EVs@Scale FUSE Project Review
This project will analyze and demonstrate SCM and VGI approaches to reduce grid impacts from EVs@Scale as a result of the charging needs of the LD, MD, and HD on-road electrified fleet.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This project will analyze and demonstrate SCM and VGI approaches to reduce grid impacts from EVs@Scale as a result of the charging needs of the LD, MD, and HD on-road electrified fleet.
Realizing the SETO 2030 mission of reducing solar energy costs to 3-5 c/kWh will require innovative enabling research on effective, cost-efficient integration of local PV within distribution systems. However, the intermittent and variable nature of PVs compels operators to impose conservative hosting capacity constraints. Given the extremely high variability of (intermittent and unpredictable) solar energy generation, relaxing the capacity constraints (which are currently around 15%) and achieving 100% or greater integration of renewables will require a fundamental transformation of the power grid via the utilization of exponentially larger amounts of AMI enabled fine-grained data. To address the challenges in increasing the penetration of renewable energy based DERs, this project envisions an Enhanced System Layer (ESL) at the distribution network level that is reliable, cost-effective and scalable to millions of Distributed Energy Resources (DERs)/devices. This includes developing: 1) Transformative and highly scalable machine learning based predictive analytics tools that plug into distribution system planning and provide real-time situational awareness at the distribution level for short and long-term operational planning. The tools will be built using novel data-driven energy models of millions of active nodes with AMI, 2) Adaptive stochastic analysis and optimization algorithms for real-time grid operations, 3) Dynamic Scenario Analysis using parallel Cloudenabled implementations with < 1 minute computational cycle times.
Extreme climate-driven events such as hurricanes, floods, and wildfires are becoming more intense in areas exposed to these threats, requiring approaches to improve the resilience of the electrical infrastructure serving these communities. Long-duration outages caused by such high impact events propagate to economic, health, and social consequences for communities. As essential service providers, electric utilities are mandated to provide safe, economical and reliable electricity to their customers. The public is becoming less tolerant to these more frequent disruptions, especially in view of technological advances that are intended to improve power quality, reliability and resilience. One promising solution is state-of-the-art microgrids and the advanced controls employed therein. This paper presents and demonstrates an approach to technoeconomic analysis that can be used to value the avoided economic consequences of grid resilience investments, as applied to the islands of Vieques and Culebra in Puerto Rico. This valuation methodology can support policies to incorporate resilience value into any investment decision-making process, especially those which serve the public interest.
Events detection is a key challenge in power grid frequency disturbances analysis. Accurate detection of events is crucial for situational awareness of the power system. In this paper, we study the problem of events detection in power grid frequency disturbance analysis using synchrophasors data streams. Current events detection approaches for power grid rely on individual detection algorithm. This study integrates some of the existing detection algorithms using the concept of machine committee to develop improved detection approaches for grid disturbance analysis. Specifically, we propose two algorithms—an Event Detection Machine Committee (EDMC) algorithm and a Change-Point Detection Machine Committee (CPDMC) algorithm. Both algorithms use parallel architecture to fuse detection knowledge of its individual methods to arrive at an overall output. The EDMC algorithm combines five individual event detection methods, while the CPDMC algorithm combines two change-point detection methods. Each method performs the detection task separately. The overall output of each algorithm is then computed using a voting strategy. The proposed algorithms are evaluated using three case studies of actual power grid disturbances. Compared with the individual results of the various detection methods, we found that the EDMC algorithm is a better fit for analyzing synchrophasors data; it improves the detection accuracy; and it is suitable for practical scenarios.
Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. As demand for the seamless integration of distributed energy resources (DERs) continues to increase, proper networking and communications systems are becoming important to support the DER infrastructure. This report summarizes validation of a private wireless LTE network in a laboratory environment. The purpose of this work is to 1) demonstrate the effectiveness of private wireless LTE communication for grid applications and 2) provide a means of evaluating latency and overall performance of wireless communication in grid applications. First, private wireless LTE communication was validated in a direct transfer trip relaying scenario as an example of one-way communications using grid equipment. This study provided a baseline understanding of the variation in latency for seven different kinds of wireless scenarios shown in Figure A below. As expected, weak (attenuated) wireless signal-based communication yielded the widest ranges in latency. When higher priority was set for the trip signal communication, this resulted in lower latency in communication timing. In the final phase of this project, the private wireless LTE network was validated using two-way communications in an advanced distribution management system (ADMS) testbed which was developed in the ESIF at NREL. The purpose of this was to study the impact of wireless communication on grid performance.
The U.S. manufacturing sector accounts for 77% of the industrial energy consumption, but its participation in demand response (DR) programs is largely lagged behind. The limited flexibility in production scheduling under high capacity utilization and the lack of DR schemes that incorporate energy demand flexibility measures are deemed as major barriers. In this study, a framework of the interactive vehicles-to-manufacturing (V2M) energy sharing system is proposed to improve the energy demand flexibility of the aggregated system and enhance the DR effectiveness for manufacturers. The V2M-based DR scheme aims to reduce the energy cost by load shifting through joint production and energy sharing control, which can eventually promote manufacturing DR implementation even under high capacity utilization requirements and dynamic real-time electricity prices. The V2M system is modeled based on a discrete-Markov chain considering the complex interconnections among various manufacturing resources and multi-directional energy flows among manufacturing facilities, electric vehicles, and the power grid. Based on the system model, a mixed-integer nonlinear programming (MINLP) problem is formulated to identify the optimal DR scheme. The effectiveness of the proposed approach is validated through comparisons with traditional manufacturing DR schemes. Finally, the results show that a 2.1 to 6.5 times energy demand flexibility improvement and an additional 4.7% to 6.9% energy cost reduction can be achieved by the proposed approach.
Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.
Distribution systems are currently facing steep operational challenges as a result of the rapidly increasing integration of renewables and other distributed energy resources (DERs) at both the primary and secondary circuit levels. Distribution utilities and system operators have traditionally had some visibility of their primary circuits using low-frequency supervisory control and data acquisition systems, and they have had very poor if not zero visibility of the secondary circuits where the presence of DERs is constantly increasing. Therefore, this paper presents simulation studies to demonstrate the benefits of an advanced, high-fidelity sensor technology, called as the Meta-Alert System (MAS), developed by Electrical Grid Monitoring, Ltd. (EGM), on the distribution grid. First, a reliable model of the EGM sensors is developed, and then two use cases, distribution system state estimation (DSSE) and fault identification are simulated to evaluate the performance of the MAS technology. Simulation results on the Electric Power Research Institute J1 feeder demonstrate that the MAS can effectively participate in system-level DSSE programs and can detect and locate faults faster than traditional distribution protection schemes.
Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.
Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.
Solid-state transformers (SSTs) are a promising solution photovoltaic (PV), wind, traction, data center, battery energy storage system (BESS), and fast charging electric vehicle (EV) applications. The traditional SSTs are typically three-stage, i.e., hard-switching cascaded multilevel rectifiers and inverters with dual active bridge (DAB) converters, which leads to bulky passives, low efficiency, and high electromagnetic interference (EMI). This article proposes a new soft-switching solid-state transformer (S4T). The S4T has full-range zero-voltage switching (ZVS), electrolytic capacitor-less dc link, and controlled dv/dt, which reduces EMI. The S4T comprises two reverse-blocking current-source inverter (CSI) bridges, auxiliary branches for ZVS, and transformer magnetizing inductor as a reduced dc link with 60% ripple. Compared with the prior S4T, an effective change on the leakage inductance diode is made to reduce the number of the devices on the main power path by 20% for significant conduction loss saving and retain the same functionality of damping the resonance between the leakage and resonant capacitors and recycling trapped leakage energy. The conduction loss saving is crucial, being the dominating loss mechanism in SSTs. Importantly, the proposed single-stage SST not only holds the potential for high power density and high efficiency but also has full functionality, e.g., multiport dc loads integration, voltage regulation, and reactive power compensation, unlike the traditional single-stage matrix SST. The S4T can achieve single-stage isolated bidirectional dc–dc, ac–dc, dc–ac, or ac–ac conversion. It can also be configured input-series output-parallel (ISOP) in a modular way for medium-voltage (MV) grids. Hence, the S4T is a promising candidate for the SST. The full functionality, e.g., voltage buck–boost, multiport, etc., and the universality of the S4T for the dc–dc, dc–ac, and ac–ac conversion are verified through the simulations and experiments of two-port and three-port MV prototypes based on 3.3 kV SiC MOSFETs in dc–dc, dc–ac, and ac–ac modes at 2 kV.
Abstract Large‐scale power systems exhibit more complex dynamics due to the increasing integration of inverter‐based resources (IBRs). Therefore, there is an urgent need to enhance the situational awareness capability for better monitoring and control of power grids dominated by IBRs. As a pioneering Wide‐Area Measurement System, FNET/GridEye has developed and implemented various advanced applications based on the collected synchrophasor measurements to enhance the situational awareness capability of large‐scale power grids. This study provides an overview of the latest progress of FNET/GridEye. The sensors, communication, and data servers are upgraded to handle ultra‐high density synchrophasor and point‐on‐wave data to monitor system dynamics with more details. More importantly, several artificial intelligence (AI)‐based advanced applications are introduced, including AI‐based inertia estimation, AI‐based disturbance size and location estimation, AI‐based system stability assessment, and AI‐based data authentication.
Electric power system operators can manage distribution system reliability by coordinating end customer usage of distributed energy resources. The end customers in this regard are Service Provisioning Customers, who provide their energy resources to a Grid Service Provider, which in turn dispatches large aggregations of distributed energy resources to provide reliable service to the power system.The security of this system relies upon information protection mechanisms, as described in IEEE 2030.5. However, in addition to preventive security measures, a monitoring function is required to ensure trustworthiness. Trust models are a method to detect and respond to both expected and unexpected behavior. Different trust models are required for various types and characteristics of each situation. This paper will describe the topics that must be considered when developing a trust model as it applies to distributed energy resources. The major contribution of this paper is the creation and application of a Distributed Trust Model applied to distributed energy resources.
Electrical utilities have relied upon potential transformers (PTs) and current transformers (CTs) for very accurate metering and to provide reliable signals for protective relays. Less expensive alternative sensing technologies offer the possibility of wider deployment, particularly in grids that employ distributed energy resources. In this work, the performance of an advanced medi-um-voltage sensor is compared with a reference PT and CT and experimentally evaluated for different power grid scenarios on an advanced outdoor power line sensor testbed at the US De-partment of Energy’s Oak Ridge National Laboratory. The sensor is based on a capacitive divider for voltage monitoring and a Rogowski coil with integrator for current monitoring. The advanced outdoor power line sensor testbed has a real-time simulator that was used to generate transient scenarios (e.g., electrical faults, capacitor bank operation, service restoration), while the analog signals were recorded by the same high resolution power meter. The behavior of analog signals, harmonic components, total harmonic distortion, and crest factors were assessed for this power line sensor compared with the reference PT/CT, because of the absence for testing standards for advanced outdoor power line sensors.
The integration of distributed energy resources (DERs), such as solar, wind, and energy storage systems, into power grids through inverter-based resources reduces power system inertia, leading to faster frequency dynamics and potential grid instability. To address this challenge, this paper proposes a distributed, consensus-based approach for the real-time control and optimization of inertia sources (synchronous generators and/or DERs) during system disturbances, enhancing both system stability and economic performance. The distributed control and optimization approach assumes each inertia source exchanges information solely with its neighbor ones, making it easily scalable to large power grid networks. The impacts of the communication connectivity among the inertia sources as well as their generation capacity limits on the distributed approach are investigated. We also demonstrate the approach’s robustness in scenarios involving communication time delays and packet losses, validating its effectiveness through numerical simulations on a 4-bus test system and a two-area 8-bus test system.
Peak reduction is an important concern that can help reduce the growing stress on distribution grid and allow to defer investments in new capacity. However, the growing concern for customer privacy and comfort may impact the performance of load control for residential devices. Water heaters represent a convenient way of reducing peak due to their ability to store thermal energy for future use. In this paper, we developed a methodology to help utilities gain more insight with respect to the impact of load control efforts for shaving peak with no necessary information about the water heaters except the device status (on/off). To this end, we use a fleet of water heaters in a controlled residential neighborhood in Atlanta, GA. Our findings show that convergence in device status can serve as a proxy for peak shifting during hours of the evening peak.
The current electric grid is transitioning through increasing penetration of distributed energy resources (DERs), which include intermittent renewable generation resources on the distribution side. Both the monitoring and control of DERs require extensive data-exchange and communication networks. These networks lead to cyber vulnerabilities and risks of new kinds of cyberattacks that may be extremely destructive for power system operations. Although current standards, such as IEEE Std. 1547-2018, do not discuss cybersecurity measures for DERs, cybersecurity controls should be developed for securing DER systems at the device level, communications level, and applications level. This paper discusses the current industry's best practices related to DER cybersecurity and proposes recommended functionalities for improving the cybersecurity posture of DERs, specifically at the device/distribution level. These practical recommendations have been discussed and verified with the industry through a DER cybersecurity working group.
Demand response is a growing concept in light of the internet of things and an increasing need for grid flexibility. Water heaters are one of the preferred devices for providing demand response for grid services and peak management due to their capability to store energy. The efficient use of water heaters for demand response requires consideration of the associated load effects such as synchronization of device schedules and rebound effect. These effects present a significant challenge. Despite the importance of the mentioned effects for water heater queuing and scheduling, there has been no effort to quantify and empirically validate their impact. This study attempts to address this gap by offering two methods - Ward clustering and Euclidean K-means - to evaluate the extent of synchronization in a fleet of 42 water heaters in Atlanta, GA. Using the aforementioned methods on the measured data, we find evidence of convergence of water heater loads as a result of optimization compared to an idle period and analyzed their impact.