Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Seeding Cracks Using a Fatigue Tester for Accelerated Gear Tooth Breaking

This report describes fatigue-induced seeded cracks in spur gears and compares them to cracks created using a more traditional seeding method, notching. Finite element analysis (FEA) compares the effective compliance of a cracked tooth to the effective compliance of a notched tooth where the crack and the notch are of the same depth. In this analysis, cracks are propagated to the desired depth using FRANC2D and effective compliances are computed in ANSYS. A compliance-based feature for detecting cracks on the fatigue tester is described. The initiated cracks are examined using both nondestructive and destructive methods. The destructive examination reveals variability in the shape of crack surfaces.

Nenadic, Nenad G.↗

IT Security Support for the Spaceport Command Control Systems Development Ground Support Development Operations

Security is one of the most if not the most important areas today. After the several attacks on the United States, security everywhere was heightened from Airports to the communication among the military branches legionnaires. With advanced persistent threats (APTs) on the rise following Stuxnet, government branches and agencies are required, more than ever, to follow several standards, policies and procedures to reduce the likelihood of a breach. Attack vectors today are very advanced and are going to continue to get more and more advanced as security controls advance. This creates a need for networks and systems to be in an updated and secured state in a launch control system environment. FISMA is a law that is mandated by the government to follow when government agencies secure networks and devices. My role on this project is to ensure network devices and systems are in compliance with NIST, as outlined in FISMA. I will achieve this by providing assistance with security plan documentation and collection, system hardware and software inventory, malicious code and malware scanning and configuration of network devices i.e. routers and IDSsIPSs. In addition I will be completing security assessments on software and hardware, vulnerability assessments and reporting, conducting patch management and risk assessments. A guideline that will help with compliance with NIST is the SANS Top 20 Critical Controls. SANS Top 20 Critical Controls as well as numerous security tools, security software and the conduction of research will be used to successfully complete the tasks given to me. This will ensure compliance with FISMA and NIST, secure systems and a secured network. By the end of this project, I hope to have carried out stated above as well as gain an immense knowledge about compliance, security tools, networks and network devices, policies and procedures.

computer information security↗

IT Security Support for the Spaceport Command Control Systems Development Ground Support Development Operations

Security is one of the most if not the most important areas today. After the several attacks on the United States, security everywhere has heightened from airports to the communication among the military branches legionnaires. With advanced persistent threats (APT's) on the rise following Stuxnet, government branches and agencies are required, more than ever, to follow several standards, policies and procedures to reduce the likelihood of a breach. Attack vectors today are very advanced and are going to continue to get more and more advanced as security controls advance. This creates a need for networks and systems to be in an updated and secured state in a launch control system environment. FISMA is a law that is mandated by the government to follow when government agencies secure networks and devices. My role on this project is to ensure network devices and systems are in compliance with NIST, as outlined in FISMA. I will achieve this by providing assistance with security plan documentation and collection, system hardware and software inventory, malicious code and malware scanning, and configuration of network devices i.e. routers and IDS's/IPS's. In addition, I will be completing security assessments on software and hardware, vulnerability assessments and reporting, and conducting patch management and risk assessments. A guideline that will help with compliance with NIST is the SANS Top 20 Critical Controls. SANS Top 20 Critical Controls as well as numerous security tools, security software and the conduction of research will be used to successfully complete the tasks given to me. This will ensure compliance with FISMA and NIST, secure systems and a secured network. By the end of this project, I hope to have carried out the tasks stated above as well as gain an immense knowledge about compliance, security tools, networks and network devices, as well as policies and procedures.

security↗

Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: Advanced Collision Avoidance System for UAS (ACAS Xu) Interoperability White Paper Presentation

The Phase 1 DAA Minimum Operational Performance Standards (MOPS) provided requirements for two classes of DAA equipment: equipment Class 1 contains the basic DAA equipment required to assist a pilot in remaining well clear, while equipment Class 2 integrates the Traffic Alert and Collision Avoidance (TCAS) II system. Thus, the Class 1 system provides RWC functionality only, while the Class 2 system is intended to provide both RWC and Collision Avoidance (CA) functionality, in compliance with the Minimum Aviation System Performance (MASPS) for the Interoperability of Airborne Collision Avoidance Systems. The FAAs TCAS Program Office is currently developing Airborne Collision Avoidance System X (ACAS X) to support the objectives of the Federal Aviation Administrations (FAA) Next Generation Air Transportation System Program (NextGen). ACAS X has a suite of variants with a common underlying design that are intended to be optimized for their intended airframes and operations. ACAS Xu being is designed for UAS and allows for new surveillance technologies and tailored logic for platforms with different performance characteristics. In addition to Collision Avoidance (CA) alerting and guidance, ACAS Xu is being tuned to provide RWC alerting and guidance in compliance with the SC 228 DAA MOPS. With a single logic performing both RWC and CA functions, ACAS Xu will provide industry with an integrated DAA solution that addresses many of the interoperability shortcomings of Phase I systems. While the MOPS for ACAS Xu will specify an integrated DAA system, it will need to show compliance with the RWC alerting thresholds and alerting requirements defined in the DAA Phase 2 MOPS. Further, some functional components of the ACAS Xu system such as the remote pilots displayed guidance might be mostly references to the corresponding requirements in the DAA MOPS. To provide a seamless, integrated, RWC-CA system to assist the pilot in remaining well clear and avoiding collisions, several issues need to be addressed within the Phase 2 SC-228 DAA efforts. Interoperability of the RWC and CA alerting and guidance, and ensuring pilot comprehension, compliance and performance, will be a primary research area.

detect and avoid↗

An Interoperability Concept for Detect and Avoid and Collision Avoidance Systems: Results from a Human-In-The-Loop Simulation

The integration of Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS) poses a variety of technical challenges to UAS developers and aviation regulators. In response to growing demand for access to civil airspace in the United States, the Federal Aviation Administration (FAA) has produced a roadmap identifying key areas requiring further research and development. One such technical challenge is the development of a "detect and avoid" system (DAA) capable of providing a means of compliance with the "see and avoid" requirement in manned aviation. The purpose of the DAA system is to support the pilot, situated at a ground control station (GCS), in maintaining "DAA well clear" of nearby aircraft through the use of GCS displays and alerts. In addition to its primary function of aiding the pilot in maintaining DAA well clear, the DAA system must also safely interoperate with existing NAS systems and operations, such as the airspace management procedures of air traffic controllers (ATC) and Collision Avoidance (CA) systems currently in use by manned aircraft, namely the Traffic Alert and Collision Avoidance System (TCAS II). It is anticipated that many UAS architectures will integrate both a DAA system and a TCAS II. It is therefore necessary to explicitly study the integration of DAA and TCAS II alerting structures and maneuver guidance formats to ensure that pilots understand the appropriate type and urgency of their response to the various alerts. This paper presents a concept of interoperability for the two systems. The concept was developed with the goal of avoiding any negative impact on the performance level of TCAS II while retaining a DAA system that still effectively enables pilots to maintain DAA well clear. The interoperability concept described in the paper focuses primarily on facilitating the transition from a late-stage DAA encounter (where a loss of DAA well clear is imminent) to a TCAS II Corrective Resolution Advisory (RA), which requires pilot compliance within five seconds of its issuance. The interoperability concept was presented to 10 participants (6 active UAS pilots and 4 active commercial pilots) in a medium-fidelity, human-in-the-loop simulation designed to stress different aspects of the DAA and TCAS II systems. Pilots' ability to maintain separation, their rate of compliance and response times using the interoperability concept are reported. Results indicated that pilots exhibited comprehension of, and appropriate prioritization within, the DAA-TCAS II combined alert structure. Pilots demonstrated a high rate of compliance with TCAS II RAs and were also seen to respond to corrective RAs within the five second requirement established for manned aircraft. The DAA system presented under test was also shown to be effective in supporting pilots' ability to maintain DAA well clear in the overwhelming majority of cases in which pilots had sufficient time to respond.

Rorie, R. Conrad↗

Alternatives for Scheduling Departures for Efficient Surface Metering in ATD-2: Exploration in a Human-in-the-Loop Simulation

Human-in-the-Loop (HITL) simulation was conducted to explore the impacts of various surface metering goals on operations and Ramp Controllers at Charlotte Douglas International Airport (CLT). Three conditions were compared: Baseline, with no surface metering, instructions to meet advisory times at the gate only, and instructions to meet advisory times at the gate as well as the times at the scheduled taxiway spot, where aircraft are delivered to Air Traffic Control (ATC). Results showed increased compliance for taxiway spot times when compliance was first met for gate advisories. Instructing Ramp Controllers to meet advisory times at the gate improves spot time compliance and therefore surface scheduling predictability at CLT. Results also demonstrated there was increased compliance overall with gate and spot times in the second condition. This was likely due to higher Ramp Controller workload in the third condition.

Airport surface scheduling↗

Increasing the Payload Capacity of Soft Robot Arms by Localized Stiffening

Soft robot arms offer safety and adaptability due to their passive compliance, but this compliance typically limits their payload capacity and prevents them from performing many tasks. This paper presents a model-based design approach to effectively increase the payload capacity of soft robot arms. The proposed approach uses localized body stiffening to decrease the compliance at the end effector without sacrificing the robot’s range of motion. This approach is validated on both a simulated and a real soft robot arm, where experiments show that increasing the stiffness of localized regions of their bodies reduces the compliance at the end effector and increases the height to which the arm can lift a payload. By increasing the payload capacity of soft robot arms, this approach has the potential to improve their efficacy in a variety of tasks including object manipulation and exploration of cluttered environments.

Daniel Bruder↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2022 (Final Report)

Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. There are three DOE offices within the Richland area. Two are responsible for the Hanford Site, whereas the Pacific Northwest Site Office (PNSO) oversees PNNL. PNNL prepares this Annual Site Environmental Report to meet the requirements of DOE Order 231.1B, Environmental, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, assuring that the public is informed of any PNNL-Richland Campus or PNNL-Sequim Campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur on the PNNL-Richland Campus in Richland, Washington, and at the PNNL-Sequim Campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification. The ASER summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and Orders, and provides environmental management performance benchmarks and their status to the public, regulatory agencies, community officials, Native American tribes, and public interest groups.

54 ENVIRONMENTAL SCIENCES↗

An Energy Codes Gap Analysis Field Study in the Southwest (Final Technical Report)

The primary goal of the “An Energy Codes Gap Analysis Field Study in the Southwest” project was to improve housing through strengthened building energy code implementation in two states, Colorado and Nevada, leading to greater energy and utility bill savings for households. Colorado is a home rule state. Nevada adopts a statewide code, but cities and counties must also adopt the code, making the state function like a home rule state. To broaden the impact of the project, an additional goal was to share and amplify project experiences, findings, and lessons that can be applied in other states. To achieve these goals, the project’s key objectives were to examine how residential energy codes are implemented in partner states; to use these findings to strengthen codes implementation through enhanced education, training, and outreach; and to enhance energy code technical assistance capabilities in the two partner states. In both partner states, the project led to the creation of a quantitative baseline understanding of compliance with high-impact energy code requirements, such as foundation, wall, and ceiling R-value; window U-factor and SHGC; envelope air tightness; duct tightness; and high-efficiency lighting. It then applied this baseline information to directly inform training in geographic areas with high levels of building and construction activity. The project has placed Colorado and Nevada among 23 states across the country that have conducted a single-family residential field study based on the established U.S. Department of Energy (DOE) methodology since 2014. It has also helped each State Energy Office test models for partnership- and relationship-building among government agencies and key stakeholder groups, including the State Energy Office and relevant code administration and professional licensing agencies, building officials, designers, builders, trades and utilities. At the national level, the project helped educate and inform State and Territory Energy Offices on a replicable methodology to assess energy code construction practices, effective stakeholder engagement strategies, and tailored energy code education and training. These findings are particularly pertinent for home-rule states, such as Colorado and Nevada, which rely on local government awareness and action to advance and implement building energy codes. By raising awareness of code adoption and compliance, this project has helped to equip each partner state with data on code compliance, strategies, education, and partnership models to advance building energy codes. This in turn will have an important impact on new construction practices in Colorado and Nevada, leading to more energy efficient and affordable housing. Currently, more than 62 percent of Colorado’s population lives in one of the 55 jurisdictions that have adopted the 2021 IECC to date, while nearly 95 percent of the state's population lives in one of the 208 jurisdictions that have adopted a code at 2015 IECC levels or higher. In Nevada, the 2018 IECC was adopted by the Governor’s Office of Energy in July 2018. By July 2020, 47 percent of the adopted energy code in the state was 2018 IECC which covers 96.5 percent of Nevada’s population. The training materials funded by this project focus on the 2021 IECC and will continue to be relevant in the two states as additional jurisdictions update their building energy codes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2022 Site Environmental Report: Idaho National Laboratory

The INL Site’s operations, as well as the ongoing cleanup mission involve a commitment to environmental stewardship and full compliance with environmental protection laws. As part of this commitment, the INL Site Environmental Report is prepared annually to inform the public, regulators, stakeholders, and other interested parties of the INL Site’s environmental performance during the year. This report is published for U.S. Department of Energy, Idaho Operations Office (DOE-ID) in compliance with DOE O 231.1B, “Environment, Safety and Health Reporting.” The purpose of the report is to provide the following: (1) Present the INL Site, mission, and programs, (2) Report compliance status with applicable federal, state, and local regulations, (3) Describe the INL Site environmental programs and activities, (4) Summarize results of environmental monitoring, (5) Discuss potential radiation doses to the public residing in the vicinity of the INL Site, (6) Report on ecological monitoring and research conducted by contractors and affiliated agencies and by independent researchers through the Idaho National Environmental Research Park, (7) Describe quality assurance methods used to ensure confidence in monitoring data, and (8) Provide supplemental technical data and reports that support the INL Site Environmental Report (https://idahoeser.inl.gov/publications.html).

54 ENVIRONMENTAL SCIENCES↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2023

Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. There are three DOE offices within the Richland area. Two are responsible for the Hanford Site, whereas the Pacific Northwest Site Office oversees PNNL. PNNL prepares an Annual Site Environmental Report to meet the requirements of DOE Order 231.1B, Environment, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, thus assuring that the public is informed of any PNNL-Richland campus or PNNL-Sequim campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur at the PNNL-Richland campus in Richland, Washington, and at the PNNL-Sequim campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification. The ASER report describes Compliance with Federal, State, and Local Laws and Regulations in 2023, Environmental Sustainability, Environmental monitoring and dose assessment, Natural and Cultural Resource Management, and Quality Assurance activities that took place during Calendar Year 2023.

40 CFR 61 Subpart H↗

Pennsylvania and Delaware Energy Code Field Studies (Final Technical Report (FTR)

Led by Northeast Energy Efficiency Partnerships (NEEP) in partnership with Performance Systems Development (PSD), the project aimed to conduct energy code compliance field studies for single-family residential buildings in Pennsylvania and Delaware, as well as multifamily and commercial buildings in Pennsylvania. Using U.S. Department of Energy (DOE) approved methodologies, trained field teams conducted on-site observations and testing to document compliance with key energy efficiency measures, including building envelope insulation, air sealing, duct leakage, windows, and mechanical systems. Data from these studies would then be analyzed to identify construction trends and compliance gaps. The goals included published baseline data for each study, and a training roadmap tailored to each state’s needs. This roadmap would have guided outreach and training for builders, code officials, and other stakeholders on the specific code requirements that offered the greatest opportunity for improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cask RT-100 Type B(U) Self-Certification for DOT 7A, Type A Nuclear Waste Transportation - 20098

The purpose of this Type A certification is to diversify the use of the RT-100 cask by allowing the end user to transport either Type A or Type B radioactive waste in accordance with the handling procedures for each waste category. The project's scope included the development of a matrix that contains all applicable requirements for a Type A package from the Code of Federal Regulations (CFR), Title 49 for the Department of Transportation (DOT) with a justification for each requirement. Moreover, the scope included the writing of conditions and restrictions list for the transportation of Type A nuclear waste, the writing of a compliance statement, and the design and fabrication of a Type A placard to be permanently placed on the RT-100 cask. Type A packages are self-certified by the end user using one of three methods as permitted by 49 CFR 173.461, either by performance of tests with prototypes or samples of the specimens representing the packaging, or reference to a previous satisfactory demonstration of compliance of a sufficiently similar nature, or calculations or reasoned evaluation using reliable and conservative procedures and parameters. Since the RT-100 cask was licensed by the Nuclear Regulatory Commission (NRC) as a Type B cask, Robatel relied on the method of reference to a previous satisfactory demonstration of compliance of a sufficiently similar nature for Type A certification. This method was determined to be acceptable, since Type B packages are evaluated for more demanding transport conditions than those required for Type A packages. This paper presents Robatel's process for certifying the RT-100 cask for Type A shipments, an overview of the DOT regulations related to Type A packages, and the documents that were generated for the end user. This paper is concluded with a discussion on the advantages of having the option to transport both Type A and Type B nuclear waste, and possible future projects to further improve the operation of the cask when making Type A shipments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quasi‐dynamic breathing model of the lung incorporating viscoelasticity of the lung tissue

Abstract We advanced a novel model to calculate viscoelastic lung compliance and airflow resistance in presence of mucus, accounting for the quasi‐linear viscoelastic stress–strain response of the parenchyma (alveoli) tissue. We adapted a continuum‐based numerical modeling approach for the lung, integrating the fluid mechanics of the airflow within individual generations of the bronchi and alveoli. The model accounts for elasticity of the deformable bronchioles, resistance to airflow due to the presence of mucus within the bronchioles, and subsequent mucus flow. Simulated quasi‐dynamic inhalation and expiration cycles were used to characterize the net compliance and resistance of the lung, considering the rheology of the mucus and viscoelastic properties of the parenchyma tissue. The structure and material properties of the lung were identified to have an important contribution to the lung compliance and airflow resistance. The secondary objective of this work was to assess whether a higher frequency and smaller volume of harmonic air flow rate compared to a normal ventilator breathing cycle enhanced mucus outflow. Results predict, lower mucus viscosity and higher excitation frequency of breathing are favorable for the flow of mucus up the bronchi tree, towards the trachea.

60 APPLIED LIFE SCIENCES↗

Direct measurement and calculation of rubber bulk modulus by piston-cylinder method using conventional mechanical testing equipment

This article describes a method to directly measure the bulk modulus of rubber using a piston-cylinder type apparatus. The function of the testing apparatus is to reliably transfer load to the water inside the vessel and allow for the accurate and continuous measurement of volumetric displacement as the contents are compressed. During the test, load is applied to a piston-cylinder containing the rubber test sample and water using a conventional mechanical testing load frame. Load and the travel of the piston are recorded by a load cell and extensometer, respectfully. A brass or stainless steel plug of the same dimensions as the test sample is tested as a control sample to isolate the compliance of the system, including the compressibility of water and compliance of the piston-cylinder. The results from this control test are used to disincorporate the compliance of the system from the sample test results. Load-linear displacement data are mathematically converted to pressure-volumetric displacement data, from which bulk modulus is calculated. The test apparatus and method are validated using the known bulk modulus of water. Finally, the bulk modulus for two similar rubbers is evaluated. The validity of the results and limitations of the device are discussed.

36 MATERIALS SCIENCE↗

OpenStudio®-ERI (Energy Rating Index (ERI) Workflow) [SWR-18-72] 1.7.0 Released 12/14/2023

The OpenStudio®-ERI project allows calculating an Energy Rating Index (ERI) using the Department of Energy's open-source OpenStudio®/EnergyPlus® simulation platform. The building description is provided in an HPXML file format. The project supports: - ANSI/RESNET/ICC 301© Standard for the Calculation and Labeling of the Energy Performance of Dwelling and Sleeping Units using an Energy Rating Index - ENERGY STAR Certification System for Homes and Apartments Using an ERI Compliance Path - IECC ERI Compliance Alternative (Section R406) - DOE ZERH Certification Using an ERI Compliance Path For more information on running simulations, generating HPXML files, etc., please visit the documentation at https://openstudio-eri.readthedocs.io/en/latest/

Horowitz, Scott↗

Analysis of the Frequency of Extreme Precipitation Events at Los Alamos National Laboratory

The Environmental Protection and Compliance (EPC) Storm Water Permitting and Compliance Program is currently updating its stormwater compliance standards for the Los Alamos National Laboratory (LANL) Engineering Standards Manual (2015) and is addressing the required current meteorological data needed for storm water applications. Information on the frequency of extreme precipitation events at LANL is needed. In response to this request, LANL Meteorology & Air Quality (MAQ) was tasked to estimate the frequency of extreme precipitation events. An earlier study by Foley (2012) which estimated extreme precipitation rates at LANL for a set of duration periods and average recurrence intervals (return periods) was evaluated. However, it was determined that this study would not be helpful since its technical support documentation was unavailable and the meteorological data and the methodology employed were not well understood. This led to the need to develop a new peer-reviewed methodology. This report documents the development of the new methodology and the application of a temporally representative precipitation dataset from February 1990 through December 2018, monitored at the official LANL meteorological station, Technical Area (TA)-6, to develop the frequency of extreme precipitation events.

54 ENVIRONMENTAL SCIENCES↗