Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “capital”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

ASK Talks with W. Scott Cameron

This paper presents an interview with Scott Cameron who is the Capital Systems Manager for the Food and Beverage Global Business Unit of Procter and Gamble. He has been managing capital projects and mentoring other project managers for the past 20 years at Procter and Gamble within its Beauty Care, Health Care, Food and Beverage, and Fabric and Home Care Businesses. Scott also has been an Academy Sharing Knowledge (ASK) feature writer since Volume One.

Cameron, W. Scott↗

Proposal Drafted for Allocating Space-to-Space Frequencies in the GPS Spectrum Bands

Radionavigation Satellite Service (RNSS) systems such as the U.S. Global Positioning System (GPS) and the Russian Global Navigation Satellite System (GLONASS) are primarily being used today in the space-to-Earth direction (i.e., from GPS satellite to Earth user) for a broad range of applications such as geological surveying; aircraft, automobile, and maritime navigation; hiking and mountain climbing; and precision farming and mining. However, these navigation systems are being used increasingly in space. Beginning with the launch of the TOPEX/Poseidon remote-sensing mission in 1992, over 90 GPS receivers have flown onboard spacecraft for such applications as real-time spacecraft navigation, three-axis attitude control, precise time synchronization, precision orbit determination, and atmospheric profiling. In addition to use onboard many science spacecraft, GPS has been used or is planned to be used onboard the shuttles, the International Space Station, the International Space Station Emergency Crew Return Vehicle, and many commercial satellite systems such as Orbcomm, Globalstar, and Teledesic. From a frequency spectrum standpoint, however, one important difference between the space and terrestrial uses of GPS is that it is being used in space with no interference protection. This is because there is no frequency allocation for the space-to-space use of GPS (i.e., from GPS satellite to user spacecraft) in the International Telecommunications Union (ITU) regulatory table of frequency allocations. If another space-based or groundbased radio system interferes with a spaceborne GPS user, the spaceborne user presently has no recourse other than to accept the interference. Consequently, for the past year and a half, the NASA Glenn Research Center at Lewis Field and other Government agencies have been working within ITU toward obtaining a GPS space-to-space allocation at the next World Radio Conference in the year 2000 (WRC 2000). Numerous interference studies have been conducted in support of a primary space-tospace allocation in the 1215- to 1260-MHz and 1559- to 1610-MHz RNSS bands. Most of these studies and analyses were performed by Glenn and submitted as U.S. input documents to the international Working Party 8D meetings in Geneva, Switzerland. In the structure of the ITU, Working Party 8D is responsible for frequency spectrum issues in the RNSS and the mobile satellite service (MSS). The full texts of the studies are available from the ITU web site under Working Party 8D contributions. Note that because spaceborne RNSS receivers operate in a receive-only mode with navigation signals already being broadcast toward the Earth, the addition of a space-tospace allocation will not result in interference with other systems. A space-based RNSS receiver, however, could experience interference from systems of other services, including intraservice interference from other RNSS systems. The interference scenarios examined in the studies can be inferred from the following frequency allocation charts. In these charts, services labeled in all capital letters (e.g., "ARNS") have primary status, whereas those labeled with sentence-style capitalization (e.g., "Amateur radio") have secondary status (i.e., a service with secondary status cannot claim interference protection from or cause harmful interference to a service with primary status). Charts showing the ITU frequency allocations in the 960 to 1350 MHZ range and the 1525-1660 MHZ range are discussed and presented.

Spence, Rodney L.↗

Communicating Risk to Program Managers

Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

Shivers, C. Herbert↗

Messaging with Cost-Optimized Interstellar Beacons

On Earth, how would we build galactic-scale beacons to attract the attention of extraterrestrials, as some have suggested we should do? From the point of view of expense to a builder on Earth, experience shows an optimum trade-off. This emerges by minimizing the cost of producing a desired power density at long range, which determines the maximum range of detectability of a transmitted signal. We derive general relations for cost-optimal aperture and power. For linear dependence of capital cost on transmitter power and antenna area, minimum capital cost occurs when the cost is equally divided between antenna gain and radiated power. For nonlinear power-law dependence, a similar simple division occurs. This is validated in cost data for many systems; industry uses this cost optimum as a rule of thumb. Costs of pulsed cost-efficient transmitters are estimated from these relations by using current cost parameters ($/W, $/sq m) as a basis. We show the scaling and give examples of such beacons. Galactic-scale beacons can be built for a few billion dollars with our present technology. Such beacons have narrow "searchlight" beams and short "dwell times" when the beacon would be seen by an alien observer in their sky. More-powerful beacons are more efficient and have economies of scale: cost scales only linearly with range R, not as R(exp 2), so number of stars radiated to increases as the square of cost. On a cost basis, they will likely transmit at higher microwave frequencies, -10 GHz. The natural corridor to broadcast is along the galactic radius or along the local spiral galactic arm we are in. A companion paper asks "If someone like us were to produce a beacon, how should we look for it?"

Benford, James↗

Instrumentation for Lunar Volatile Analysis

Understanding the available lunar resources is key to incorporating their availability into exploration architectures. Previous lunar missions have provided insight into the potential resources on the moon as an initial step enabling in-situ resource utilization (ISRU). Orbiting missions, such as Clementine and Lunar Prospector, have mapped the lunar polar region and found enhanced hydrogen signals on kilometer-scale resolution. The Lunar Crater Observation and Sensing Satellite (LCROSS) mission provided the first direct measurement of water ice in a permanently shadowed region. Future missions will provide ground truth data to measure and quantify lunar volatiles.One approach to exploration capitalizes on commercial partnerships for Class D risk aware missions. Partnerships with commercial partners enable rapid design cycles, leveraging the investment of the commercial industry in instrument development. Modified Commercial off the Shelf (COTS) hardware can be utilized to enhance capabilities in exploration missions. The hardware under development at the Kennedy Space Center for availability within the Commercial Lunar Payload Services opportunities capitalizes on modified COTS, enabling an aggressive delivery schedule and low-cost development. The modified hardware has been integrated and tested in a thermal vacuum environment, with final flight modifications currently in work. The use of a modified COTS instruments will be discussed for space applications.

Captain, J.↗

Aerocapture: An Enabling Technology for Flagship-Class Uranus Orbiter and Probe Mission

Introduction: The current decadal survey published by the National Academies of Sciences has informed National Aeronautics and Space Administration (NASA) to prioritize the study of the Ice Giants, especially Uranus. To gather the required data that addresses the science questions raised in this survey, a mission to Uranus with an orbiter and atmospheric probe must be designed. The Uranus Orbiter and Probe (UOP) study, which the survey identified as the flagship mission of this decade, proposes a 2031 launch to take advantage of a Jupiter fly-by and utilizes a fully propulsive orbit insertion design with an Earth-to-Uranus transit times ranging from 13 to 15 years. This fully propulsive orbit insertion at Uranus will be very fuel expensive (wet mass percentages of around 60-70\%) thereby leaving less mass for the scientific payload and additional planetary probes. In addition, scientists are more interested in visiting Uranus before 2049, when the Spring Equinox will occur, as it allows studying Uranus seasons not seen during Voyager 2's flyby in 1987. A NASA Flagship-Class mission would require at least 10 years of lead time prior to launch thereby making the 2031 launch to take advantage of the Jupiter fly-by extremely challenging. The consequence of missing the Jupiter fly-by and launching in the late 2030s is the challenge of a fully-propulsive mission like UOP to have a feasible alternative interplanetary trajectory that reaches Uranus before 2050. As an alternative, to address the shortcomings of the fully propulsive mission, one can design a mission to Uranus using aerocapture. What is aerocapture: Aerocapture is an atmospheric maneuver that uses aerodynamic forces generated by flight within a planetary atmosphere to decelerate and achieve orbit insertion. Using aerocapture allows one to provide the change in velocity (Delta V) needed to slow down from the approach hyperbolic trajectory to achieve the desired captured orbit around the target planet using aerodynamic forces of the vehicle (lift and drag). Using aerodynamic forces instead of fully-propulsive maneuvers results in significant savings in the fuel. Furthermore, aerocapture can also allow one to consider interplanetary trajectories with higher approach hyperbolic velocities, thus reducing the mission transit times. Aerocapture as an enabling technology: To use aerocapture as an enabling technology for the Uranus exploration mission, one would require an integrated system-level design, including a Thermal Protection System (TPS), hardware needed for aerodynamic modulation, and autonomous Guidance, Navigation, and Control (GNC) systems. Aerocapture has yet to be demonstrated, despite considering it for several past missions. Recent advancements in TPS and GNC capabilities show the potential for using rigid, heritage entry vehicle configurations already flown at other planetary bodies for Uranus aerocapture. Aerocapture can be a robust technology that can deliver spacecraft to Uranus science orbits while substantially increasing on-orbit payload mass (more than 40\%) that can enable robust atmospheric entry probes. Additionally, the aerocapture maneuver would reduce the interplanetary transit time by 2–5 years (15-30\%) relative to fully-propulsive orbit insertion. Recent work has shown that one can conduct a flagship-class mission in a shorter period than fully-propulsive missions if using aerocapture. What does aerocapture bring in for a Uranus Mission: Using aerocapture for a Uranus orbiter and atmospheric probe mission can provide one with considerable propellant savings. Spacecraft in interplanetary trajectories to Uranus typically need an Delta V in orders of kilometers per second to insert into science orbit. One would require thousands of kilograms of fuel to achieve such a Delta V using a traditional fully propulsive maneuver, leaving less mass for payload during the mission launch. Aerocapture can reduce the propulsion needs by dissipating energy in the sizable atmosphere of Uranus without a significant mass increase due to the need for an aeroshell. One can use the mass savings achieved using the aerocapture to reduce the launch vehicle requirements. In addition, one can also have additional science instruments on the orbiter or create a robust instrumentation suite on an atmospheric probe that can significantly increase the science outcome of the Uranus exploration mission. Furthermore, since aerocapture performance is relatively insensitive to increases in hyperbolic excess velocity, one can design the interplanetary trajectory to arrive at Uranus faster, reducing the interplanetary transit time and operations cost. All these savings, achieved using aerocapture, could help fit a larger class mission, such as the Uranus mission within a smaller capital, e.g., a Flagship-class orbiter mission in a New Frontiers class capital. Summary: This talk will provide an overview of how aerocapture can enable the Uranus exploration mission. Specifically, this talk will discuss the latest advancements made in the Uranus aerocapture study, such as investigating interplanetary trajectories with higher hyperbolic approach velocities and their implications on the aero heating and the TPS design, incorporating FNPAG (an advanced numerical-predictor guidance) and comparison of multiple navigation approaches. In addition, this talk will focus on mechanical design that can house more than one atmospheric probe and the six degrees of freedom simulation of aerocapture at Uranus. Findings from a recent NASA Space Technology Mission Directorate (STMD)-funded activity studying the aerocapture as an enabling technology for a Uranus orbiter will be presented. Using the science payload recommended by the Decadal Survey for Uranus exploration, this work shows many improvements over the baseline fully-propulsive mission. These improvements include a shorter cruise phase, flexibility in launch opportunities late into the 2030s while reaching Uranus before the 2050 equinox for the desired science opportunities, and lower propellant mass needs. This talk will highlight how aerocapture can be utilized for Uranus science orbit insertion using a lower-risk, heritage entry vehicle configuration used extensively as a Mars entry, descent, and landing vehicle. Furthermore, this talk will explore how the demonstration of aerocapture at Earth can benefit the aerocapture-enabled Uranus mission.

Aerocapture↗

Energy Storage Analysis

This study presents a comprehensive techno-economic characterization of energy storage and exible low carbon power generation technologies that can shift energy across days, weeks, or months to balance daily, weekly, and seasonal disparities in supply and demand. Energy storage technologies evaluated here include pumped hydropower storage (PHS), adiabatic and diabatic compressed air energy storage (CAES), vanadium redox flow batteries (VRBs), pumped thermal energy storage (P-TES), and renewably produced hydrogen stored in either geologic formations or underground pipes with re-electrification via combustion turbines in combined cycles, stationary proton exchange membrane (PEM) fuel cells, or the novel use of PEM fuel cells designed for heavy-duty vehicles (HDVs) which are expected to have shorter lives but also lower capital costs. We also evaluate flexible low-carbon power generation systems, including ethanol combustion in gas turbines and natural gas combustion with carbon capture and sequestration (CCS). We estimate current costs with literature data, use learning rates to characterize future costs, and develop capacity factors calibrated to an 85% renewables grid to calculate the levelized cost of energy (LCOE) of each technology. Results illustrate that at the 12-hour storage duration, PHS and CAES have the lowest LCOE with current costs, and VRBs become competitive if future costs are achieved. At the 120-hour storage duration, hydrogen systems with geologic storage and natural gas with CCS achieve the lowest LCOE in both current and future capital cost scenarios. In particular, the new configuration of HDV-PEM fuel cells with hydrogen storage in geologic formations evaluated here could lower the LCOE by 22-27% compared to stationary fuel cell systems typically evaluated and might help enable very high (>80%) renewable energy electric power systems. P-TES and hydrogen stored in underground pipes are the least-cost options at the 120-hour storage duration rating that do not require some form of geologic storage. Sensitivity analysis and Monte Carlo analysis illustrate that the general trends seen in this study are valid for a wide range of capacity factors and future cost scenarios. The study also illustrates that coproducing and selling hydrogen to other markets could reduce the LCOE of hydrogen systems by up to 39%.

carbon capture and sequestration↗

Assessing Cost-Optimal Battery Energy and Solar-Plus-Storage Systems for Federal Customers: A Nationwide Assessment: Preprint

Prior research has identified that the financial viability of behind-the-meter battery energy storage systems is heavily dependent on technology cost, utility rate structure, energy consumption patterns, and co-deployment with synergistic technologies like solar photovoltaics (PV), among other factors. This study builds on existing research by comprehensively evaluating the economics of battery energy storage systems (BESS) and solar-plus-storage systems for a reference office building at 755 reference sites under 834 utility rates, and four storage capital cost scenarios. Results indicate that even with dramatic cost reductions, BESS is likely to be cost-effective only under utility rates that include demand charges, and possibly include time-of-use (TOU) pricing as well. Even under these utility rates, BESS systems provide marginal savings, and office building operators are unlikely to deploy the technology for cost savings alone. Solar-plus-storage systems provide more savings than BESS and allow for larger economic storage capacities. Solar-plus-storage provides compelling savings opportunities at baseline prices, and even at capital costs 25% higher than baseline. Solar-plus-storage is most effective where there are demand charges and energy pricing schemes include TOU pricing, or where electricity is expensive (at least $0.30/kWh). Our case studies illustrate that the presence of demand charges, even at similar energy costs, can be the deciding factor in BESS and solar-plus-storage viability. The findings and maps from this assessment may be of use to planners, building owners, and developers looking for potentially economic storage opportunities.

battery energy storage systems↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Deciphering Degradation: Machine Learning on Real-World Performance Data (Final Report)

This project addresses a fundamental flaw in solar PV research and solar project financing; the assumed rate of degradation for solar plants. The solar industry currently relies on an out-dated report that observed a 0.5% degradation rate based on a small sample size of systems (~100). While the research conducted at the time was new and innovative, the solar community has not updated this research and universally applies this 0.5% degradation assumption in financial models. Our project updates this assumption by analyzing observed degradation from the industry’s largest dataset of operating solar assets (>10,000 systems) and creating the first machine-learning model based on these observed results to quantify and identify features that drive degradation. There are two strategic goals for this award: reduce the cost of capital (enable solar to attract more capital) and improve the reliability of solar itself. These dual goals are achieved by leveraging an industry dataset to observe system degradation on a large scale, deploying advanced data analysis and machine learning methods to quantify and predict system reliability, and engaging with industry stakeholders to help them accurately price degradation in financial models.

14 SOLAR ENERGY↗

Integrated Operations for Nuclear Business Operation Model Analysis and Industry Validation

The purpose of this report is to refine and analyze five work reduction opportunities first presented in INL/EXT-21-64134, Process for Significant Nuclear Work Function Innovation Based on Integrated Operations Concepts. This report seeks to further refine and analyze five work reduction opportunities first presented in the original report. Researchers selected five work reduction opportunities from the full Integrated Operations for Nuclear (ION) suite. A selected group of utilities then verified details and inputs from the original report. Categories for verification included capital cost, technology requirements, and savings. Researchers then modeled the data points and data ranges using probabilistic analysis which predicts the likelihood of positive or negative net present value. Research results show four out of the five work reduction opportunities have a greater than fifty percent chance of a positive net present value outcome when analyzed independently. When the five work reduction opportunities are grouped and analyzed together the model indicates a sixty percent chance that the outcome of all five taken together will be positive. The nuclear industry should interpret these results as encouraging. In line with the ION model, positive financial analysis supports the investment of capital dollars into existing nuclear power plants along the ION model. Implementation of the five work reduction opportunities in this report is likely to result in substantive long-term savings for the owners and operators of domestic nuclear power plants.

99 GENERAL AND MISCELLANEOUS↗

Process-based cost estimation framework for assessing economic viability of environmentally and socially sustainable rare earth element feedstocks

Rare Earth Elements (REEs) are critical raw material inputs that are required to enable the energy transition. Constraints on the U.S. supply of conventional REE feedstocks and the desire to diversify U.S. reliance on foreign supply chains have motivated the pursuit of REE recovery from unconventional feedstocks including waste products. Recovery of REEs from unconventional sources is also motivated by environmental and social considerations, including the potential to offset new mining activity and subsidize the remediation of REE-containing wastes from coal, natural gas, and other mineral extraction activities. Sourcing REEs from unconventional feedstocks would reduce supply chain constraints and minimize the environmental impacts of REE extraction, but current processes to exploit these feedstocks have uncertain technical and economic performance and the processes have not been demonstrated at scale. This work aims to reduce uncertainty in evaluating the performance of new REE production pathways. A database of operating and capital expenses for REE recovery and establish consistent process unit costs for common stages in the conventional supply chain are developed. Market prices are used to develop well-defined methods for determining product values for a diverse set of products that can be generated (e.g. oxalates, alloys, end-use products such as magnets) but are not typically considered in technoeconomic analyses. Finally, to provide insight on the effects of economies of scale and feedstock purity on capital and operating costs, process unit level cost functions relating total costs per kilogram of REE produced are reported. These tools can be applied to assess and facilitate scale-up of REE production from diverse sources of REEs.

Fritz, Alison↗

Panel Session 25: DOE Waste Isolation Pilot Plant (WIPP) Update 2020

This panel focused on the WIPP operational efficiencies and capital improvement progress in the year 2020. Because WIPP is a key component of the US DOE EM cleanup strategy, the progress on returning WIPP to full design capacity and throughput by 2021 is of importance. Panelists with presentations: Status of WIPP Capital Asset Projects (Stephen Smith); WIPP Update (Sean Dunagan); CBFO Update (Greg Sosson)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimating the Value of Nuclear Integrated Hydrogen Production and the Dependency of Electricity and Hydrogen Markets on Natural Gas

Producing low carbon Hydrogen at a competitive price is one of the challenges to hydrogen being part of the solution to reach net-zero emission targets set by the U.S. DOE by 2050. With projected near-term improvements in technology, hydrogen production via solid oxide electrolysis cell (SOEC) / high-temperature steam electrolysis (HTSE) integrated with existing light water reactor (LWR) Nuclear Power Plants (NPP-HTSE) can produce carbon-free hydrogen competitively. In the near term, a 10-year production tax credit (PTC) found in the Inflation Reduction Act (IRA) has been passed, which will catalyze the development and improvement of hydrogen production technology to be competitive. The “1-1-1” target set by the U.S. DOE is to reduce the cost of carbon-free hydrogen by 80% to $1 per kilogram in 1 decade. Several models are available to analyze the profitability, opportunity, and technical capability of NPP-HTSE systems. In order of complexity from most complex to least complex some of these models include: RAVEN/HERON, process models using Aspen HYSYS and capital expense estimations using Aspen Process Economic Analyzer (APEA) and levelized cost of hydrogen (LCOH) calculation using the H2A model (Hydrogen Analysis Model), and custom spread sheets built by the interested party. Though some of the more advanced existing models provide detailed analysis to complex grid integrated problems, they also can take considerable time to setup and run. These advanced models are well suited to complex grid integrated analysis and the consideration of flexibility and variability of regulated and de-regulated electricity price and advanced estimation of capital and operating expenses and heat and material balances.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Techno-Economic Analysis of Geologically Connected Seawater Air Conditioning (GeoSWAC) Concept for District Cooling at the University of Puerto Rico at Rio Piedras: Preprint

At the University of Puerto Rico at Rio Piedras, a central chilled water plant supplies cooling to several campus buildings, contributing significantly to electricity demand during daytime peak hours, particularly in the summer months. These operational challenges are exacerbated by Puerto Rico's tropical rainforest climate and a power grid vulnerable to frequent disruptions caused by hurricanes and tropical storms. This study presents a techno-economic analysis of the existing chilled water plant serving four representative campus buildings and introduces a conceptual alternative: the Geologically connected Seawater Air Conditioning (GeoSWAC) system. GeoSWAC leverages stable low temperatures of deep ocean water (~1 km depth), hydraulically connected to an inland well, to deliver cooling without the use of vapor-compression refrigeration. Using modeled annual cooling loads and chiller performance data, capital costs, energy consumption, and levelized cost of cooling (LCOC) were evaluated for both systems. While GeoSWAC showed higher capital costs than the chiller-based scenario, operational costs were significantly lower at $26k-$53k annually, resulting in a lower LCOC between $2.3/MWh and $8.2/MWh compared to $30.2/MWh-$33.6/MWh for the chiller scenario. These results suggest that the GeoSWAC system offers a promising, low-energy, and climate-resilient alternative for large-scale cooling in tropical coastal environments, with significant potential to reduce peak electricity demand and improve long-term system reliability.

15 GEOTHERMAL ENERGY↗

Oversizing and Part-Load Problems

Oversizing, the common engineering practice of specifying devices with capacity exceeding the actual load requirement, is a widespread practice across virtually all building technologies end-use categories, including HVAC, electrical systems, lighting, appliances, and plug loads. This practice, driven by factors like design uncertainty, institutional pressures, and risk aversion, results in wasted capital investment, control difficulties, and excessive energy consumption due to inefficient part-load operation. Part-load operation, where devices run below maximum capacity, is the dominant operating mode in most energy systems and presents a complex design challenge. Solutions to match output to load fall into three broad categories: constraining the output, adjusting the device’s internal behavior, and linking output to energy storage or other waste-heat reuse applications. The energy implications of part-load are critical, as efficiency often drops sharply as load decreases across a wide diversity of devices. To quantify the extent of this problem, we derive a dimensionless Part-Load Metric (PLM) based on device efficiency and its frequency distribution of operating hours at various output levels. The PLM quantifies the deviation of a device's actual efficiency from its maximum design efficiency. This metric also serves as a measure of "capital inefficiency," enabling engineers to compare the impact of different part-load solutions and providing a unified framework for evaluating performance across various devices and systems.

Meier, Alan↗

Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)

Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

2022↗

U.S. Solar Photovoltaic BESS System Cost Benchmark Q1 2020 Report

NREL has been modeling U.S. solar photovoltaic (PV) system costs since 2009. This year, our report benchmarks costs of U.S. PV for residential, commercial, and utility-scale systems, with and without storage, built in the first quarter of 2020 (Q1 2020). The methodology includes bottom-up accounting for all system and project-development costs incurred when installing residential, commercial, and utility-scale systems and it models the capital costs and levelized cost of energy for such systems.

14 SOLAR ENERGY↗