Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Selection of Next Priority IMPACT Medical Conditions Based on Available Terrestrial and Spaceflight Data

BACKGROUND: As the era of exploration class missions begins, identification of medical conditions that may occur and require management becomes essential for the modeling of medical risk. To this end, NASA has developed IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces), a suite of tools to assist in assessment of medical risk analysis. It has incorporated an initial list of the 120 conditions of highest concern, labeled the IMPACT condition list 1.0 (ICL 1.0). This abstract describes a method for prioritizing the 92 conditions included on the Proposed Future Conditions List (PFCL) for inclusion in future iterations of the ICL. OVERVIEW: To construct the Prioritized Proposed Future Conditions List (P-PFCL), each condition on the PFCL was scored as “low,” “medium,” or “high” on each of four variables: incidence, likelihood of significant task impairment, diagnostic and treatment complexity, and treatment futility. Qualitative assessment using clinical judgement was utilized to score complexity, futility, and likelihood of impairment. Incidence was assessed quantitatively using spaceflight data and/or analog populations where available then assigned a score using established cutoffs. Logarithmic numerical values were assigned to each category label. A Prioritization Score was generated for each condition by taking the product of incidence and likelihood of task impairment (risk) divided by the product of complexity and futility (difficulty of care), with higher values corresponding to higher priority for future inclusion in the ICL. DISCUSSION: The described methods allow for the generation of a ranked P-PFCL to act as a decision support tool for selection of the next generation of modeled medical conditions. Some of the conditions ranked highly on the P-PFCL include EVA-related upper and lower extremity sprain/strain, iron deficiency, delirium, and hypertension, among others. While this effort does not attempt to quantify the absolute risk associated with each condition, it does attempt to semi-quantitatively estimate the risk of each condition relative to the other possible conditions. This tool in concert with subject matter expert opinion could optimize the future use of limited resources thereby producing a more accurate medical risk model, which will be essential to the upcoming exploration class missions.

Michael Pohlen↗

Accuracy Assessment of Two Gps Fidelity Prediction Services in Urban Terrain

Low altitude flight in urban areas is susceptible to degraded GNSS-based navigation system performance due to terrain interference with radio signals from orbital positioning satellites. Predictive navigation performance fidelity tools are needed a) in preflight planning to assist in the creation of safe flight paths and b) in-flight to provide contingency management agents with the navigation risk of proximal flight corridors. Two navigation fidelity prediction services are validated by comparison with over 6000 readings from GNSS sensors collected along a five-mile path through urban areas of Corpus Christi, Texas, on three dates in 2022. Predictions are based on satellite line of sight through 3D terrain data collected in 2018. Each service predicts a set of navigation fidelity metrics over a user-specified time period. One metric estimated by both is the number of visible satellites. A direct comparison of the number of predicted visible satellites with the number sensed by the receiver is used to validate the prediction services. Results show an exact match in the number of predicted satellites for 60% of the measurements, and a match within +/- 4 satellites for 95% of the measurements. As expected, agreement improves away from vertical blocking terrain. Most cases of mismatch are due a lower predicted count than measured (false negatives), and can be accounted for by receiver pickup of stray signals caused by multipath propagation. About 10% of mismatches are false positives and are mostly accounted for by foliage effects. The two services predict visibility of the same set of satellites 80% of the time, differ by two or less satellites 95% of the time, and can compute predictions for one hour of observations in one minute or less. Validation is analyzed statistically and in detailed case studies of selected observation times. The prediction services validated in this study run fast enough for preflight safety planning. The more stringent challenge of inflight navigation fidelity prediction for contingency management requires both a speedup of the current level of modeling and equally fast stray signal modeling.

Andrew Moore↗

Accuracy Assessment of Two GPS Fidelity Prediction Services in Urban Terrain

Low altitude flight in urban areas is susceptible to degraded GNSS-based navigation system performance due to terrain interference with radio signals from orbital positioning satellites. Predictive navigation performance fidelity tools are needed a) in preflight planning to assist in the creation of safe flight paths and b) in-flight to provide contingency management agents with the navigation risk of proximal flight corridors. Two navigation fidelity prediction services are validated by comparison with over 6000 readings from GNSS sensors collected along a five-mile path through urban areas of Corpus Christi, Texas, on three dates in 2022. Predictions are based on satellite line of sight through 3D terrain data collected in 2018. Each service predicts a set of navigation fidelity metrics over a user-specified time period. One metric estimated by both is the number of visible satellites. A direct comparison of the number of predicted visible satellites with the number sensed by the receiver is used to validate the prediction services. Results show an exact match in the number of predicted satellites for 60% of the measurements, and a match within +/- 4 satellites for 95% of the measurements. As expected, agreement improves away from vertical blocking terrain. Most cases of mismatch are due a lower predicted count than measured (false negatives), and can be accounted for by receiver pickup of stray signals caused by multipath propagation. About 10% of mismatches are false positives and are mostly accounted for by foliage effects. The two services predict visibility of the same set of satellites 80% of the time, differ by two or less satellites 95% of the time, and can compute predictions for one hour of observations in one minute or less. Validation is analyzed statistically and in detailed case studies of selected observation times. The prediction services validated in this study run fast enough for preflight safety planning. The more stringent challenge of inflight navigation fidelity prediction for contingency management requires both a speedup of the current level of modeling and equally fast stray signal modeling.

Andrew J. Moore↗

Balancing Predictive and Reactive Science Planning for Mars 2020 Perseverance

The design of the science planning process for a space science mission needs to find a balance between operational and resource constraints and scientific decision-making. Science planning has previously been characterized as either predictive or reactive. Predictive science planning is needed when constraints drive science activities to be planned far in advance. For example, a combination of long one-way light time plus high-stakes science decisions drove the Cassini-Huygens mission to Saturn to have an extremely predictive planning process. On the other extreme, reactive science planning is needed when constraints drive science activities to be planned based on the results of the previous plan. For example, the Mars Exploration Rover mission interacted with the surface of Mars, and so the planning team needed to know the state of the rover at the end of each planning cycle before starting the next cycle. Operational and resource constraints that require management on intermediate timescales has led to the development of a science planning process between these two extremes. For example, the Mars Science Laboratory is a technically complex rover and has a parallel predictive process that allows the operations team to manage engineering constraints several days in advance while maintaining the reactive tactical planning process similar to that of MER. The Mars 2020 Perseverance rover is a technically complex rover in the MSL style, but has an added layer of science complexity: it is tasked with collecting a returnable cache of scientifically valuable samples of Mars within prime mission. Thus, the science planning process also needs to accommodate high-stakes longer-term science decisions in the style of Cassini. In order to balance the push-pull of these constraints, we have developed a science campaign-focused operational paradigm for Mars 2020 Perseverance that allows for both predictive planning to accommodate technological complexity and high-stakes science decisions as well as reactive planning to accommodate the realities of interacting with the martian surface. This paradigm influenced the design of operational processes and operational tools.

Spanovich, Nicole↗

Climate Extremes and Risks: Links Between Climate Science and Decision-Making

The World Climate Research Programme (WCRP) envisions a future where actionable climate information is universally accessible, supporting decision makers in preparing for and responding to climate change. In this perspective, we advocate for enhancing links between climate science and decision-making through a better and more decision-relevant understanding of climate impacts. The proposed framework comprises three pillars: climate science, impact science, and decision-making, focusing on generating seamless climate information from sub-seasonal, seasonal, decadal to century timescales informed by observed climate events and their impacts. The link between climate science and decision-making has strengthened in recent years, partly owing to undeniable impacts arising from disastrous weather extremes. Enhancing decision-relevant understanding involves utilizing lessons from past extreme events and implementing impact-based early warning systems to improve resilience. Integrated risk assessment and management require a comprehensive approach that encompasses good knowledge about possible impacts, hazard identification, monitoring, and communication of risks while acknowledging uncertainties inherent in climate predictions and projections, but not letting the uncertainty lead to decision paralysis. The importance of data accessibility, especially in the Global South, underscores the need for better coordination and resource allocation. Strategic frameworks should aim to enhance impact-related and open-access climate services around the world. Continuous improvements in predictive modeling and observational data are critical, as is ensuring that climate science remains relevant to decision makers locally and globally. Ultimately, fostering stronger collaborations and dedicated investments to process and tailor climate data will enhance societal preparedness, enabling communities to navigate the complexities of a changing climate effectively.

climate extremes↗

Time Step Considerations when Simulating Dynamic Behavior of High Performance Homes

Building energy simulations, especially those concerning pre-cooling strategies and cooling/heating peak demand management, require careful analysis and detailed understanding of building characteristics. Accurate modeling of the building thermal response and material properties for thermally massive walls or advanced materials like phase change materials (PCMs) are critically important.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hot-Isostatic Pressing of Sellafield SIXEP Sand/Clinoptilolite Wastes - 18281

Clinoptilolite is an ion-exchange material currently in use at the SIXEP plant (Sellafield, UK) to remove radioactive Cs and Sr from aqueous solution. Clinoptilolite material exists in a granular form that requires consolidation prior to disposal in a Geological Disposal Facility (GDF). The existing baseline treatment technology is to produce cementitious waste packages, which is not ideal due to the large increase in waste volume and poor quality of the wasteform produced. Hot-Isostatic Pressing (HIPing) has been investigated as an alternative treatment method to immobilise this material. This paper presents the results of an investigation that illustrates the capability to process clinoptilolite into a durable, monolithic glass-ceramic wasteform, which should be considered suitable for GDF disposal. The product of HIPing SIXEP sand /clinoptilolite materials is a dense vitreous wasteform with a small quantity of crystalline inclusions, primarily in the form of quartz/cristobalite. Under PCT testing the wasteform produced was shown to be at least an order of magnitude more durable than glasses currently used for the immobilisation of High-Level Wastes (HLW). It was calculated that the treatment of SIXEP sand/clinoptilolite wastes using HIP technology will provide at least a 6.3-fold reduction in the number of waste packages which require management and disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of Maintaining Institutional Controls: Maintenance of an Alternate Water Supply- A Case Study - 19583

The US Department of Energy (DOE) cofunded an alternate water-supply system (AWSS) with the Indian Health Service that was installed in the vicinity of the former uranium mill site near Riverton, Wyoming, as one of the institutional controls (ICs) at the site. The AWSS was constructed in 1998 to supply drinking water to residents within the IC boundary in lieu of drinking untreated groundwater that could potentially be impacted by the contaminated shallow aquifer. The AWSS derives water from three source wells that pump groundwater from the sandstones of the Wind River Formation to a 3.8 x 106 liter (1,000,000 gallon) storage tank. Water from the storage tank is distributed throughout the AWSS service area by approximately 18 kilometers (11 miles) of PVC pipeline. The AWSS currently serves 103 residential customers and 1 commercial customer. DOE and the Northern Arapaho tribe (owner of the AWSS) have partnered over the years to address numerous challenges with the AWSS that included engineering assessments, scientific investigations, sampling support, a hydrant flushing program, and funding. Challenges with the AWSS have included the following: (1) Transmission pipe installed during initial construction did not have a pressure rating high enough to account for system pressure surges. (2) AWSS appurtenances were initially installed without accounting for the effects of corrosive soils on metal components. (3) Natural radium from the Wind River Formation groundwater builds up in the AWSS transmission pipes to levels above the primary drinking water standard because of the lack of a flushing program, dead-end lines, and low system demand. A 2-year study showed that a unidirectional hydrant-flushing program will control the radium buildup. (4) Aging system components including hydrants, valves, and pumps are nearing their effective lifespan and are in need of replacement. (5) With the addition of large commercial customers, demand on the system has increased since the initial installation of the system, and future growth in the area will continue to increase demand. (6) Additional connections and integration of the AWSS with an areawide water system in the near future will require changes to the current flushing plan and add additional complexity regarding areas of responsibility. (7) A well-organized financial and administrative infrastructure is not in place, and additional revenue is needed to operate, maintain, and improve the AWSS. To be a viable IC, the AWSS will require management, maintenance, and upgrades to provide safe drinking water until groundwater meets drinking water standards. Responsibilities and funding for maintaining the AWSS as a viable IC are the focus of current discussions, and decisions regarding responsibilities and funding will be formalized in future cooperative agreements and memoranda of understanding with the owners. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an expert system prototype for determining software functional requirements for command management activities at NASA Goddard

The development of an expert system prototype for software functional requirement determination for NASA Goddard's Command Management System, as part of its process of transforming general requests into specific near-earth satellite commands, is described. The present knowledge base was formulated through interactions with domain experts, and was then linked to the existing Knowledge Engineering Systems (KES) expert system application generator. Steps in the knowledge-base development include problem-oriented attribute hierarchy development, knowledge management approach determination, and knowledge base encoding. The KES Parser and Inspector, in addition to backcasting and analogical mapping, were used to validate the expert system-derived requirements for one of the major functions of a spacecraft, the solar Maximum Mission. Knowledge refinement, evaluation, and implementation procedures of the expert system were then accomplished.

Liebowitz, J.↗

Development of an expert system prototype for determining software functional requirements for command management activities at NASA Goddard

The development of an expert system prototype for determining software functional requirements for NASA Goddard's Command Management System (CMS) is described. The role of the CMS is to transform general requests into specific spacecraft commands with command execution conditions. The CMS is part of the NASA Data System which entails the downlink of science and engineering data from NASA near-earth satellites to the user, and the uplink of command and control data to the spacecraft. Subjects covered include: the problem environment of determining CMS software functional requirements; the expert system approach for handling CMS requirements development; validation and evaluation procedures for the expert system.

Liebowitz, J.↗

Compliance of NNSS Activities with P322-4 Issues Management and NNSSWAC Requirements

The Institutional Quality and Performance Assurance Division's Quality Support Services Group conducted a surveillance of the compliance of Waste Management Program activities to Issues Management/Corrective Action requirements communicated in P322-4 and the Nevada National Security Site Waste Acceptance criteria (NNSSWAC). All corrective actions reviewed and records examined were found to be compliant with appropriate and relevant procedures. There were no Findings or Opportunities for Improvement noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA Risk Management Handbook

The purpose of this handbook is to provide guidance for implementing the Risk Management (RM) requirements of NASA Procedural Requirements (NPR) document NPR 8000.4A, Agency Risk Management Procedural Requirements [1], with a specific focus on programs and projects, and applying to each level of the NASA organizational hierarchy as requirements flow down. This handbook supports RM application within the NASA systems engineering process, and is a complement to the guidance contained in NASA/SP-2007-6105, NASA Systems Engineering Handbook [2]. Specifically, this handbook provides guidance that is applicable to the common technical processes of Technical Risk Management and Decision Analysis established by NPR 7123.1A, NASA Systems Engineering Process and Requirements [3]. These processes are part of the \Systems Engineering Engine. (Figure 1) that is used to drive the development of the system and associated work products to satisfy stakeholder expectations in all mission execution domains, including safety, technical, cost, and schedule. Like NPR 7123.1A, NPR 8000.4A is a discipline-oriented NPR that intersects with product-oriented NPRs such as NPR 7120.5D, NASA Space Flight Program and Project Management Requirements [4]; NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements [5]; and NPR 7120.8, NASA Research and Technology Program and Project Management Requirements [6]. In much the same way that the NASA Systems Engineering Handbook is intended to provide guidance on the implementation of NPR 7123.1A, this handbook is intended to provide guidance on the implementation of NPR 8000.4A. 1.2 Scope and Depth This handbook provides guidance for conducting RM in the context of NASA program and project life cycles, which produce derived requirements in accordance with existing systems engineering practices that flow down through the NASA organizational hierarchy. The guidance in this handbook is not meant to be prescriptive. Instead, it is meant to be general enough, and contain a sufficient diversity of examples, to enable the reader to adapt the methods as needed to the particular risk management issues that he or she faces. The handbook highlights major issues to consider when managing programs and projects in the presence of potentially significant uncertainty, so that the user is better able to recognize and avoid pitfalls that might otherwise be experienced.

Dezfuli, Homayoon↗

Electrical, Electronic, and Electromechanical (EEE) Parts Management and Control Requirements for Space Flight Hardware and Critical Ground Support Equipment...aka... The NASA EEE Parts Standard, NASA-STD 8739.10

Describes development and content of a new NASA Standard for Electrical Electronic and Electromechanical (EEE) parts. This Standard reflects current practices, instead of changing them. Most NASA Centers utilize local documents, but there is minimal consistency across the Agency. A gap analysis clearly shows the differences that exist among the different centers and with respect to the NASA Parts Policy. Once approved, the new standard can be referenced in contracts and agreements with organizations outside of NASA.

Electronic↗

Managing System of Systems Requirements with a Requirements Screening Group

Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

99 GENERAL AND MISCELLANEOUS↗

Learning Management System User Requirements for the National Nuclear Security Administration's International Nuclear Safeguards Engagement Program

The National Nuclear Security Administration's (NNSA) International Nuclear Safeguards Engagement Program (INSEP) is considering investing in new tools that would allow the program to support its partner states from a distance. At the same time, the program is considering approaches that would allow several organizations, including NNSA, IAEA, national laboratories and contractor staff, to collaborate in the development and maintenance of instructional content. Software systems known as Learning Management Systems (LMSs) might represent a mechanism through which INSEP could accomplish these goals (collaborative development and remote support). To assess the usefulness of an LMS, INSEP has specified its needs for delivering online training and compared those needs to the capability of a range of LMSs. This comparison will allow INSEP to determine whether an LMS would be a useful tool and may set the stage for a "make-buy" decision in the future. The study team concluded that INSEP's content development and delivery needs align well with the capabilities of the leading LMSs on the market today and that that INSEP performance requirements allow for a customized approach using existing training portals that are already available to NNSA. Additional work would be required to specify the desired processes for developing online training and outreach materials, structuring the databases, specifying the data that should be collected, and detailing the desired system reports and documentation.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Linking habitat suitability with a longleaf pine-hardwood model: Building a species-predictive fire-land management framework

Active management of fire-dependent ecosystems for specific species leads to complex tradeoffs, which affect conservation outcomes to other species. Therefore a multi-species evaluation of management actions is required. Habitat Suitability Models (HSMs) can help in predicting the likelihood of species occurrence using corresponding environmental variables and empirical relationships that link occurrence with specific environmental conditions. Incorporating multiple species into HSMs and relating them to habitat dynamics is crucial for ecosystems that require active management with prescribed fire. To address this issue, we developed multi-species HSM driven within an existing population model of the longleaf pine-hardwood ecosystem to assess the suitability of an ecosystem given different fire management strategies and environmental conditions. The population model used in this study provides spatial and temporal changes of longleaf pine-hardwood habitat structure in response to fire. These habitat values are used by the HSM to calculate habitat suitability for three threatened and endangered faunal species of this ecosystem, which all thrive with frequent fire, but have unique habitat requirements. Transient habitat conditions are traced to predict longleaf pine ecosystem trajectories under various management strategies, thereby evaluating current land management actions, such as thinning or prescribed fire frequencies. We tested a suite of environmental conditions to emphasize the sensitivity of the species to different fire management actions. The results of our modeling suggest that maximum suitable habitat for all three species can be achieved with fire frequency occurring at approximately once every three years. The modeling results support current management actions and provide a new habitat assessment tool that incorporates ecological factors for multiple species, thus providing for habitat optimization.

54 ENVIRONMENTAL SCIENCES↗

Management of Operational Support Requirements for Manned Flight Missions

This Instruction establishes responsibilities for managing the system whereby operational support requirements are levied for support of manned flight missions including associated payloads. This management system will ensure that support requirements are properly requested and responses are properly obtained to meet operational objectives.

SPACE MISSIONS↗

Early Outcomes From Three Prospective Trials of Image-Guided Proton Therapy for Prostate Cancer

Purpose: To report early outcomes with image-guided proton therapy for prostate cancer. Methods and Materials: We accrued 211 prostate cancer patients on prospective Institutional Review Board-approved trials of 78 cobalt gray equivalent (CGE) in 39 fractions for low-risk disease, dose escalation from 78 to 82 CGE for intermediate-risk disease, and 78 CGE with concomitant docetaxel followed by androgen deprivation for high-risk disease. Minimum follow-up was 2 years. Results: One intermediate-risk patient and 2 high-risk patients had disease progression. Pretreatment genitourinary (GU) symptom management was required in 38% of patients. A cumulative 88 (42%) patients required posttreatment GU symptom management. Four transient Grade 3 GU toxicities occurred, all among patients requiring pretreatment GU symptom management. Multivariate analysis showed correlation between posttreatment GU 2+ symptoms and pretreatment GU symptom management (p < 0.0001) and age (p = 0.0048). Only 1 Grade 3+ gastrointestinal (GI) symptom occurred. The prevalence of Grade 2+ GI symptoms was 0 (0%), 10 (5%), 12 (6%), and 8 (4%) at 6, 12, 18, and 24 months, with a cumulative incidence of 20 (10%) patients at 2 years after proton therapy. Univariate and multivariate analyses showed significant correlation between Grade 2+ rectal bleeding and proctitis and the percentage of rectal wall (rectum) receiving doses ranging from 40 CGE (10 CGE) to 80 CGE. Conclusions: Early outcomes with image-guided proton therapy suggest high efficacy and minimal toxicity with only 1.9% Grade 3 GU symptoms and <0.5% Grade 3 GI toxicities.

62 RADIOLOGY AND NUCLEAR MEDICINE↗