Integrity Monitoring, Prediction and Assessment, Corrosion Control, and Repair of the Hanford Storage Tanks – 25213

The Hanford Nuclear Reservation site contains approximately 211 million liters of radioactive and chemically hazardous waste arising from nuclear weapons production, beginning with World War II, and continuing through the Cold War [1]. The waste is stored in 177 carbon-steel underground storage tanks, of which 149 are single-shell tanks (SSTs) and the remaining are double-shell tanks (DSTs). The mission of an ongoing River Protection Project is to retrieve the waste from the underground storage tanks and then treat and immobilize (i.e., vitrify) it for disposal. Waste from the older SSTs is being progressively retrieved into the newer DSTs for storage pending treatment, immobilization, and disposal. Figure 1 depicts a typical DST design [2]. The tank is approximately 23 m in diameter and 9 m high and has a domed structure and has a capacity of 4000 m3. The tank wall and floor vary in thickness between approximately 10 mm and 25 mm depending on location. The thicker wall sections are near the curved transition between the tank wall and the floor, while the thinner sections are located near the top of the tank wall. The tank floor thickness varies from 25 mm at the tank center to 10 mm near the tank wall. The tanks were constructed of either ASTM A516 Grade 65 or ASTM A537 Class 1 carbon steel and were post-weld heat treated to reduce the risk of SCC.

Shukla, Pavan K. [Savannah River National Laborato↗

Strain-Gauge Measurement of Weight of Fluid in a Tank

A method of determining the amount of fluid in a tank is based on measurement of strains induced in tank supports by the weight of the fluid. Unlike most prior methods, this method is nonintrusive: there is no need to insert instrumentation in the tank and, hence, no need to run wires, cables, or tubes through the tank wall. Also unlike most prior methods, this method is applicable even if the fluid in the tank is at supercritical pressure and temperature, because it does not depend on the presence of a liquid/gas interface (as in liquid-level-measuring methods). The strain gauges used in this method are of two types: foil and fiber-optic. Four foil gauges and one or more fiber-optic gauges are mounted on each of the tank-supporting legs. An additional fiber-optic gauge is mounted on an object, made of the same material as that of the tank-supporting legs, that is not subjected to any mechanical load. The reading obtained by the additional fiber-optic gauge is used to compensate for apparent strains caused by changes in temperature. The signals from the foil and fiber-optic gauges are conditioned, then digitized for input to a computer. As the tank is filled or emptied, the deformation in each leg increases or decreases, respectively. Measured deformations of all legs are added to obtain a composite deformation indicative of the change in weight of the tank plus fluid. An initial calibration is performed by recording data at two points (usually, empty and full) for which the mass or weight of fluid is known. It is assumed that the deformations are elastic, so that the line passing through the two points can be used as a calibration curve of mass (or weight) of fluid versus deformation. At the time of reporting the information for this article, a set of foil gauges had been tested on the supports of a 500-gallon (1,900-liter) tank. The gauges were found to be capable of measuring the deformations (up to 22 microstrain) that occurred during filling and emptying the tank. The fluid masses calculated from the gauge readings were found to be accurate within 4.5 percent. It has been estimated that once the fiber-optic gauges are put into operation, it should be possible to determine fluid masses with 3 percent or less. It may be possible to increase accuracy further by increasing the signal-to-noise ratio through the use of more deformable tank supporting legs.

Figueroa, Jorge↗

Method of delivering lunar generated fluid to earth orbit using an external tank

A method and apparatus are provided for delivering lunar generated fluid to Earth orbit from lunar orbit. Transport takes place in an external tank of a shuttle which has been suitably outfitted in Earth orbit for reusable travel between Earth orbit and a lunar orbit. The outfitting of the external tank includes the adding of an engine, an electrical system, a communication system, a guidance system, an aerobraking device, and a plurality of interconnected fluid storage tanks to the hydrogen and oxygen tanks of the external tank. The external tank is then propelled to lunar orbit the first time using Earth-based propellant. In lunar orbit, the storage tanks are filled with the lunar generated fluid with the remainder tank volumes filled with lunar generated liquid oxygen and hydrogen which serve as propellants for returning the tank to Earth orbit where the fluid is off-loaded. The remaining lunar generated oxygen and hydrogen is then sufficient to return the external tank to lunar orbit so that a subsequent cycle of fluid delivery is repeated. A space station in a higher Earth orbit is preferably used to outfit the external tank, and a lunar node in lunar orbit is used to store and transfer the fluid and liquid oxygen and hydrogen to the external tank. The lunar generated fluid is preferably .sup.3 He.

Butterfield, Ansel J.↗

Liquid Hydrogen Propellant Tank Sub-Surface Pressurization with Gaseous Helium

A series of tests were conducted to evaluate the performance of a propellant tank pressurization system with the pressurant diffuser intentionally submerged beneath the surface of the liquid. Propellant tanks and pressurization systems are typically designed with the diffuser positioned to apply pressurant gas directly into the tank ullage space when the liquid propellant is settled. Space vehicles, and potentially propellant depots, may need to conduct tank pressurization operations in micro‐gravity environments where the exact location of the liquid relative to the diffuser is not well understood. If the diffuser is positioned to supply pressurant gas directly to the tank ullage space when the propellant is settled, then it may become partially or completely submerged when the liquid becomes unsettled in a microgravity environment. In such case, the pressurization system performance will be adversely affected requiring additional pressurant mass and longer pressurization times. This series of tests compares and evaluates pressurization system performance using the conventional method of supplying pressurant gas directly to the propellant tank ullage, and then supplying pressurant gas beneath the liquid surface. The pressurization tests were conducted on the Engineering Development Unit (EDU) located at Test Stand 300 at NASA Marshall Space Flight Center (MSFC). EDU is a ground based Cryogenic Fluid Management (CFM) test article supported by Glenn Research Center (GRC) and MSFC. A 150 ft3 propellant tank was filled with liquid hydrogen (LH2). The pressurization system used regulated ambient helium (GHe) as a pressurant, a variable position valve to maintain flow rate, and two identical independent pressurant diffusers. The ullage diffuser was located in the forward end of the tank and was completely exposed to the tank ullage. The submerged diffuser was located in the aft end of the tank and was completely submerged when the tank liquid level was 10% or greater. The ullage diffuser tests were conducted as a baseline to evaluate the performance of the pressurization system, and the submerged diffuser tests showed how the performance of the pressurization system was compromised when the diffuser was submerged in LH2. The test results are evaluated and compared, and included in this report for various propellant tank fill levels.

Stephens, J. R.↗

Hanford Double-Shell Tank Extent-of-Condition Construction Review

During routine visual inspections of Hanford double-shell waste tank 241-AY-102 (AY-102), anomalies were identified on the annulus floor which resulted in further evaluations. Following a formal leak assessment in October 2012, Washington River Protection Solutions, LLC (WRPS) determined that the primary tank of AY-102 was leaking. The formal leak assessment, documented in RPP-ASMT-53793,Tank 241-AY-102 Leak Assessment Report, identified first-of-a-kind construction difficulties and trial-and-error repairs as major contributing factors to tank failure. To determine if improvements in double-shell tank (DST) construction occurred after construction of tank AY-102, a detailed review and evaluation of historical construction records were performed for the first three DST tank farms constructed, which included tanks 241-AY-101, 241-AZ-101, 241-AZ-102, 241-SY-101, 241-SY-102, and 241-SY-103. The review for these six tanks involved research and review of dozens of boxes of historical project documentation. These reviews form a basis to better understand the current condition of the three oldest Hanford DST farms. They provide a basis for changes to the current tank inspection program and also provide valuable insight into future tank use decisions. If new tanks are constructed in the future, these reviews provide valuable "lessons-learned" information about expected difficulties as well as construction practices and techniques that are likely to be successful.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EVALUATION OF THE IMPACT OF THE DEFENSE WASTE PROCESSING FACILITY (DWPF) LABORATORY GERMANIUM OXIDE USE ON RECYCLE TRANSFERS TO THE H-TANK FARM

When processing High Level Waste (HLW) glass, the Defense Waste Processing Facility (DWPF) cannot wait until the melt or waste glass has been made to assess its acceptability, since by then no further changes to the glass composition and acceptability are possible. Therefore, the acceptability decision is made on the upstream feed stream, rather than on the downstream melt or glass product. This strategy is known as 'feed forward statistical process control.' The DWPF depends on chemical analysis of the feed streams from the Sludge Receipt and Adjustment Tank (SRAT) and the Slurry Mix Evaporator (SME) where the frit plus adjusted sludge from the SRAT are mixed. The SME is the last vessel in which any chemical adjustments or frit additions can be made. Once the analyses of the SME product are deemed acceptable, the SME product is transferred to the Melter Feed Tank (MFT) and onto the melter. The SRAT and SME analyses have been analyzed by the DWPF laboratory using a 'Cold Chemical' method but this dissolution did not adequately dissolve all the elemental components. A new dissolution method which fuses the SRAT or SME product with cesium nitrate (CsNO{sub 3}), germanium (IV) oxide (GeO{sub 2}) and cesium carbonate (Cs{sub 2}CO{sub 3}) into a cesium germanate glass at 1050 C in platinum crucibles has been developed. Once the germanium glass is formed in that fusion, it is readily dissolved by concentrated nitric acid (about 1M) to solubilize all the elements in the SRAT and/or SME product for elemental analysis. When the chemical analyses are completed the acidic cesium-germanate solution is transferred from the DWPF analytic laboratory to the Recycle Collection Tank (RCT) where the pH is increased to {approx}12 M to be released back to the tank farm and the 2H evaporator. Therefore, about 2.5 kg/yr of GeO{sub 2}/year will be diluted into 1.4 million gallons of recycle. This 2.5 kg/yr of GeO{sub 2} may increase to 4 kg/yr when improvements are implemented to attain an annual canister production goal of 400 canisters. Since no Waste Acceptance Criteria (WAC) exists for germanium in the Tank Farm, the Effluent Treatment Project, or the Saltstone Production Facility, DWPF has requested an evaluation of the fate of the germanium in the caustic environment of the RCT, the 2H evaporator, and the tank farm. This report evaluates the effect of the addition of germanium to the tank farm based on: (1) the large dilution of Ge in the RCT and tank farm; (2) the solubility of germanium in caustic solutions (pH 12-13); (3) the potential of germanium to precipitate as germanium sodalites in the 2H Evaporator; and (4) the potential of germanium compounds to precipitate in the evaporator feed tank. This study concludes that the impacts of transferring up to 4 kg/yr germanium to the RCT (and subsequently the 2H evaporator feed tank and the 2H evaporator) results in <2 ppm per year (1.834 mg/L) which is the maximum instantaneous concentration expected from DWPF. This concentration is insignificant as most sodium germanates are soluble at the high pH of the feed tank and evaporator solutions. Even if sodium aluminosilicates form in the 2H evaporator, the Ge will likely substitute for some small amount of the Si in these structures and will be insignificant. It is recommended that the DWPF continue with their strategy to add germanium as a laboratory chemical to Attachment 8.2 of the DWPF Waste Compliance Plan (WCP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK 26F SUPERNATANT AND 2F EVAPORATOR EDUCTOR PUMP SAMPLE CHARACTERIZATION RESULTS

In an effort to understand the reasons for system plugging problems in the SRS 2F evaporator, supernatant samples were retrieved from the evaporator feed tank (Tank 26F) and solids were collected from the evaporator eductor feed pump for characterization. The variable depth supernatant samples were retrieved from Tank 26F in early December of 2010 and samples were provided to SRNL and the F/H Area laboratories for analysis. Inspection and analysis of the samples at SRNL was initiated in early March of 2011. During the interim period, samples were frequently exposed to temperatures as low as 12 C with daily temperature fluctuations as high as 10 C. The temperature at the time of sample collection from the waste tank was 51 C. Upon opening the supernatant bottles at SRNL, many brown solids were observed in both of the Tank 26F supernatant samples. In contrast, no solids were observed in the supernatant samples sent to the F/H Area laboratories, where the analysis was completed within a few days after receipt. Based on these results, it is believed that the original Tank 26F supernatant samples did not contain solids, but solids formed during the interim period while samples were stored at ambient temperature in the SRNL shielded cells without direct climate control. Many insoluble solids (>11 wt. % for one sample) were observed in the Tank 26F supernatant samples after three months of storage at SRNL which would not dissolve in the supernatant solution in two days at 51 C. Characterization of these solids along with the eductor pump solids revealed the presence of sodium oxalate and clarkeite (uranyl oxyhydroxide) as major crystalline phases. Sodium nitrate was the dominant crystalline phase present in the unwashed Eductor Pump solids. Crystalline sodium nitrate may have formed during the drying of the solids after filtration or may have been formed in the Tank 26F supernatant during storage since the solution was found to be very concentrated (9-12 M Na{sup +}). Concentrated mineral acids and elevated temperature were required to dissolve all of these solids. The refractory nature of some of the solids is consistent with the presence of metal oxides such as aluminosilicates (observed as a minor phase by XRD). Characterization of the water wash solutions and the digested solids confirmed the presence of oxalate salts in both solid samples. Sulfate enrichment was also observed in the Tank 26F solids wash solution, indicating the presence of sulfate precipitates such as burkeite. OLI modeling of the Tank 26F filtered supernatant composition revealed that sodium oxalate has a very low solubility in this solution. The model predicts that the sodium oxalate solubility in the Tank 26F supernatant is only 0.0011 M at 50 C. The results indicate that the highly concentrated nature of the evaporator feed solution and the addition of oxalate anion to the waste stream each contribute to the formation of insoluble solids in the 2F evaporator system.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Review of Tank 48H Treatment of Tetraphenylborate with Permanganate

Tank 48H contains roughly 270,000 gallons of radioactive waste material. The waste stored in this tank was to be processed in multiple stages utilizing facilities at the Savannah River Site (SRS) almost 30 years ago. The In-Tank Precipitation Process (ITP) was initiated in Tank 48H, which precipitated highly radioactive cesium-137 using sodium tetraphenylborate (NaTPB). While the process succeeded in precipitating the Cs, Sr, and other actinides, it also generated an unexpectedly large amount of benzene. The evolved benzene created a safety concern and made the waste incompatible with further downstream processing. This halted the ITP, and a new method of treatment was required to continue processing the legacy waste contained in Tank 48H. A myriad of treatment options have been proposed with multiple teams of researchers assembled to work on this highly complex issue over the last few decades. This review investigated one potentially viable treatment option, in-tank oxidation with sodium permanganate. Permanganate has been well known in literature as a strong oxidizing agent for organic compounds, as well as being utilized at the Savannah River Site (SRS) in other processes. A small number of studies have been conducted utilizing waste simulants to evaluate the use of permanganate as an oxidant for tetraphenylborate (TPB). A search of the literature and data from these studies indicates that permanganate could be a viable treatment for destruction of TPB in Tank 48H. While the scoping studies had a small number of individual experiments and nonideal conditions, the permanganate decomposed up to 90% of the TPB. A free hydroxide concentration above 1.0 M is required for tank corrosion control. Simulant studies indicate no decrease in TPB decomposition by permanganate until pH 14. The simulant studies show an increase in TPB decomposition as the temperature of the solution is increased to 40 °C. The post-reaction analysis of previous simulant tests did not look at all of the organic degradation products. Investigations into what these organic products are and in what quantity will help guide determinations as to whether the downstream processing facilities are able to handle the material that will be generated. Study on the time frame for the reaction between permanganate and TPB should be investigated as the literature reports only extend out to two weeks reaction time. The permanganate treatment conditions indicate no corrosion control concerns and a longer timescale reaction may be needed for in-tank treatment. In addition, further study would be useful to identify a lower boundary condition for the ratio of TPB and oxidant. The simulant tests applied large excesses of permanganate, and this may be unnecessary. The size constraint of the tank means that there will be practical limitations on the amount of sodium permanganate that can be added to the tank. The amount of permanganate should be minimized as much as possible while still ensuring decomposition of the TPB to minimize the amount of manganese dioxide solids generated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Video Camera Improvements to Support Hanford Tank Farms - 17141

Hanford Tank Farms consist of 177 underground storage tanks that contain 56 million gallons of radioactive waste. The current mission is to safely manage this waste in preparation to feed the Waste Treatment Plant. Fulfilling this mission includes inspecting each tank regularly to ensure tank integrity and support ongoing operations such as transferring waste from older single-shell tanks to the newer double-shell tanks. Video cameras derived from commercially available equipment have provided the ability to remotely see inside the tanks, reducing some of the challenges of fulfilling this mission. However, there are many challenges and limitations with the currently used video systems. Among some of the challenges are limited tank interior entry points for camera deployment, high radiation dose rates, limited equipment longevity in the environmental conditions, need for high resolution image quality, low light conditions, and in-tank obstructions. Washington River Protection Solutions (WRPS) has identified and tested new video systems that will effectively manage these challenges and increase capability, efficiency, and improve safety. The new camera systems are planned for deployment to support the next Single Shell Tank Retrieval Project in the A/AX tank Farm complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress of the enhanced Hanford single shell tank (SST) integrity project - 15497

To improve understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the US DOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matter experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. In late 2010, seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The change package identified two phases of work for SST integrity. The initial phase was focused on efforts to envelope the integrity of the tanks. The initial phase was divided into two primary areas of investigation: structural integrity and leak integrity. If necessary, based on the outcome from the initial work, second phase would be focused on further definition of the integrity of the tanks and liners. Combined these two phases are designed to support the formal integrity assessment of the Hanford SSTs in 2018 by an Independent Qualified Registered Engineer. As the initial phase of this work completes in early 2015, this paper summarizes the project formation and status the work of the past few years associated the implementation of the Phase one recommendations. Work in the initial phase to further define the DOE's understanding of the structural integrity SSTs involved preparing a modern Analysis of Record (AOR) using finite element analysis. Structural analyses of the SSTs have been conducted since 1957, but these analyses used analog calculations, less rigorous models, or focused on individual structures. As such, an integrated understanding of all of the SSTs has not been developed to modern expectations. In support of this effort, other activities addressed the visual inspection of tank internal conditions and the collection of concrete core samples from the tanks, including a full height tank sidewall core, for analysis of current mechanics properties. The work on the liner leak integrity has examined leaks from 25 tanks with known liner failures. Individual leak assessments were developed for each tank to identify the leak cause and location and estimate historic leak rates. A common cause/failure analysis study was performed to take data from individual tanks to look for trends in the causes of failure. A separate activity is being conducted to examine the propensity for corrosion in select SSTs with aggressive waste layers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Double-Shell tank Integrity program - 15533

Waste at Hanford is stored in 149 single-shell tanks and 28 double-shell tanks (DSTs). Concerns related to aging radioactive waste storage facilities throughout the US DOE complex led to Brookhaven National Laboratory (BNL) developing guidelines for structural integrity programs for tank systems (BNL-52527, Guidelines for Development of Structural Integrity Programs for DOE High-Level Waste Storage Tanks). The committee of experts who developed these guidelines is commonly known as the Tank Structural Integrity Panel (TSIP). The US DOE has subsequently adopted these guidelines, and requires site operators to have a program consistent with them (DOE M 435.1, Radioactive Waste Management Manual). The Washington River Protection Solutions, LLC (WRPS) manages the tanks for the US DOE Office of River Protection (ORP) under the Tank Operations Contract (TOC). The US DOE-ORP contractual agreement with the TOC (11-NSD-010) includes a requirement to 'maintain the tank structural integrity program as described in RPP-7574, Double-Shell tank Integrity Project Plan'. The DST integrity is maintained with a variety of activities such as ultrasonic and visual inspections, chemistry controls, corrosion monitoring and structural analyses methods. The recent loss of tank 241-AY-102 has led to the formation of the High-Level Waste Integrity Assessment Panel to evaluate the DST integrity project (DSTIP) and to recommend improvements to the DSTIP. This panel continues the DOE practice of seeking expert advice to guide the formulation and continuous assessment of tank integrity activities. The panel has concluded its work and WRPS has developed a series of tasks to implement their recommendations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overcoming Waste Removal Challenges at Savannah River Site: A Case Study of Tank 15 - 16198

Tank 15 is a High Level Waste Tank at the Savannah River Site containing sludge waste that had been allowed to dry due to several flaws in the primary tank wall. In order to remove the tank waste, the sludge had to first be re-hydrated. Due to the age of Tank 15 and the thirty years of 'dry sludge tank' status, there were numerous technical challenges and risks that had to be addressed to demonstrate operational readiness to add liquid to a tank with known flaws. Liquid management was a key to readiness since Tank 15 did not have the infrastructure to mitigate waste accumulating in the annulus or to transfer waste out of the primary tank as a means to control a large leak. The project team's fundamental expectation was that some amount of liquid would migrate to the annulus through identified flaws as the sludge waste was re-hydrated. Communication was crucial to ensuring this expectation was propagated to management, the customer, and the regulators. Equipment upgrades, provisions for annulus liquid management (monitoring and removal), and readiness for outgoing transfers mitigated waste migration. Liquid addition methodology and facility modifications were developed to safely re-hydrate the sludge while monitoring the integrity of the primary tank. These efforts culminated in successfully adding 697 m{sup 3} (184,000 gal) of liquid to Tank 15, re-hydrating the sludge waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TCCR Operational Summary and Optimization for Tank 9 Processing - 20314

Savannah River Remediation (SRR) manages and operates the liquid waste facilities at Savannah River Site (SRS) for the Department of Energy (DOE). Stored liquid waste is a complex mixture of insoluble solids (sludge) and soluble salts in an alkaline solution. SRR has deployed the Tank Closure Cesium Removal (TCCR) system, a tank-side ion exchange process, to remove radioactive cesium from salt waste and enable onsite disposal of the resulting decontaminated salt solution as low-level waste at the Saltstone facilities. The TCCR system consists of two prefilters, four ion exchange (IX) columns, one resin trap, and a ventilation system. The IX process uses a form of inorganic crystalline silicotitanate (CST), which has a high affinity for cesium and other alkali metals, strontium, and actinides. This process is currently deployed utilizing salt feed from Tank 10, with future plans to dissolve solid salt in Tank 9 and transfer the salt solution to Tank 10 for processing through TCCR. The feed for TCCR must be created from salt-cake in Tank 10 through a dissolution process. Once enough salt has been dissolved, a qualification process is entered. This process characterizes the feed and ensures the cesium loading on the columns will not cause boiling of waste within the columns during or after processing. Once the batch has been qualified, salt waste is fed to the TCCR system through a transfer pump in the center of the tank. The waste is filtered through a set of two shielded, dead-end prefilters that prevent solids buildup in the columns. The filtered salt solution then travels to the shielded IX columns, which can be operated individually or in series, where the cesium is sorbed on the CST media. The decontaminated salt solution (DSS) then travels through a resin trap and out of the module to Tank 11. TCCR has successfully processed approximately 795,000 L of Tank 10H radioactive salt waste over two batches to date. There has not yet been a system induced shutdown. The prefilters performed as expected with only minor degradation in recovery of differential pressure after a backflush sequence. The time between backflushes decreased as each batch reached the end of processing. The hydraulics in the IXCs mostly performed as expected at all flow rates, except for one IXC that will be further investigated during Batch 3 processing. The TCCR system has shown some opportunities for more efficient processing during the length of the demonstration so far. For future processing of material from Tank 9H through Tank 10H and the TCCR unit, TCCR 1A will implement changes to the prefilters and the IXCs. The prefilters will have an increased surface area and a new filter media in an effort to increase time between filter swaps and improve backwashing cleaning capability. The IXCs will have a reduced diameter to allow for increased heat transfer out of the column and increased loading of Cs-137. Additionally, a new form of CST with an increased kinetic performance is being investigated for use during TCCR 1A operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CHANGING THE SAFETY CULTURE IN HANFORD TANK FARMS

In 2000 the Hanford Tank Farms had one of the worst safety records in the Department of Energy Complex. By the end of FY08 the safety performance of the workforce had turned completely around, resulting in one of the best safety records in the DOE complex for operations of its kind. This paper describes the variety of programs and changes that were put in place to accomplish such a dramatic turn-around. The U.S. Department of Energy's 586-square-mile Hanford Site in Washington State was established during World War II as part of the Manhattan Project to develop nuclear materials to end the war. For the next several decades it continued to produce plutonium for the nation's defense, leaving behind vast quantities of radioactive and chemical waste. Much of this waste, 53,000,000 gallons, remains stored in 149 aging single-shell tanks and 28 newer double-shell tanks. One of the primary objectives at Hanford is to safely manage this waste until it can be prepared for disposal, but this has not always been easy. These giant underground tanks, many of which date back to the beginning of the Manhattan Project, range in size from 55,000 gallons up to 1.1 million gallons, and are buried beneath 10 feet of soil near the center of the site. Up to 67 of the older single-shell tanks have leaked as much as one million gallons into the surrounding soil. Liquids from the single-shell tanks were removed by 2003 but solids remain in the form of saltcake, sludges and a hardened heel at the bottom of some tanks. The Department of Energy's Office of River Protection was established to safely manage this waste until it could be prepared for disposal. For most of the last seven years the focus has been on safely retrieving waste from the 149 aging single-shell and moving it to the newer double-shell tanks. Removing waste from the tanks is a difficult and complex task. The tanks were made to put waste in, not take it out. Because of the toxic nature of the waste, both chemically as well as radiologically, all retrieval operations must be performed using remote-controlled equipment which has to be installed in each tank, then removed when retrieval is completed. This process involves a variety of potentially hazardous construction activities including crane and rigging, excavation, electrical and piping work. It also requires strong attention to safety to avoid injuries to personnel and contamination of the environment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Test Report for Permanganate and Cold Strontium Strike for Tank 241-AN-102

Tanks 241-AN-102 and 241-AN-107 supernatants contain soluble Sr-90 and transuranic elements that require removal prior to vitrification to comply with the Waste Treatment and Immobilization Plant immobilized low-activity waste specification (WTP Contract, DE-AC27-01RV 14136, Specification 2.2.2.8, "Radionuclide Concentration Limitations") and the U.S. Nuclear Regulatory Commission provisional agreement on waste incidental to reprocessing (letter, Paperiello, C. J., "Classification of Hanford Low-Activity Tank Waste Fraction"). These two tanks have high concentrations of organics and organic complexants and are referred to as complexant concentrate tanks. A precipitation process using sodium permanganate (NaMnO 4 ) and strontium nitrate (Sr(NO 3 ) 2 ) was developed and tested with tank waste samples to precipitate Sr-90 and transuranic elements from the supernate (PNWD-3141, Optimization of Sr/TRU Removal Conditions with Samples of AN-102 Tank Waste). Testing documented in this report was conducted to further evaluate the use of the strontium nitrate/sodium permanganate process in tank farms with a retention time of up to 12 months. Previous testing was focused on developing a process for deployment in the ultrafiltration vessels in the Waste Treatment and Immobilization Plant. This environment is different from tank farms in two important ways: the waste is diluted in the Waste Treatment and Immobilization Plant to ~5.5 M sodium, whereas the supernate in the tank farms is ~9 M Na. Secondly, while the Waste Treatment and Immobilization Plant allows for a maximum treatment time of hours to days, the in-tank farms treatment of tanks 241-AN102 and 241-AN-107 will result in a retention time of months (perhaps up to12 months) before processing. A comparative compilation of separation processes for Sr/transuranics has been published as RPP-RPT-48340, Evaluation of Alternative Strontium and Transuranic Separation Processes. This report also listed the testing needs for the permanganate precipitation process to be field-deployable. A more comprehensive listing of future testing needs to allow the process to be field deployable are contained in RPP-PLAN-51288, Development Test Plan for Sr/TRU Precipitation Process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of performing an MST strike in Tank 21H

Previous Savannah River National Laboratory (SRNL) tank mixing studies performed for the Small Column Ion Exchange (SCIX) project have shown that 3 Submersible Mixer Pumps (SMPs) installed in Tank 41 are sufficient to support actinide removal by MST sorption as well as subsequent resuspension and removal of settled solids. Savannah River Remediation (SRR) is pursuing MST addition into Tank 21 as part of the Large Tank Strike (LTS) project. The preliminary scope for LTS involves the use of three standard slurry pumps (installed in N, SE, and SW risers) in a Type IV tank. Due to the differences in tank size, internal interferences, and pump design, a separate mixing evaluation is required to determine if the proposed configuration will allow for MST suspension and strontium and actinide sorption. The author performed the analysis by reviewing drawings for Tank 21 [W231023] and determining the required cleaning radius or zone of influence for the pumps. This requirement was compared with previous pilot-scale MST suspension data collected for SCIX that determined the cleaning radius, or zone of influence, as a function of pump operating parameters. The author also reviewed a previous Tank 50 mixing analysis that examined the ability of standard slurry pumps to suspend sludge particles. Based on a review of the pilot-scale SCIX mixing tests and Tank 50 pump operating experience, three standard slurry pumps should be able to suspend sludge and MST to effectively sorb strontium and actinides onto the MST. Using the SCIX data requires an assumption about the impact of cooling coils on slurry pump mixing. The basis for this assumption is described in this report. Using the Tank 50 operating experience shows three standard slurry pumps should be able to suspend solids if the shear strength of the settled solids is less than 160 Pa. Because Tank 21 does not contain cooling coils, the shear strength could be larger.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Ion Exchange Testing Using a Three-Column System with Crystalline Silicotitanate and Hanford Tank Waste 241-AP-107

Washington River Protection Solutions (WRPS) is working to support early production of immobilized low-activity waste by feeding Hanford tank supernate from tank farms to the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) facility. This goal incorporates the design of a Tank-Side Cesium Removal (TSCR) system, which in effect filters tank waste supernate and processes it through a cesium ion exchange medium to remove 137Cs. The 137Cs-depleted product is sent to the WTP for vitrification. Rovira et al. (2018) reported the successful Cs removal from Hanford tank 241-AP-107 waste (hereafter called AP-107) using crystalline silicotitanate (CST) ion exchange media manufactured by Honeywell UOP, LLC (product IONSIVTM R9140-B, Batch 2081000057) in a lead-lag column system. Since that testing, WRPS has changed the column design to a three-column system. WRPS requested a repeated study with AP-107 tank waste using a different batch of IONSIVTM R9140-B, Lot 2002009604, in a three-column format. A small-scale test platform was constructed to demonstrate solids filtration, Cs removal, and LAW vitrification and installed at Pacific Northwest National Laboratory. This report describes the small-scale ion exchange testing system component of the test platform and the processing of approximately 8.55 L of filtered AP-107 supernate using CST, Lot 8056262-999, that passed through a 25-mesh filter. This report also describes the Cs ion exchange batch contact testing to determine the Cs distribution coefficient and the maximum Cs loading capacity in the AP-107 tank waste matrix. Batch contact testing helps to evaluate CST performance on tank waste supernate and is often used prior to processing tank waste through ion exchange columns to assess some performance metrics (e.g., 50% Cs breakthrough). Batch contact tests were performed with the filtered AP-107 tank waste at four Cs concentrations at a phase ratio of 200 (liquid volume to exchanger mass). The distribution coefficient (K d ) at the equilibrium condition of 9.2 µg Cs/mL (AP-107 feed condition) was determined to be 806 mL AP 107/g CST. With a CST bed density of 1.01 g/mL (<25 mesh CST), this K d corresponded to a predicted 50% Cs breakthrough of 814 bed volumes (BVs). The Cs load capacity at the equilibrium feed condition was determined to be 8.3 mg Cs/g dry CST. The three-column format testing was prototypic to the intended TSCR operations, albeit on a small scale with 10-mL CST beds. Flowrate was adjusted to match the CST contact time expected for the full-scale operation, i.e., matched bed volumes per hour (BV/h) flow rate. The feed was processed downflow through the lead column, then through the middle column, and then through the polish column. Loading continued at an average of 1.88 BV/h (1.83 to 2.04 BV/h range) until the entire available AP-107 feed was processed. The Cs-decontaminated product will be provided for vitrification testing. The lead column only reached 45% Cs breakthrough after processing 855 BVs of feed. The 50% Cs breakthrough was extrapolated to occur at ~900 BVs. This extrapolated 50% Cs breakthrough value differed from the batch contact estimate (814 BVs) by 13%. The waste acceptance criteria (WAC) or contract limit for the WTP LAW vitrification facility is 3.18E-5 Ci 137 Cs per mole Na. For the AP-107 tank waste, only 0.127% of the influent 137 Cs concentration may be delivered to the WTP; this required a Cs decontamination factor of 787. The Cs effluent from the middle column reached the WAC after processing 590 BVs. Cs breakthrough from the polish column began at 590 BVs, reaching 6.3E-3 µCi/mL or 4.3E-3% Cs breakthrough after processing 844 BVs of feed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK 40 FINAL SB5 CHEMICAL CHARACTERIZATION RESULTS PRIOR TO NP ADDITION

A sample of Sludge Batch 5 (SB5) was pulled from Tank 40 in order to obtain radionuclide inventory analyses necessary for compliance with the Waste Acceptance Product Specifications (WAPS). This sample was also analyzed for chemical composition including noble metals. Prior to radionuclide inventory analyses, a final sample of the H-canyon Np stream will be added to bound the Np addition anticipated for Tank 40. These analyses along with the WAPS radionuclide analyses will help define the composition of the sludge in Tank 40 that is currently being fed to DWPF as SB5. At the Savannah River National Laboratory (SRNL) the 3-L Tank 40 SB5 sample was transferred from the shipping container into a 4-L high density polyethylene vessel and solids allowed to settle overnight. Supernate was then siphoned off and circulated through the shipping container to complete the transfer of the sample. Following thorough mixing of the 3-L sample, a 239 g sub-sample was removed. This sub-sample was then utilized for all subsequent analytical samples. Eight separate aliquots of the slurry were digested, four with HNO{sub 3}/HCl (aqua regia) in sealed Teflon{reg_sign} vessels and four in Na{sub 2}O{sub 2} (alkali or peroxide fusion) using Zr crucibles. Due to the use of Zr crucibles and Na in the peroxide fusions, Na and Zr cannot be determined from this preparation. Additionally, other alkali metals, such as Li and K that may be contaminants in the Na{sub 2}O{sub 2} are not determined from this preparation. Three Analytical Reference Glass-1 (ARG-1) standards were digested along with a blank for each preparation. The ARG-1 glass allows for an assessment of the completeness of each digestion. Each aqua regia digestion and blank was diluted to 1:100 mL with deionized water and submitted to Analytical Development (AD) for inductively coupled plasma--atomic emission spectroscopy (ICPAES) analysis, inductively coupled plasma--mass spectrometry (ICP-MS) analysis of masses 81-209 and 230-252, and cold vapor atomic absorption (CV-AA) analysis for Hg. Equivalent dilutions of the peroxide fusion digestions and blank were submitted to AD for ICP-AES analysis. Tank 40 SB5 supernate was collected from a mixed slurry sample in the SRNL Shielded Cells and submitted to AD for ICP-AES. Weighted dilutions of slurry were submitted for ion chromatography (IC), total inorganic carbon/total organic carbon (TIC/TOC), and total base analyses. The following conclusions were drawn from the analytical results reported here: (1) The elemental ratios of the major elements for the SB5 WAPS sample, whose major Tank 51 Qualification sample component underwent Al dissolution, are similar to those measured for the SB4 WAPS sample. (2) The elemental composition of this sample and the analyses conducted here are reasonable and consistent with DWPF batch data measurements in light of DWPF pre-sample concentration and SRAT product heel contributions to the DWPF SRAT receipt analyses. (3) Fifty percent of the sulfur in the SB5 WAPS sample is insoluble, and this represents a significantly larger fraction than that observed in previous sludge batches. (4) The noble metal and Ag concentrations predicted from the measured values for the Tank 51 Confirmation sample and Tank 40 SB4 WAPS sample using a two-thirds Tank 51, one-third Tank 40 heel blend ratio used to arrive at the final SB5 composition, agree with the values for the Tank 40 SB5 WAPS sample measured for this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗