Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Final Report Report: Smart Grid Ready PV Inverters with Utility Communication

In 2011, EPRI began a four-year effort under the Department of Energy (DOE) SunShot Initiative Solar Energy Grid Integration Systems - Advanced Concepts (SEGIS-AC) to demonstrate smart grid ready inverters with utility communication. The objective of the project was to successfully implement and demonstrate effective utilization of inverters with grid support functionality to capture the full value of distributed photovoltaic (PV). The project leveraged ongoing investments and expanded PV inverter capabilities, to enable grid operators to better utilize these grid assets. Developing and implementing key elements of PV inverter grid support capabilities will increase the distribution system’s capacity for higher penetration levels of PV, while reducing the cost. The project team included EPRI, Yaskawa-Solectria Solar, Spirae, BPL Global, DTE Energy, National Grid, Pepco, EDD, NPPT and NREL. The project was divided into three phases: development, deployment, and demonstration. Within each phase, the key areas included: head-end communications for Distributed Energy Resources (DER) at the utility operations center; methods for coordinating DER with existing distribution equipment; back-end PV plant master controller; and inverters with smart-grid functionality. Four demonstration sites were chosen in three regions of the United States with different types of utility operating systems and implementations of utility-scale PV inverters. This report summarizes the project and findings from field demonstration at three utility sites.

14 SOLAR ENERGY↗

FY17 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models.

Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014), Hadgu et al. (2015) and Hadgu and Appel (2016). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5, 11.1 and 12.0 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA- type analysis on the server cluster. The current tasks included preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 12.0 and address DLL-related issues observed in the FY16 work. The model upgrade task successfully converted the Nominal Modeling case to GoldSim Versions 11.1/12. Conversions of the rest of the TSPA models were also attempted but program and operational difficulties precluded this. Upgrade of the remaining of the modeling cases and distributed processing tasks is expected to continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

97 MATHEMATICS AND COMPUTING↗

Sighten Final Technical Report DEEE0006690 Deploying an integrated and comprehensive solar financing software platform

Over the project, Sighten built a comprehensive software-as-a-service (Saas) platform to automate and streamline the residential solar financing workflow. Before the project period, significant time and money was spent by companies on front-end tools related to system design and proposal creation, but comparatively few resources were available to support the many back-end calculations and data management processes that underpin third party financing. Without a tool like Sighten, the solar financing processes involved passing information from the homeowner prospect into separate tools for system design, financing, and then later to reporting tools including Microsoft Excel, CRM software, in-house software, outside software, and offline, manual processes. Passing data between tools and attempting to connect disparate systems results in inefficiency and inaccuracy for the industry. Sighten was built to consolidate all financial and solar-related calculations in a single software platform. It significantly improves upon the accuracy of these calculations and exposes sophisticated new analysis tools resulting in a rigorous, efficient and cost-effective toolset for scaling residential solar. Widely deploying a platform like Sighten’s significantly and immediately impacts the residential solar space in several important ways: 1) standardizing and improving the quality of all quantitative calculations involved in the residential financing process, most notably project finance, system production and reporting calculations; 2) representing a true step change in terms of reporting and analysis capabilities by maintaining more accurate data and exposing sophisticated tools around simulation, tranching, and financial reporting, among others, to all stakeholders in the space; 3) allowing a broader group of developers/installers/finance companies to access the capital markets by providing an out-of-the-box toolset that handles the execution of running investor capital through a rooftop solar financing program. Standardizing and improving all calculations, improving data quality, and exposing new analysis tools previously unavailable affects investment in the residential space in several important ways: 1) lowering the cost of capital for existing capital providers by mitigating uncertainty and de-risking the solar asset class; 2) attracting new, lower cost investors to the solar asset class as reporting and data quality resemble standards of more mature asset classes; 3) increasing the prevalence of liquidity options for investors through back leverage, securitization, or secondary sale by providing the tools necessary for lenders, ratings agencies, etc. to properly understand a portfolio of residential solar assets. During the project period, Sighten successfully built and scaled a commercially ready tool for the residential solar market. The software solution built by Sighten has been deployed with key target customer segments identified in the award deliverables: solar installers, solar developers/channel managers, and solar financiers, including lenders. Each of these segments greatly benefits from the availability of the Sighten toolset.

14 SOLAR ENERGY↗

Reproduction of the Yucca Mountain Project TSPA-LA Uncertainty and Sensitivity Analyses and Preliminary Upgrade of Models

Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014) and Hadgu et al. (2015). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5 and 11.1.6 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The current tasks included verification of the TSPA-LA uncertainty and sensitivity analyses, and preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 11.1. All the TSPA-LA uncertainty and sensitivity analyses modeling cases were successfully tested and verified for the model reproducibility on the upgraded 2014 server cluster (CL2014). The uncertainty and sensitivity analyses used TSPA-LA modeling cases output generated in FY15 based on GoldSim Version 9.60.300 documented in Hadgu et al. (2015). The model upgrade task successfully converted the Nominal Modeling case to GoldSim Version 11.1. Upgrade of the remaining of the modeling cases and distributed processing tasks will continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2021 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models and Testing of Selected Process Models

Sandia National Laboratories continued evaluation of the total system performance assessment (TSPA) for License Application (LA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. The FY21 task included continued operation of the cluster; maintenance of the TSPA-LA models (with GoldSim 9.60.300); continued assessment of the status of the Infiltration Model; (a process model that feeds the TSP -LA) and preliminary assessments of the Unsaturated Zone Flow Model and the Saturated Zone Flow and Transport Model Abstraction (process models that feed the TSPA-LA). The 2014 cluster and supporting software systems are currently fully operational to support TSPA-LA type analyses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of low-density, high-performance operation of sustained spheromaks and favorable scalability toward compact, low-cost fusion power plants (Final Scientific/Technical Report)

This project worked to advance the technical viability of a novel method for efficiently sustaining stable, high-performance spheromak plasma configurations to serve as the basis of compact, low-cost fusion power plants. In particular, our group worked to improve the method of Steady Inductive Helicity Injection (SIHI) with Imposed-Dynamo Current Drive (IDCD) for spheromak plasma sustainment. Prior to this project demonstrations of this plasma sustainment technology have achieved plasma performance consistent with entry milestone 3 of the BETHE FOA. Research and development (R&D) activities for this project were focused on increasing plasma performance toward a level consistent with exit milestone 4. To do this the PI and his group worked to increase the performance of sustained spheromaks produced in an existing experimental prototype (HIT-SIU) while improving confidence in projections to and design of future, higher performance devices through three primary R&D activities: 1) Improved control over the density of plasma in the device throughout a discharge to provide a pathway for demonstration of spheromaks Ohmically heating to the Mercier beta limit via: a. Fueling the device directly with plasma through the installation of pre-ionized source on the injectors b. Optimization of electrical current waveforms in the driver circuits to enable low-density plasma formation with a lower fueling rate 2) Computational demonstration of a validated, realistic injector circuit coupled to a dynamic plasma model capable of use as a design tool for SIHI drivers and associated circuits for new experimental design points on the pathway to commercial reactors. The improvements in plasma performance achieved during research activity 1), and the computational projections performed in research activity 2) increased the technological readiness level (TRL) of this fusion energy concept toward a level sufficient to attract early-stage private investment and/or other forms of follow-on investment to pursue required R&D activities required for the eventual fusion power plants based on this novel technical approach.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

NIF Enhanced Yield Capability Conceptual Design Review Report

The purpose of the NIF Enhanced Yield Capability (EYC) Conceptual Design Review was to evaluate key aspects of the design and assess readiness to move to the next phase of the project. The NNSA accepted the NIF Integrated Product Review Board (IPRB) process as an appropriate means of conducting the review. The review committee finds that the NIF EYC Design Team has successfully addressed the review scope objectives. No Type 1 action items or liens were identified during the technical review. Some recommendations and observations are recorded below to assist the team.

42 ENGINEERING↗

Technology transfer - LSA project to industry

Program goals, procedural steps, and examples of different situations encountered in the Low-cost Solar Array (LSA) project managed at the Jet Propulsion Laboratory in conjunction with industrial contractors are outlined. The project is intended to result in the production-ready status of photovoltaic panels which produce power at $.70/peak W by 1986. The first phase of the program identified materials and processes which were promising for further development. Phase II served to correct steps and materials which did not work and were important to the array processing. The third phase will bring the processes to technical readiness by demonstration of successful fabrication of modules at a scale which can be increased to commercial production. An information exchange is ongoing between manufacturers and the JPL to alter specific steps which yield results which vary from those found in the laboratory when transferred to the factory.

Gallagher, B. D.↗

Communications system evolutionary scenarios for Martian SEI support

In the Space Exploration Initiative (SEI) mission scenarios, expanding human presence is the primary driver for high data rate Mars-Earth communications. To support an expanding human presence, the data rate requirement will be gradual, following the phased implementation over time of the evolving SEI mission. Similarly, the growth and evolution of the space communications infrastructure to serve this requirement will also be gradual to efficiently exploit the useful life of the installed communications infrastructure and to ensure backward compatibility with long-term users. In work conducted over the past year, a number of alternatives for supporting high data rate Mars-Earth communications have been analyzed with respect to their compatibility with gradual evolution of the space communications infrastructure. The alternatives include RF, millimeter wave (MMW), and optical implementations, and incorporate both surface and space-based relay terminals in the Mars and Earth regions. Each alternative is evaluated with respect to its ability to efficiently meet a projected growth in data rate over time, its technology readiness, and its capability to satisfy the key conditions and constraints imposed by evolutionary transition. As a result of this analysis, a set of attractive alternative communications architectures have been identified and described, and a road map is developed that illustrates the most rational and beneficial evolutionary paths for the communications infrastructure.

Kwong, Paulman W.↗

Decision Gate Process for Assessment of a NASA Technology Development Portfolio

The NASA Dust Management Project (DMP) was established to provide technologies (to Technology Readiness Level (TRL) 6) required to address adverse effects of lunar dust to humans and to exploration systems and equipment, to reduce life cycle cost and risk, and to increase the probability of sustainable and successful lunar missions. The technology portfolio of DMP consisted of different categories of technologies whose final product was either a technology solution in itself, or one that contributes toward a dust mitigation strategy for a particular application. A Decision Gate Process (DGP) was developed to assess and validate the achievement and priority of the dust mitigation technologies as the technologies progress through the development cycle. The DGP was part of continuous technology assessment and was a critical element of DMP risk management. At the core of the process were technology-specific criteria developed to measure the success of each DMP technology in attaining the technology readiness levels assigned to each decision gate. The DGP accounts for both categories of technologies and qualifies the technology progression from technology development tasks to application areas. The process provided opportunities to validate performance, as well as to identify non-performance in time to adjust resources and direction. This paper describes the overall philosophy of the DGP and the methodology for implementation for DMP, and describes the method for defining the technology evaluation criteria. The process is illustrated by example of an application to a specific DMP technology.

Kohli, Rajiv↗

Programmable Ultra Lightweight System Adaptable Radio (PULSAR) Low Cost Telemetry - Access from Space Advanced Technologies or Down the Middle

Software Defined Radio (SDR) technology has been proven in the commercial sector since the early 1990's. Today's rapid advancement in mobile telephone reliability and power management capabilities exemplifies the effectiveness of the SDR technology for the modern communications market. In contrast, presently qualified satellite transponder applications were developed during the early 1960's space program. Programmable Ultra Lightweight System Adaptable Radio (PULSAR, NASA-MSFC SDR) technology revolutionizes satellite transponder technology by increasing data through-put capability by, at least, an order of magnitude. PULSAR leverages existing Marshall Space Flight Center SDR designs and commercially enhanced capabilities to provide a path to a radiation tolerant SDR transponder. These innovations will (1) reduce the cost of NASA Low Earth Orbit (LEO) and Deep Space transponders, (2) decrease power requirements, and (3) a commensurate volume reduction. Also, PULSAR increases flexibility to implement multiple transponder types by utilizing the same hardware with altered logic - no analog hardware change is required - all of which can be accomplished in orbit. This provides high capability, low cost, transponders to programs of all sizes. The final project outcome would be the introduction of a Technology Readiness Level (TRL) 7 low-cost CubeSat to SmallSat telemetry system into the NASA Portfolio.

Sims. Herb↗

UAS NAS IHITL Test Readiness Review (TRR)

Requesting release of IHITL test readiness review (TRR) charts to ensure UAS-NAS project primary stakeholders, the Federal Aviation Administration through the RTCA special committee -228 and the Office of the Secretary of Defense Sense and Avoid Science and Research Panel, are well informed on the IHITL test plan and expected outcomes as they relate to their needs to safely fly UAS in the NAS.

Unmanned↗

The Balloon Experimental Twin Telescope for Infrared Interferometry (BETTII): First Flight

The Balloon Experimental Twin Telescope for Infrared Interferometry (BETTII) is an 8-meter far-infrared (30-100 μm) double-Fourier Michelson interferometer designed to fly on a high altitude scientific balloon. The project began in 2011, and the payload was declared ready for flight in September 2016. Due to bad weather, the first flight was postponed until June 2017; BETTII was successfully launched on June 8, 2017 for an engineering flight. Over the course of the one night flight, BETTII acquired a large amount of technical data that we are using to characterize the payload. Unfortunately, the flight ended with an anomaly that resulted in destruction of the payload. In this paper, we will discuss the path to BETTII flight, the results of the first flight, and some of the plans for the future.

Rinehart, S. A.↗

Characterization of Low-Temperature, Co-Fired Ceramic-Manufactured Electrostatic Thruster-Closeout Report

The goal of the project was to evaluate prototypes of an experimental thruster developed by the University of Arkansas (UA), Fayetteville, AR. The design under evaluation is a radio frequency (RF) electrostatic thruster that was fabricated using the low-temperature, co-fired ceramic (LTCC) materials and fabrication process. This materials system is analogous to printed circuit board (PCB) technology with the most significant difference being that the laminate is replaced by a ceramic material and the copper layer is replaced by printed sinterable silver paste. LTCC designs are baked after fabrication and assembled to realize an entirely monolithic structure with internal conductors, vias, and cavities. In this process, the LTCC electrostatic thruster (LTCC-ET) that is the subject of the present work becomes a monolithic ceramic thruster capable of withstanding temperatures in excess of 500 ºC. The UA and NASA Marshall Space Flight Center (MSFC) jointly performed prototype testing on the LTCC-ET under a NASA Cooperative Agreement Notice (CAN) award. The LTCC-ET was tested at MSFC in May 2018 over a 1-week period. There were two goals for the test program: (1) Testing to determine the operating parameters required to create plasma ignition in the test articles. This was explored by setting a propellant flowrate and increasing RF power until plasma ignition was observed. Testing was conducted with both argon and krypton. (2) Investigate the thrust and specific impulse (Isp) performance of the thruster as a function of propellant flowrate and grid voltage. This goal was not met during the project as technical challenges in maintaining stable plasma ignition arose due to stress and heating of the RF power feed. In summary, a prototype thruster design (consisting of three packaged units) was fabricated by UA and tested for the first time under vacuum conditions at MSFC to experimentally determine basic performance metrics and functionality. It was found that the design was not sufficiently optimized or robust enough in its initial iteration to support a significant test campaign or characterization program. It was concluded that the propellant outlet channels must be reduced in size with the flowpaths adjusted to increase propellant residence time in the thruster, and that the RF connector must be replaced with a version capable of handling higher power throughput and heating. However, even in its unoptimized form, a plasma could be produced in the LTCCET, demonstrating the efficacy of the design approach. The design is especially compelling due to its low cost to manufacture and, more importantly, its scalability of size and power throughput. Low cost and scalability are also important in that additional functionalities, such as thrust vectoring and plume charge neutralization, can be integrated into future designs with minimal additional cost. This project has matured the LTCC-ET development Technology Readiness Level (TRL) from 1 to 2. The low-cost RF plasma source portion of the LTCC device was matured from TRL 2 to 4 through the demonstration of RF plasma ignition under vacuum conditions.

Huang, P.-H. A.↗

Sizing and Performance Analysis of a MW-Class Electrified Aircraft Propulsion (Eap) System for A Parallel Hybrid Turboprop Concept

Aircraft electrification has emerged as a pivotal research and development focus in the 21st century, gaining international momentum as a strategic approach to curtail fuel consumption and emissions in the civil aviation sector. Under the Electrified Powertrain Flight Demonstration (EPFD) project, NASA and industry partners are raising the technical readiness, addressing integration challenges and gathering data for future standards and regulations for demonstrate Megawatt (MW) class Electrified Aircraft Propulsion (EAP) systems which can be utilized on regional turboprop or single aisle transports. With the rapid emergence of novel EAP concepts, risk reduction efforts are focused on developing the capabilities to evaluate the impacts of electrification at the conceptual design level where high variability in the EAP system architecture must be accounted for. This paper details an integrated, approach to parametric sizing of multi-MW EAP systems with the primary goal of assessing vehicle-level performance sensitivities to variations in electrical system component-level performance metrics. The focus of this work is to investigate the degree to which EAP component parameters such as specific power, efficiency, and energy density impact range and overall fuel savings.

EAP↗

Sizing and Performance Analysis of a MegaWatt-Class Electrified Aircraft Propulsion (EAP) System for a Parallel Hybrid Turboprop Concept

Aircraft electrification has emerged as a pivotal research and development focus in the 21st century, gaining international momentum as a strategic approach to curtail fuel consumption and emissions in the civil aviation sector. Under the Electrified Powertrain Flight Demonstration (EPFD) project, NASA and industry partners are raising the technical readiness, addressing integration challenges and gathering data for future standards and regulations for demonstrate Megawatt (MW) class Electrified Aircraft Propulsion (EAP) systems which can be utilized on regional turboprop or single aisle transports. With the rapid emergence of novel EAP concepts, risk reduction efforts are focused on developing the capabilities to evaluate the impacts of electrification at the conceptual design level where high variability in the EAP system architecture must be accounted for. This paper details an integrated, approach to parametric sizing of multi-MW EAP systems with the primary goal of assessing vehicle-level performance sensitivities to variations in electrical system component-level performance metrics. The focus of this work is to investigate the degree to which EAP component parameters such as specific power, efficiency, and energy density impact range and overall fuel savings.

EAP↗

BETO 2021 Peer Review - FCIC Task 5 - Preprocessing

In the study of feedstock variability, this presentation specifically looks at preprocessing processes that will created well-defined and homogenous feedstock from variable biomass resources, in the quest to produce homogeneous intermediates that will be converted into market-ready products. The objective of this stage of the project is to develop science-based design and operation principles informed by TEA/LCA that result in predictable, reliable, and scalable performance of preprocessing unit operations (comminution, fractionation, deconstruction, and real-time imaging).

biomass↗

The Technical, Economic, Risk, and Adoption Assessment for Evaluating Work Reduction Opportunities in the Nuclear Industry

Automation and cost-saving initiatives, such as process automation with advances in artificial intelligence, are gaining traction in modernization efforts across the nuclear industry. As these innovations are increasingly adopted, it becomes crucial to evaluate their impacts comprehensively. Various technical and economic attributes, along with risk and human readiness factors, must be achieved to ensure that innovative projects enabling automation and modernization are successful. However, no systematic or integrated framework exists that allows plants to evaluate these innovative projects. To address this gap, the Technical, Economic, Risk, and Adoption (TERA) assessment offers a structured method to evaluate innovative technologies, ensuring solutions meet both operational and safety standards. The TERA framework integrates the disparate perspectives to assess modernization opportunities in nuclear operations. It combines qualitative and quantitative models to evaluate the relationship between performance and business impacts, while also enabling continuous re-evaluation during project development. This approach helps plant owners identify high-priority opportunities, optimize cost savings, and minimize risks, ensuring projects remain on track to achieve desired returns. By providing a comprehensive, systematic methodology, TERA enables informed, data-driven decisions that support successful modernization efforts, enhancing efficiency, safety, and cost savings across nuclear operations. This paper explains the TERA framework and its benefits for the nuclear industry.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗