (MCL) runtime to accelerate pipe-lined and parallel workloads where multiple applications are running in the same system. MCL’s asynchronous task library and runtime dynamically manages resources to allow co-scheduling of multiple processes sharing heterogeneous resources. In addition, we design a custom ex- tension of the Open Compute Language (OpenCL) to enable multiple processes to share device memory. We enable MCL to coordinate these shared buffers to allow for easy, fast data sharing between applications. Using malleable micro-benchmarks and two application workflows that combine scientific simulation and AI-based analysis, we show that our method outperforms traditional approaches.

Index Terms—Parallel systems, Scheduling and Task ↗

A Fast-Time Study of Aircraft Reordering in Arrival Sequencing and Scheduling

In order to ensure that the safe capacity of the terminal area is not exceeded, Air Traffic Management ATM often places restrictions on arriving flights transitioning from en route airspace to terminal airspace. This restriction of arrival traffic is commonly referred to as arrival flow management, and includes techniques such as metering, vectoring, fix-load balancing, and the imposition of miles-in-trail separations. These restrictions are enacted without regard for the relative priority which airlines may be placing on individual flights based on factors such as crew criticality, passenger connectivity, critical turn times, gate availability, on-time performance, fuel status, or runway preference. The development of new arrival flow management techniques which take into consideration priorities expressed by air carriers will likely reduce the economic impact of ATM restrictions on the airlines and lead to increased airline economic efficiency by allowing airlines to have greater control over their individual arrival banks of aircraft. NASA and the Federal Aviation Administration (FAA) have designed and developed a suite of software decision support tools (DSTs) collectively known as the Center TRACON Automation System (CTAS). One of these tools, the Traffic Management Advisor (TMA) is currently being used at the Fort Worth Air Route Traffic Control Center to perform arrival flow management of traffic into the Dallas/Fort Worth airport (DFW). The TMA is a time-based strategic planning tool that assists Traffic Management Coordinators (TMCs) and En Route Air Traffic Controllers in efficiently balancing arrival demand with airport capacity. The primary algorithm in the TMA is a real-time scheduler which generates efficient landing sequences and landing times for arrivals within about 200 no a. from touchdown. This scheduler will sequence aircraft so that they arrive in a first- come - first-served (FCFS) order. While FCFS sequencing establishes a fair order based on estimated times of arrival, it does not take into account individual airline priorities among incoming flights. NASA is exploring the possibility of allowing airlines to express relative arrival priorities to air traffic management through the development of new CTAS scheduling algorithms which take into consideration airline arrival preferences. The accommodation of airline priorities in arrival sequencing and scheduling would under most circumstances result in a deviation from a "natural" or FCFS arrival order. As a First step toward developing airline influenced sequencing algorithms, an investigation was conducted to determine the feasibility of reordering arrival traffic from a strict FCFS sequence. A fast-time simulation has been developed which allows statistical evaluation of sequencing and scheduling algorithms for arrival traffic at the Dallas/Fort Worth Airport. In contrast to real-time simulation or field tests, which would require on the order of ninety minutes to examine a single traffic rush period, the fast-time simulation allows examination of multiple rush periods in a matter of seconds.

Carr, Greg↗

Hiilangaay Hydroelectric Project – Final Report

The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

13 HYDRO ENERGY↗

Evaluation of Preventative Radiological/Nuclear Detector Archetypes to Validate Repurpose to the Consequence Management Mission

In the event of a radiological or nuclear emergency involving a large-scale release of radioactive material, local responders would be the primary means to perform radiation measurements to assess impacts and issue protective action recommendations for the responders and the public. Over the first 24-36 hours, Federal responders and resources will deploy to augment the local efforts, and if necessary, provide extensive radiation monitoring and assessment capabilities coordinated by the Department of Energy-led Federal Radiological Monitoring and Assessment Center and Federal Emergency Management Agency-led Multiagency Coordination Group. Unless Federal resources happen to be deployed at the moment an incident occurs, such as a preventative radiological/nuclear detection mission for a scheduled special event, the local response to an incident will commence and persist for many hours with no on-scene Federal support. For a catastrophic incident, such as a nuclear detonation or severe reactor accident, the local jurisdictions may not have a full range of adequate supplies of health physics instruments and personnel dosimetry. Therefore early in a crisis, the local responders will inevitably conduct their operations with the radiation detection and dosimetry capabilities that they have available until additional resources and support are requested and arrive. Most of the radiation detection instruments currently fielded at the local level are carried by law enforcement personnel and are designed for interdiction missions - referred to here as preventative radiological/nuclear detection (PRND) instruments. This study investigated how this PRND equipment can be repurposed in consequence management (CM) missions.

61 RADIATION PROTECTION AND DOSIMETRY↗

Differential Very Long Baseline Interferometry for 50 nanoradian deep space navigation - Results from quasar pair experiments

Deep space tracking experiments completed at JPL have demonstrated a 50-nanoradian angular positioning accuracy with wideband differential Very Long Baseline Interferometry (delta VLBI). This meets the stringent navigation requirements of NASA's Galileo mission, scheduled for launch in May 1986 and for encounter with Jupiter in December 1988. Pairs of extragalactic radio sources (quasars) with well-known coordinates were used to simulate deep space navigation passes in which quasar-spacecraft pairs are observed. This paper discusses the accuracy of the delta VLBI technique and how it is affected by source separations, source elevations, source strengths, solar plasma and ionosphere. Several observation strategies are discussed and one is shown to be especially effective in minimizing these major error sources.

Trinkle, B. K.↗

The Habitat Demonstration Unit System Integration

The Lunar Surface System Habitat Demonstration Unit (HDU) will require the project team to integrate a variety of contributions from NASA centers and potential outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture. To accomplish the development of the HDU from conception in June 2009 to rollout for operations in July 2010, the HDU team is using several strategies to mitigate risks and bring the separate efforts together. First, a set of design standards is being developed to define the interfaces between the various systems of HDU and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a Habitat avionics test bed prior to equipment installation into HDU. A coordinated effort to establish simplified Computer Aided Design standards and the utilization of a modeling and simulation systems will aid in design and integration concept development. Finally, decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU to maximize the efficiency of both integration and field operations.

Kennedy, Kriss J.↗

A Generation-Storage Coordination Dispatch Strategy for Power System Based on Causal Reinforcement Learning

In the backdrop of global energy transformation, power systems integrating high proportions of renewable energy sources are facing unprecedented challenges in operational stability and dispatch efficiency. To address these challenges, this study introduces a generation-storage coordination real-time dispatch strategy based on Causal Power System Dynamic Reinforcement Learning (CPSDRL). Diverging from traditional reinforcement learning approaches, CPSDRL innovatively incorporates causal inference within the state prediction model - the crux of model-based reinforcement learning - thereby establishing the Power Causal Dynamic Model (PCDM). Assisted by the prior knowledge of power systems, the model significantly enhances prediction accuracy and reliability through a two-stage training process. Utilizing PCDM, this study further applies a direct policy search algorithm to optimize the real-time dispatch strategy. Experimental results indicate that the proposed method improves the stability of generation-storage coordination real-time dispatch and exhibits competitive advantages in sample efficiency and computational speed, compared to traditional model-based and model-free reinforcement learning algorithms. This method is expected to enhance the practicality and adaptability of causal reinforcement learning techniques in power system scheduling and control.

causal reinforcement learning↗

Dynamic Multi-Sensor Multi-Mission Optimal Planning Tool

Remote sensing systems have firmly established a role in providing immense value to commercial industry, scientific exploration, and national security. Continued maturation of sensing technology has reduced the cost of deploying highly-capable sensors while at the same time increased reliance on the information these sensors can provide. The demand for time on these sensors is unlikely to diminish. Coordination of next-generation sensor systems, larger constellations of satellites, unmanned aerial vehicles, ground telescopes, etc. is prohibitively complex for existing heuristics-based scheduling techniques. The project was a two-year collaboration spanning multiple Sandia centers and included a partnership with Texas A&M University. We have developed algorithms and software for collection scheduling, remote sensor field-of-view pointing models, and bandwidth-constrained prioritization of sensor data. Our approach followed best practices from the operations research and computational geometry communities. These models provide several advantages over state of the art techniques. In particular, our approach is more flexible compared to heuristics that tightly couple models and solution techniques. First, our mixed-integer linear models afford a rigorous analysis so that sensor planners can quantitatively describe a schedule relative to the best possible. Optimal or near-optimal schedules can be produced with commercial solvers in operational run-times. These models can be modified and extended to incorporate different scheduling and resource constraints and objective function definitions. Further, we have extended these models to proactively schedule sensors under weather and ad hoc collection uncertainty. This approach stands in contrast to existing deterministic schedulers which assume a single future weather or ad hoc collection scenario. The field-of-view pointing algorithm produces a mosaic with the fewest number of images required to fully cover a region of interest. The bandwidth-constrained algorithms find the highest priority information that can be transmitted. All of these are based on mixed-integer linear programs so that, in the future, collection scheduling, field-of-view, and bandwidth prioritization can be combined into a single problem. Experiments conducted using the developed models, commercial solvers, and benchmark datasets have demonstrated that proactively scheduling against uncertainty regularly and significantly outperforms deterministic schedulers.

47 OTHER INSTRUMENTATION↗