Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Task Force”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

An Overview of the U.S. Department of Energy's GeoVision Report: Preprint

The U.S. Department of Energy's (DOE's) Geothermal Technologies Office (GTO) engaged in a multiyear research collaboration among national laboratories, industry experts, and academia to identify a vision for growth of the domestic geothermal industry across a range of geothermal energy types. The effort, called the GeoVision analysis, assessed opportunities to expand geothermal energy deployment by improving technologies, reducing costs, and mitigating barriers. The analysis also evaluated the economic and environmental impacts of such deployment - including industry growth, consumer energy prices, water use, and air emissions - and investigated opportunities for desalination, mineral recovery, and hybridization with other energy technologies for greater efficiencies and lower costs. The GeoVision analysis used a suite of modeling tools and scenarios to evaluate the performance of geothermal technologies relative to other energy technologies. The assessment included evaluating the potential role of existing and future geothermal deployment in both the electric sector and the heating and cooling sector. In the electric sector, the GeoVision analysis considered electricity generation from existing conventional (hydrothermal) geothermal resources as well as unconventional geothermal resources, such as enhanced geothermal systems (EGS). In the heating and cooling sector, the analysis modeled geothermal heat pumps (GHPs, also called ground source heat pumps) and district-heating systems using both conventional and EGS resources. The analysis culminated in a summary report, GeoVision: Harnessing the Heat Beneath Our Feet (DOE 2019), as well as eight supporting task force reports (Lowry et al. 2017, Doughty et al. 2018, Wendt et al. 2018, Augustine et al. 2019, Liu et al. 2019, McCabe et al. 2019, Millstein et al. 2019, Young et al. 2019). Among other results, key findings of the analysis indicate that optimized permitting could potentially double geothermal capacity by 2050; technology improvements could increase geothermal power generation nearly 26-fold from today; and increased geothermal deployment can provide economic and environmental benefits to the United States. The analysis also concludes that GHPs can provide heating and cooling solutions to the equivalent of 28 million households and geothermal district-heating systems could experience exponential growth - from 21 installations today to 17,500 nationwide. In addition to summarizing analytical results about geothermal energy opportunities, the report includes a Roadmap of actionable items on which the stakeholder community can engage to achieve the outcomes of the analysis. The GeoVision Roadmap is a comprehensive call to action to encourage and guide stakeholders toward the shared goal of realizing the deployment levels and resulting benefits identified in the GeoVision analysis.

15 GEOTHERMAL ENERGY↗

Optimizing the LSST Observing Strategy for Dark Energy Science: DESC Recommendations for the Wide-Fast-Deep Survey

Cosmology is one of the four science pillars of LSST, which promises to be transformative for our understanding of dark energy and dark matter. The LSST Dark Energy Science Collaboration (DESC) has been tasked with deriving constraints on cosmological parameters from LSST data. Each of the cosmological probes for LSST is heavily impacted by the choice of observing strategy. This white paper is written by the LSST DESC Observing Strategy Task Force (OSTF), which represents the entire collaboration, and aims to make recommendations on observing strategy that will benefit all cosmological analyses with LSST. It is accompanied by the DESC DDF (Deep Drilling Fields) white paper (Scolnic et al.). We use a variety of metrics to understand the effects of the observing strategy on measurements of weak lensing, large-scale structure, clusters, photometric redshifts, supernovae, strong lensing and kilonovae. In order to reduce systematic uncertainties, we conclude that the current baseline observing strategy needs to be significantly modified to result in the best possible cosmological constraints. We provide some key recommendations: moving the WFD (Wide-Fast-Deep) footprint to avoid regions of high extinction, taking visit pairs in different filters, changing the 2x15s snaps to a single exposure to improve efficiency, focusing on strategies that reduce long gaps (>15 days) between observations, and prioritizing spatial uniformity at several intervals during the 10-year survey.

Lochner, Michelle↗

IMPLEMENTING CYBERSECURITY INTO AN EXISTING NATIONAL NUCLEAR NON-PROLIFERATION PROGRAMME – A CASE STUDY

Cyber threat profiling and risk mitigation is critical to any nuclear state organization and should be considered as part of any comprehensive nuclear security programme. Defining and evaluating the impact of the cyber threat to mission can be challenging. An existing national nuclear non-proliferation organization undertook an effort to incorporate computer security activities into its programme to address cyber risk. One of the primary goals of this endeavour was to develop a set of prioritised recommendations for organizational follow-through. The organization dedicated subject matter expert resources in the form of a cyber task force to support this goal. Opportunities were identified where computer security could be built into each programme including office-level strategies and tools. Of course, no new identified threat vector is easily considered and incorporated into existing programmes without impact. There are many obstacles to be overcome. Technically literate subject matter experts are difficult to find, management has comparatively less experience applying computer security into its programmes, and trying to change the culture to consider computer security risk at policy and programmatic levels takes time and management attention. As an outcome of this process, a roadmap for program integration was developed, including the establishment of a cyber support team. This paper will discuss the challenges and successes associated with establishing such a team.

Cyber Security, Nuclear, Non-proliferation↗

An Overview of the U.S. Department of Energy’s GeoVision Report

The U.S. Department of Energy's (DOE's) Geothermal Technologies Office (GTO) engaged in a multiyear research collaboration among national laboratories, industry experts, and academia to identify a vision for growth of the domestic geothermal industry across a range of geothermal energy types. The effort, called the GeoVision analysis, assessed opportunities to expand geothermal energy deployment by improving technologies, reducing costs, and mitigating barriers. The analysis also evaluated the economic and environmental impacts of such deployment - including industry growth, consumer energy prices, water use, and air emissions - and investigated opportunities for desalination, mineral recovery, and hybridization with other energy technologies for greater efficiencies and lower costs. The GeoVision analysis used a suite of modeling tools and scenarios to evaluate the performance of geothermal technologies relative to other energy technologies. The assessment included evaluating the potential role of existing and future geothermal deployment in both the electric sector and the heating and cooling sector. In the electric sector, the GeoVision analysis considered electricity generation from existing conventional (hydrothermal) geothermal resources as well as unconventional geothermal resources, such as enhanced geothermal systems (EGS). In the heating and cooling sector, the analysis modeled geothermal heat pumps (GHPs, also called ground source heat pumps) and district-heating systems using both conventional and EGS resources. The analysis culminated in a summary report, GeoVision: Harnessing the Heat Beneath Our Feet (DOE 2019), as well as eight supporting task force reports (Lowry et al. 2017, Doughty et al. 2018, Wendt et al. 2018, Augustine et al. 2019, Liu et al. 2019, McCabe et al. 2019, Millstein et al. 2019, Young et al. 2019). Among other results, key findings of the analysis indicate that optimized permitting could potentially double geothermal capacity by 2050; technology improvements could increase geothermal power generation nearly 26-fold from today; and increased geothermal deployment can provide economic and environmental benefits to the United States. The analysis also concludes that GHPs can provide heating and cooling solutions to the equivalent of 28 million households and geothermal district-heating systems could experience exponential growth - from 21 installations today to 17,500 nationwide. In addition to summarizing analytical results about geothermal energy opportunities, the report includes a Roadmap of actionable items on which the stakeholder community can engage to achieve the outcomes of the analysis. The GeoVision Roadmap is a comprehensive call to action to encourage and guide stakeholders toward the shared goal of realizing the deployment levels and resulting benefits identified in the GeoVision analysis.

40 EE - Geothermal Technologies Office (EE-4G)↗

Non-Electric Applications of Generation IV Reactors: Accelerating Economy-Wide Decarbonization via Nuclear Energy

This presentation covers the role of nuclear energy in support net-zero solutions, highlighting work within the US DOE Integrated Energy Systems, Light Water Reactor Sustainability, and Hydrogen at Scale programs. The discussion will also introduce the recently-establishing Generation-IV International Forum (GIF) interim task force on non-electric applications of nuclear heat (NEaNH-iTF). This work is presented within a special invited webinar organized by the GIF Education and Training Working Group and the International Atomic Energy Agency.

08 HYDROGEN↗

U.S. Commercial Building Stock Analysis of COVID-19 Mitigation Strategies: Preprint

The COVID-19 pandemic highlights the importance of improving building indoor air quality to reduce occupants’ chances of contracting airborne illness. The ASHRAE Epidemic Task Force (ASHRAE-ETF) released several COVID-19 mitigation strategies at the onset of the pandemic. This study explores four of those recommendations for reducing transmission of COVID-19 inside buildings: (1) 100% outdoor air ventilation, (2) MERV-13 or better filters, (3) demand control ventilation removal, and (4) HVAC flushing mode. These recommendations were simulated and assessed using ComStock, a model of the U.S. commercial building stock. The study showed the 100% outdoor air ventilation recommendation had the largest impact on energy consumption, noncoincident peak demand, and thermostat violations. Removing demand control ventilation had the smallest national aggregate impact, installing MERV-13 filters led to slight increases in energy use and peak demand, and HVAC outdoor air flushing led to modest energy use and peak demand increases.

building energy modelling↗

Muon Cooling and R&D for the Muon Collider - A 5 Year Plan for the US

The Neutrino Factory and Muon Collider Collaboration and the Fermilab Muon Collider Task Force have recently submitted a proposal to the US Department of Energy Office of High Energy Physics to deliver a Design Feasibility Study for a Muon Collider after a 5 year R&D program. This paper presents a brief physics motivation for and the description of a Muon Collider facility and then discusses in some detail the technical components of the proposal with respect to the muon ionization cooling R&D needed for an Energy-Frontier, high luminosity Muon Collider.

43 PARTICLE ACCELERATORS↗

Assessing Cybersecurity Resilience of Distributed Ledger Technology in Energy Sector Using the MITRE ATT&CK® ICS Framework

Digitization in the power industry enables wide connectivity among multiple new entrants such as DERs, prosumers, and P2P counterparts within or outside the Distributed Ledger Technology (DLT). The use of DLT to improve resilience in the power grid has growing support, but new technology provides new opportunities for adversaries to cause harm. This work completed by the Cybersecurity- focused task force of IEEE SA P2418.5 evaluates the potential risks by applying the MITRE ATT&CK® ICS matrix to the DLT Engineering and Cybersecurity Stack designed for power systems applications

Gourisetti, Sri Nikhil Gupta↗

Case Studies and Model Guidance for Establishing Solar Cybersecurity Working Groups

This tool outlines actions that states can take to establish state-level working groups, which can be a critical first step to establishing state cybersecurity programs and efforts to support cybersecurity in distributed energy resources. Specifically, these working groups can lead the development of cybersecurity task forces focused around distributed energy resources, formal recommendations for policy makers and regulators, and the creation of a response strategies and plans for cybersecurity impacts or incidents in solar photovoltaic systems.

14 SOLAR ENERGY↗

Coal without carbon: an investment plan for federal action

This study examines several technologies for CCS that are not currently receiving adequate development support but that could - in the right policy environment - provide the kind of significant cost reductions (and significant improvements in efficiency) that could greatly accelerate broad, economically attractive CCS deployment. Clean Air Task Force selected these technology areas (though not the technologies themselves) and solicited reports from experts in each field to explore how these technologies might fit into a broader CCS deployment strategy. Each expert was asked to develop a research, development, and demonstration (RD&D) 'road map' that could efficiently move each technology from the laboratory into the commercial mainstream. Because the chapter authors are either technical experts or commercial players and are not, for the most part, energy policy experts, subsequent work will translate their RD&D recommendations into actionable policy proposals. The heart of this report consists of four chapters on advanced coal and CCS technologies: underground coal gasification (UCG), written by Julio Friedmann at Lawrence Livermore National Laboratory; Next generation coal gasification (surface-based gasification) led by Eric Redman at Summit Power Group; Advanced technologies for post-combustion capture (PCC) of CO{sub 2}, led by Howard Herzog at Massachusetts Institute of Technology; and RD&D to speed commercialization of geological CO{sub 2} sequestration (GCS), led by Julio Friedmann. 12 refs., 5 figs., 2 tabs.

01 COAL, LIGNITE, AND PEAT↗

Alternative cooling resource for removing the residual heat of reactor

The Recirculated Cooling Water (RCW) system of a Candu reactor is a closed cooling system which delivers demineralized water to coolers and components in the Service Building, the Reactor Building, and the Turbine Building and the recirculated cooling water is designed to be cooled by the Raw Service Water (RSW). During the period of scheduled outage, the RCW system provides cooling water to the heat exchangers of the Shutdown Cooling System (SDCS) in order to remove the residual heat of the reactor, so the RCW heat exchangers have to operate at all times. This makes it very hard to replace the inlet and outlet valves of the RCW heat exchangers because the replacement work requires the isolation of the RCW. A task force was formed to prepare a plan to substitute the recirculated water with the chilled water system in order to cool the SDCS heat exchangers. A verification test conducted in 2007 proved that alternative cooling was possible for the removal of the residual heat of the reactor and in 2008 the replacement of inlet and outlet valves of the RCW heat exchangers for both Wolsong unit 3 and 4 were successfully completed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Design change management in regulation of nuclear fleets: World nuclear association's working groups on Cooperation in Reactor Design Evaluation and Licensing (CORDEL)

The 60 year life of a reactor means that a plant will undergo change during its life. To ensure continuing safety, changes must be made with a full understanding of the design intent. With this aim, regulators require that each operating organisation should have a formally designated entity responsible for complete design knowledge in regard to plant safety. INSAG-19 calls such an entity 'Design Authority'. This requirement is difficult to achieve, especially as the number of countries and utilities operating plants increases. Some of these operating organisations will be new, and some will be small. For Gen III plants sold on a turnkey basis, it is even more challenging for the operating company to develop and retain the full knowledge needed for this role. CORDEL's Task Force entitled 'Design Change Management' is investigating options for effective design change management with the aim to support design standardization throughout a fleet's lifetime by means of enhanced international cooperation within industry and regulators. This paper starts with considering the causes of design change and identifies reasons for the increased beneficial involvement of the plant's original vendor in the design change process. A key central theme running through the paper is the definition of responsibilities for design change. Various existing mechanisms of vendor-operator interfaces over design change and how they are managed in different organisational and regulatory environments around the world are considered, with the functionality of Owners Groups and Design Authority being central. The roles played in the design change process by vendors, utilities, regulators, owners' groups and other organisations such as WANO are considered The aerospace industry approach to Design Authority has been assessed to consider what lessons might be learned. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhancement of NRC station blackout requirements for nuclear power plants

The U.S. Nuclear Regulatory Commission (NRC) established a Near-Term Task Force (NTTF) in response to Commission direction to conduct a systematic and methodical review of NRC processes and regulations to determine whether the agency should make additional improvements to its regulatory system and to make recommendations to the Commission for its policy direction, in light of the accident at the Fukushima Dai-ichi Nuclear Power Plant. The NTTF's review resulted in a set of recommendations that took a balanced approach to defense-in-depth as applied to low-likelihood, high-consequence events such as prolonged station blackout (SBO) resulting from severe natural phenomena. Part 50, Section 63, of Title 10 of the Code of Federal Regulations (CFR), 'Loss of All Alternating Current Power,' currently requires that each nuclear power plant must be able to cool the reactor core and maintain containment integrity for a specified duration of an SBO. The SBO duration and mitigation strategy for each nuclear power plant is site specific and is based on the robustness of the local transmission system and the transmission system operator's capability to restore offsite power to the nuclear power plant. With regard to SBO, the NTTF recommended that the NRC strengthen SBO mitigation capability at all operating and new reactors for design-basis and beyond-design-basis external events. The NTTF also recommended strengthening emergency preparedness for prolonged SBO and multi-unit events. These recommendations, taken together, are intended to clarify and strengthen US nuclear reactor safety regarding protection against and mitigation of the consequences of natural disasters and emergency preparedness during SBO. The focus of this paper is on the existing SBO requirements and NRC initiatives to strengthen SBO capability at all operating and new reactors to address prolonged SBO stemming from design-basis and beyond-design-basis external events. The NRC initiatives are intended to enhance core and spent fuel pool cooling, reactor coolant system integrity, and containment integrity. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Regulatory Perspective on Potential Fuel Reconfiguration and Its Implication to High Burnup Spent Fuel Storage and Transportation - 13042

The recent experiments conducted by Argonne National Laboratory on high burnup fuel cladding material property show that the ductile to brittle transition temperature of high burnup fuel cladding is dependent on: (1) cladding material, (2) irradiation conditions, and (3) drying-storage histories (stress at maximum temperature) [1]. The experiment results also show that the ductile to brittle temperature increases as the fuel burnup increases. These results indicate that the current knowledge in cladding material property is insufficient to determine the structural performance of the cladding of high burnup fuel after it has been stored in a dry cask storage system for some time. The uncertainties in material property and the elevated ductile to brittle transition temperature impose a challenge to the storage cask and transportation packaging designs because the cask designs may not be able to rely on the structural integrity of the fuel assembly for control of fissile material, radiation source, and decay heat source distributions. The fuel may reconfigure during further storage and/or the subsequent transportation conditions. In addition, the fraction of radioactive materials available for release from spent fuel under normal condition of storage and transport may also change. The spent fuel storage and/or transportation packaging vendors, spent fuel shippers, and the regulator may need to consider this possible fuel reconfiguration and its impact on the packages' ability to meet the safety requirements of Part 72 and Part 71 of Title 10 of the Code of Federal Regulations. The United States Nuclear Regulatory Commission (NRC) is working with the scientists at Oak Ridge National Laboratory (ORNL) to assess the impact of fuel reconfiguration on the safety of the dry storage systems and transportation packages. The NRC Division of Spent Fuel Storage and Transportation has formed a task force to work on the safety and regulatory concerns in relevance to high burnup fuel storage and transportation. This paper discusses the staff's preliminary considerations on the safety implication of fuel reconfiguration with respect to nuclear safety (subcriticality control), radiation shielding, containment, the performance of the thermal functions of the packages, and the retrievability of the contents from regulatory perspective. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comprehensive Fuel Cycle - Community Perspective - 13093

Should a five-county region surrounding the Department of Energy's Savannah River Site ('SRS') use its assets to help provide solutions to closing the nation's nuclear fuel cycle? That question has been the focus of a local ad hoc multi-disciplinary community task force (Tier I) that has been at work in recent months outlining issues and identifying unanswered questions to determine if assuming a leadership role in closing the nuclear fuel cycle is in the community's interest. If so, what are the terms and conditions under which we the community would agree to participate? Our starting point was the President's Blue Ribbon Commission on America's Nuclear Future ('Commission') which made a total of eight (8) recommendations in its final report. There are several recommendations that are directly relevant to the Tier I group and potential efforts of the Region. These are the 'consent-based approach', the creation of an independent nuclear waste management entity funded from the existing nuclear waste fee; the 'prompt efforts to develop one or more consolidated storage facilities', and 'continued U.S. innovation in nuclear energy technology and for workforce development'. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Blue Ribbon Commission, Yucca Mountain Closure, Court Actions - Future of Decommissioned Reactors, Operating Reactors and Nuclear Power - 13249

Issues related to back-end of the nuclear fuel cycle continue to be difficult for the commercial nuclear power industry and for the decision makers at the national and international level. In the US, the 1982 NWPA required DOE to develop geological repositories for SNF and HLW but in spite of extensive site characterization efforts and over ten billion dollars spent, a repository opening is nowhere in sight. There has been constant litigation against the DOE by the nuclear utilities for breach of the 'standard contract' they signed with the DOE under the NWPA. The SNF inventory continues to rise both in the US and globally and the nuclear industry has turned to dry storage facilities at reactor locations. In US, the Blue Ribbon Commission on America's Nuclear Future issued its report in January 2012 and among other items, it recommends a new, consent-based approach to siting of facilities, prompt efforts to develop one or more geologic disposal facilities, and prompt efforts to develop one or more consolidated storage facilities. In addition, the March 2011 Fukushima Daiichi accident had a severe impact on the future growth of nuclear power. The nuclear industry is focusing on mitigation strategies for beyond design basis events and in the US, the industry is in the process of implementing the recommendations from NRC's Near Term Task Force. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Rinsing Effluent Evaporator for Dismantling Operations - 13271

Between 1958 and 1997, the UP1 plant at Marcoule - located in the south of France - reprocessed and recycled nearly 20,000 MT of used fuel from special defense applications reactors, as well as fuel from the first generation of electricity generating reactors in France (natural uranium fuel, CO{sub 2}-cooled, graphite-moderated). Decommissioning and Dismantling of the UP1 plant and its associated units started in 1998. Since 2005, the UP1 facility has been operated by AREVA as the Marcoule Management and Operation contractor for French Atomic Energy Commission (CEA). An important part of this decommissioning program deals with the vitrification facility of Marcoule. This facility includes 20 tanks devoted to interim storage of highly active solutions, prior to vitrification. In 2006, a rinsing program was defined as part of the tank cleanup strategy. The main objective of the rinsing phases was to decrease activity in order to limit the volume of 'long-life active' waste produced during the decommissioning operations, so the tanks can be dismantled without the need of remote operations. To enable this rinsing program, and anticipating large volumes of generated effluent, the construction of an evaporation unit proved to be essential. The main objective of this unit was to concentrate the effluent produced during tank rinsing operations by a factor of approximately 10, prior to it being treated by vitrification. The evaporator design phase was launched in September 2006. The main challenge for the Project team was the installation of this new unit within a nuclear facility still in operation and in existing compartments not initially designed for this purpose. Cold operating tests were completed in 2008, and in May 2009, the final connections to the process were activated to start the hot test phase. During the first hot test operations performed on the first batches of clean-up effluent, the evaporator had a major operating problem. Extremely large quantities of foam were produced, affecting the evaporator operation, and creating the risk of a reduction in its capacity and throughput performance. A task force of AREVA process, operations, and safety experts from Marcoule and the La Hague reprocessing complex was assembled. New operating parameters were defined and tested to improve the process. Since then, the evaporator has performed very satisfactorily. The foam buildup phenomenon has been brought under complete control. All the different types of effluents produced during cleanup operations have been concentrated, and the results obtained in terms of quality and throughput, have ensured a consistent supply to the vitrification unit. The evaporator was operated until the end of April 2012, and enabled the production of 500 cubic meters of very high activity effluent, concentrating the fission products rinsed from the storage tanks. The evaporator will now be deactivated and decommissioned, with the first rinsing and cleanup operations scheduled to begin in 2014. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

La Hague Legacy Waste Recovery Program: Scope, Progress and Issues -12080

A significant inventory of process waste of varying natures and quantities has been generated during the thirty years of operation of UP2 400 facility on the site of La Hague, France. The retrieval, packaging and final storage of such an inventory has never been achieved before in France and thus requires the design and qualification of new processes, equipment, and waste packages. Following AREVA strategic decisions and French safety authority requirements, the legacy waste program has begun around the year 2000 and is scheduled to be completed around the year 2025. It is under the responsibility of AREVA Site Value Development Project teams. For each category of waste to be recovered, AREVA teams conducted detailed investigations, defined recovery modes, treatment processes, as well as final waste package forms, which they subsequently submitted to French safety and waste management authorities. A Task force initiative was subsequently launched to optimize the program cost and scenario, and lead to an optimization of about 15% of the entire program. The qualification of processes and waste packages required a significant amount of research and development which is now well under way for processes, and scheduled to be completed in 2015. Preparation work has begun on several installations to clear space for the construction of future retrieval facilities, scheduled to begin in the coming three years. La Hague Legacy waste retrieval program represents a significant challenge in the sense that it covers a significant variety and quantity of waste needing recovery and reconditioning, with tight financial objectives and a binding recovery schedule. During the past five years, AREVA SVD successfully conducted design, research, development, and qualification activities which lead to the definition of qualified processes and waste packages for each retrieval program. Preparation work and supplier consultations are now on-going, in order to meet our objectives of beginning retrieval operations in compliance with our commitments to the safety authorities, in 2015 and 2016. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗