Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Space station operations task force. Panel 3 report: User development and integration

The User Development and Integration Panel of the Space Station Operations Task Force was chartered to develop concepts relating to the operations of the Space Station manned base and the platforms, user accommodation and integration activities. The needs of the user community are addressed in the context with the mature operations phase of the Space Station. Issues addressed include space station pricing options, marketing strategies, payload selection and resource allocation options, and manifesting techniques.

Source record↗

SURE (Science User Resource Expert): A science planning and scheduling assistant for a resource based environment

SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.

Thalman, Nancy E.↗

Automated electric power management and control for Space Station Freedom

A comprehensive automation design is being developed for Space Station Freedom's electric power system. It strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. An integrated approach to the power system command and control problem is defined and used to direct technology development in: diagnosis, security monitoring and analysis, battery management, and cooperative problem-solving for resource allocation. The prototype automated power system is developed using simulations and test-beds.

Dolce, James L.↗

A task control architecture for autonomous robots

An architecture is presented for controlling robots that have multiple tasks, operate in dynamic domains, and require a fair degree of autonomy. The architecture is built on several layers of functionality, including a distributed communication layer, a behavior layer for querying sensors, expanding goals, and executing commands, and a task level for managing the temporal aspects of planning and achieving goals, coordinating tasks, allocating resources, monitoring, and recovering from errors. Application to a legged planetary rover and an indoor mobile manipulator is described.

Simmons, Reid↗

Planning for execution monitoring on a planetary rover

A planetary rover will be traversing largely unknown and often unknowable terrain. In addition to geometric obstacles such as cliffs, rocks, and holes, it may also have to deal with non-geometric hazards such as soft soil and surface breakthroughs which often cannot be detected until rover is in imminent danger. Therefore, the rover must monitor its progress throughout a traverse, making sure to stay on course and to detect and act on any previously unseen hazards. Its onboard planning system must decide what sensors to monitor, what landmarks to take position readings from, and what actions to take if something should go wrong. The planning systems being developed for the Pathfinder Planetary Rover to perform these execution monitoring tasks are discussed. This system includes a network of planners to perform path planning, expectation generation, path analysis, sensor and reaction selection, and resource allocation.

Gat, Erann↗

Impacting Space Station Freedom design with operations and safety requirements - An availability process

The unusually long mission duration of Space Station Freedom leads to operations costs that have significant impacts on life-cycle cost relative to previous manned space programs. Maintaining an affordable program requires that operations costs be considered throughout the design process. An appropriate means of impacting the design with operations concerns is to specify requirements that ensure operational effectiveness when implemented. The Space Station Freedom Program has developed a process defining such requirements. It focuses on specifying functional profiles and allocating resources such that designers gain a better understanding of the operational envelope in which their systems must perform. This paper examines the details of the process, where it came from, and why it is effective.

Garegnani, Jerry J.↗

Assured Shuttle Availability Project

This paper discusses the development of the Assured Shuttle Availability Project (ASA). The ASA project has been created to provide a structure by which the Space Shuttle Program (SSP) may allocate resources to hardware redesign efforts required to extend effective Space Shuttle operational life through the year 2020. Specific ASA Project goals and evaluation criteria have been set, and redesign efforts have been evaluated using systems engineering methods.

Scott, John H.↗

Software design with fuzzy requirements (A case study)

The author describes the resource allocation and planning helper (RALPH) scheduling system developed at NASA's Jet Propulsion Laboratory. RALPH addresses the concerns of designing software systems to minimize the need to recode for changes and upgrades; this concern is acute when requirements are uncertain or changing. Determining requirements, understanding the problem, designing for change, and tradeoffs are also discussed.

Werntz, David G.↗

An overview of the artificial intelligence and expert systems component of RICIS

Artificial Intelligence and Expert Systems are the important component of RICIS (Research Institute and Information Systems) research program. For space applications, a number of problem areas that should be able to make good use of the above tools include: resource allocation and management, control and monitoring, environmental control and life support, power distribution, communications scheduling, orbit and attitude maintenance, redundancy management, intelligent man-machine interfaces and fault detection, isolation and recovery.

Feagin, Terry↗

The Temporal Logic of the Tower Chief System

The purpose is to describe the logic used in the reasoning scheme employed in the Tower Chief system, a runway configuration management system. First, a review of classical logic is given. Defensible logics, truth maintenance, default logic, temporally dependent propositions, and resource allocation and planning are discussed.

Hazelton, Lyman R., Jr.↗

The CRAF mission and Earth-based comet observations

The Comet Rendezvous Asteroid Flyby (CRAF) mission is now being designed and planned to perform detailed studies of a typical short period comet as it moves around its orbit, building on the data gained from the Giotto, Vega, and Suisei fast flybys of Comet Halley in 1986. CRAF will be launched in Aug. 1995 and will match orbits with short period Comet Kopff in July 2000, 850 days before perihelion at a heliocentric distance of 5.05 AU. After a series of close, slow flybys, the spacecraft will be placed in orbit around the nucleus for a better than 1 m/line-pair imaging resolution on the nucleus surface. Earth based observations of the target comet, either by ground based facilities or Earth orbiting satellites, can provide essential data for CRAF mission planning, and are needed in support of the rendezvous mission. Estimates of the nucleus size, albedo, shape, rotation period, and rotation pole orientation are needed for preliminary mission planning, resource allocation, and sequence design.

Weissman, Paul R.↗

Approach to transaction management for Space Station Freedom

The Space Station Freedom Manned Base (SSFMB) will support the operation of the many payloads that may be located within the pressurized modules or on external attachment points. The transaction management (TM) approach presented provides a set of overlapping features that will assure the effective and safe operation of the SSFMB and provide a schedule that makes potentially hazardous operations safe, allocates resources within the capability of the resource providers, and maintains an environment conducive to the operations planned. This approach provides for targets of opportunity and schedule adjustments that give the operators the flexibility to conduct a vast majority of their operations with no conscious involvement with the TM function.

Easton, C. R.↗

Automated electric power management and control for Space Station Freedom

A comprehensive automation design is being developed for Space Station Freedom's electric power system. It strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. An integrated approach to the power system command and control problem is defined and used to direct technology development in: diagnosis, security monitoring and analysis, battery management, and cooperative problem-solving for resource allocation. The prototype automated power system is developed using simulations and test-beds.

Dolce, James L.↗

A preliminary study of the Soviet civil space program. Volume 1: Organization and Operations

The organization, planning, and personnel is focused of Soviet space, advantage is taken of glasnost and improved foreign relations to explore a hitherto obscure subject. The way in which the civil space program obtains approval and funding is altered. Missions must be approved before the Supreme Soviet, and public opinion is beginning to play a greater role in the legislature's budget decision. The Soviet civil space program remains a collection of disparate elements, not unified by any national, centralized space agency. An attempt was made to catalog and delineate the relationships between the components proves helpful. There is little or no coordination of independent associations' efforts, and the planning process relied on previously to set priorities and allocate resources appears to be currently inoperative or in a state of flux. The civil space program is moving in new directions: toward budget tautness, more international interactions, an emphasis on civilian over military applications, commercialization, and fiscal accountability. This study is a snapshot of a dynamic subject, but hopefully on which has highlighted the critical elements to track.

Newton, Elizabeth K.↗

Coordinating space telescope operations in an integrated planning and scheduling architecture

The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

Muscettola, Nicola↗

Scheduling lessons learned from the Autonomous Power System

The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

Ringer, Mark J.↗

Completable scheduling: An integrated approach to planning and scheduling

The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

Gervasio, Melinda T.↗

Electronic Neural Networks

Viewgraphs on electronic neural networks for space station are presented. Topics covered include: electronic neural networks; electronic implementations; VLSI/thin film hybrid hardware for neurocomputing; computations with analog parallel processing; features of neuroprocessors; applications of neuroprocessors; neural network hardware for terrain trafficability determination; a dedicated processor for path planning; neural network system interface; neural network for robotic control; error backpropagation algorithm for learning; resource allocation matrix; global optimization neuroprocessor; and electrically programmable read only thin-film synaptic array.

Thakoor, Anil↗