Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIOACTIVE WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Lessons Learned From Decommissioning B411 Decontamination Centre at Whiteshell Laboratories - 18211

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on the largest organically cooled, heavy water moderated nuclear reactor in the world, the WR-1. It is now operated by Canadian Nuclear Laboratories (CNL) and is the first major decommissioning project of a nuclear research establishment in Canada. One of the major projects to support the closure of Whiteshell Laboratories (WL) is the decommissioning and demolition of the Building 411 (B411) Decontamination Centre, which provided a decontamination service for maintaining research and development of experimental rigs, equipment and tools in a safe usable state. It also provided a laundry service for radioactively contaminated clothing. The team successfully self-performed their first demolition of a nuclear facility, but not without challenges. The baseline decommissioning strategy assumed most of the facility would meet unconditional clearance levels; however when characterization revealed the extent of contamination exceeded initial assumptions projected from process knowledge, in conjunction with resource challenges and a waste disposal pathway not firmly established, active remediation of the facility was undertaken. With an unknown waste acceptance criteria for the future waste disposal facility, sludge that had accumulated in a tank used to collect xylene and organic coolant from contaminated tools and equipment and the selection of appropriate waste packages for waste storage, transportation and disposal forced the project team to adjust their demolition timeline. This, coupled with developing an open air demolition plan and managing an uncertain end state criteria, were just some of the major tasks the team successfully navigated. The impact on both schedule and cost performance caused by the change in strategy, and the lessons learned experienced by the WL Decommissioning Project Team that are being applied as the Whiteshell Laboratories Closure Project (WLCP) moves forward with the next major decommissioning challenge, are highlighted in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement of the U-235 Content of Concreted Waste Drums

A challenging assay situation recently arose, whereby the fissile (i.e. total plutonium plus U-235) content of a population of 164 historical waste drums containing concrete needed to be measured, to comply with nuclear safety limits for transport to, and interim storage within, an Engineered Drum Store. BIL Solutions Ltd has developed a new methodology for measurement of the U-235 content of these 'concrete' drums, because the approach normally used by the in-situ Drum Monitors was found to be overly pessimistic. Initial investigations indicated significant quantities of uranium were present in these drums (but negligible plutonium), mixed with Np-237 and / or Ra-226. These initial measurements also indicated that the uranium was likely to be depleted in enrichment. The U-235 content was therefore determined by measuring the U-238 mass via the passive coincident neutron emission, and combining this with the U-235 and U-238 isotopic abundances, obtained by analysis of a gamma spectrum. Of the uranium isotopic analysis codes available, the FRAM (Fixed energy, Response function Analysis with Multiple efficiencies) software was selected as being most suitable for this application. A wide gamma-ray energy range is used (i.e. 120 keV to 1200 keV) which was considered more likely to yield results when there is significant attenuation. The software is also user configurable, enabling interferences from the other radionuclides present (i.e. Np-237 and Ra-226) to be accounted for. A series of test measurements were performed with well-characterised uranium sources attenuated by concrete shielding, to gain confidence in the performance of FRAM under such conditions. These test measurements indicated that FRAM was able to correctly determine the enrichment of heavily shielded uranium. The new U-235 measurement methodology was then applied to the population of concrete drums; successfully yielding U-235 results despite the dense waste matrix and significant interference from Np-237 and / or Ra-226. The U-235 mass results obtained were significantly more accurate than those that would have been obtained had the traditional approach (i.e. transmission corrected 186 keV count rate) been used, facilitating safe transport and storage of the drums. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Combined Assay Systems for the Characterisation of Historical ILW at of the Dounreay Shaft and Silo-18140

In 1955 the Dounreay nuclear power development establishment was created on the northern coast of Scotland primarily to pursue the UK Government policy of developing Fast Breeder Reactor (FBR) technology. The site operated then by the United Kingdom Atomic Energy Authority (UKAEA) saw the development, test and operation of 3 nuclear reactors, two of them FBRs, alongside fabrication and reprocessing facilities for the FBR fuel elements. From the late 1950's until 1977 Intermediate Level radioactive Waste (ILW) generated on site was disposed of into a 65 m deep, 4.6 m diameter shaft. In January 1977, an explosion thought to be caused by hydrogen generated from sodium and potassium wastes reacting with water occurred in the upper part of the shaft, thus stopping any further waste disposal. A second ILW storage facility, the ILW-Silo, started operation in 1971 to deal with the increasing volume of intermediate level waste generated on site in the mid-1960's and continued receiving waste until 1998. The decommissioning of the Shaft and Silo facilities is a challenging engineering task due to the complexity and potential hazards linked with the retrieval and handling of historical waste. Following recovery it is intended to shred the majority of the waste and load it into 200-l assay drums. Sludges would be separated and solidified within a special annulus drum to make them suitable for assay. To support the decommissioning strategies put forward by Dounreay Site Restoration Limited (DSRL), Mirion Technologies Canberra UK Ltd have designed and completed the manufacture of a pair of combined non-destructive waste assay (NDA) systems. The two identical automated ILW counters are intended to provide a means to characterise the waste materials by performing active and passive neutron measurement as well as segmented high resolution gamma spectrometry (HRGS) of 200-l sacrificial waste drums. The active neutron technique is based on the Differential Die Away (DDA) technique using a pulsed Deuterium-Tritium neutron generator to interrogate fissile material present in the waste. The active neutron measurements support, as well as the passive neutron coincidence measurements, a matrix correction capability by use of an Add-a-Source mechanism. The publication will describe in broad lines the approach proposed by DSRL in the processing of the waste retrieved from both the Shaft and Silo facilities. It will also present a description of the overall design of the NDA counters, illustrating how the measurements to be performed will allow DSRL to safely characterise the retrieved waste materials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Plan for the Disposal of Existing and Future TRU Wastes - 18616

Now that the Waste Isolation Pilot Plant (WIPP) has re-opened, after being down for three years due to an accident the DOE National TRU Program has re-developed a plan for the disposal of existing and future TRU wastes. The National TRU Waste Management Plan (NTWMP) is an integrated plan to address the needs of DOE sites across the DOE Weapons Complex that create and store TRU waste, and is centered on the capability of WIPP to receive and dispose of TRU waste. The WIPP capability is planned as a weekly shipping rate and is defined by emplacement and receipt rate capabilities since WIPP is not permitted for long-term storage. And, shipping rates may be constrained by new WIPP Waste Acceptance Criteria (WAC) and future plans for repository configurations and disposal package capabilities over the next 30 years. Since WIPP is the only disposal system available to the DOE for TRU waste disposal, DOE has a newly projected life-cycle need for WIPP to remain open and available up to 2050. It is projected that the need for WIPP will continue up to the year 2050 for the disposition of the remaining legacy TRU inventories and for the disposal of TRU waste continuing to be generated at DOE's National Laboratories. In addition, there are several other potential new waste streams in which WIPP is being considered an alternative solution for their disposition. The NTWMP has been updated to reflect the short-term and long-term plans for TRU waste disposal at WIPP. The short-term plan is used by DOE for budget projection and integration purposes to facilitate and inform budget planning, both in DOE's Environmental Management (EM) and National Nuclear Security Administration (NNSA) organizations. Most legacy TRU waste (generated in the past and stored at DOE sites today) is owned and managed by EM. And, EM submits integrated budget requests for DOE sites, including the integration of resources for TRU waste management. NNSA and DOE's Office of Science (OS) funds TRU waste management as part of their mission funding and NNSA should eventually be the primary user of the WIPP resources as EM's legacy TRU waste is cleaned-up. Prior to the unexpected shutdown of WIPP in 2014, there was a small back-log of waste certified for WIPP disposal and shipments of TRU waste to WIPP were 'just-in-time' as waste was certified. After three years of WIPP being down, DOE sites have built significant back-logs of TRU waste to be certified for WIPP. That back-log built up to over 25,000 containers of TRU waste during that three-year period (Table 1). The backlog included both Contact-Handled (CH) TRU waste and Remote-Handled (RH) TRU waste, and even though WIPP re-opened in April of 2017, it is only open for TRU waste containers that can be stacked on disposal room floors. Plans for changing RH waste disposal packages and methods are in-the-works, but are not yet mature enough for significant planning. In addition, the WIPP underground facilities are now partially contaminated with radioactive particulate, which significantly reduces the WIPP operational efficiencies as compared to 2014. With a large back-log of waste ready for WIPP disposal and limited throughput for WIPP disposal rates, the focus of the NTWMP is to prioritize the selection of TRU wastes from the various sites based on WIPP waste emplacement rates and shipping rates to WIPP. Some TRU waste sites have a significant need to be top priority for shipments to WIPP, and that must be balanced with the need for all TRU waste sites to have some shipments to deplete their back-log of TRU wastes. Storage and management of TRU waste is very costly for DOE and many of those resources could be used to optimize the overall disposition of TRU waste and save DOE significant funding. In addition, the plan will show the possible transition of TRU Waste Management from primarily being an EM function to being an NNSA function in the coming years. As legacy TRU waste inventories are removed, and as NNSA mission-related TRU waste inventories are produced, DOE will be faced with deciding where the primary responsibility for TRU waste management should reside. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 134: Stakeholder Involvement in Consolidated ISF Storage, Disposal, and Transportation Initiatives

Planning of activities related to waste storage, transportation, and disposal requires involvement and engagement on the parts of both regulators and stakeholders. There have been challenges felt by both parties, which has led to discussions about how to best proceed with projects not just from a technical perspective, but how to create better relationships between the general public and scientific community. This panel was designed to highlight lessons learned, best practices, and next steps in anticipated projects. This panel focused on the current efforts undertaken by initiatives to involve stakeholders for the success of ISF Storage and Disposal facilities. For example, two license applications were submitted to the US NRC by two private entities - Interim Storage Partners (WCS, Inc, and Orano) and Holtec, Inc./ELLA - for consolidated ISF in West Texas and in NM (respectively). This panel discussed elements needed for success in engaging various stakeholders at all levels of the project life cycle, and can include lessons learned from previous projects. Panelists with presentations: Stakeholder Engagement in SNF Storage and Disposal (Miriam Juckett); Stakeholders, Siting and Nuclear Waste Disposal -Thoughts on a Path Forward (Jim Hamilton)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Three Sites for the Global Nuclear Energy Partnership

The Global Nuclear Energy Partnership (GNEP) is an initiative managed by the United States Department of Energy (DOE) to work with other nations to develop and deploy advanced nuclear recycling and reactor technologies. The purpose of this initiative is to help provide reliable, emission-free energy with less waste burden of older technologies and without making available separated plutonium that could be used by rogue states or terrorists for nuclear weapons. In November 2006, DOE awarded multiple contracts to EnergySolutions to prepare separate siting studies to determine the possibility of hosting a Consolidated Fuel Treatment Center (CFTC) and/or an Advanced Burner Reactor (ABR) at three proposed sites: The Atomic City Site in Bingham County, Idaho; the Roswell Site in Chaves County, New Mexico, and the Barnwell Site in Barnwell County, South Carolina. EnergySolutions prepared Detailed Siting Reports (DSRs) that describe the overall character of each site and its local environment in sufficient detail to understand how it could be affected by the proposed GNEP facilities. A comprehensive review of the potentially affected environment showed that there were no foreseeable environmental impacts or regulatory prohibitions that would prevent each of the sites from serving as an effective host for GNEP. Each site was found to be of sufficient size to locate either or both of the planned GNEP Demonstration Facilities and to have sufficient room to provide suitably sized feed buffer and interim waste product storage capability. All three sites had water rights and access to a reliable source of water to support site operations. In each case, there is strong local and state interest in and support for siting the proposed GNEP facilities. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Low- and Intermediate-Active Waste Management in the Federal Republic of Germany - 16567

Waste with negligible heat generation (low- and intermediate-active waste) generated in Germany is to be emplaced in the Konrad repository. As the start of operation of the Konrad repository is expected in 2022, regulations have been developed that allow a longer storage period while keeping the same high level of safety. The guidelines for the storage of radioactive waste with negligible heat-generation have become part of the regulatory framework and its enforcement is thoroughly guided by the responsible Federal Ministry. Radioactive waste generated during the operation or the decommissioning of nuclear power plants and nuclear fuel cycle facilities has to be stored by the operator until the Konrad repository is available. In contrast, radioactive waste generated from other industrial, medical and research applications including spent nuclear sources, initially has to be delivered to a Land collecting facility and has to be registered, treated and stored there. The Land collecting facilities will deliver the resulting waste packages to the disposal facility as of 2022. While the operation of the Land Collecting Facilities is a task of the responsible Laender authorities, the operation of the repository Konrad is a federal task. The interaction of the involved different parties will be described. This paper will focus on the management of low- and intermediate-active waste. It will give an insight to the expected amounts and different kinds of waste streams. The different concepts for collecting and qualification procedures for waste packages depending on the origin of the waste will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Legacy of Taiwan Lanyu LLW Interim Storage Site - 17491

The Lanyu (Orchid Island) LLW (Low Level Waste) interim storage facility for the Taiwan LLW is located on Lanyu Island off the coast of Taiwan (Republic of China). It is perhaps the only outdoor LLW interim storage facility in the world. The shipment of LLW to the Lanyu LLW interim storage facility began in May 1982 and ceased in June 1995 after strong opposition from the local aboriginal Yamei tribe people. Since the shipment of LLW to the Lanyu LLW storage facility ceased in 1995, the LLW in Taiwan has been stored temporarily at the indoor facilities at the Taipower (Taiwan Electric Power Company) three operating NPPs (nuclear power plants) and the INER (Institute of Nuclear Energy Research). The current Taiwan government has recently begun to lay out a multi-faceted plan to address the Lanyu LLW interim storage facility and evaluate different options of relocating Lanyu LLW to other possible sites. However, many challenges remain, notably the site selection for the LLW final disposal site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dose estimates and their uncertainties for use in epidemiological studies of radiation-exposed populations in the Russian Southern Urals

Many residents of the Russian Southern Urals were exposed to radioactive environmental pollution created by the operations of the Mayak Production Association in the mid- 20 th century. There were two major releases: the discharge of about 1x10 17 Bq of liquid waste into the Techa River between 1949 and 1959; and the atmospheric release of 7.4 * 10 16 Bq as a result an explosion in the radioactive waste-storage facility in 1957. The releases into the Techa River resulted in the exposure of more than 30,000 people who lived in riverside villages between 1950 and 1961. The 1957 accident contaminated a larger area with the highest exposure levels in an area that is called the East Urals Radioactive Trace (EURT). Current epidemiologic studies of the exposed populations are based on dose estimates obtained using a Monte-Carlo dosimetry system (TRDS-2016MC) that provides multiple realizations of the annual doses for each cohort member. These dose realizations provide a central estimate of the individual dose and information on the uncertainty of these dose estimates. In addition, the correlation of individual annual doses over realizations provides important information on shared uncertainties that can be used to assess the impact of shared dose uncertainties on risk estimate uncertainty.This paper considers dose uncertainties in the TRDS-2016MC. Individual doses from external and internal radiation sources were reconstructed for 48,036 people based on environmental contamination patterns, residential histories, individual 90 Sr body-burden measurements and dietary intakes. Dietary intake of 90 Sr resulted in doses accumulated in active bone marrow (or simply, marrow) that were an order of magnitude greater than those in soft tissues. About 84% of the marrow dose and 50% of the stomach dose was associated with internal exposures. The lognormal distribution is well-fitted to the individual dose realizations, which, therefore, could be expressed and easily operated in terms of geometric mean (GM) and geometric standard deviation (GSD). Cohort average GM for marrow and stomach cumulative doses are 0.21 and 0.03 Gy, respectively. Cohort average dose uncertainties in terms of GSD are as follows: for marrow it is 2.93 (90%CI: 2.02–4.34); for stomach and the other non-calcified tissues it is 2.32 (90% CI: 1.78–2.9).

61 RADIATION PROTECTION AND DOSIMETRY↗

Flowsheet Definition for the Tank Side Cesium Removal Unit and the Importance of Early Communication - 19142

The U.S. Department of Energy (DOE) tank operations contractor Washington River Protection Solutions, LLC (WRPS) is working toward the start of low-activity waste (LAW) treatment in direct feed mode as soon as 2022. WRPS is responsible for providing the pre-treated feed for this direct feed mode and had originally planned to use the Low Activity Waste Pretreatment System (LAWPS) to supply the initial feed in 2021. In September 2017, in response to a DOE-sponsored LAWPS program review, a new system was proposed to provide the initial feed during direct feed mode until a supplemental pretreatment capability is ready to begin processing feed. This system, known as the Tank Side Cesium Removal (TSCR) system, is based on the Savannah River Tank Closure Cesium Removal (TCCR) system and technology used to separate cesium out of reactor water at Fukushima. A preliminary flowsheet was needed to form the initial basis for future decisions and allow discussions between operations, project management, and the customer. The main goal of the TSCR flowsheet was to form a process flow diagram, process description, and much of the preliminary information to be used to help inform future decisions. When flowsheet development first began, little to no information was readily known and what was known needed to be compiled in one place and digestible by several audiences. The impacts of various parameters on the system also needed a vehicle for clear communication to varying audiences. While a more complicated model was being completed, a model of the process was created using Microsoft Excela which could have several parameters changed while maintaining basic logical requirements (such as treated waste volume cannot exceed the volume of the Interim LAW Storage Tank [ILST], must shutdown for so many days for column changeout, etc.). This program allowed the unit downtime, start dates, treatment rates, and several other variables to be modified and reflect the ILST storage volume as a function of mission progression. The model with several different parameters gathered from the various groups was combined into an early flowsheet of the TSCR process and created one of the first citable documents about TSCR implementation at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feedback of the Dutch Historical Waste Management Program - 17085

This paper provides a feedback on the Dutch historical waste management program. Over the past decades, the High Flux Reactor located in Petten in the province of North Holland has tested numerous types of materials and fuels irradiation, for both medical and nuclear energy applications. A number of waste containers was accumulated on site, where the storage facility was initially built. Following Dutch political decisions in the 1980's, the contents of the waste storage facility in Petten must be transferred to another location. The consequences of this decision included the transportation of waste containers from Petten to the new location, which is located in the South-West of the Netherlands. This project was initiated and is now running. It includes a complex structure and can be described as follows: each historical-waste container will be opened, its contents segregated in three categories depending on the dose rate emission, characterized and repacked in new containers suitable for transportation and storage at the new site. The approach chosen is based on the final dose rate emitted by the repacked containers, which are sub-divided into 3 categories.. The lowest dose-emitting containers are transported directly to the new storage facility. The 2 other categories are first transported to a third party to be super compacted and subsequently transported to the new storage facility. So far, the segregation method is based on Co-60 gamma emission and nuclide vectors associated to the different materials. A pre-sorting has been established to fit as much as possible IAEA recommendations. Historical waste has then to be classified in families sharing common history. Thus, a set of canisters containing the pieces of the old reactor vessel, which was replaced in 1984 was the first challenge, followed by a set of canisters containing residues of instruments only and pieces coming from the top of the control rods of the reactor which were not directly irradiated in the reactor. So far, the two first sets of canisters are being treated and characterized as well as possible. Reporting and official documents have been filled up to comply to Dutch transport regulations and to define waste acceptance criteria for the storage facility. The first transports of containers with Low Level Waste occurred in October 2015, and another transport took place at the end of 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt Waste Processing Facility project lessons learned: Acquisition through construction - 15518

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar Liquid Radioactive Waste (LRW) processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. The SWPF facilitates DOE-EM clean-up at SRS by decontaminating the salt waste, which is the dominant volumetric component in the LRW tanks, thereby allowing the cleaned salt waste to be removed from the tanks and stabilized into an approved grout-based final waste form. The small volume of removed radionuclides is sent to the Defense Waste Processing Facility (DWPF) for vitrification. Emptied LRW storage tanks are then grouted into an approved configuration for final closure. The SWPF project is currently 100% complete with design, 80% complete with construction, and 10% complete with commissioning. To date there have been numerous lessons learned with regard to project acquisition, design, procurement, construction, and quality assurance (QA) approaches (both good practices and mistakes) that are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE enterprise. An overview of the current SWPF project status is provided and key lessons learned in the aforementioned areas are presented relative to improving future DOE major project execution performance. Specific areas to be addressed include strategies to optimize integration of design and nuclear safety, constructability tools for design and construction synchronization, commercial grade dedication (CGD) approaches to mitigate atrophy in the nuclear supply chain, and QA perspectives to facilitate effective and efficient project execution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance and Implementation of Hydrophobic Filter Material for Nuclear Material Transportation and Storage Containers - 18550

Los Alamos National Laboratory has developed a hydrophobic filter material that resists water ingress after exposure to radiation and/or elevated temperature. Facility and transportation accident scenarios often include fire, impact and subsequent water spray or flooding conditions. The hydrophobic filter material provides enhanced resistance to fire and radiation damage, and continues to minimize water ingress after such an accident. Test results indicate that the treated filters provide resistance to a water column pressure test and have filtration efficiencies and air flow pressure drops that meet the current performance criteria for the SAVY{sup TM}-4000. These filters could broaden the use of filtered containers in the transportation and storage of nuclear materials, and could have broader implications in other industrial applications. Implementation of the new hydrophobic filter material is planned for the SAVY{sup TM}-4000 nuclear storage container, which will lead the way for this robust material to be applied to other nuclear material transportation and storage containers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A design for a V&V and UQ discovery process.

There is currently sparse literature on how to implement systematic and comprehensive processes for modern V&V/UQ (VU) within large computational simulation projects. Important design requirements have been identified in order to construct a viable 'system' of processes. Significant processes that are needed include discovery, accumulation, and assessment. A preliminary design is presented for a VU Discovery process that accounts for an important subset of the requirements. The design uses a hierarchical approach to set context and a series of place-holders that identify the evidence and artifacts that need to be created in order to tell the VU story and to perform assessments. The hierarchy incorporates VU elements from a Predictive Capability Maturity Model and uses questionnaires to define critical issues in VU. The place-holders organize VU data within a central repository that serves as the official VU record of the project. A review process ensures that those who will contribute to the record have agreed to provide the evidence identified by the Discovery process. VU expertise is an essential part of this process and ensures that the roadmap provided by the Discovery process is adequate. Both the requirements and the design were developed to support the Nuclear Energy Advanced Modeling and Simulation Waste project, which is developing a set of advanced codes for simulating the performance of nuclear waste storage sites. The Waste project served as an example to keep the design of the VU Discovery process grounded in practicalities. However, the system is represented abstractly so that it can be applied to other M&S projects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Industrial Perspective of Research Within the DISTINCTIVE Program - 18045

UK Engineering and Physical Sciences Research Council (EPSRC) and three industrial partners, the Nuclear Decommissioning Authority (NDA), the National Nuclear Laboratory (NNL) and Sellafield Ltd (SL) are supporting the DISTINCTIVE (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories) consortium of eleven universities to carry out research in four theme areas of importance to the UK nuclear industry: Advanced Gas-cooled Reactor (AGR), Magnox and exotic spent fuels; PuO{sub 2} and fuel residues; legacy ponds and silo wastes; and structural integrity. This paper describes the main industry challenges in each of these theme areas and some of industry led activities to address these challenges, and provides examples of where the DISTINCTIVE research output is assisting the nuclear industry in meeting these challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Concept of Operations for the Spent Fuel Management System+ - 17134

The Nuclear Fuels Storage and Transportation Planning Project (NFST) within the US Department of Energy's Office of Nuclear Energy is tasked with identifying, planning, and conducting activities for developing interim storage and transportation capabilities in support of an integrated waste management system (IWMS). The IWMS is expected to transport Spent Nuclear Fuel (SNF) from a reactor and deliver it to a repository in a suitable container, with the possibility of interim storage. The system will be composed of multiple subsystems including possible interim storage facilities (ISFs), one or more repositories, facilities to package and/or repackage SNF, and transportation. The project team is analyzing options for an IWMS to identify viable options. To support analysis, the project team has developed a concept of operations framework for SNF related components of the potential integrated system and the interdependencies between those components. A goal of this work is to aid system analysts in developing consistent models across the project. The concept of operations framework will be updated periodically as new developments emerge. At a high level, SNF is expected to be transported from reactor sites to a repository. Initially, SNF is unloaded from reactors and placed in spent fuel pools (SFPs) for wet storage at utility sites. To maintain space in SFPs, SNF is placed in containers at reactor sites for storage and/or transportation only after the SNF has cooled enough to satisfy loading limits. Once transportation requirements are met, the SNF may be transported to an ISF, where it is stored until a repository is developed, or it is transported directly to a repository if one is available.While the high level operation of the system is straightforward, analysts must evaluate numerous alternatives, such as the number of ISFs (if any), ISF design, the stage at which SNF repackaging occurs (if needed), repackaging technology, types of containers used, repository design, component sizing, and timing of events. These alternatives arise due to technological, economic, or policy considerations. This paper provides an overview of the potential alternatives identified in the concept of operations framework at a conceptual level. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Fuel Storage Operational Experience With Increased Crud Activities

A significant part of the electricity production in Hungary is provided by 4 units of VVER 440 nuclear reactors at the Paks Nuclear Power Plant. Interim dry storage of the spent fuel assemblies that are generated during the operation of the reactors is provided in a Modular Vault Dry Storage (MVDS) facility that is located in the immediate vicinity of the Paks Nuclear Power Plant. The storage capacity of the MVDS is being continuously extended in accordance with spent the fuel production rate from the four reactors. An accident occurred at unit 2 of the Paks Nuclear Power Plant in 2003, when thirty irradiated fuel assemblies were damaged during a cleaning process. The fuel assemblies were not inside the reactor at the time of the accident, but in a separate tank within the adjacent fuel decay pool. As a result of this accident, contamination from the badly damaged fuel assemblies spread to the decay pool water and also became deposited onto the surface of (hermetic) spent fuel assemblies within the decay pool. Therefore, it was necessary to review the design basis of the MVDS and assess the effects of taking the surface contaminated spent fuel assemblies into dry storage. The contaminated hermetic assemblies were transferred from the unit 2 pool to the interim storage facility in the period between 2005 and 2007. Continuous inspection and measurement was carried out during the transfer of these fuel assemblies. On the basis of the design assessments and measurement of the results during the fuel transfer, it was shown that radiological activity values increased due to the consequences of the accident but that these levels did not compromise the release and radiation dose limits for the storage facility. The aim of this paper is to show the effect on the operation of the MVDS interim storage facility as a result of the increased activity values due to the accident that occurred in 2003, as well as to describe the measurements that were taken, and their results and experience gained. In summary: On the basis of the design assessments and measurement of the results during the fuel transfer operations, it was shown that radiological activity values increased due to the consequences of the 2003 accident but that these levels did not compromise the release and dose limits for the fuel storage facility. In the environment there was no measurable radioactivity as a result of the operation of the Paks ISFSI. The exposure of the surrounding population was calculated on measured releases and meteorological data. The calculations show negligible doses until 2004. Due to the increased surface contamination on the spent fuel assemblies the dose rate increased almost 5 times compared to the least annual value, but still less then 0.01 percent of the allowed dose restriction. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗