Methods and apparatuses for preparing upgraded pyrolysis oil

Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The JLAB 12 GeV Energy Upgrade of CEBAF

This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, procurement, installation and commissioning of the magnet and SRF components of the upgrade.

43 PARTICLE ACCELERATORS↗

Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons

A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

02 PETROLEUM↗

Integrated oil production and upgrading using molten alkali metal

A method that combines the oil retorting process (or other process needed to obtain/extract heavy oil or bitumen) with the process for upgrading these materials using sodium or other alkali metals. Specifically, the shale gas or other gases that are obtained from the retorting/extraction process may be introduced into the upgrading reactor and used to upgrade the oil feedstock. Also, the solid materials obtained from the reactor may be used as a fuel source, thereby providing the heat necessary for the retorting/extraction process. Other forms of integration are also disclosed.

02 PETROLEUM↗

Tritium Plasma Experiment Upgrade and Improvement of Surface Diagnostic Capabilities at STAR Facility for Enhancing Tritium and Nuclear PMI Sciences

The Tritium Plasma Experiment (TPE) is a unique high-flux linear plasma device that can handle beryllium, tritium, and neutron-irradiated plasma facing materials, and is the only existing device dedicated to directly study tritium retention and permeation in neutron-irradiated materials with tritium [M. Shimada et.al., Rev. Sci. Instru. 82 (2011) 083503 and and M. Shimada, et.al., Nucl. Fusion 55 (2015) 013008]. The plasma-material-interaction (PMI) determines a boundary condition for diffusing tritium into bulk PFCs, and the tritium PMI is crucial for enhancing fundamental sciences that dictate tritium fuel cycles and safety and are high importance to an FNSF and DEMO. Recently the TPE has undergone major upgrades in its electrical and control systems. New DC power supplies and a new control center enable remote plasma operations from outside of the contamination area for tritium, minimizing the possible exposure risk with tritium and beryllium. We discuss the electrical upgrade, enhanced operational safety, improved plasma performance, and development of optical spectrometer system. This upgrade not only improves operational safety of the worker, but also enhances plasma performance to better simulate extreme plasma-material conditions expected in ITER, Fusion Nuclear Science Facility (FNSF), and Demonstration reactor (DEMO). This work was prepared for the U.S. Department of Energy, Office of Fusion Energy Sciences, under the DOE Idaho Field Office contract number DE-AC07-05ID14517.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Progress on the Proton Power Upgrade of the Spallation Neutron Source

The Proton Power Upgrade Project is underway at the Spallation Neutron Source at Oak Ridge National Labor-atory and will double the proton beam power capability from 1.4 MW to 2.8 MW to provide increased neutron intensity at the first target station and to support future operation of the second target station. This will be ac-complished by increasing the beam energy to 1.3 GeV and the beam current to 38 mA (average during the macropulse). Installation of 28 additional superconduct-ing cavities and their associated technical systems will provide for the energy increase. Increased beam loading throughout the accelerator will be accommodated primar-ily through the use of existing margin in the RF systems and the installation of 700 kW klystrons to power the new superconducting cavities. Upgrades of a few existing RF stations may also be needed. The injection and ex-traction regions of the accumulator ring will be upgraded, a ring to second target station tunnel stub will be con-structed, and a 2 MW target will be developed for the first target station. The project anticipates attainment of Criti-cal Decision 1 in 2017 to ratify the project conceptual design and cost range.

Champion, Mark S↗

Toward a New Light: ALS Upgrade Project Moves Forward

This video highlights the next step toward realization of an upgrade at Berkeley Lab's scientific centerpiece, the Advanced Light Source. This 2-minute video provides a historical context of pioneering discoveries and innovations in accelerator science that have been a Berkeley Lab hallmark since its inception. The video also details the technology that will transform the ALS –producing beams of light 100 times brighter than today that also have a more ordered ("coherent") structure, like regularly spaced ripples in a pond – and the science that this upgrade will enable. The video features interviews with: Michael Witherell, Berkeley Lab Director David Robin, ALS Upgrade (ALS-U) Project Director Elke Arenholz, Senior Staff Scientist, ALS (Video Credit: Marilyn Chung/Berkeley Lab)

43 PARTICLE ACCELERATORS↗

Using Qualified On-Site Nuclear Power Plant Simulators in Human Factors Validations of Control Room Upgrades

Existing commercial nuclear power plants (NPPs) are valuable assets in the infrastructure portfolio of the United States (U.S.) because they safely and reliably generate about 1/5th of all the electricity used. The instrumentation and control (I&C) systems in commercial NPPs are the ‘eyes and ears' of the operator, allowing operators to maintain situation awareness, thereby allowing the plant to operate safely and efficiently for all phases of operation. Because the I&C systems in NPPs are still mostly based on analog technologies, which are reliable but not especially cost-effective, upgrading the existing I&C in com-mercial NPPs to new digital I&C is very important. Furthermore, simulators and simulation are critical human factors engineering tools for this I&C modernization work. NPP control room simulators are essential test beds to simulate normal, abnormal, and emergency operations that allow human factors researchers to safely and realistically evaluate early design phase prototypes of the upgraded digital I&C, and validate final as-built digital I&C systems that have been modernized deployed in NPPs. This paper describes research performed using qualified on-site NPP simulators to perform human factors validations of digital I&C control room upgrades.

99 GENERAL AND MISCELLANEOUS↗

BETO 2021 Peer Review - Biological Upgrading of Sugars (BUS) 2.3.2.105

The Biological Upgrading of Sugars (BUS) project directly targets the anaerobic conversion of lignocellulosic feedstocks into intermediate molecules readily upgradeable to fuel precursors. Recent efforts on the BUS project have a particular emphasis on the biological production of butyric acid, an intermediate that can be readily upgraded to sustainable aviation fuel, diesel blend-stocks, and high value chemicals. The BUS project approaches this direction through a combination of strain engineering, fermentation process engineering, development of novel separations technologies, and the design and build of pilot scale systems. Our ultimate project goal is to develop an integrated cost-effective process at pilot scale to achieve DOE's MYPP targets of $2.50/GGE. The major thrust of the BUS project over the last project cycle was on the development of integrated processes surrounding the anaerobic production of carboxylic acids using diverse Clostridium species. We developed and expanded genetic tools for several Clostridium species and rewired microbial metabolism in an attempt to maximize substrate utilization and flux towards butyric acid. We designed and built novel bioreactors with an in situ product recovery system enabling the biological production and recovery of highly purified acids. We leveraged this system to generate 100s of grams of acid from corn stover hydrolysate. In this presentation we highlight data surrounding our proposed process and accompanying results from technoeconomic and life-cycle analyses of our integrated process. Finally, we detail plans of our pilot scale reactor system that is in process and discuss our future routes towards achieving economically viable and sustainable diesel and jet blendstocks.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Control System Plans for SNS Upgrade Projects

The Spallation Neutron Source at Oak Ridge National Laboratory is planning two major upgrades to the facility. The Proton Power Upgrade project, currently underway, will double the machine power from 1.4 to 2.8 MW by adding seven additional cryomodules and associated equipment. The Second Target Station project, currently in conceptual design, will construct a new target station effectively doubling the potential scientific output of the facility. This paper discusses the control system upgrades required to integrate these projects into the existing EPICS based control systems used for the machine and neutron instrument beamlines. While much of the control system can be replicated from existing solutions, some systems require new hardware and software. Operating two target stations simultaneously will require a new run permit system to safely manage beam delivery.

Hartman, Steven↗

It's All About the Envelope: Prioritizing Envelope Upgrades for Electrification of Cold Climate Homes

Building decarbonization via electrification on a clean grid is the most promising climate solution proposed to date for the building sector. In cold climate zones, building electrification will be driven in large part by moving from natural gas space heating to cold climate heat pumps (CCHPs). CCHPs are commercially available today, including economical cold climate air source heat pumps (ccASHPs). But there's one big problem - wide-scale adoption of ccASHPs will dramatically increase winter peak electricity demand, even with the highest efficiency ccASHP products. Furthermore, cold climate space heating loads will drive unprecedented electric system peaks during the lowest periods of renewable generation and are likely to overwhelm existing distribution systems. This scenario is avoidable by coupling electrification with building envelope upgrades to reduce peak heating loads. This paper presents a model, built from home energy audit and research data sets, that quantifies the above challenges. Results demonstrate how weatherization efforts coupled with additional high-performance envelope upgrade measures can prepare the building stock for electrification and show the benefit these measures can bring to future utility operations. Much of this envelope upgrade work is cost-effective, according to conservative cost-benefit testing and program successes to date, and is coupled with substantial non-energy benefits. However, persistent market barriers have made scaling of envelope retrofit work challenging for decades, suggesting additional policy support is required. Lessons learned from previous policy experience, combined with new technology and administrative support, create exciting potential for this decarbonization climate solution.

air sealing↗

Upgrades to Monteburns, version 3.0

Monteburns, a Monte Carlo burnup code which has the flexibility to model time-dependent isotopic changes for a variety of nuclear systems by linking the neutron transport code MCNP/X to a production/depletion code, has undergone several performance upgrades recently that have increased the code's capabilities. Once limited to a specific number of regions, enhancements have been implemented that afford a much greater number of burn materials, such that users will be more limited by the physical constraints of their computing environment as opposed to inherent limits built into the coding of Monteburns. In conjunction with the increase in the number of burn materials, parallel execution of a production/depletion code of choice has been implemented, such that users have the option of using CINDER90, 0RIGEN2, or the newly released version of ORIGEN. Finally, the recoverable energy per fission calculation was upgraded to include capture gamma energy deposited in all specified materials as a function of irradiation time. The sum of the prompt and delayed recoverable energies from fission was obtained as before. These upgrades were first tested on a rigorous 1/8 core model of a Pressurized Water Reactor with fresh, once- and twice-burned fuel. We can now model several orders of magnitude more materials using Monte Carlo techniques, which is a significant advance in the reactor modeling world. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Study of the performance of the Micromegas chambers for the ATLAS Muon Spectrometer Upgrade

The ATLAS collaboration at LHC has chosen the Micromegas (Micro Mesh Gaseous Structure) technology along with the small-strip Thin Gap Chambers (sTGC) for the high luminosity upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel (NSW). It employs eight layers of Micromegas detectors and eight layers of sTGC. The NSW project requires fully efficient Micromegas chambers with spatial resolution down to 100 μm in the precision coordinate for momentum reconstruction, and at mm level in the azimuthal (second) coordinate, over a total active area of 1200 m{sup 2}, with a rate capability up to about 15 kHz/cm{sup 2} and operation in a moderate magnetic field up to B = 0.4 T. The required tracking capability is provided by the intrinsic space resolution combined with a mechanical precision at the level of 30 μm along the precision coordinate. Together with the precise tracking capability the Micromegas chambers should provide a trigger signal. Several tests have been performed on small (10x10 cm{sup 2}) and large (1 x 1 m{sup 2}) size single gap chambers prototypes using high energy hadron beams at CERN, low and intermediate energy (0.5-5 GeV) electron beams at Frascati and DESY, neutron beams at Demokritos (Athens) and Garching (Munich) and cosmic rays. More recently two quadruplets with dimensions 1.2 x 0.5 m{sup 2} and the same configuration and structure foreseen for the NSW upgrade have been built at CERN and tested with high energy pions/muons beam. Results obtained in the most recent tests, in different configurations and operating conditions, in dependence with the magnetic field, will be presented, along with a comparison between different read-out electronics, either based on the APV25 chips, or based on a new digital front-end ASIC developed in its second version (VMM2) as a new prototype of the final chip that will be employed in the NSW upgrade. (authors)

43 PARTICLE ACCELERATORS↗

Status of Electronics Upgrades to the LANL Green is Clean Phoswich Detector Systems - 16419

Los Alamos National Laboratory radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to assay and verify that GIC candidate waste meets free release disposal requirements. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The crystals are set in an oxygen-free high-conductivity copper housing with a very thin (0.025 mm) aluminum entrance window. The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. These electronic modules provide the buffering, amplification, and pulse shape analyzer needed for the proper presentation of signals to the custom Phosmux router module. The router module separates the sodium iodide and cesium iodide signals by their rise times and transfers this information into the computer-mounted multichannel analyzer, a Canberra Model S-100 system. While these NIM Bin counting electronics configurations have been effective for approximately 20 years of operation, they are bulky requiring numerous modules per detector and the important Phosmux module is no longer manufactured by LANL. Modern advancement of commercial counting electronics now offer more compact options for equivalent detector signal processing. A pulse shape discriminator module, the DGF Pixie-4, made by XIA LLC, has been identified that can replace the majority of the original NIM bin electronics in a much more compact chassis - one Pixie-4 replaces four NIM amplifiers and four NIM PSAs and fits in a small National Instruments{sup TM} chassis. Thus, LANL has initiated a system upgrade project to replace the historic NIM electronics with the XIA Pixie4 and associated configuration software. The hardware for one Phoswich systems has been procured for the project and the configuration software, customized for the LANL Phoswich detector application, has been written by the manufacturer. Initial setup and optimization of the Pixie-4 configuration has been performed. Qualitative and quantitative baseline comparisons to the NIM electronics has been performed. Good agreement of key low energy gamma lines between the systems has allowed 'Proof of Concept' to be concluded. Further optimization and performance evaluations are in progress. Modifications to the LabVIEW{sup TM} based operating software (originally written by VI Control Systems Ltd.) are being performed by a LANL LabVIEW{sup TM} programmer to accommodate the electronics upgrade. A new LabVIEW{sup TM} interface to control the Pixie-4 has already been developed. Final optimization and testing, formal software QA, and revisions to operating procedures are in progress to achieve completion of the GIC system upgrade project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Davis-Besse Water Processing System Upgrade - 19654

This paper looks at the in-house liquid radwaste (LRW) processing system configuration at Davis-Besse Nuclear Power Station in Oak Harbor, Ohio. The suboptimal performance of that system, which had been in service for over three decades, prompted Plant Management to canvass the industry for LRW processing technologies and techniques that might offer improvements. The goal was to upgrade water processing performance at Davis-Besse, particularly during outages, when water generation is high and the most difficult to decontaminate water is produced. This paper reviews the goals established by Management to guide the selection of technology and equipment components. The chosen vendor would be responsible for designing a system that would incorporate the plant's existing equipment as much as feasible, while respecting the limited space and funding available for the project. The LRW processing system changes eventually made by Davis-Besse are identified and discussed. We also offer a summary of pre- and post-upgrade operation and performance in vital areas, including manpower requirements (for operation and maintenance), effluent quality, waste production and overall operating cost. The information and experiences cited in this paper are directly applicable to other nuclear power plants who might contemplate an upgrade of LRW processing systems or of individual system components. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Collimators and beam dumps for the APS-upgrade storage ring - 25478

Argonne's Advanced Photon Source is planning a major upgrade that will increase the storage ring current from the present 100 mA to 200 mA and decrease the beam lifetime due to high charge-per-bunch and substantially smaller transverse beam size. Collimators in the horizontal plane around the storage ring will be used to control beam losses. These collimators will also serve as whole beam dumps in cases where the stored beam must be dumped for machine protection. Another feature of the Upgrade is swap-out injection, in which a stored electron bunch will be extracted to a dedicated swap-out dump when its charge falls to about 90% of the initial value and immediately replaced with a new bunch. Since particle losses will be concentrated in these collimators and beam dumps, there is the potential for high dose rates around these locations and for activation of nearby accelerator components. This paper contains a brief summary of the APS Upgrade, discusses electron losses in the storage ring, and presents calculations of dose rates and induced activity around the collimators and beam dumps. (authors)

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗

Control System Upgrade for Canal ARC SAW

Upgrading the specific components of the Arc Saw, such as the HMI, the components of the chassis involving the I/O modules, servo motor modules, and PLC modules offers numerous advantages. By enhancing the HMI, the operators will benefit having a user-friendly interface, enabling smoother control and monitoring of the ARC SAW’s functionality. Upgrading the modules will contribute to an improved precision and responsiveness in changing modes of the ARC SAW as well as the adjusting the saw blades position, further enhancing the system's overall performance. These upgrades, while maintaining the same functionality, enable the latest technological advancements without needing significant changes or disruptions to existing operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗