Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Status Update: Deposition Modeling For SNF Canister CISCC

This report fulfills the M3 milestones M3SF-21PN010207025 & M3SF-20PN0102070412. During fiscal year (FY) 2020, Pacific Northwest National Laboratory (PNNL) worked to further develop the FY 2019 deposition and particle tracking models. This status report outlines these efforts and presents the progress made so far. Model development work is ongoing and is planned to continue in FY 2021. The FY 2020 model development included work on: Wind Effects. Model development and sensitivity studies, investigated how wind direction and speed affect deposition; Brownian Motion. Implementing Brownian Motion into existing models; Particle Size Variability. Depending on the particle composition, the diameter of the particle may vary with changes in relative humidity. Models were developed to analyze this; Multiphase and Fluid Film Modeling. Investigating canister surface wetting and drying, and how this effects overall deposition. Models were developed to analyze this; Difusophoresis. Performing initial work to implement diffusiophoresis into the existing models; Turbophoresis. Performing initial work to implement turbophoresis into the existing models. Much of this work will continue into FY21. The authors present initial results and discus current and future work.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY21 Status report on the CMVB and CNWG International Collaborations

The ART-GCR Methods area includes an international collaboration work package that covers the tasks defined for the Computational Methods Validation and Benchmark (CMVB)and Civil Nuclear Energy Research and Development Working Group (CNWG) projects. This report summarizes the status of the FY21 tasks and planned FY22 DOE contributions. The CMVB Project Arrangement (PA) is not yet formally approved by all signatories, and no work has therefore been performed in FY21 at INL related to this activity. The CNWG activities inFY21 consisted of the simulation of the High Temperature Test Reactor (HTTR) Loss Of Forced Cooling (LOFC) experimental with the Idaho National Laboratory (INL) codes Griffin, BISON and RELAP-7 based on the Multiphysics Object-Oriented Simulation Environment (MOOSE).It was found that the multiphysics coupled suite is capable of simulating all the important phenomena occurring during the Depressurized Loss of Forced Cooling (DLOFC) experiments showing promising agreement with the measurements given the number of uncertainties and approximations introduced into the model.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Flow Sensor Test Article (F-STAr) - Status Report for FY2021

This report will review updates on the status of F-STAr. First, the report will describe a general overview of the test article and how each component interacts. Then, each main component will be discussed in a deep dive section which will review the design and other relevant details. F-STAr components which are discussed in more detail include the 120 GPM-pump, the support structure and test sections, 5 kW-heater, the 2 kW-cooler and cooling system, and the submersible flowmeter. Finally, this report will conclude with a brief recap and a bulleted outline of the path moving forward.

42 ENGINEERING↗

Thermal Hydraulic Experimental Test Article - Status Report FY20 Q2

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (like a redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA will be installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2. The design work for the facility has been completed, most primary component have been fabricated, primary components are being assembled in preparation for initial testing, and procurement is continuing with the secondary system components. Since the FY19 THETA status report, The THETA primary system components are at Argonne National Laboratory (ANL) and have been dry assembled. The secondary sodium system for heat rejection from intermediate heat exchanger has all been analyzed according to ASME code. All secondary side piping, fittings and a U-stamped air-to-sodium heat exchanger has been procured.

42 ENGINEERING↗

Annual Status Report (FY 2020): Performance Assessment for the Disposal of Low Level Waste in the 200 East Area Burial Grounds

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 East Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-SD-WM-TI-730). The estimates are compared with requirements of DOE O 435.1 Chg 1 and performance objectives defined in companion documents DOE M 435.1-1 Chg 1and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 Chg 1 is expected. A new PA study was initiated in fiscal year (FY) 2019 for evaluation of active disposal sites within the 200 East and 200 West Areas (Trench 94 in 200 East; Trenches 31 and 34 in 200 West) due to extended time elapsing between the current annual status report and the original PA for the active disposal sites. The new PA for the active disposal sites is expected to be completed in FY 2021. Within the active burial grounds in the 200 East Area, low-level waste and mixed low-level waste will continue to be disposed of in the dedicated U.S. Navy reactor compartment trench at the 218-E-12B Burial Ground (Trench 94). During this reporting period (FY 2020, from October 1, 2019, through September 30, 2020), two reactor compartments were disposed in Trench 94. Results from sorption experiments are summarized for this reporting period to quantify the efficacy of concrete waste forms in retaining key radionuclides (e.g., technetium-99 and iodine-129). The test durations ranged from 1 to 3 months. Continued groundwater monitoring of the 200 East Area LLBGs indicates no groundwater contamination due to LLBG waste. Current assumptions about future land use at the Hanford Site are consistent with PA analysis1 assumptions of a post-closure facility that will not be degraded by human activity. The LLBGs are located in an area identified for waste management and containment of residual contamination. This area will remain after final environmental remediation and the proposed shrinkage of Hanford Site boundaries to small sections within the 200 East and 200 West Areas in the Central Plateau (DOE/EIS-0391). The current closure plan for the LLBGs (DOE/RL-2000-707) estimates that the 200 East LLBGs will be closed in the 2050 timeframe. The Disposal Authorization Statement, other technical basis documents, and the radioactive waste management basis are of continued adequacy to meet the performance objectives of DOE O 435.1 Chg 1. Overall, there are no substantive changes to primary PA assumptions nor the PA analysis conclusion; therefore, compliance with DOE O 435.1 Chg 1 and the Disposal Authorization Statement is maintained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status Report on the INL IES Plug-and-Play Framework

This report discusses the advancements and status of the flexible plug-and-play framework development currently ongoing that aims to integrate Modelica/Dymola with the Risk Analysis and Virtual ENvironment (RAVEN) software in terms of both Functional Mock-Up Interface (FMI)/Functional Mock-Up Unit (FMU) construction and usage, which aims to ease the sharing and simulation of complex dynamic models. This report discusses the FMI/FMU development advancements, overall focusing on the deployment of methodologies for RAVEN to export and use FMI/FMU of both Python-based models and advanced AI-constructed algorithms.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FY2021 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models and Testing of Selected Process Models

Sandia National Laboratories continued evaluation of the total system performance assessment (TSPA) for License Application (LA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. The FY21 task included continued operation of the cluster; maintenance of the TSPA-LA models (with GoldSim 9.60.300); continued assessment of the status of the Infiltration Model; (a process model that feeds the TSP -LA) and preliminary assessments of the Unsaturated Zone Flow Model and the Saturated Zone Flow and Transport Model Abstraction (process models that feed the TSPA-LA). The 2014 cluster and supporting software systems are currently fully operational to support TSPA-LA type analyses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Status Report Confirming Completion of Mechanical Testing of HFIR Irradiated Nanocomposite Materials

This report provides a final status report on the in-cell mechanical testing of High Flux Isotope Reactor (HFIR)-irradiated nanodispersion-strengthened materials at the Irradiated Materials Examination and Testing (IMET) facility. All tension tests were performed at room temperature with a nominal strain rate of 0.018 mm/mm/min using shoulder-loading grip sets by following the standard testing procedure in ASTM E8/E8M. Round 1 (unirradiated) and round 2 (0.7 dpa) testing was completed in FY 2021. This report confirms completion of round 3 (1.4 dpa) and round 4 (2.1 dpa) tensile testing in FY 2022 with examples of test data collected on select sample conditions. Additionally, the report includes IDs of samples selected for shipment to Idaho National Laboratory (INL) for additional characterization.

36 MATERIALS SCIENCE↗

NIOWAVE Oxygen Control Status Report, July 2022

The following is a summary of the status report: Oxygen concentration in liquid metal measurement; Literature search on oxygen control in liquid metal coolant in nuclear installation; Possible oxygen control in vacuum system are getter materials and cold trap; and, Initial ideas on implementation of these two methods

43 PARTICLE ACCELERATORS↗

Status of the muon neutrino charged-current zero mesons cross section measurement in the NOvA near detector

NOvA is a long-baseline accelerator neutrino experiment at Fermilab whose physics goals include precision neutrino oscillation as well as cross-section measurements. We present the status of the measurement of muon neutrino charged-current cross section with zero mesons in the final state at the NOvA near detector. This measurement will be made with respect to the kinematics of the final state particles. Our chosen interaction channel is especially sensitive to quasielastic and meson exchange current interactions and will provide a handle for constraining the cross section systematic uncertainties in oscillation analyses in current and future experiments. For particle identification, we use a convolutional neural network (CNN) trained on individual particles simulated in the NOvA near detector that allows us to select the desired signal while reducing the potential bias from neutrino interaction modeling. Charged pion background constraining is further improved via Michel electron tagging.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi - November 2022 Meeting Notes and Information Request Status

Information obtained from Fukushima Daiichi Nuclear Power Station (Daiichi) is required to inform future Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. commercial nuclear power plants. This document summarizes results from the Fiscal Year 2023 (FY2023) U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy, is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Fukushima-related information and associated discussions during these meetings benefit operating, new, and advanced reactors. Significant safety insights have been and are continuing to be obtained in several areas: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Furthermore, Daiichi-related activities, such as code modeling improvements and analysis, testing, and new technology deployment efforts, have the potential to offer additional benefits to the operating fleet and new LWR and non-LWR designs. U.S. evaluations of obtained examination information and input regarding future Daiichi examinations are of interest to several organizations within Japan. Since its inception, the U.S. has provided consensus input for high priority time-sequenced examination tasks and supporting research activities. In their Mid-to-Long-term Examination Plan for 1F investigations, TEPCO included all remaining U.S. consensus information requests and additional information requests they identified. TEPCO periodically provides reports on the status of these requests (reflecting D&D priorities, new insights from investigations, and new technologies that become available). Hence, U.S. experts agreed that it was appropriate for TEPCO to track and prioritize these information requests as D&D progresses. U.S. experts will continue to review and comment on the information obtained from examinations and, as needed, provide additional details and relevant background material to support future examinations. As documented in this report, several other items, such as additional details on information requests pertaining to ex-vessel examinations, relevant references from prior research, additional documents to provide insights regarding recent investigation findings, and reviews of recently released documents, were agreed to during the FY2023 meeting.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Status of ORNL TSL evaluations [Slides]

This presentation is on the status of Oak Ridge National Laboratory (ORNL) Thermal Scattering Evaluation (TSL) evaluations. A focus of this presentation centers on the preliminary work on Teflon and Polyethylene evaluation validation.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Status of ORNL TSL evaluations [Slides]

This lecture provides details on the status of ORNL TSL evaluations. Main sections include modeling of concrete, updates of polyethylene evaluation, and initial transmission measurements at Oak Ridge National Labatory (ORNL). The presentation Conclusions show that literature review and initial modeling of concrete components have been performed. INS and transmission measurements of concrete and hydrated cement have been also planned. Additionally, A new TSL library for Polyethylene was created and submitted to NNDC and development for a new transmission capability at ORNL is underway.

36 MATERIALS SCIENCE↗

The current status of inelastic and capture Gamma-ray production evaluations in translated ENDF-VIII.0 GNDS files and recommended remediation actions

This report provides the status of discrete nuclear levels and inelastic gamma-ray production for neutron induced reactions in current ENDF-VIII.0 evaluations for the isotopes in the GRIN project. Different categories of issues are identified after a comparison with information from “adopted” ENSDF files. Improvement strategies are given and recommendations are described. We have included a similar, but more limited, analysis for thermal capture data where EGAF and ENSDF thermal libraries are considered. In addition, we provide a validation plan to employ different transport code simulations.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

U.S. State Renewables Portfolio & Clean Electricity Standards: 2023 Status Update [Slides]

This report provides an overview and status update on U.S. state renewables portfolio standards (RPS) and has been expanded from previous editions to also cover 100% clean electricity standards (CES) adopted by a growing number of states. The report, published in slide-deck form along with accompanying data files, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on clean electricity development, and compliance costs. The 2023 edition presents historical data through year-end 2022 and projections out to 2050. Key trends from this edition of the report include the following: -Evolution of state RPS and CES programs: States continue to refine and revise their RPS policies, often by adopting higher targets and/or broader CES policies. Among the 29 states plus DC with an RPS, 16 states have RPS targets of at least 50% of retail sales, and 17 states have a 100% CES or RPS target. -Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements, though that percentage has declined in recent years, representing 30% of all U.S. RE capacity additions in 2022. Within some regions, particularly the Northeast and Mid-Atlantic, RPS policies play a more central role in motivating RE growth. -Future RPS and CES demand and incremental needs: RPS and CES policies will require roughly 300 terawatt-hours (TWh) of additional clean electricity supply by 2030 and 800 TWh by 2050, requiring total U.S. non-hydro RE generation to reach 28% of electricity sales by 2050 (compared to 17% today). This amounts to roughly one-quarter of EIA’s projected RE growth through 2050. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. Most CES targets are not yet in force. -Renewable energy certificate (REC) pricing trends: Prices for NEPOOL Class I RECs remained at roughly $\$40$ /MWh over the past year, just below alternative compliance payment (ACP) rates in the larger state markets, while PJM Tier I REC prices continued to rise, reaching $\$30$ /MWh by year-end. Prices for solar RECs (or SRECs) remained relatively stable, and continue to exhibit wide variation across states, with the highest prices ($\$200-450$ /MWh) in NJ, MA, and DC. -RPS compliance costs: RPS compliance costs average roughly 3.5% of retail electricity bills across RPS states, though vary widely from state to state, with the highest costs (8-12% of retail bills) in states with solar carve-outs and high SREC prices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design Status of BCC Cryomodule for LCLS-II HE

A Buncher or Capture Cavity (BCC) Cryomodule is currently in development at Fermilab for use in a second injector for LCLS-II-HE. The BCC Cryomodule is designed to contain one 1.3 GHz cavity and one solenoid magnet as part of a 100MeV low emittance injector. The design considerations for the Cryomodule are similar to the LCLS-II cryomodule with additional requirements to account for additional vacuum loading at the end of this vessel due to the termination of the insulating vacuum. To accomplish this design, the cryomodule is being developed using the experience gained during the development of the LCLS-II cryomodule. The design, analysis, and status of the Cryomodule will be discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status of GNDS Support in AMPX [Slides]

This presentation covers the status of GNDS Support in AMPX. This presentation covers an overview of GNDS support in AMPX. Then the presentation touches on the AMPX process in GNDS and a checklist. This presentation concludes with a continuing effort section and conclusions.

97 MATHEMATICS AND COMPUTING↗