Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “VC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

The Harmonized Landsat and Sentinel-2 Surface Reflectance Data Set

The Harmonized Landsat and Sentinel-2 (HLS) project is a NASA initiative aiming to produce a VirtualConstellation (VC) of surface reflectance (SR) data acquired by the Operational Land Imager (OLI) and MultiSpectral Instrument (MSI) aboard Landsat 8 and Sentinel-2 remote sensing satellites, respectively. The HLS products are based on a set of algorithms to obtain seamless products from both sensors (OLI and MSI): atmospheric correction, cloud and cloud-shadow masking, spatial co-registration and common gridding, bidirectional reflectance distribution function normalization and spectral bandpass adjustment. Three products are derivedfrom the HLS processing chain: (i) S10: full resolution MSI SR at 10 m, 20 m and 60 m spatial resolutions; (ii)S30: a 30 m MSI Nadir BRDF (Bidirectional Reflectance Distribution Function)-Adjusted Reflectance (NBAR);(iii) L30: a 30 m OLI NBAR. All three products are processed for every Level-1 input products from Landsat 8/OLI (L1T) and Sentinel-2/MSI (L1C). As of version 1.3, the HLS data set covers 10.35 million km2 and spans from first Landsat 8 data (2013); Sentinel-2 data spans from October 2015. The L30 and S30 show a good consistency with coarse spatial resolution products, in particular MODIS Collection 6 MCD09CMG products (overall deviations do not exceed 11%) that are used as a reference for quality assurance. The spatial co-registration of the HLS is improved compared to original Landsat 8 L1T and Sentinel 2A L1C products, for which misregistration issues between multi-temporal data are known. In particular, the resulting computed circular errors at 90% for the HLS product are 6.2 m and 18.8 m, for S10 and L30 products, respectively. The main known issue of the current data set remains the Sentinel-2 cloud mask with many cloud detection omissions. The cross-comparison with MODIS was used to flag products with most evident non-detected clouds. A time series outlier filtering approach is suggested to detect remaining clouds. Finally, several time series are presented to highlight the high potential of the HLS data set for crop monitoring.

Landsat Sentinel-2↗

Optimization for Load Alleviation of Truss-Braced Wing Aircraft with Variable Camber Continuous Trailing Edge Flap

This paper focuses on load alleviation optimization for a high aspect ratio truss braced wing (TBW) aircraft. The TBW aircraft model is based on the Subsonic Ultra Green Aircraft Research (SUGAR) concept developed by Boeing, with the wing structures of the model modified to include a novel aerodynamic control surface known as the Variable Camber Continuous Trailing Edge Flap (VCCTEF). The purpose of the study is to investigate the effectiveness of a Performance Adaptive Aeroelastic Wing (PAAW) technology, specifically the VCCTEF, for alleviating load on the TBW wing during flight maneuver. The specific flight maneuver under consideration in this study is a 2.5g pull-up maneuver. Constrained gradient-based optimization is conducted to tailor the deflections of the VC- CTEF such that bending moment along the wing is minimized at the 2.5g pull-up flight condition. Aerodynamic modeling for this study is conducted using a vortex-lattice method code called Vorlax. A non-linear finite element analysis (FEA) method is constructed for analyzing the structural deformation and resulting bending moment along the wing of the aircraft with the inclusion of effects from tension-stiffening due to axial loading in the truss. This study is the first phase of several, and involves optimization of a rigid wing aircraft for preliminary analysis. Future studies will incorporate flexible wing structures with aeroelastic interactions and deformations. The results of this first phase positively demonstrate the potential of utilizing the novel control surface on modern aircraft wing designs for shaping control in order to provide load alleviation during flight maneuver.

Lebofsky, Sonia↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM completed in September 2019 for the Northern Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. The IGWM was implemented for the Northern VOC Area to provide additional data, to be evaluated along with previous long-term monitoring data, to determine future IGWM options and to evaluate the efficacy of monitored natural attenuation (MNA) as a passive remedial measure in comparison to active remedies for the Northern VOC Area. The primary contaminants of concern in the Northern VOC Area are trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), vinyl chloride (VC), and benzene.

groundwater↗

Aerodynamic Optimization of Mach 0.745 Transonic Truss-Braced Wing Aircraft with Variable-Camber Continuous Trailing-Edge Flap

This paper presents an aerodynamic optimization study of the Mach 0.745 Transonic Truss-Braced Wing (TTBW) aircraft with Variable-Camber Continuous Trailing-Edge Flap (VC-CTEF). The VCCTEF is a novel wing shaping control concept to improve aircraft aerodynamic efficiency. Drag reduction studies are conducted for three different VCCTEF configurations with 6-, 10-, and 21-spanwise sections, respectively. A simple VCCTEF actuator weight model is proposed to account the weight penalty of the actuator in the design. A vortex-lattice model of the TTBW model is developed with transonic small disturbance, integral boundary-layer, and wing-strut interference corrections for rapid aerodynamic performance evaluations. The VSPAERO model has been validated against wind tunnel test data. The optimization results show that the 21-spanwise sections VCCTEF has largest absolute drag coefficient reduction, however, the 6-spanwise sections VCCTEF provides a relatively better solution for drag reduction when the actuator weight penalty is considered. A high-fidelity CFD solver FUN3D is used to validate the VCCTEF optimization.

Aerodynamic Optimization↗

A Spectralon BRF data base for MISR calibration applications

The Multi-angle Imaging SpectroRadiometer (MISR) is an Earth-observing sensor which provides global retrievals of aerosols, clouds, and land surface parameters. Instrument specifications require an accurate absolute calibration, as well as accurate camera-to-camera, band-to-band, and pixel-to-pixel relative response determinations. In order to achieve these requirements, MISR makes use of an on-board calibrator (OBC), as well as vicarious calibration (VC) experiments.

Satellite↗

Aerodynamic Optimization of Mach 0.8 Transonic Truss-Braced Wing Aircraft using Variable Camber Continuous Trailing Edge Flap

This paper presents an aerodynamic optimization study of the Mach 0.8 Transonic Truss-Braced Wing (TTBW) aircraft with Variable Camber Continuous Trailing Edge Flap (VC-CTEF). The VCCTEF is a novel wing shaping control concept to improve aircraft aerodynamic efficiency. Drag reduction studies are conducted for two different VCCTEF configurations with 6- and 10-spanwise sections, respectively. A simple VCCTEF actuator weight model is used to account the weight penalty of the actuator in the design for the Mach 0.8 TTBW aircraft. A vortex-lattice model of the Mach 0.8 TTBW aircraft is developed with transonic small disturbance, integral boundary-layer, and wing-strut interference corrections for rapid aerodynamic performance evaluations. The VSPAERO model has been validated against the wind tunnel test data. The optimization results show that the 6-spanwise sections VCCTEF provides a relatively better solution for drag reduction when the actuator weight penalty is considered. A high-fidelity CFD solver FUN3D is used to verify the VCCTEF optimization design.

Aerodynamic optimization↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Paint and Oil Locker, SWMU 067 Southern Treatment Area Air Sparge System Construction Completion and Performance Monitoring and Paint and Oil Locker, Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion, Performance Monitoring, and Long-Term Monitoring (LTM) Report presents activities conducted at the Paint and Oil Locker (POL) (Solid Waste Management Unit [SWMU] 067) and Supply Warehouse #3 (SW3) (SWMU 088) sites located at the Kennedy Space Center (KSC), Florida. Activities include implementation and Year 1 (Quarters [Q] 1 through 4) and Q5 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) in the POL Southern Treatment Area, LTM results for the POL Northern Area and SW3, and supplemental direct push technology (DPT) sampling at both sites to support the LTM and performance monitoring programs. The timeframe for activities included in this report extends from August 2019 to August 2022. The scope for these sites currently includes two main components, which are documented within this report: (1) LTM at SW3 and POL Northern Area where an AS system began operation at these sites in May 2009 and June 2013, respectively, and subsequently turned off for both sites in March 2018 (during the previous reporting period); and (2) Active AS operations and performance monitoring in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The AS IM in the POL Southern Treatment Area was implemented between 2019 and 2021 to treat a chlorinated solvent groundwater plume that resulted from historic operations supporting the National Aeronautics and Space Administration’s (NASA) Space Program. The objective of the AS IM is to remediate groundwater within the treatment zone to support transition to monitored natural attenuation (MNA). The overall Corrective Action objective is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2- dichloroethene (tDCE), and vinyl chloride (VC) present in groundwater to levels below their respective State of Florida Groundwater Cleanup Target Levels (GCTLs). The AS IM was installed in the POL Southern Treatment Area to target the high concentration plume (HCP), which includes a source zone (SZ) area where TCE was found to exceed 11,000 micrograms per liter (µg/L), and extend to a depth of 30 feet below land surface (bls).

TCE↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Hemispheric Airborne Measurements of Air Quality (HAMAQ)

Hemispheric Airborne Measurements of Air Quality (HAMAQ, pronounced “hammock”) was selected for funding under NASA’s Earth Venture Suborbital (EVS-4) solicitation. As originally proposed, HAMAQ would have flown under each of the geostationary satellites in the Atmospheric Composition Virtual Constellation (AC-VC). Selected under a reduced budget ($15M), HAMAQ has been descoped to include only sampling under TEMPO. The science objectives and approach are still relevant to the broader constellation, and partnerships are still in place to continue the pursuit of the larger vision of HAMAQ to also sample in Asia and Europe. HAMAQ plans include two deployments in 2028, including the Mexico City megalopolis and a second North American site yet to be selected. The effort will include two aircraft, NASA’s B777 for in situ sampling and G-III for remote sensing. These aircraft will be used to complete the integrated observing system, combining satellite observations, ground-based monitoring, research observations, and air quality modeling. With the long lead time for deployments in 2028, HAMAQ leadership are soliciting feedback on the project white paper available for download at https://science.larc.nasa.gov/HAMAQ.

Laura M Judd↗

Converter Compressor Building, SWMU 089 Monitoring Well 21 Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011/80KSC019F0070, for the implementation of a bioremediation Interim Measure (IM) at the Converter Compressor Building (CCB) site located at Kennedy Space Center (KSC), Florida. The location of CCB within KSC is shown on Figure A-1. CCB has been designated as Solid Waste Management Unit (SWMU) 089 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. The overall Corrective Action Objective (CAO) for CCB is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), and vinyl chloride (VC) to less than State of Florida Groundwater Cleanup Target Levels (GCTLs). The objective for the IM associated with this IM is to reduce groundwater concentrations for the contaminants of concern (COCs) to less than their Natural Default Attenuation Concentrations (NADCs) within the Monitoring Well 21 Area (herein referred to as MW21 Area) via bioremediation injections to support transition to long term monitoring (LTM). This IWP describes the activities that will be performed for the treatment of the MW21 Area. The Revision 1 CCB MW21 Area Interim Measure Work Plan (IMWP; NASA, 2024), which was approved by the Florida Department of Environmental Protection (FDEP) on December 26, 2024, was used as the design basis for this IWP.

Mark Jonnet↗

AT2 DS II - Accelerator System Design (Part II) - CCC Video Conference

Discussion Session - Accelerator System Design (Part II) Tutors: C. Darve, J. Weisend II, Ph. Lebrun, A. Dabrowski, U. Raich Video Conference with the CERN Control Center. Experts in the field of Accelerator science will be available to answer the students questions. This session will link the CCC and SA (using Codec VC).

action games↗

On the Dissociation of Molecular Hydrogen by Au Supported on Transition Metal Carbides: Choice of the Most Active Support

A systematic density functional study of the adsorption and dissociation of H{sub 2} on the clean (001) surface of various transition metal carbides (TMCs; TM = Ti, Zr, V, Mo) and on Au{sub 4} nanoclusters supported on these TMCs is presented. It is found that the H{sub 2} dissociation on the bare clean TMCs strongly depends on the chemical nature of the support. Thus, the H{sub 2} molecule interacts rather strongly with TiC(001) and ZrC(001) but very weakly with VC(001) and {delta}-MoC(001). For the supported Au{sub 4} cluster, two different types of molecular mechanisms are found. For Au{sub 4}/TiC(001) and Au{sub 4}/ZrC(001), H{sub 2} dissociation leads to a H atom directly interacting with the Au{sub 4} cluster while the second H atom is transferred to the support. In contrast, for Au{sub 4}/VC(001) and Au{sub 4}/{delta}-MoC(001), both H atoms interact with the Au{sub 4} cluster. Overall, the present study suggests that, among the systems studied, Au/ZrC is the best substrate for H{sub 2} dissociation.

08 HYDROGEN↗

Effect of the Support on the Electronic Structure of Au Nanoparticles Supported on Transition Metal Carbides: Choice of the Best Substrate for Au Activation

Periodic density functional theory calculations on large supercells have been carried out to investigate the atomic and electronic structure of small gold particles (Au{sub 2}, Au{sub 4}, Au{sub 9}, Au{sub 13}, and Au{sub 14}) supported on the (001) surface of various transition metal carbides (TiC, ZrC, VC, and {delta}-MoC). All the supported Au particles exhibited strong interactions with the C sites of the metal-carbide surfaces. Nevertheless, the interactions between adsorbed Au atoms were attractive, thus ultimately facilitating nucleation of two- or three-dimensional metal particles. The presence of the underlying carbide strongly modified the electronic structure and charge density of the supported metal particles resulting in the experimentally proven improved catalytic performance of the resulting systems as compared with cases where the support is an oxide. The electronic perturbations were quite strong for two-dimensional gold particles directly in contact with the carbide substrates and gradually decreased for two-layer and three-layer thick supported particles. While all the metal carbides examined induced a qualitatively similar perturbation on the supported Au particles, the effect is significantly larger for ZrC thus suggesting that the resulting model catalyst would perform even better than the already tried Au/TiC system.

36 MATERIALS SCIENCE↗

Implementation of Enhanced Attenuation at the DOE Mound Site OU-1 Landfill: Accelerating Progress and Reducing Costs

At the US Department of Energy (DOE), Office of Legacy Management, Mound, Ohio, Site, chlorinated organic contaminants (cVOCs) originating from the former solid-waste landfill have impacted groundwater in Operable Unit 1 (OU-1). The baseline groundwater remedy was groundwater pump and treat (P&T). Since the source materials have been removed from the landfill, the Mound core team, which consists of DOE, US Environmental Protection Agency (US EPA), Ohio EPA, and other stakeholders, is assessing the feasibility of switching from the active P&T remedy to a passive attenuation-based remedy. Toward this end, an enhanced attenuation (EA) strategy based on the creation of structured geochemical zones was developed. This EA strategy addresses the residual areas of elevated cVOCs in soil and groundwater while minimizing the rebound of groundwater concentrations above regulatory targets (e.g., maximum contaminant levels [MCLs]) and avoiding plume expansion while the P&T system is turned off. The EA strategy has improved confidence and reduced risk on the OU-1 groundwater transition path to monitored natural attenuation (MNA). To better evaluate the EA strategy, DOE is conducting a field demonstration to evaluate the use of edible oils to enhance the natural attenuation processes. The field demonstration is designed to determine whether structured geochemical zones can be established that expedite the attenuation of cVOCs in the OU-1 groundwater. The EA approach at OU-1 was designed based on “structured geochemical zones” and relies on groundwater flow through a succession of anaerobic and aerobic zones. The anaerobic zones stimulate relatively rapid degradation of the original solvent source compounds (e.g., cVOCs such as tetrachloroethene [PCE] and trichloroethene [TCE]). The surrounding aerobic areas encourage relatively rapid degradation of daughter products (such as dichloroethene [DCE] and vinyl chloride [VC]) as well as enhanced cometabolism of TCE resulting from the utilization of methane and other reduced hydrocarbons that are formed and released from the anaerobic zones.

54 ENVIRONMENTAL SCIENCES↗

DIRECT LASER DEPOSITION OF POROUS STRUCTURES AND GRADIENT METAL-CERAMIC COMPOSITE COATINGS

Direct laser deposition is an additive manufacturing technique capable of producing complex geometries, bond different materials, repair broken parts, and add protective coating. In the present study it is used to make micro-porous scaffolds and apply protective vanadium and niobium carbide coatings. Micro-porous metal filters are a difficult thing to make but are required for many applications. In this study it was hypothesized that laser engineering net shaping (LENS) could be used to make porous Ti6Al4V scaffolds with an interconnected micro-porous structure. This proved to be true with cylinders made to have 15.9% porosity, and a pore size less than 100μm. These structures were made by only altering processing parameters, which yielded a scaffold with obstructed random pore interconnectivity. The scaffolds had a compressive strength of 645-556MPa and martensitic like α' grains. Another study was done to apply hard niobium and vanadium carbide surface coatings to stainless steel. The objective was to used LENS to deposit stainless steel coatings with added carbides to eventually make a gradient coating with increased protective qualities. Parts that have suffered material loss from abrasive wear or cavitation could have material added back as well as add a protective coating at the same time. Compositions ranging from 5% to 100% of the carbides were mixed with stainless steel. The coatings were then deposited on a stainless steel 304 substrate individually, as well as in a series to make a gradient structure. These coatings all increased hardness, wear resistance, and 100%VC significantly increased the materials resistance to damage from abrasive water. The carbides integrated into the SS304 matrix on the grain boundaries making a metal ceramic composite. These precipitates left residual stress in the structure which increased the hardness and wear resistance. The study proved that the addition of these carbides did increase the protective qualities and could make a gradient coating with properties tailored to the user’s preference.

13 HYDRO ENERGY↗

Production of Medium-Scale Metal Additive Geometry With Hybrid Manufacturing Technology

Oak Ridge National Lab’s (ORNL) Metal Big Area Additive Manufacturing (mBAAM) and Hybrid Manufacturing teams in the Manufacturing Demonstration Facility (MDF) was tasked with developing a part that exceeded 24 inches in length and 100lbs in weight on a laser hotwire welding system. The Mazak VC-500A/5X AM HWD hybrid 5-axis CNC laser hotwire system was leveraged to complete the task. The proposed geometry was manufactured with 410 stainless steel on AISI1018 steel substrate in just over 36 hours of build time. The proposed geometry was sliced and additively manufactured in three segments; the base, and two extrusions measuring 10 inches in length and 14 inches in length. Production of this component demonstrated hybrid capabilities requiring fixed 5-axis rotations to complete geometry that exceeded the defined build volume of the machine. Multiple repairs of the part were conducted in-situ leveraging the additive and subtractive capabilities of the Mazak hybrid system. Significant overbuilding challenges were encountered and manually addressed by leveraging subtractive capabilities of the hybrid system. Future processes are presented for development to reduce overheating of top layers. Final part measurements exceeded 107 lbs. in weight and 24.5 inches in length along the principal axis; the largest and heaviest part created by a hybrid system at the MDF.

Saleeby, Kyle↗