Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Accelerate Performance (Final Technical Report)

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero-energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based project formed the basis of Accelerate Performance, an expanded program using utilities as the primary outreach channel to replicate the approach. Four utilities partnered with Slipstream, a not-for-profit program implementer, to develop pilot incentive offerings to focus building owners on the whole building rather than on individual building components and systems. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. The experiences and lessons learned in different new construction markets led to further process adaptations as well as the development of templates and tools to streamline outreach and technical support efforts. The approach can be adapted to utility new construction programs and is a powerful tool for engaging many building owners early in the project planning process as they make critical energy decisions that impact the performance of the building. The approach has led to real energy savings in building projects by encouraging cost-effective, low-risk, and creative design solutions. The performance-based approach was tested in a variety of applications including different building types and owner types, with many owners adopting performance-based procurement techniques, some with variations, but all maintaining the same core principles. Over the course of the project, nearly 100 building projects were impacted and additional projects will continue to be supported through ongoing program offerings with three leading utilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Magnetic Fields on the National Ignition Facility (MagNIF)

A magnetized target capability on the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) has been investigated. Stakeholders’ needs and project feasibility analysis were considered in order to down-select from a wide variety of different potential magnetic field magnitudes and volumes. From the large range of different target platforms, laser configurations, and diagnostics configurations of interest to the stakeholders, the gas-pipe platform has been selected for the first round of magnetized target experiments. Gas pipe targets are routinely shot on the NIF and provide unique value for external collaborators. High-level project goals have been established including an experimentally relevant 20Tesla magnetic field magnitude. The field will be achieved using pulsed power-driven coils. A system architecture has been proposed. The pulsed power drive system will be located in the NIF target bay. This decision provides improved maintainability and mitigates equipment safety risks associated with explosive failure of the drive capacitor. High-level and first-level subsystem requirements have been established. Requirements have been included for two distinct coil designs – full solenoid and quasi-Helmholtz. A Failure Modes and Effects Analysis (FMEA) has been performed and documented. Additional requirements have been derived from the mitigations included in the FMEA document. A project plan is proposed. The plan includes a first phase of electromagnetic simulations to assess whether the design will meet performance requirements, then a second phase of risk mitigation projects to address the areas of highest technical risk. The duration from project kickoff to the first magnetized target shot is approximately 29 months.

42 ENGINEERING↗

Guidelines for the development of a Project Data Management Plan (PDMP)

The purpose of this document is to assist NASA Project personnel in the preparation of their Project Data Management Plans (PDMP) in accordance with NASA Management Instruction (NMI) 8030.3A. In addition, this report summarizes the scope of a PDMP and establishes important aspects that must be addressed for the long term management and archiving of the data from a NASA space flight investigation.

Green, James L.↗

Southwestern Regional Partnership For Carbon Sequestration (Phase 2) Pump Canyon CO2- ECBM/Sequestration Demonstration, San Juan Basin, New Mexico

Within the Southwest Regional Partnership on Carbon Sequestration (SWP), three demonstrations of geologic CO{sub 2} sequestration are being performed -- one in an oilfield (the SACROC Unit in the Permian basin of west Texas), one in a deep, unmineable coalbed (the Pump Canyon site in the San Juan basin of northern New Mexico), and one in a deep, saline reservoir (underlying the Aneth oilfield in the Paradox basin of southeast Utah). The Pump Canyon CO{sub 2}-enhanced coalbed methane (CO{sub 2}/ECBM) sequestration demonstration project plans to demonstrate the effectiveness of CO{sub 2} sequestration in deep, unmineable coal seams via a small-scale geologic sequestration project. The site is located in San Juan County, northern New Mexico, just within the limits of the high-permeability fairway of prolific coalbed methane production. The study area for the SWP project consists of 31 coalbed methane production wells located in a nine section area. CO{sub 2} was injected continuously for a year and different monitoring, verification and accounting (MVA) techniques were implemented to track the CO{sub 2} movement inside and outside the reservoir. Some of the MVA methods include continuous measurement of injection volumes, pressures and temperatures within the injection well, coalbed methane production rates, pressures and gas compositions collected at the offset production wells, and tracers in the injected CO{sub 2}. In addition, time-lapse vertical seismic profiling (VSP), surface tiltmeter arrays, a series of shallow monitoring wells with a regular fluid sampling program, surface measurements of soil composition, CO{sub 2} fluxes, and tracers were used to help in tracking the injected CO{sub 2}. Finally, a detailed reservoir model was constructed to help reproduce and understand the behavior of the reservoir under production and injection operation. This report summarizes the different phases of the project, from permitting through site closure, and gives the results of the different MVA techniques.

01 COAL, LIGNITE, AND PEAT↗

The 11 T dipole for HL-LHC: Status and plan

The upgrade of the Large Hadron Collider (LHC) collimation system includes additional collimators in the LHC lattice. The longitudinal space for these collimators will be created by replacing some of the LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. The project plan comprises the construction of two cryoassemblies containing each of the two 11-T dipoles of 5.5-m length for possible installation on either side of interaction point 2 of LHC in the years 2018-2019 for ion operation, and the installation of two cryoassemblies on either side of interaction point 7 of LHC in the years 2023-2024 for proton operation. The development program conducted in conjunction between the Fermilab and CERN magnet groups is progressing well. The development activities carried out on the side of Fermilab were concluded in the middle of 2015 with the fabrication and test of a 1-m-long two-in-one model and those on the CERN side are ramping up with the construction of 2-m-long models and the preparation of the tooling for the fabrication of the first full-length prototype. The engineering design of the cryomagnet is well advanced, including the definition of the various interfaces, e.g., with the collimator, powering, protection, and vacuum systems. Several practice coils of 5.5-m length have been already fabricated. This paper describes the overall progress of the project, the final design of the cryomagnet, and the performance of the most recent models. Furthermore, the overall plan toward the fabrication of the series magnets for the two phases of the upgrade of the LHC collimation system is also presented.

43 PARTICLE ACCELERATORS↗

TCCSP Task 6 Risk Assessment Report

For this Risk Assessment Plan, TCCSP has conducted a site-based risk assessment that quantifies the risk of CO 2 and/or brine leakage as a result of CO 2 injection at TCCSP. The risk assessment covers project planning, construction, injection, post-injection periods and closure of TCCSP. Key technical and non-technical Project risks are identified as part of the Risk Workshop and include a thorough evaluation of related scenarios. Mitigation strategies for the identified risk scenarios are defined to develop a scientifically sound, and community acceptable CO 2 storage Project.

58 GEOSCIENCES↗

Coal gasification systems engineering and analysis. Volume 1: Executive summary

Feasibility analyses and systems engineering studies for a 20,000 tons per day medium Btu (MBG) coal gasification plant to be built by TVA in Northern Alabama were conducted. Major objectives were as follows: (1) provide design and cost data to support the selection of a gasifier technology and other major plant design parameters, (2) provide design and cost data to support alternate product evaluation, (3) prepare a technology development plan to address areas of high technical risk, and (4) develop schedules, PERT charts, and a work breakdown structure to aid in preliminary project planning. Volume one contains a summary of gasification system characterizations. Five gasification technologies were selected for evaluation: Koppers-Totzek, Texaco, Lurgi Dry Ash, Slagging Lurgi, and Babcock and Wilcox. A summary of the trade studies and cost sensitivity analysis is included.

Source record↗

NASA Year 2000 (Y2K) Program Plan

NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

Source record↗

Ocular Blood Flow Measured Noninvasively in Zero Gravity

In spaceflight or a reduced-gravity environment, bodily fluids shift to the upper extremities of the body. The pressure inside the eye, or intraocular pressure, changes significantly. A significant number of astronauts report changes in visual acuity during orbital flight. To date this remains of unknown etiology. Could choroidal engorgement be the primary mechanism and a change in the curvature or shape of the cornea or lens be the secondary mechanism for this change in visual acuity? Perfused blood flow in the dense meshwork of capillaries of the choroidal tissue (see the preceding illustration) provides necessary nutrients to the outer layers of the retina (photoreceptors) to keep it healthy and maintain good vision. Unlike the vascular system, the choroid has no baroreceptors to autoregulate fluid shifts, so it can remain engorged, pushing the macula forward and causing a hyperopic (farsighted) shift of the eye. Experiments by researchers at the NASA Glenn Research Center could help answer this question and facilitate planning for long-duration missions. We are investigating the effects of zero gravity on the choroidal blood flow of volunteer subjects. This pilot project plans to determine if choroidal blood flow is autoregulated in a reduced-gravity environment.

Ansari, Rafat R.↗

Distribution of Cost Growth in Robotic Space Science Missions

Cost growth characterization is a critical factor for effective cost risk analysis and project planning. This study analyzed low level budget changes in Jet Propulsion Laboratory-managed space science missions, which occurred during the development of the project. The data was then curve fit, according to cost distribution categories, to provide a reference set of distribution parameters with sufficient granularity to effectively model cost growth in robotic space science missions.

cost↗

Southern Bhutan Ecological Forecasting Project Summary - Modeling Asian Elephant (Elephas Maximus) Habitat Suitability along the Southern Bhutan Border with NASA Earth Observations

Asian elephants (Elephas maximus) are a flagship species essential for the functioning of forest ecosystems, and they also have cultural significance in Bhutan. Elephants receive the highest legal protection as listed under Schedule I of the Bhutan Forests and Nature Conservation Act, 1995. Yet, they face threats of extinction due to poaching for ivory as well as the loss and fragmentation of their habitat. Due to the recent clearing of forests and the growing populations in these areas, there has been an increase in incidents of human-elephant conflict. These conflicts have been detrimental to farmer’s annual harvests and livelihoods and have led to retaliatory killing and injury of elephants in southern Bhutan. The DEVELOP Southern Bhutan Ecological Forecasting team partnered with the Bhutan Foundation and Bhutan Tiger Center to help address this problem. The team integrated NASA Earth observations, including Landsat 5 Thematic Mapper (TM), Landsat 8 Operational Land Imager (OLI), Terra Moderate Resolution Imaging Spectroradiometer (MODIS), and the Shuttle Radar Topography Mission (SRTM) to acquire information on land cover change and elephant habitat suitability along the southern border of Bhutan. The team utilized Esri ArcGIS Pro and Software for Assisted Habitat Modeling (SAHM) for data analysis, modeling, and visualization. The team used elephant occurrence data and environmental variables to model current habitat suitability for migrating elephant populations. This analysis provided partners with maps to inform decisions about the placement and conservation of elephant corridors and helped build their capacity to use satellite data for future studies and project planning.

DEVELOP Project Summary↗

BUILDING 9201-5

Building 9201-5 (Alpha-5) functioned as a uranium enrichment facility during World War II and furthered the plant's mission of producing enriched uranium for the atomic bomb. As an Alpha processing facility associated with the Manhattan Project, Building 9201-5 aided in the development of wholly new technology and substantially advanced the field of nuclear science. In terms of facility planning, project engineers originally designed all Alpha and Beta buildings with "zero tolerance" for building movement or settling as the successful operation of the Y-12 Plant's calutrons depended on absolute structural stability. After World War II, the building was used in the plant’s COLEX process of the 1950s which separated the element Lithium-6 (Li-6). This was an important component in the manufacture of hydrogen bombs and the COLEX process is of notable significance in Cold War history. Building 9201-5 is eligible for inclusion in the National Register.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

An Overview of NASA Engine Ice-Crystal Icing Research

Ice accretions that have formed inside gas turbine engines as a result of flight in clouds of high concentrations of ice crystals in the atmosphere have recently been identified as an aviation safety hazard. NASA s Aviation Safety Program (AvSP) has made plans to conduct research in this area to address the hazard. This paper gives an overview of NASA s engine ice-crystal icing research project plans. Included are the rationale, approach, and details of various aspects of NASA s research.

Addy, Harold E., Jr.↗

Improving Flood and Drought Management in Agricultural River Basins: An Application to the Mun River Basin in Thailand

Agriculture productivity is regularly affected by floods and droughts, and the severity is likely to increase in the future. Even if significant efforts are spent on water development projects, ineffective project planning often means that they continue to occur or are only partly mitigated, for example, in the Mun River Basin, Thailand, where 1000s of water projects have been implemented. Despite this, the basin regularly experiences floods and droughts. In this study, an analysis of the adverse impacts of basin-scale floods and droughts on rice cultivation in the Mun River Basin is conducted, and an estimation of the coping capacity of existing measures. The results demonstrate that while the total storage capacity of in-situ and ongoing projects would be sufficient to tackle both hazards, it can only be achieved if the projects are effectively utilised. Based on this, proposed solutions for the region include small farm ponds, a subsurface floodwater harvesting system, and oxbow lake reconnections. The suggested measures are practicable, economical, environmentally low-impact, and their implementation (if executed with appropriate care) would reduce flood and drought problems in the basin. Notably, the measures and calculation methods proposed for this basin can also be applied to other crops and regions.

Farm pond↗

Phase C/D program development plan. Volume 1: Program plan

The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

Source record↗

NASA atmospheric effects of aviation projects: Status and plans

NASA's Atmospheric Effects of Aviation Project is developing a scientific basis for assessment of the atmospheric impact of subsonic and supersonic aviation. Issues addressed include predicted ozone changes and climatic impact, and related uncertainties. A primary goal is to assist assessments of United Nations scientific organizations and, hence, consideration of emission standards by the International Civil Aviation Organization. Project focus is on simulation of atmospheric processes by computer models, but studies of aircraft operations, laboratory studies, and remote and in situ observations of chemical, dynamic, and radiative processes are also included.

Wesoky, Howard L.↗

Stennis Space Center Environmental Geographic Information System

As NASA's lead center for rocket propulsion testing, the John C. Stennis Space Center (SSC) monitors and assesses the off-site impacts of such testing through its Environmental Office (SSC-EO) using acoustical models and ancillary data. The SSC-EO has developed a geographical database, called the SSC Environmental Geographic Information System (SSC-EGIS), that covers an eight-county area bordering the NASA facility. Through the SSC-EGIS, the Enivronmental Office inventories, assesses, and manages the nearly 139,000 acres that comprise Stennis Space Center and its surrounding acoustical buffer zone. The SSC-EGIS contains in-house data as well as a wide range of data obtained from outside sources, including private agencies and local, county, state, and U.S. government agencies. The database comprises cadastral/geodetic, hydrology, infrastructure, geo-political, physical geography, and socio-economic vector and raster layers. The imagery contained in the database is varied, including low-resolution imagery, such as Landsat TM and SPOT; high-resolution imagery, such as IKONOS and AVIRIS; and aerial photographs. The SSC-EGIS has been an integral part of several major projects and the model upon which similar EGIS's will be developed for other NASA facilities. The Corps of Engineers utilized the SSC-EGIS in a plan to establish wetland mitigation sites within the SSC buffer zone. Mississippi State University employed the SSC-EGIS in a preliminary study to evaluate public access points within the buffer zone. The SSC-EO has also expressly used the SSC-EGIS to assess noise pollution modeling, land management/wetland mitigation assessment, environmental hazards mapping, and protected areas mapping for archaeological sites and for threatened and endangered species habitats. The SSC-EO has several active and planned projects that will also make use of the SSC-EGIS during this and the coming fiscal year.

Lovely, Janette↗

Fuel Cell Powered Airport GSE (Ground Support Equipment) Deployment

The Fuel Cell Powered Airport GSE (Ground Support Equipment) Deployment Project was initiated in 2013 between Plug Power and U. S. Department of Energy Fuel Cell Technologies Office (DOE). The project plan included development and deployment of fifteen fuel cell powered units for two years at an airport to understand the feasibility and economic viability of hydrogen powered GSE. Project participants were the Department of Energy, Plug Power, and FedEx. The Memphis, TN airport is the hub of FedEx’s freight operation and was selected as the site for the demonstration portion of the project.

08 HYDROGEN↗