Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SUBSTATIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Site 300 Spill Prevention, Control, and Countermeasures (SPCC) Plan

This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).

54 ENVIRONMENTAL SCIENCES↗

Supplemental Information for New York State Standardized Interconnection Requirements

This document is intended to aid in the understanding and application of the New York State Standardized Interconnection Requirements (SIR) and Application Process for New Distributed Generators 5 MW or Less Connected in Parallel with Utility Distribution Systems, and it aims to provide supplemental information and discussion on selected topics relevant to the SIR. This guide focuses on technical issues that have to date resulted in the majority of utility findings within the context of interconnecting photovoltaic (PV) inverters. This guide provides background on the overall issue and related mitigation measures for selected topics, including substation backfeeding, anti-islanding and considerations for monitoring and controlling distributed energy resources (DER).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm)

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm) - Volume #2 - Appendices #16-17

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Value Streams from Distribution Grid Support Using Utility-Scale Vanadium Redox Flow Battery: NREL-Sumitomo Electric Battery Demonstration Project

The National Renewable Energy Laboratory (NREL) collaborated with Sumitomo Electric to provide research support in modeling and optimally dispatching a utility-scale vanadium redox flow battery (VRFB) energy storage. The objective of the project was to identify value streams from using utility-scale VRFB for local grid support use-cases, including voltage regulation (droop), capacity firming, peak shaving and valley filling, and energy arbitrage. This project was also supported by San Diego Gas and Electric (SDGandE). SDGandE provided data and approval to operate their VRFB energy storage system on an SDGandE distribution feeder. NREL worked with Sumitomo Electric to evaluate optimal dispatch strategies to VRFB, analyze the technical impacts, and calculate the associated cost-benefit ratio of substation-level energy storage on an SDG&E distribution feeder. To support this research, NREL evaluated the impacts of the battery use cases suggested by Sumitomo on the SDGandE host feeder. In addition to evaluating the battery use case, this effort identified possible ways to monetize the benefits from distribution feeder support.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Washington Clean Energy Fund: Energy Storage System Performance Test Plans and Data Requirements

This report documents the test plans, including detailed duty cycles, used in evaluating the technical performance of five energy storage systems (ESSs) sponsored by the Washington State Clean Energy Fund (CEF). These ESSs were installed at three participating utilities’ (Avista, Snohomish Public Utility District or SnoPUD, and Puget Sound Energy or PSE) designated sites. Under each test plan, a number of baseline and use case tests are defined. This report documents the test plan for each utility, including duty cycles, data and performance reporting requirements. Baseline tests defined in this report mainly focus on determining an initial or reference performance for each ESS, which may be compared with the performance at any later time to assess the state of health of the ESS. Parameter values of a given ESS obtained from baseline tests are applied for different modeling purposes and use case tests. The stored energy capacity test is the first test conducted in the baseline test program, which generates data to calculate round trip efficiency (RTE). The response time and ramp rate tests provide the time required for an ESS to change from zero to full charging/discharging rate and hence the ramp rate, which is important in understanding ESS performance for applications calling for fast response. Internal resistance testing of ESS cells is also conducted in conjunction with the response time and ramp rate tests. Finally, the baseline tests include frequency regulation (FR) and peak shaving (PS) tests based on real-world duty cycles. Upon completion of the baseline tests, use case tests are conducted at each of the storage sites with duty cycles developed to meet the site-specific criteria and conditions. The use cases are grouped according to their intended target benefits within the electric infrastructure topology (e.g., transmission versus distribution). Although an ESS may be located on the low-voltage side of a substation that provides power to a distribution feeder, a use case that addresses bulk power services could still be provided and would be grouped under the transmission or bulk-power benefits. Use cases for ESS applications deep into the distribution circuit would be categorized under the distribution system cases.

25 ENERGY STORAGE↗

Identification of Potential Locations for Placement of Strategic Transformers Reserve in Puerto Rico

Extreme weather events such as tropical storms cause extensive damage to energy infrastructures including generator stations, substations, poles, transformers, power transmission lines, etc. due to their presence in hazardous locations. Often these damages lead to long term power outage as was seen in Puerto Rico (PR) following the landfall of Hurricane Maria (2017). A potential solution to long-term power outage is strategic placement of reserve generators and transformers that would ensure continued power supply to enable restoration and recovery activities. The strategic placement of energy storage devices requires identification of potential sites such that (i) the damage from extreme events to energy infrastructures is minimized, (ii) power supply is optimized, and (iii) installation of these infrastructures is cost effective. To meet this goal, in this research, a Multi-Criteria Evaluation (MCE) technique-based site suitability analysis was implemented to identify potential sites for reserve generators and transformers in PR. To determine suitable sites and existing government facilities, the following steps were implemented: (i) identify physical, environmental, technical and socio-economic factors contributing to site suitability; (ii) determine siting constraints based on guidelines and standards used for energy sector (i.e., siting of nuclear plants, solar or wind farms), (iii) implement a raster data model using 30m x 30m spatial resolution to create suitability layers for each factor, (iv) combine suitability and exclusionary layers to create the final suitability layer. Results show that six hospitals, four colleges and universities, and five correctional facilities are in very high suitability areas and could be used for to store reserve generators. These facilities are in the eastern, south-eastern, south-western, and southern part of the island except for one correctional facility that is in the northern part of PR. Not surprisingly, coastal areas were found to be unsuitable for siting any energy facility. More than half (55.9%) of the island was also found to be unsuitable while only 14% of the island was found to be very highly suitable. Further assessment of current power plants and sub-stations indicated that only 16% and 42% of existing power plants and sub-stations respectively are in suitable areas. Given that northern part of the island lacks any facility that could be used for placement of reserve generators, suitable sites identified in this region could be used for placement of storage devices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lawrence Livermore National Laboratory Site 300 Spill Prevention, Control, and Countermeasures Plan

This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL’s) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014). The SPCC Plan is intended for distribution to all LLNL personnel who operate, maintain, and are responsible for containers of oil (oil-handlers). The updated Plan is available online at: https://eshint. llnl.gov/spcc/spcc-hp.html.

54 ENVIRONMENTAL SCIENCES↗

Grid Ready, Flexible Large Power Transformer

GE Research and its partner Prolec GE have proposed a novel and breakthrough concept to improve the flexibility and interchangeability of large power transformers (LPTs). LPTs refer in this report to transformers with a power rating equal or greater than 100 MVA. The concept consists of a 3-phase autotransformer bank having one specified high voltage side (HV) voltage and three configurable low voltage side (LV) voltage taps. Moreover, the leakage impedance is adjustable offline using taps which allows to accommodate short-circuit requirements for a wide range of LPTs applications. The research performed aimed to develop and validate a cost-effective design of a flexible LPT and to demonstrate its competitiveness with the LPT fleet currently in operation in the U.S. The concept is intended for the long-term replacement of existing LPTs. In this project, the U.S based population of LPTs was analyzed to determine their commonality in power, voltage classes, and impedance range. Up to 9,700 units, currently deployed in the NERC’s Eastern and Western interconnection regions, were evaluated. This analysis yielded the specifications of two flexible LPTs to be designed to demonstrate the manufacturability and competitiveness of the concept: a 345 kV, 230 MVA and a 230 kV, 100 MVA LPTs. The two LPTs are both configurable to 161 kV, 138 kV, and 115 kV on the LV side and allow leakage impedance variation between 4% and 14%. The design output showed that the flexible LPT is manufacturable and competitive with conventional LPT. The proposed design has a power efficiency of 99.5% and a total active part weight increase ranging only between 15% and 28% relative to conventional LPTs it can be substituted with. Indeed, for the flexible LPT, the higher the LV side voltage is, the higher is its power rating. Hence, flexible LPTs are more competitive when compared with the largest conventional LPT they can replace. Power systems analyses were carried out to evaluate the performance of the flexible LPT when replacing an existing conventional LPT. These analyses showed that short-circuit and inrush currents will remain respectively within 15% and 9.4% of their original levels suggesting that no substations equipment is likely to be replaced due the installation of the flexible LPT. In addition, the analyses showed that the transient overvoltage anticipated at the impedance configuration switch will be manageable and will not pose any particular risk during lightning or switching events. This research proved that the deployment of flexible LPTs in the U.S power grid can greatly improve the grid reliability and its resiliency especially in the event of the loss of multiple LPTs. Moreover, the concept can significantly help reduce LPTs’ spare inventory by providing a high spare coverage level. The performed analysis showed that the designed 345 kV flexible LPT can serve as a spare for up to 34 units currently in operation in the U.S while the designed 230 kV flexible LPT can replace up to 101 units. Flexible LPTs offer new opportunities to U.S utilities to improve interchangeability of LPTs in the transmission system and to better strategize the upcoming renewal of about 70% of the population of LPTs anticipated to retire within the next two decades.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Snohomish Public Utility District MESA 2: An Assessment of Flow Battery Energy Storage System Technical Performance

This report investigates the technical performance of the 2.2 MW, 8 MWh MESA 2 advanced vanadium flow battery energy storage system (FBESS), consisting of four 0.55 MW, 2 MWh strings, based on a number of baseline and use case tests. The FBESS is located at the Everett, Washington substation and owned by SnoPUD. The FBESS was procured by SnoPUD with matching funds by the Washington Clean Energy. Baseline tests were intended to assess the general technical capability of the FBESS (e.g., stored energy capacity, ramp rate performance, ability to track varying charge/discharge commands, direct current (DC) battery internal resistance). Use case tests were used to examine the performance of the FBESS while engaged in specific grid services (e.g., arbitrage, power factor correction). The project measured and/or calculated parameters that are important for understanding FBESS performance when subjected to actual field operation for achieving economic benefits, e.g., round trip efficiency (RTE) with and without rest, with and without auxiliary loads, auxiliary power consumption, signal command tracking, temperature trends during operation, parasitic power loss unaccounted by auxiliary load during rest, and state of charge (SOC) excursions. These baseline and use case parameters were analyzed using recorded test results. In addition, the results and lessons presented herein are also beneficial for any task or effort that needs technical assessment on similar and different types of FBESS based on technical specifications and/or field deployment results, since the assessment methodology remains the same.

25 ENERGY STORAGE↗

Avista Turner Energy Storage System: Assessment of Battery Technical Performance

This report investigates the technical performance of the 1 MW, 3.2 MWh advanced vanadium flow battery energy storage system (FBESS), consisting of two 0.5 MW, 1.6 MWh strings, based on a number of reference performance and use case tests. The FBESS is located on the utility 12 kV distribution system, between the Turner Substation and SEL’s manufacturing facility in Pullman, Washington. Reference performance tests (RPTs) were intended to assess the general technical capability of the FBESS (e.g., stored energy capacity, ramp rate performance, ability to track varying charge/discharge commands, direct current (DC) battery internal resistance). Use case tests were used to examine the performance of the FBESS while engaged in specific grid services (e.g., arbitrage, frequency regulation, balancing, volt ampere reactive (var) support, dynamic peak shaving). The project determined performance metrics that are important for understanding FBESS performance when subjected to field operation for achieving economic benefits from measurements and/or calculations. These metrics were: • RTE with and without rest, with and without auxiliary loads • Auxiliary power consumption • Reference signal tracking • Temperature excursions beyond normal operating range • Parasitic power loss unaccounted by auxiliary load during rest, and • State of charge (SOC) excursions beyond normal operating range. These RPT and use case performance metrics were analyzed using recorded test results. In addition, the results and lessons presented are also beneficial for any task or effort that needs technical assessment on similar and different types of FBESS, and BESS in general, based on technical specifications and/or field deployment results, since the assessment methodology remains the same.

25 ENERGY STORAGE↗

Automated Identification of Human Incursion

According to a CBS news report, on April 16, 2013 a San Jose, CA PG&E substation’s security fence was breached, and five transformers were damaged. The damaged transformers had a lead time of several months, leaving the electrical system with reduced capacity through the summer. With the increasing value of copper, the theft of copper electrical lines has also become an issue. Such occurrences highlight the vulnerability of our electrical grid and the need for greater security than fencing.

42 ENGINEERING↗

Relaying for Distribution and Microgrids Evolving from Radial to Bidirectional Power Flow

As distributed energy resources (DERs) achieve higher penetration levels in distribution systems, the normal flow of power (and fault current) is no longer unidirectional, from substation source to load (or fault). The increased importance of DERs has also led to revisions in the DER interconnection standards, particularly voltage regulation and ride-through, with publication of a new IEEE Standard 1547 2018. These changes have complicated normal distribution system operation, and they will also complicate distribution system protection. The U.S. Department of Energy undertook a review of the protection state of the art for this new environment in order to identify gaps and propose near-term solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Visualization and Analytics of Distribution Systems with Deep Penetration of Distributed Energy Resources (VADER)

In its current state, the distribution system is incapable of handling small to moderate amounts of photovoltaic (PV) penetration. This is because it was initially designed for handling passive loads which, at the level of a substation, have low variability and are forecastable with high accuracy. It has been an open loop system with little monitoring and control. With the addition of PV energy sources, the overall scenario will change dramatically due to (1) two way power flow on network; and (2) high aggregate variability. Additionally, changes on the consumption side lead to a number of smart loads, Electric Vehicles (EVs), and Demand Response. These fundamental changes in the characteristics of the generation and consumption of power will lead to a number of practical engineering problems which must be overcome to allow increased penetration of Distributed PV. Solving the unique engineering challenges which arise at moderate levels of PV penetration requires closed loop integration of data from (1) PV sources; (2) customer load data from smart meters; (3) EV charging data; and (4) local and line mounted precision instruments. These data are not traditionally used by utilities in operations since they are ”non-SCADA” and the current grid does not require such levels of control. To integrate this data and provide real time intelligence from these non-SCADA data, we created the Visualization and Analytics of Distribution Systems with Deep Penetration of Distributed Energy Resources (VADER) platform. VADER is a collection of analytics enabled by integration of massive and heterogeneous data streams for granular real-time monitoring, visualization and control of Distributed Energy Resources (DER) in distribution networks. VADER analytics enable utilities to have greater visibility into distributed energy resources. We built several batch- and stream-analytics in VADER which help operators better understand the impact of distributed energy resources on the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity for Distance Relay Protection

This project is a DOE follow-up effort on the CREDC workshop held on September 13, 2018 in Cambridge, MA to discuss cybersecurity of distance relays, which considered the benefits, vulnerabilities and risk mitigations for the use of communication systems in power system protection. The objectives of this project are to define the taxonomy of relay protection and associated communications; define use cases describing approaches to reduce the cyber-attack surface on those protective relays; and evaluate the loss of operational functional capability from changes to communication coverage. Mitigating controls will also be evaluated to understand if there are other approaches to reduce attack surfaces while maintaining communications or partial communications. Distance relays are used to protect transmission lines of approximately 10 to 300 miles in length, by detecting short circuits (i.e., faults) on the lines and then tripping circuit breakers in the substation. Such protection systems are a subset of the power system and they incorporate sensing, logic and communication functions. Protection system exposure to cyberattack could be drastically limited by disconnecting relays from all vulnerable communication systems, but this may adversely impact overall power system performance in the absence of cyberattack. This project began with a use case analysis of protection systems with communications, as summarized in this report. It continued with modeling, testing and evaluation in a miniature power system (MPS), located in the Western Area Power Administration (WAPA) Electric Power Training Center (EPTC). The project also incorporated feedback from two industry meetings held in February and September 2019. The suggested next steps account for and complement the work already underway with DOE/CESER funding: 1. Study the performance of LCD and PC vs. PUTT, which is less reliant on communication system performance and GPS timing references. The PUTT scheme could prove to be more resilient to cyberattack or communications-related disruption. It could also be more tolerant of message re-routing with SDN/SDR communication systems. On the other hand, it will be more vulnerable to false tripping during dynamic events or to loss of the voltage signal. The optimum choice of scheme may depend on the specific power system and risk assessment. This study could provide a new template for evaluation based on business functions. 2. Research and develop new methods to detect and monitor distributed physical attacks, possibly using drones, video sensors, thermal sensors, machine learning and other advanced techniques. This will help mitigate the impact of cyberattack on the protection system, and will also help mitigate the impact of wild fires. 3. Implement a scalable PKI for use in electric utility protection systems. This will encourage widespread adoption of secure authentication methods that are already available, but not widely used at present. This will help secure engineering access to the relays. 4. Investigate the use of SDN in combination with SDR to achieve better cybersecurity and electromagnetic security of the network, incorporating path variability. This would help secure both engineering access and peer-to-peer GOOSE messaging. 5. Perform additional testing, with operator evaluation of “red button” scenarios, PUTT vs. LCD, relay mis-operations, and other cyberattacks in the EPTC. This is an important advantage of testing in the EPTC rather than by computer simulation or even hardware-in-the-loop simulation; the EPTC is already dedicated to managing the situational awareness, operator response times and other human impacts. One of the project objectives was to settle on a common nomenclature for this problem space. We have concluded that the OSI layer model, supplemented by ANSI device numbers and other IEEE standards, is already well-accepted by the industry. The IEEE PSRC knowledge base provides a great deal of public information

24 POWER TRANSMISSION AND DISTRIBUTION↗

Simulating Distributed Energy Resource Responses to Transmission System-Level Faults Considering IEEE 1547 Performance Categories on Three Major WECC Transmission Paths

This study performs a large quantity of transmission and distribution simulations for three regions in the Western Interconnection along with final transmission simulations informed by distribution simulation results. Results find that the type of ride-through implemented by distributed energy resources (DERs) is a significant factor to the overall power system response to transmission-level faults. This impact is particularly high for transmission-level faults that depress voltage levels for high numbers of substations (i.e., for cases that experience large regional voltage sags). Because of the programmed nature of the ride-through of IEEE 1547-compliant DERs, the potential for large reductions in real power injection is possible based on IEEE 1547 interpretation and specific implementation. In this study, we made a first attempt to determine the quantity of DERs affected by a variety of transmission-level faults as well as a granular response of distribution-simulated DERs to a few types of IEEE 1547-2003 interpretations and IEEE 1547-2018 voltage ride-through categories. The distribution-informed transmission studies show that the category of IEEE 1547 adherence, particularly with the new 2018 standard, can have a significant impact on the amount of DER-based generation lost following transmission-level fault events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2020 State of the Science Report, Chapter 8: Encounters of Marine Animals with Marine Renewable Energy Device Mooring Systems and Subsea Cables

Many marine renewable energy (MRE) technologies, including floating or midwater wave and tidal devices, require mooring systems (i.e., mooring lines and anchors) to maintain their position within the water column or on the sea surface. In the case of some devices such as tidal kites, these lines and cables can be highly dynamic. An array of non-bottom-mounted devices may also include transmission cables within the water column interconnecting devices to one another, or to offshore substations or hubs on the seabed. The potential for these lines and cables to present hazards for marine animals that may become entangled or entrapped in them, or confused by their presence remains an issue of uncertainty. The degree to which mitigation to avoid or reduce entanglement risk might be required for future MRE installations is yet to be determined, pending greater understanding of the actual nature of the risk. In this chapter, the entanglement or entrapment of a marine animal is defined as the cause to become caught in a system without possibility of escaping. https://tethys.pnnl.gov/publications/state-of-the-science-2020-chapter-8-moorings

16 TIDAL AND WAVE POWER↗

Flexible Large Power Solid State Transformer (FLP-SST)

A large power transformer (LPT) is a major component in the electric power system grid. With the passage of time their reliability in terms of failure and service maintenance has been a big concern. According to a report by EPRI, various agencies have emphasized, and recent events have demonstrated, the critical nature of power transformers in the face of possible high-impact, low-frequency (HILF) events. The HILF events include intentional malicious events (e.g., physical attacks, cyber-attacks, coordinated attacks, electromagnetic pulse weapons, and others), natural disasters (e.g., hurricanes, earthquakes, severe geomagnetic disturbances, etc.), and non-intentional or accidental events such as nuclear power plant accidents. With aging, the line frequency transformers (LFTs) are also prone to failure due to insulation degradation, coolant leakage, mechanical failure, inadequate maintenance, etc. and thus poses a bigger threat to the electrical grid. Moreover, these transformers are custom made to fit the needs at the substation and weighs approximately between 100-400 tons, hence are neither interchangeable nor stored as a spare one. Hence reasonable efforts need to be made regarding the replacement of the LPT with a more feasible technology that does not pose similar issues. The concept of Flexible Large Power Solid-State Transformer (FLPSST) has addressed the aforementioned issues to provide an economical solutions for the failure of LPTs.

24 POWER TRANSMISSION AND DISTRIBUTION↗