Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RCRA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Environmental requirements management: Maintaining an effective compliance program is key to a robust environmental management system - 15184

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organisation's ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: - Communicating requirements- Planning work - Maintaining work controls - Maintaining compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving groundwater monitoring optimization at SRS: a core team process based on rigorous technical assessment - 15273

The optimization of groundwater monitoring at Savannah River Site (SRS) was achieved through a core team process based on the application of a comprehensive, technical evaluation of individual regulated groundwater units. Groundwater monitoring at SRS is required at dozens of waste sites and includes about 4,000 samples annually. The expected longevity of groundwater contamination and associated groundwater monitoring and reporting constitutes a significant long-term cost to the environmental management budget. The core team, consisting of representatives from the Department of Energy (DOE); U.S. Environmental Protection Agency (USEPA); and the South Carolina Department of Health and Environmental Control (SCDHEC), recognized that monitoring needs for individual plumes evolve as remediation work progresses. The technical evaluation plan was generally based on the availability of many years of monitoring data. In addition, it was recognized that the well network, sampling frequency, and analytical suite had been the same for years and warranted evaluation to determine if the existing monitoring was meeting the current objectives. In order to systematically evaluate monitoring at eighteen different groundwater units, SRS developed a decision-logic analysis using flow sheets to address five areas of optimization identified with core team agreement, including: (1) current monitoring vs regulatory requirements, (2) spatial optimization, (3) temporal assessment, (4) analyte assessment, and (5) reporting assessment. The evaluation resulted in SRS proposing changes in the spatial, temporal, analyte, and reporting aspects of groundwater monitoring for fifteen of the eighteen individual groundwater units evaluated. Overall, these changes have resulted in annual savings of $370 K to date, with an additional $200 K in annual savings pending. Early and frequent core team deliberations helped ensure the success of this optimization effort. The technical evaluation was conducted after receiving core team buy-in for the goals and methods of the project. Technical evaluations for each unit were proposed to the regulators in unit-specific regulatory submittals. The technical justifications and core team decisions were all documented and implemented in accordance within the framework of the SRS Federal Facility Agreement or Resource Conservation and Recovery Act (RCRA) Permit process. This optimization approach can be expected to be highly successful for sites with rich historical data sets and where the requirements in regulatory monitoring plans can be negotiated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater monitoring report streamlining techniques - 15305

Compliance with national and state environmental regulations (e.g. RCRA and CERCLA [SuperFund] requires Savannah River Site (SRS) to extensively collect and report groundwater monitoring data, with potential fines for missed reporting deadlines. Large reports, which may contain dozens to hundreds of monitoring stations, are especially challenging to present data in a way that is quick and easy to interpret. Initially analyzing hundreds to thousands of records of data to be summarized in the report can be daunting, and producing maps can be extremely time consuming. Several utilities have been developed at SRS to facilitate production of the regulatory reports which include data tables, charts, maps, and cross-sections. Components of each report are generated in accordance with complex sets of regulatory requirements specific to each site monitored. SRS developed a relational database to incorporate the detailed reporting rules with the groundwater data, and created a set of automation tools to interface with the information and generate the report components. Maps produced with ArcGIS use a technique that can be repeatedly used to display data very quickly and in a consistent form. Cross-sections developed with RockWorks provide a more technical and geological analysis and representation of well and boring data, while allowing for automated data placement. These process improvements have streamlined the repetitive job of creating data tables, charts, maps, and cross-sections. It has also enhanced report quality and consistency by centralizing the information, and has reduced manpower and production time through automated efficiencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Longevity of geo-synthetic cover components - 15450

Geo-synthetics form many of the key components in modern landfill cell and final cover designs. Models for the long-term performance assessment of systems incorporating these components have traditionally relied on a small number of standard assumptions originally developed to address the needs of the Resource Conservation and Recovery Act (RCRA) Subtitle D solid waste industry. These past estimates demonstrated that, even under a series of highly conservative factors, the longevity of these components far exceeds the requirements for typical solid waste facilities. Traditionally, the interpretation of the geo-synthetic degradation research has been deterministic as opposed to probabilistic, often due to the relative scarcity of degradation data for particular formulations and environmental conditions. Long-term studies of the mechanical and chemical properties of geo-synthetics subjected to accelerated aging processes have been conducted in an attempt to better quantify their longevity to address applications where performance may be required for 1,000 years or more. Of the many cover system geo-synthetic components, geo-membranes appear to have the most significant impact on the long-term performance of cover systems. Based on available long-term aging studies, a series of property degradation curves and their corresponding model parameters are available for geo-membranes. A strong area of need in the performance assessment of shallow disposal facilities is how to connect these research findings with inputs to probabilistic models. Significantly, factors affecting geo-membrane performance, such as geo-membrane thickness, anti-oxidant package, molecular weight, oxygen exposure, and drainage, can be adjusted and re-engineered using a proposed approach to meet specific performance targets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Macro-encapsulation as Manufactured Components for Disposal at the Nevada National Security Site (NNSS) - 16213

Macro-encapsulation as Manufactured is a relatively new terminology that supports the disposal of classified legacy weapon components at the Area 5 Disposal Cell at the Nevada National Security Site (NNSS). These components are composed of hundreds and sometimes thousands of parts. Examples of this type of item include firing sets, trainers, radar assemblies, neutron generators and other similar components. Sometimes there are hazardous Resource Conservation and Recovery Act-regulated (RCRA) metals involved in the parts that make up the components. The typical regulated metals in the components can be lead and silver from circuit boards and wiring, cadmium or chromium from plating operations of the parts. To perform the Toxicity Characteristic Leaching Procedure (TCLP) components have to be completely disassembled and sanitized prior to being sent to laboratories for analysis. The results vary but the majority of times there are regulated metals present in these samples. The levels are relatively low and since analysis has been performed then a disposal process needs to be followed. A process needed to be developed and approved by governing boards to allow disposal of these items as long as this material meets the Waste Acceptance Criteria (WAC) (No liquids, compressed gases, explosives, SNM, etc.) before being sent to the Nevada desert for disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mechanical Failure Modes and Longevity of Geo-membranes - 16365

Estimates of the long-term performance of geo-synthetic liner and final cover components have traditionally relied on a small number of standard assumptions originally developed to address the needs of the Resource Conservation and Recovery Act (RCRA) Subtitle D solid waste industry. These past estimates demonstrated that, even under a series of highly conservative factors, the longevity of these components far exceeds the requirements for typical municipal solid waste (MSW) facilities. However, interest in the performance of these components for the disposal of low-level (LLW) and intermediate-level (ILW) radioactive waste landfills has led to additional study of geo-synthetic degradation to address longer assessment periods. These studies allow for the possibility of more rigorous, reliability-based risk assessments of landfill system performance. A particularly strong research need for LLW/ILW facilities is a complete enumeration of the various chemical and mechanical failures modes for geo-membranes serving as final cover and base liner barrier systems. For final covers, failure is defined as allowing an unacceptable flow of water into a containment system. Studies of the various mechanical modes of deformation and rupture for polyethylene sheet allow for a rigorous exploration of the potential causes of geo-membrane barrier system failure. Of particular interest in the performance assessment and engineering of these systems is the ability to use the resulting models to quantify the longevity of these systems with a probabilistic model. An example of this approach is used to illustrate how the consideration of the mechanism for stress cracking in final cover geo-membranes can be adapted for use in simulations of long-term landfill system performance. The results indicate that the effects of cover system design geometry and geo-membrane formulation on performance can be varied significantly by the cover system engineering to meet target performance goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unique Facilities, Innovative Treatment Processes, and a Talented Workforce Allow Fluor Idaho to Successfully Disposition Transuranic Waste - 18388

Fluor Idaho is utilizing state-of-the-art equipment, treatment technologies, and employee expertise at the Department of Energy's (DOE) Idaho Site to treat contact-handled transuranic (CH-TRU) waste, as well as extremely challenging remote-handled transuranic (RH-TRU) waste forms, to prepare the material for shipment and permanent disposal at the Department's Waste Isolation Pilot Plant (WIPP). Nowhere else in the DOE Complex - perhaps the world - will one find the compilation of tools and an experienced workforce with an unparalleled history of safely retrieving, characterizing, treating, repackaging, certifying, and shipping TRU waste. Since 2003, the Advanced Mixed Waste Treatment Project (AMWTP) has used both conventional and unique retrieval concepts, high-tech characterization equipment - including real-time radiography and radioassay - robotics, and automated treatment processes to retrieve and treat 65,000 cubic meters of above-ground CH-TRU waste. Additionally, engineered controls and specialized personal protective equipment have allowed employees to make thousands of entries into high-radiation areas without a skin or clothing contamination incident - evidence of the employees' commitment to safety. AMWTP has encountered and found solutions for many challenging waste forms, including polychlorinated biphenyl-contaminated wastes, TRU waste containers with up to 1,000 fissile gram equivalent plutonium-239, oversized TRU boxes, and partially absorbed organic sludge waste. By utilizing additional facilities and equipment at the Accelerated Retrieval Project V and VII, Fluor Idaho has developed new processing lines and capabilities to ensure worker safety and milestone completion. These two soft-sided buildings, located at a facility adjacent to AMWTP, were originally constructed to exhume Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) TRU wastes from a section of a 97-acre landfill. After a total of 1,150 cubic meters of targeted waste were removed, personnel, working in collaboration with state regulators, successfully implemented a unique regulatory strategy that allowed these CERCLA facilities to be modified and permitted to treat Resource Conservation and Recovery Act (RCRA) wastes from the AMWTP - a savings of tens of millions of dollars over the cost of constructing new buildings. Adding to the AMWTP's technological uniqueness is its ability to treat wastes from other facilities in the DOE Complex. Two prior decision documents and an agreement with the state of Idaho have allowed AMWTP to treat wastes from 15 other DOE sites. It is the only project in the complex to have done so. At another project located next to AMWTP, targeted waste exhumation within the Subsurface Disposal Area is approximately two years ahead of schedule. Crews have removed more than 8,600 cubic meters of CH-TRU and hazardous wastes from eight exhumation areas that equal a combined footprint of 4.75 acres. Less than one acre remains to be exhumed to satisfy the 2008 Record of Decision waste exhumation end state between the DOE, Environmental Protection Agency, and state of Idaho. Construction of the final building where targeted waste exhumation will continue was completed during the summer of 2017. Exhumation will be completed within the next few years. Following exhumation completion, an evapotranspiration barrier (or cap) will be constructed over the entire landfill. Fluor Idaho continues to make progress on a more challenging project involving an inventory of RH-TRU waste that also contains the reactive metal sodium. Crews are utilizing hot cells, once used for spent nuclear fuel reprocessing and high-level waste treatment at the Idaho Nuclear Technology and Engineering Center, to render this challenging waste form safe for disposal in a national geologic waste repository. The treatment methods being employed on this RH-TRU waste are unique in the DOE Complex. Minute concentrations of water are sprayed onto the sodium-contaminated material in a process called 'spritzing' to chemically change the sodium from a reactive metal to a non-reactive salt. In other cases, sodium-contaminated waste is dipped in water to initiate a reaction in a process called 'immersion.' Lastly, for more challenging waste shapes that could not be successfully treated with the two prior methods, crews lower the sodium-contaminated RH-TRU waste into a one-of-a-kind distillation unit that uses high temperature and vacuum to volatilize the sodium and recapture it in a condenser unit for disposal. The RH-TRU waste treated with this technology is then safe for permanent disposal. Fluor Idaho is proud to operate DOE's CH- and RH-TRU waste treatment facilities, as well as use innovative processes and its talented workforce to complete this important work-scope. Such capabilities allow the contractor to meet the commitments made by the DOE to the state of Idaho. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification Process for Idaho HLW Calcine - 18433

The majority of the liquid wastes produced from reprocessing of several types of spent nuclear fuel at the Department of energy's (DOE) Idaho site have been volume reduced by calcination. The resulting ∼155,600 ft{sup 3} of calcined waste is stored in 43 shielded stainless steel bins, which have a 500-year design life. The calcined material is both a high-level waste and a RCRA hazardous waste, which complicates treatment and disposal options. In addition to a potential direct disposal option, treatment options that have been considered include steam reforming, hot isostatic pressing (HIP), and vitrification. This paper describes testing and evaluation of a vitrification option for the calcine. Vitrification to produce a borosilicate glass has the advantage that it is the only treatment that provides a waste form that meets the current HLW repository waste acceptance criteria. It is therefore the lowest risk option in terms of regulatory and legislative concerns. The present work addressed several key questions: (i) Calcine waste loadings in glass, which determine the number of HLW canisters produced and the required glass production rate (throughput) for the system design; (ii) Melt rate per unit glass pool surface area of the melter, which determines the sizing of the vitrification system; and (iii) The ability to meet waste form acceptance requirements (PCT and TCLP) while achieving reasonable waste loadings. These are issues of fundamental importance to the sizing estimates for the unit operations and overall flow-sheet and they, therefore, directly impact the cost and schedule estimates. Fully compliant, high-waste-loading glasses were developed for two of the four Idaho calcine wastes. The results demonstrate that waste loadings of 35 wt% waste oxides are achievable for the two alumina calcines and about 30 wt% is achievable for the two zirconia calcines. Testing of these formulations in a joule-heated ceramic melter showed glass production rates of over 5000 kg/(m2/d) for the Alumina calcine and over 8500 kg/(m{sup 2}/d) for the Zirconium-Na Blend calcine. These extremely high production rates translate directly into smaller system size and shorter mission duration and, therefore, reduced costs. Based on these results, a preliminary design for the full-scale vitrification system was developed. The system consists of waste receipt, vitrification, off-gas treatment, and canister sealing and decontamination equipment. The calcine is blended with the appropriate glass forming chemicals (or glass frit) and fed to the melter as a solid stream. The melter has a glass pool surface area of about 2.5 m{sup 2} and is equipped with a bubbling system to increase processing rates. Glass production rates of about 6 metric tons per day are projected. The vitrification system would be installed into the existing Idaho Waste Treatment Unit Facility (IWTU) so that no new facilities are required to house the treatment system, thus greatly reducing overall cost, duration, and risk. The system would be designed to treat all of the calcine waste within a period of 12 years at an operating efficiency of 80%, producing a total of about 8500 canisters each weighing two metric tons. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Problematic Reactive Metal Wastes Using the GeoMelt{sup R} In-Container Vitrification (ICV{sup TM}) Process - 18639

Decommissioning of sodium cooled reactors and fast reactor technologies have generated a number of reactive metal waste configurations that are problematic to treat and typically lack cost effective treatment methods and disposition options. As a result, Veolia Nuclear Solutions, under contract with Idaho National Laboratory (owned by the U.S. Department of Energy and managed and operated by Battelle Energy Alliance, LLC) demonstrated its GeoMelt{sup R} In-Container Vitrification (ICV){sup TM} technology to safely convert sodium metal to a non-reactive vitrified oxide form. The demonstration project, supported by glass formulation and crucible testing, consisted of a series of ICV{sup TM} melts that processed elemental sodium into stable non-reactive glass. Battelle Energy Alliance, LLC is evaluating the GeoMelt{sup R} technology as a means to safely and reliably convert radioactive reactive metal residues that contaminate components from sodium cooled reactors into waste forms that comply with existing disposition pathways. Reactive metal wastes at INL require treatment in order to remove the Resource Conservation and Recovery Act (RCRA) reactivity and ignitability characteristics in order to comply with land disposal restrictions. GeoMelt{sup R}, which is an alternative to other potential treatment approaches, provides a robust approach that chemically converts the reactive metals to an inert oxide while also immobilizing radionuclides in a vitrified waste form with durability equal to or better than vitrified nuclear fuel reprocessing wastes (very robust and inert waste forms). Most other treatment approaches generate hydrogen gas which is problematic. In 2016, Veolia Nuclear Solutions demonstrated the effectiveness of the GeoMelt{sup R} ICV{sup TM} process in deactivating reactive sodium metal. Crucible, bench-scale, and engineering-scale demonstrations were conducted on several surrogate waste configurations with various ratios of sodium metal and glassformers. Each ratio and configuration demonstrated complete deactivation of the surrogate sodium metal. Follow-on work in 2017 demonstrated the deactivation of reactive sodium by GeoMelt{sup R} ICV{sup TM} at a higher waste loading relative to previously demonstrated work performed in 2016. The higher waste loading optimized glass chemistry while enhancing the economical full-scale treatment of reactive metals. The GeoMelt{sup R} technology is a proven radioactive waste treatment technology capable of immobilizing radioactive wastes, including bulk rubble such as drums and other steel vessels usually without pretreatment. Utilizing the GeoMelt{sup R} technology to treat reactive metals eliminates pretreatment steps resulting from having to separate the reactive metal from steel containers or jackets as GeoMelt{sup R} can easily operate at temperatures sufficient to melt the steel and expose the reactive metal for treatment. Eliminating handling steps of reactive metals is a significant safety advantage since reactive metals are pyrophoric. The results of this two-year demonstration program and future planned activities are presented in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Handling and Treatment of Sodium-Potassium Alloy (NaK) after the Loss of Key Personnel - 19002

In September 2010, during cleanup and removal efforts associated with a glovebox containing a sodium-potassium alloy (NaK) cooling system, a NaK reaction event occurred. Near the end of the evolution, which was at a Materials and Fuels Complex (MFC) research facility at the Idaho National Laboratory, a 2 to 3-ounce sample of NaK was being transferred from a metal can to a polyethylene bottle so it could be sent to the disposal outlet for verification analysis. During the transfer, a reaction of the NaK with ambient air was observed in both the metal can and sample container. The potential for a reaction was identified during the planning of this activity and mitigating steps were included in the procedures. In response, the two containers were flooded with argon, closed, and observed overnight. No additional reaction was noted. The sample container and metal can were packaged into a 10-gallon drum and transferred to a permitted storage location pending disposal. While the other containers generated from the deactivation and decommissioning activity were sent off-site for disposal, the 10-gal drum remained due to concerns by a staff specialist that the material could contain potassium superoxide (KO{sub 2}) as a result of the reaction event. The intent at that time was to treat the NaK in a Resource Conservation and Recovery Act (RCRA)-permitted treatment facility at MFC, instead of sending it off-site for disposal. The container was labeled, inspected, and managed as a hazardous waste. Due to the complexities associated with safely handling and treating NaK and KO{sub 2}, the container remained in storage. Treatment and disposal of the NaK and KO{sub 2} container was revisited in 2016, when researchers and chemists were consulted regarding the potential for superoxide formation and the best means to safely store and treat the container. The facility came to realize that due to the retirements of key personnel, it needed to provide current employees operational experience with the handling and treatment of NaK. An outside company was identified and contracted to provide training and consulting services. Several Battelle Energy Alliance, Inc. (BEA) personnel then attended an alkali metals safety training class. The training course provided participants with classroom and hands-on instruction associated with: - Hazards associated with handling and using sodium and NaK; - Proper personal protection equipment, spill control techniques, and first aid; - Common design approaches for buildings, systems, and equipment used to contain sodium and NaK; - What to expect in the event of a water reaction and how to respond; - How to properly prepare for a fire and contain/extinguish small metal fires; - A hands-on demonstration of NaK reaction and controls. Following the training, a procedure was developed to open the container, and inspect and treat the NaK. In June 2017, facility operations personnel successfully completed the inspection and treatment of the NaK drum, eliminating the legacy liability. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Implementation of a Dose-based Compliance System for WCS - 19178

Waste Control Specialists LLC (WCS) operates a low-level radioactive waste (LLRW) disposal facility in Andrews, Texas. The site includes a compact waste facility (CWF) that began receiving waste in 2012, a federal waste facility (FWF) that started receiving waste in 2013, as well as a Resource Conservation and Recovery Act (RCRA) landfill and a byproduct facility. The current site license uses a complex system of concentration-based investigation levels and action levels (ILs and ALs) coupled with analytical decision levels (ADLs) that, when exceeded, require specific steps to be taken. These concentration-based ILs and ALs are media specific (i.e. air, soil, water), radionuclide specific, location specific, and disposal facility specific. This results in thousands of individual ILs, ALs, and ADLs that need to be managed and evaluated routinely in order to demonstrate compliance. Further, under the current system, each exceedance of an IL and AL can trigger comparisons to numerous additional isotopic ILs per sample, which is cumbersome, error prone, and costly. This paper describes implementation of a dose-based compliance system that has been developed to replace the existing system. The dose-based compliance system is implemented in RACER{sup C}, a cloud-based software developed by Risk Assessment Corporation (RAC). This system maintains all the analytical results related to the sampling and analysis conducted as part of the Radiological Environmental Monitoring Program (REMP) together with the geo-spatial data allowing instantaneous trending and analysis of the data. Further, the system contains the information needed to compare the analytical results to the new media-specific screening levels that have been developed, and the parameters and routines to compute doses using prescribed exposure scenarios and dose coefficients for compliance evaluation. Once measurement data are entered into RACER, the routines for continuous screening of air, soil, groundwater, and dosimeter data are triggered, and any sample result failing the screening step or exceeding the dose IL/AL is identified and flagged automatically for further review or action, as appropriate. Because RACER is cloud-based, the data, screening, and dose calculations can be accessed remotely at any time, providing a timely and efficient method for identifying any possible releases from the site to the environment as well as determining the potential dose consequences associated with a release. Furthermore, the system is accessible by the regulator providing transparency and ensuring they remain fully informed in an efficient manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Erosion Control Measures at Oak Ridge Reservation Landfills Oak Ridge, Tennessee - 19190

URS-CH2M Oak Ridge LLC (UCOR) manages the cleanup of the 2,200-acre East Tennessee Technology Park (ETTP) for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The ETTP was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. In disposing of low-level radioactive and other wastes from demolition activities, the UCOR approach relies on the availability of onsite facilities to streamline disposal, reduce costs and enhance cleanup schedules while confining shipments and related hazards onsite. The sanitary/industrial waste facility, known as the Oak Ridge Reservation Landfill Facility (ORRLF) is a solid waste operation that receives and disposes of sanitary/industrial, construction/demolition and classified, special waste; and spoil materials types of waste generated at the U.S. Department of Energy (DOE) Oak Ridge facilities. ETTP is the primary generator; however, the landfill accepts waste from Y-12 National Security Complex (Y-12), Oak Ridge National Laboratory and other DOE prime contractors in the Oak Ridge area. ORRLF's mission is to receive nonhazardous, non-radioactive, and non-Resource Conservation and Recovery Act of 1976 (RCRA)-regulated solid wastes. Approved operations include receiving, compacting, and covering wastes; leachate management, site drainage; erosion control and prevention, inspections, maintenance and recording keeping. The Oak Ridge Reservation has three separate State of Tennessee-permitted active landfills (Landfill IV, Landfill V, and Landfill VII) that meet different disposal needs -- classified industrial waste, industrial waste that includes office trash and cafeteria waste, and construction and demolition debris,. As with a typical landfill, strategic waste placement and covering involves moving a lot of soil, usually resulting in large areas of exposed land. After increased sediment was noted in streams following heavy rains, a concerted erosion prevention and sediment control effort began in 2017. While not uncommon for landfills, the ORRLF staff knew they could do better in controlling sediment. In response, the ORRLF staff developed an approach of aggressive revegetation, ditch improvements and other erosion controls. Staff developed a list of all the areas that needed the most attention and requested resources. UCOR management arranged funding for needed improvements. The oldest of the three landfills is Industrial Landfill IV, which opened in 1989 and has an expected remaining 60 years of life. Therefore, how the landfills are maintained/managed today directly affects the compliance posture, the capacity, and the infrastructure in the future. A systematic, aggressive and multi-pronged approach was taken to address the major concerns first, then continue with longer-term, and/or lower priority projects. Buy-in was obtained from both craft and supervision, resulting in approaches like 'Ditch of the Month'. In addition, management support at the highest levels has provided resources and recognition that further fuels progress. After working on the site for the past year, what used to be exposed brown hills looks more like a golf course now. Now that the grass is established and other erosion controls are in place, the amount of sediment leaving the site has been reduced, and the appearance of the landfills is improved. Vegetation dissipates the kinetic energy from rain droplets while the root system helps hold the soil in place, and wire-reinforced silt fences and straw wattles have greatly improved erosion control. Improved ditches reduce the runoff velocities allowing sediments to fall out of suspension in the stormwater before they reach the receiving waters, and structures are in place to let finer sediment settle in ponds rather than going downstream. In addition, the project has added more stone to roadways to minimize tracking dirt down the road as an average of 20 to 40 trucks per day enter and leave the site. Ongoing landfill erosion and sediment control must be funded and maintained continually. The lack of attention to either resource will negatively affect the condition of the landfill fairly quickly. Constant compliance commitment is necessary to ensure protection to the environment, the operator/workers and the public. Operations must include sediment control, pond maintenance and clean out, road maintenance and construction, erosion prevention, seeps repair, leachate management, landfill expansion, mowing and grounds upkeep and much more. Knowledgeable/experience staff is also crucial. Knowing how to build lifts, create leachate drainage windows, respond to high rains events, compact waste will impact operations today and future operations into the closure / post closure periods. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 126: US and International Waste Classifications; Differences and Issues

The panel focused and addressed the existing US waste classification scheme set forth in US 10 CFR Part 61 and DOE Order 435.1 focusing upon the commensurate risk associated with the disposal of radioactive Low-Level (LLW) and High-Level Waste (HLW). The panel provided insights on the ongoing efforts by the NRC in conducting its Very LLW Scoping Study, the waste classification scheme used by the IAEA with a comparison of that system to the waste classification regulatory process in the US and the increasing role of RCRA sites in disposal of LLW in the US. The process used for very low activity waste disposal known as Bulk Survey for Release in the State of Tennessee was discussed as well as various studies conducted by EPRI addressing the relative risks of very low activity waste will be addressed. The panel strived to compare the risks of radioactive LLW and HLW to the operational process used for its disposal in the US and Internationally and determine if changes are needed in the process. The audience heard the perspectives from six panelists that addressed issues ranging from the technical basis used to establish the waste classification system specified in Title 10 of the Code of Federal Regulations (CFR) Part 61 developed by the Nuclear Regulatory Commission; the approaches and impacts for dispositioning materials with Very Low Levels of Radioactive Waste (VLLRW); approaches used by the Department of Energy (DOE) to disposition Low-Level Radioactive Waste (LLW) in accordance with Order 435.1; and methods adopted by the international community to classify and disposition LLW and Intermediate Level Waste (ILW). A summary of each of the presentations given by the panelists is provided herein. Presentations proposed include: 1 - U.S. Low-Level Radioactive Waste Classification System 10 CFR Part 61 - Basis, Updates, and Issues (Rateb (Boby) Abu Eid, US NRC (USA)); 2 - EPRI Research on the Technical Basis for VLLW Classification (Lisa Edwards, EPRI (USA)); 3 - Division of Radiological Health (Anthony Hogan, State of Tennessee (USA)); 4 - Perspectives on VLLW Based on EPA's Low Activity Waste Effort (Thomas Peake, US EPA (USA)); 5 - US Department of Energy Perspectives on Waste Classification (Justin Marble, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Minimizing Transuranic Waste Generated in Hot Cells at Oak Ridge National Laboratory Through Use of a Non-Destructive CO{sub 2} Pellet Cleaning System - 19577

Wastes generated in shielded hot cells containing materials contaminated with transuranic (TRU) waste present unique problems in waste disposal at Department of Energy (DOE) sites. Oak Ridge National Laboratory (ORNL) routinely processes materials contaminated with TRU waste from the High Flux Isotope Reactor (HFIR) and from other sources (both on and off-site) in their hot cell facilities, generating wastes that require eventual disposal. The waste streams generated by these processes are often high activity and exhibit high dose rates, driving them into the remote-handled (RH) category at the Waste Isolation Pilot Plant (WIPP). Reduction of the TRU waste footprint is desirable from a disposal cost perspective due to constraints with RH waste processing and a lack of space availability at the WIPP. Historically TRU waste generated at ORNL has been processed by the TRU Waste Processing Center (TWPC), which belongs to the Department of Energy's Office of Environmental Management (DOE-EM). Now that Oak Ridge legacy TRU waste is reaching its final stage, DOE-EM has turned over the mission of processing newly-generated TRU waste streams to the DOE Office of Science at ORNL. To reduce the volume of potential TRU waste occupying valuable space in the ORNL Hot Cells, a non-destructive CO{sub 2} pellet cleaning system will be used to capture particulate contaminants removed from the surfaces of waste inside the ORNL Non-Reactor Nuclear Facilities (NNFD) Hot Cells at the Irradiated Fuels Examination Laboratories (IFEL). The particulate will be segregated by particle size and captured for disposal later. This action will separate some of the TRU isotopes (particulate) from the larger waste volume (debris waste items), resulting in both lower waste disposal costs and reduced TRU waste volumes. This will be accomplished through a specialized cyclone separator. Secondary wastes are usually generated through other methods of decontamination, such as water jets and abrasive agents. These secondary wastes are absent with the CO{sub 2} pelletized system, due to sublimation of the dry ice upon impact. This is an important consideration with IFEL, a facility whose primary mission is to perform a series of R and D testing on nuclear fuel rods. Liquid is not a feasible method of decontamination as the IFEL's drains in the Hot Cells were plugged years ago due to Resource Conservation and Recovery Act (RCRA) regulations. Constraints at IFEL, such as criticality safety concerns with use of hydrogenous materials, are also alleviated with the non-destructive CO{sub 2} pellet cleaning system. These are a couple of the considerations why this method of decontamination is preferred. Due to concerns with oxidizers at WIPP grouting will be performed on the contaminated particulate produced during the trapping by the cyclone separation phase. This method will comply with mitigating oxidizing properties in TRU waste, required by the recently published Basis of Knowledge (BoK) document as part of Acceptable Knowledge (AK) by WIPP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Critical Design Elements for an On-Site Mercury Concentration and Holding Facility - 20175

Administrative changes and funding issues have delayed the Department of Energy (DOE) from establishing and commissioning a National Repository for mercury as required under the Mercury Export Ban Act (MEBA) of 2008. In the interim, a few hazardous waste Treatment, Storage, and Disposal Facilities (TSDFs) have been authorized to accept mercury classified as a hazardous waste as under Subtitle C of the Resource Conservation and Recovery Act (RCRA). Waste generators are charged (either by weight or by volume) for the waste they manifest to these TSDFs. In many cases, mercury and mercury compounds have chemically sorbed to (or physically lodged into) the interstitial spaces of a substrate material. This almost always causes the amount of waste generated to be unnecessarily large, due to the extra volume (or weight) of the accompanying, non-mercury materials. Depending on a multitude of factors, it could be financially beneficial for waste generators to take greater control of their mercury affairs by separating these substrate materials from the mercury and mercury compounds that have become associated with them. Building and operating an on-site mercury Concentration and Holding Facility (CHF) could help relieve a waste generator's overall cost burden. The purpose of such CHFs is not to treat or dispose of mercury, but to recover and concentrate mercury from bulky mercury-laden materials to the extent that the host substrate to which the mercury may have previously been sorbed could pass a Toxicity Characteristic Leaching Procedure (TCLP) test and either be disposed of at a conventional landfill, or be disposed of at a hazardous waste landfill, but absent additional restrictions specifically for mercury. A CHF represents a way for waste generators to save money by separating mercury from common host materials, concentrating it, and then safely storing it until transportation to an authorized TSDF takes place This paper focuses on the critical design elements waste generators should consider when designing and operating a mercury CHF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analyses for the Hanford Integrated Disposal Facility Performance Assessment - 20102

In 2014, the Department of Energy (DOE) Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Site's Integrated Disposal Facility (IDF). The IDF is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste that will be produced at the Waste Treatment and Immobilization Plant (WTP). IDF is also expected to receive solid secondary waste produced at the WTP and other solid wastes from site activities. The IDF has been in a preoperational state awaiting authorization from DOE and a RCRA permit modification from the State of Washington Department of Ecology to receive waste. Both the Disposal Authorization Statement and permit modification require a performance assessment demonstrating that the system of engineered and natural features will limit releases of radionuclides and hazardous chemicals from the IDF and be protective of human health and the environment. The simulated duration is 10,000 years. Based on the analyses presented in the 2017 Integrated Disposal Facility Performance Assessment, DOE issued a conditional Operating Disposal Authorization Statement for the IDF in June 2018. The long-term performance of the IDF to be protective of human health and the environment was evaluated under the requirements of DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the IDF would comply with DOE requirements. In the time that has passed since the performance assessment was approved by DOE, new information has been discovered that had not been considered in the performance assessment. Since this new information has not been evaluated, the potential impact of the changes have not been taken into consideration in DoE's disposal authorization. DOE and its contractors follow a change control process to screen and, when necessary, evaluate new information that could potentially impact the conclusions of the completed performance assessment. This paper will describe the change control process and provide two examples of evaluations performed following the change control process. The first example evaluates a new waste form for liquid secondary waste that was not evaluated in the performance assessment. In the performance assessment, liquid secondary waste was assumed to be solidified with grout. A new recommendation to dispose of the liquid secondary waste after drying it to a powder was evaluated. The second example evaluates inventory implications from changes to the flow sheet that estimates the feed composition to the low-activity waste vitrification facility. The changes result in higher strontium concentrations in the vitrified waste stream. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗