Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SERVICE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Results for the Independent Sampling and Analysis of Used Oil Drums at the Impact Services Facility in Oak Ridge, Tennessee

The U.S. Department of Energy (DOE) requested that Oak Ridge Associated Universities (ORAU), via the Oak Ridge Institute for Science and Education (ORISE) contract, perform independent sampling and analysis of used oils contained within eight 55 gallon drums stored at the former IMPACT Services facility, located at the East Tennessee Technology Park in Oak Ridge, Tennessee. These drums were originally delivered by LATA Sharp Remediation Services (LSRS) to IMPACT Services on January 11, 2011 as part of the Bldg. K-33 demolition project, and the drums plus contents should have been processed as non-hazardous non-radiological waste by IMPACT Services. LSRS received a certificate of destruction on August 29, 2012 (LSRS 2012a). However, IMPACT Services declared bankruptcy and abandoned the site later in 2012, and eight of the original eleven K-33 drums are currently stored at the facility. The content of these drums is the subject of this investigation. The original drum contents were sampled by LSRS in 2010 and analyzed for gross alpha, gross beta, and polychlorinated biphenyls (PCBs), using both compositing and grab sampling techniques. The objective of this 2013 sample and analysis effort was to duplicate, to the extent possible, the 2010 sampling and analysis event to support final disposition decisions. Part of that decision process includes either verifying or refuting the assertion that oils that are currently stored in drums at the IMPACT Services facility originated from Bldg. K-33 equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Wind Turbine Kinetic Energy to Supply Transmission Level Services

This paper discusses the broad use of rotational kinetic energy stored in wind turbine rotors to supply services to the electrical power grid. The grid services are discussed in terms of zero-net-energy, which do not require a reduction in power output via pitch control (spill), but neither do they preclude doing so. The services discussed include zero-net-energy regulation, transient and small signal stability, and other frequency management services. The delivery of this energy requires a trade-off between the frequency and amplitude of power modulation and is limited, in some cases, by equipment ratings and the unresearched long-term mechanical effects on the turbine. As wind displaces synchronous generation, the grid's inertial storage is being reduced, but the amount of accessible kinetic energy in a wind turbine at rated speed is approximately 6 times greater than that of a generator with only a 0.12% loss in efficiency and 75 times greater at 10% loss. The potential flexibility of the wind's kinetic storage is also high. However, the true cost of providing grid services using wind turbines, which includes a potential increase in operations and maintenance costs, have not been compared to the value of the services themselves.

17 WIND ENERGY↗

Preliminary Environmental and Financial Viability Analysis of Circular Economy Scenarios for Satisfying PV System Service Lifetime

PV deployment has grown rapidly in recent decades, and this growth is expected to continue. At the same time, the rapid increase in PV panel efficiencies offers the opportunity to repower/revamp existing installations - replacing operational, lower-efficiency panels before the end of their 30-year service lifetime with newer, higher-efficiency panels. As a result, an increasing volume of PV panels could be decommissioned well before reaching the end of their 30-year service lifetime. Two broad strategies can be applied to manage the expected increase in decommissioned PV panels: (i) recycle prematurely decommissioned panels, and (ii) prevent recycling of these panels by satisfying the typical service lifetime of 30 years through circular economy strategies such as repair and reuse. Each strategy presents an environmental and economic trade-off. Retaining and satisfying the lifetime of the older, lower-efficiency panels avoids environmental burdens from recycling or landfilling but incurs burdens from additional repair and forgoing the opportunity to install newer panels with greater electricity-generation capabilities. This study assesses whether satisfying the expected service lifetime of a PV system through circular economy scenarios generates a greater environmental and financial benefit than recycling used panels and installing newer panels with higher efficiencies. The circular economy scenarios include repair and reuse of the PV system. Specifically, the study determines whether it is better for the environment to keep a PV panel in use for its 30-year service life after accounting for potential repair and additional transportation, or to replace older panels with more efficient new ones. In addition, we explore whether satisfying the service lifetime of PV panels proves competitive with the recycling route from a financial perspective.

14 SOLAR ENERGY↗

Developing a Framework for Valuation of Grid Services

The electric system is rapidly evolving and growing, raising new questions about how to define and value grid services delivered by a diverse set of resources, including customer-owned assets. This report advances a service–parameter–value framework that links what a grid service does to why it matters, and how its benefits are evidenced. We build upon prior efforts (Bender et al. 2021) and extend them to include value categories (reliability, resilience, cost & access, and security) with primary and secondary tiers, service-specific value streams that explain how benefits materialize, and metrics that make valuation traceable and comparable. We apply the framework to the six core grid services defined in (Kolln et al. 2023): Frequency Response, Regulation, Reserves, Energy, Voltage Management, and Blackstart and demonstrate it on three use cases to highlight the adaptability of these value streams. Further, we outline how the framework integrates with existing tools such as asset optimization, hosting capacity and cost-benefit analysis, and propose a path to portable qualifications and consistent stacking rules for use in tariffs and filings. Finally, we identify future pathways for research and application research needs to support standardization and decision-ready comparisons across services, assets, and architectures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Public Service Communications Satellite User Requirements Workshop

Information on user requirements for public service communications was acquired to provide the basis of a study to determine the optimum satellite system to satisfy user requirements. The concept for such a system is described: Topics discussed included requirements for data and message services, elementary and secondary education, extension and continuing education, environmental communications, library services, medical education, medical services, public broadcasting, public safety, religious applications, state and local communications, and voluntary services. Information was also obtained on procedures to follow to make the transfer to commercial services.

Wolff, E. A.↗

Integrated orbital servicing study follow-on. Volume 2: Technical analysis and system design

In-orbit service functional and physical requirements to support both low and high Earth orbit servicing/maintenance operations were defined, an optimum servicing system configuration was developed and mockups and early prototype hardware were fabricated to demonstrate and validate the concepts selected. Significant issues addressed include criteria for concept selection; representative mission equipment and approaches to their design for serviceability; significant serviceable spacecraft design aspects; servicer mechanism operation in one-g; approaches for the demonstration/simulation; and service mechanism structure design approach.

Source record↗

NASA service experience with composite components

NASA Langley has been active in sponsoring flight service programs with advanced composites during the past decade. A broad data base and confidence in the durability of composite structures are being developed. Flight service experience is reported for more than 140 composite aircraft components with up to 8 years service and almost two million successful component flight hours. Composite components are being evaluated on Boeing, Douglas, and Lockheed transport aircraft. Components are currently under development for service evaluation on Bell and Sikorsky helicopters. Design concepts and inspection and maintenance results are reported for components currently in service. Components under development in the NASA Aircraft Energy Efficiency (ACEE) program are discussed. Results of flight, outdoor ground, and controlled laboratory environmental tests on composite materials used in the flight service programs are also presented.

Dexter, H. B.↗

Flight service evaluation of Kevlar-49 epoxy composite panels in wide-bodied commercial transport aircraft

Kevlar-49 fairing panels, installed as flight service components on three l-1011's, were inspected after 8 years service. The fairings had accumulated a total of 62,000 hours, with one ship set having 20,850 hours service. Kevlar-49 components were found to be performing satisfactorily in service with no major problems. The only defects noted were minor impact damage, a few minor disbonds and a minor degree of fastener hole fraying and elongation. The service history to date indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structures.

Stone, R. H.↗

Satellite services system analysis study. Volume 1: Executive summary

Service requirements are considered. Topics include development of on-orbit operations scenarios, service equipment summary, crew interaction, and satellite features facilitating servicing. Service equipment concepts are considered. Topics include payload deployment, close proximity retrieval, on-orbit servicing, backup/contingency, delivery/retrieval of high energy payloads, Earth return, optional service, and advanced capabilities. Program requirements are assessed.

Source record↗

Service life evaluation of rigid explosive transfer lines

This paper describes a joint Army/NASA-sponsored research program on the service life evaluation of rigid explosive transfer lines. These transfer lines are used to initiate emergency crew escape functions on a wide variety of military and NASA aircraft. The purpose of this program was to determine quantitatively the effects of service, age, and degradation on rigid explosive transfer lines to allow responsible, conservative, service life determination. More than 800 transfer lines were removed from the U.S. Army AH-1G and AH-1S, the U.S. Air Force B-1 and F-111, and the U.S. Navy F-14 aircraft for testing. The results indicated that the lines were not adversely affected by age, service, or a repeat of the thermal qualification tests on full-service lines. Extension of the service life of rigid explosive transfer lines should be considered, since considerable cost savings could be realized with no measurable decrease in system reliability.

Bement, L. J.↗

Customer premises services market demand assessment 1980 - 2000. Volume 1: Executive summary

Estimates of market demand for domestic civilian telecommunications services for the years 1980 to 2000 are provided. Overall demand, demand or satellite services, demand for satellite delivered Customer Premises Service (CPS), and demand for 30/20 GHz Customer Premises Services are covered. Emphasis is placed on the CPS market and demand is segmented by market, by service, by user class and by geographic region. Prices for competing services are discussed and the distribution of traffic with respect to distance is estimated. A nationwide traffic distribution model for CPS in terms of demand for CPS traffic and earth stations for each of the major SMSAs in the United States are provided.

Gamble, R. B.↗

Satellite services system analysis study: Propellant transfer system

General servicing requirements, a servicing mission concept and scenario, overall servicing needs, basic servicing equipment, and a general servicing mission configuration layout are addressed. Servicing needs, equipment concepts, system requirements equipment specifications, preliminary designs, and resource requirements for flight hardware for the propellant transfer system are also addressed.

Source record↗

Demand for satellite-provided domestic communications services up to the year 2000

Three fixed service telecommunications demand assessment studies were completed for NASA by The Western Union Telegraph Company and the U.S. Telephone and Telegraph Corporation. They provided forecasts of the total U.S. domestic demand, from 1980 to the year 2000, for voice, data, and video services. That portion that is technically and economically suitable for transmission by satellite systems, both large trunking systems and customer premises services (CPS) systems was also estimated. In order to provide a single set of forecasts a NASA synthesis of the above studies was conducted. The services, associated forecast techniques, and data bases employed by both contractors were examined, those elements of each judged to be the most appropriate were selected, and new forecasts were made. The demand for voice, data, and video services was first forecast in fundamental units of call-seconds, bits/year, and channels, respectively. Transmission technology characteristics and capabilities were then forecast, and the fundamental demand converted to an equivalent transmission capacity. The potential demand for satellite-provided services was found to grow by a factor of 6, from 400 to 2400 equivalent 36 MHz satellite transponders over the 20-year period. About 80 percent of this was found to be more appropriate for trunking systems and 20 percent CPS.

Stevenson, S.↗

Flight-service program for advanced composite rudders on transport aircraft

Flight service experience and in-service inspection results are reported for DC-10 graphite composite rudders during the third year of airline service. Test results and status are also reported for ground-based and airborne graphite-epoxy specimens with three different epoxy resin systems to obtain moisture absorption data. Twenty graphite composite rudders were produced, nine of which were installed on commercial aircraft during the past three years. The rudders collectively accumulated 75,863 flight hours. The high time rudder accumulated 12,740 flight hours in slightly over 36 months. The graphite composite rudders were inspected visually at approximately 1000 flight hour intervals and ultrasonically at approximately 3000 flight hour intervals in accordance with in-service inspection plans. All rudders were judged acceptable for continued service as a result of these inspections. Composite moisture absorption data on small specimens, both ground-based and carried aboard three flight-service aircraft, are given. The specimens include Thornel 300 fibers in Narmco 5208 and 5209 resin systems, and Type AS fibers in the Hercules 3501-6 resin system.

Source record↗

Space station automation study-satellite servicing, volume 2

Technology requirements for automated satellite servicing operations aboard the NASA space station were studied. The three major tasks addressed: (1) servicing requirements (satellite and space station elements) and the role of automation; (2) assessment of automation technology; and (3) conceptual design of servicing facilities on the space station. It is found that many servicing functions cloud benefit from automation support; and the certain research and development activities on automation technologies for servicing should start as soon as possible. Also, some advanced automation developments for orbital servicing could be effectively applied to U.S. industrial ground based operations.

Meissinger, H. F.↗

Cost characteristics of tilt-rotor, conventional air and high speed rail short-haul intercity passenger service

The cost analysis done to support an assessment of the potential for a small tilt-rotor aircraft to operate in short-haul intercity passenger service is described in detail. Anticipated costs of tilt-rotor air service were compared to the costs of two alternatives: conventional air and high speed rail (HSR). Costs were developed for corridor service, varying key market characteristics including distance, passenger volumes, and minimum frequency standards. The resulting cost vs output information can then be used to compare modal costs for essentially identical service quality and passenger volume or for different service levels and volumes for each mode, as appropriate. Extensive sensitivity analyses are performed. The cost-output features of these technologies are compared. Tilt-rotor is very attractive compared to HSR in terms of costs over the entire range of volume. It also has costs not dramatically different from conventional air, but tilt-rotor costs are generally higher. Thus some of its other advantages, such as the VTOL capability, must offset the cost disadvantage for it to be a preferred or competitive mode in any given market. These issues are addressed in the companion report which considers strategies for tilt-rotor development in commercial air service.

Schoendorfer, David L.↗

Advanced orbital servicing capabilities development

The potential servicing requirements of the Space Station and associated free-flying platforms are identified and analyzed; the selected servicing tasks encompass orbital maneuver vehicle refueling, reaction-control subsystem thruster module replacement, and body-mounted radiator changeout. Attention is presently given to the commonality of all servicing activities, the definition of servicing interfaces, and the roles played by automation and robotics. The servicing concepts for each representative servicing task were selected on the basis of a weighed combination of seven factors: safety, productivity, relative cost, mission effectiveness, design flexibility and simplicity, and development status.

Olsen, Roy E.↗

Remote servicing of space systems

Space systems are difficult to maintain on orbit. The difficulty arises from the limited ability and availability of the astronaut work force in the hazardous space environment. Remote robotic manipulation can free the astronaut from the hazardous working environment while also increasing the work force. However, remote robotic servicing is not without its own set of problems and limitations, such as communication time delay and unstructured worksites. Tests and test equipment are described which are designed to increase the understanding of the remote servicing problems and to allow development of potential solutions. A half scale satellite mockup was developed for evaluating and improving upon the design of replaceable subsystems, such as batteries and electronic boxes. A servicer system, that includes a six degree of freedom PUMA 560 robot and interchangeable end effectors (tools), was developed to aid in driving out servicer design requirements. The results include the time delay impact on servicing timelines and requirements for the servicer system.

Collins, S. L.↗