Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

SPC-70804 Rev 1 Zircar ZAL-45 Alumina Standoff Plates for Use in MARVEL

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL ZAL-45 standoff plates manufactured by Zircar. The design requires eight (8) ceramic standoff plates; however, the requested quantity shall be twelve to account for required testing after receipt of materials. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70843 Rev 0 MARVEL Control Drum Actuator Fabrication Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of components that make up the control drum (CD) actuators. This specification outlines the requirements for fabrication, acknowledging that specific elements will integrate into final assemblies, while others will be delivered as standalone components. The Subcontractor is not responsible for the CD actuator’s final assembly. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

JEFFERSON LAB 12 GEV CEBAF UPGRADE

The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at approx6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

43 PARTICLE ACCELERATORS↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

Electric Grid Reliability in an Era of Unprecedented Uncertainty: A Review of Advances in Electric Sector Resource Adequacy Assessment and Planning

Recent changes to the principal causes of energy shortage events on the electric grid have necessitated are thinking of paradigms for resource adequacy (RA) assessment and the related topic of procurement of a reliable portfolio. Prior studies have laid out elements of a modern paradigm for these planning activities, but there does not exist a comprehensive overview of the topic spanning academic and gray literature, and the relationship of these suggested paradigms to methods used in industry has also not been surveyed. In this paper we review recent literature establishing best practices for RA assessment and reliable portfolio procurement, and survey current practices used in industry in relation to these best practices. We establish seven key best practices for RA assessment, cover a modern methodology for capacity accreditation, and find that industry practices are not far behind the identified best practices, though some key gaps remain. We also present a suggested agenda for both academic research on the topic and opportunities for advancement in the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FY11 Level-2 Milestone 3953: TLCC2 contract awarded

This report documents completion of FY11 L2 milestone No.3953-TLCC2 contract award. This milestone was scheduled for completion on 3/31/11 and was completed on 4/14/11. There is a separate milestone (3856), due at the end of the fiscal year, concerned with installation of the first LLNL SU and early user access. Efforts related to this tri-lab L2 milestone started early in 2010 with the development of tri-lab requirements for the second ASC capacity system procurement. The SOW was then developed along with necessary RFP paperwork and sent to HQ/DOE for their review prior to being released. There was significant delay in getting this step completed which led to this milestone being put at risk for several months. However, once the RFP was approved and released we were able to get the procurement back on track with aggressive proposal response and review timelines.

97 MATHEMATICS AND COMPUTING↗

TANKS 18 AND 19-F STRUCTURAL FLOWABLE GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: (1) physically stabilize the final landfill by filling the empty volume in the tanks with a non compressible material; (2) provide a barrier for inadvertent intrusion into the tank; (3) reduce contaminant mobility by (a) limiting the hydraulic conductivity of the closed tank and (b) reducing contact between the residual waste and infiltrating water; and (4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identify a single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: (1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). (2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. (3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. (4) Prepare samples for hydraulic property measurements for comparison to the values in the F and H- Tank Farm Performance Assessments (PAs). (5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification [Forty, 2011 a, b, c]. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP-8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification [Forty 2011 a] and requested admixture recommendations and property confirmation for this formulation [Forty, 2011 b]. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational Benefits of Meeting California's Energy Storage Targets

In October 2013, the California Public Utilities Commission (CPUC) finalized procurement targets and other requirements to its jurisdictional utilities for a minimum of 1,325 MW of 'viable and cost-effective' energy storage systems by 2020. The goal of this study is to explore several aspects of grid operations in California and the Western Interconnection resulting from meeting the CPUC storage targets. We perform this analysis using a set of databases and grid simulation tools developed and implemented by the CPUC, the California Independent System Operator (CAISO), and the California Energy Commission (CEC) for the CPUC's Long-term Procurement Plan (LTPP). The 2014 version of this database contains information about generators, storage, transmission, and electrical demand, for California in the year 2024 for both 33% and 40% renewable energy portfolios. We examine the value of various services provided by energy storage in these scenarios. Sensitivities were performed relating to the services energy storage can provide, the capacity and duration of storage devices, export limitations, and negative price floor variations. Results show that a storage portfolio, as outlined by the CPUC, can reduce curtailment and system-wide production costs for 33% and 40% renewable scenarios. A storage device that can participate in energy and ancillary service markets provides the grid with the greatest benefit; the mandated storage requirement of 1,325 MW was estimated to reduce the total cost of production by about 78 million per year in the 33% scenario and 144 million per year in the 40% scenario. Much of this value is derived from the avoided start and stop costs of thermal generators and provision of ancillary services. A device on the 2024 California grid and participating in only ancillary service markets can provide the system with over 90% of the value as the energy and ancillary service device. The analysis points to the challenge of new storage providing regulation reserve, as the added storage could provide about 75% of the regulation up requirement for all of California, which would likely greatly reduce regulation prices and potential revenue. The addition of storage in California decreases renewable curtailment, particularly in the 40% RPS case. Following previous analysis, storage has a mixed impact on emissions, generally reducing emissions, but also creating additional incentives for increased emissions from out-of-state coal generations. Overall, storage shows significant system cost savings, but analysis also points to additional challenges associated with full valuation of energy storage, including capturing the operational benefits calculated here, but also recovering additional benefits associated avoided generation, transmission, and distribution capacity, and avoided losses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Solar Market Pathway for Independent Colleges in Virginia

Building on its history of facilitating collaboration among its members, in 2014 the Council of Independent Colleges in Virginia submitted a proposal for a United States Department of Energy Solar Market Pathways grant, a program of the U.S. Department of Energy’s SunShot Initiative. Fifteen CICV member institutions signed onto the proposal to increase solar energy use at Independent Colleges in Virginia, and the application was successful. The primary objective of the Solar Market Pathway for Independent Colleges in Virginia (SMP-ICV) project was to enable a statewide network of private colleges to plan for and jointly procure solar photovoltaic (PV) arrays for deployment on their campuses. While the primary goal of the project was to create a revolving joint procurement model to be implemented over the course of 5 years, the process itself was also important and brought significant value to the participating colleges and their communities. This report outlines the results of the project.

14 SOLAR ENERGY↗

Accelerate Performance (Final Technical Report)

Encouraging commercial building owners to set measurable energy goals before design begins can drive design and contractor teams to develop innovative energy efficiency solutions within conventional building budgets. A federal building owner piloted this technique and created a large-scale zero-energy office building on a budget comparable to local market construction rates. The successes and lessons learned from this performance-based project formed the basis of Accelerate Performance, an expanded program using utilities as the primary outreach channel to replicate the approach. Four utilities partnered with Slipstream, a not-for-profit program implementer, to develop pilot incentive offerings to focus building owners on the whole building rather than on individual building components and systems. The original performance-based procurement process and its successful implementation in a federal building project informed all these efforts. The experiences and lessons learned in different new construction markets led to further process adaptations as well as the development of templates and tools to streamline outreach and technical support efforts. The approach can be adapted to utility new construction programs and is a powerful tool for engaging many building owners early in the project planning process as they make critical energy decisions that impact the performance of the building. The approach has led to real energy savings in building projects by encouraging cost-effective, low-risk, and creative design solutions. The performance-based approach was tested in a variety of applications including different building types and owner types, with many owners adopting performance-based procurement techniques, some with variations, but all maintaining the same core principles. Over the course of the project, nearly 100 building projects were impacted and additional projects will continue to be supported through ongoing program offerings with three leading utilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Use Intensity and its Influence on the Integrated Daylighting Design of a Large Net Zero Energy Building: Preprint

Net-zero energy buildings generate as much energy as they consume and are significant in the sustainable future of building design and construction. The role of daylighting (and its simulation) in the design process becomes critical. In this paper we present the process the National Renewable Energy Laboratory embarked on in the procurement, design, and construction of its newest building, theResearch Support Facility (RSF) - particularly the roles of daylighting, electric lighting, and simulation. With a rapid construction schedule, the procurement, design, and construction had to be tightly integrated; with low energy use. We outline the process and measures required to manage a building design that could expect to operate at an efficiency previously unheard of for a building ofthis type, size, and density. Rigorous simulation of the daylighting and the electric lighting control response was a given, but the oft-ignored disconnect between lighting simulation and whole-building energy use simulation had to be addressed. The RSF project will be thoroughly evaluated for its performance for one year; preliminary data from the postoccupancy monitoring efforts will also bepresented with an eye toward the current efficacy of building energy and lighting simulation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Progress in design and integration of the ITER Electron Cyclotron H&CD system

The Electron Cyclotron system for ITER is an in-kind procurement shared between five parties and the total installed power will be 24 MW, corresponding to a nominal injected power of 20 MW to the plasma, with a possible upgrade up to 48 MW (corresponding to 40 MW injected). Some critical issues have been raised and changes are proposed to simplify these procurements and to facilitate the integration into ITER. The progress in the design and the integration of the EC system into the whole project is presented in this paper, as well as some issues still under studies and some recommendations made by external expert committees.

43 PARTICLE ACCELERATORS↗

Operational Benefits of Meeting California's Energy Storage Targets

In October 2013, the California Public Utilities Commission (CPUC) finalized procurement targets and other requirements to its jurisdictional utilities for a minimum of 1,325 MW of 'viable and cost-effective' energy storage systems by 2020. The goal of this study is to explore several aspects of grid operations in California and the Western Interconnection resulting from meeting the CPUC storage targets. We perform this analysis using a set of databases and grid simulation tools developed and implemented by the CPUC, the California Independent System Operator (CAISO), and the California Energy Commission (CEC) for the CPUC's Long-term Procurement Plan (LTPP). The 2014 version of this database contains information about generators, storage, transmission, and electrical demand, for California in the year 2024 for both 33 percent and 40 percent renewable energy portfolios. We examine the value of various services provided by energy storage in these scenarios. Sensitivities were performed relating to the services energy storage can provide, the capacity and duration of storage devices, export limitations, and negative price floor variations. Results show that a storage portfolio, as outlined by the CPUC, can reduce curtailment and system-wide production costs for 33 percent and 40 percent renewable scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

54 ENVIRONMENTAL SCIENCES↗

Including operational aspects in the planning of power systems with large amounts of variable generation: A review of modeling approaches

In the past, power system planning was based on meeting the load duration curve at minimum cost. The increasing share of variable generation (VG) makes operational constraints more important in the planning problem, and there is more and more interest in considering aspects such as sufficient ramping capability, sufficient reserve procurement, power system stability, storage behavior, and the integration of other energy sectors often through demand response assets. In VG integration studies, several methods have been applied to combine the planning and operational timescales. We present a four-level categorization for the modeling methods, in order of increasing complexity: (1a) investment model only, (1b) operational model only, (2) unidirectionally soft-linked investment and operational models, (3a) bidirectionally soft-linked investment and operational models, (3b) operational model with an investment update algorithm, and (4) co-optimization of investments and operation. The review shows that using a low temporal resolution or only few representative days will not suffice in order to determine the optimal generation portfolio. In addition, considering operational effects proves to be important in order to get a more optimal generation portfolio and more realistic estimations of system costs. However, operational details appear to be less significant than the temporal representation. Furthermore, the benefits and impacts of more advanced modeling techniques on the resulting generation capacity mix significantly depend on the system properties. Thus, the choice of the model should depend on the purpose of the study as well as on system characteristics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Expert and operator perspectives on barriers to energy efficiency in data centers

Abstract It was last estimated in 2016 that data centers (DCs) comprise approximately 2% of total US electricity consumption. However, this estimate is currently being updated to account for the massive increase in computing needs due to streaming, cryptocurrency, and artificial intelligence (AI). To prevent energy consumption that tracks with increasing computing needs, it is imperative we identify energy efficiency strategies and investments beyond the low-hanging fruit solutions. In a two-phased research approach, we ask: What non-technical barriers still impede energy efficiency (EE) practices and investments in the data center sector, and what can be done to overcome these barriers? In particular, we are focused on social and organizational barriers to EE. In Phase I, we performed a literature review and found that technical solutions are abundant in the literature, but fail to address the top-down cultural shifts that need to take place in order to adapt new energy efficiency strategies. In Phase II, reported here, we interviewed 16 data center operators/experts to ground-truth our literature findings. Our interview protocols focus on three aspects of DC decision-making: procurement practices, metrics and monitoring, and perceived barriers to energy efficiency. We find that vendors are the key drivers of procurement decisions, advanced efficiency metrics are facility-specific, and there is convergence in the design of advanced facilities due to the heat density of parallelized infrastructure. Our ultimate goals for our research are to design DC decarbonization policies that target organizational structure, empower individual staff, and foster a supportive external market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Group purchasing organization design: a clustering approach

Supply chain management is monitoring of activities involved in supply chain, for integrating and coordinating between suppliers, manufacturing, inventory and transportation both within and among members. The ultimate aim of supply chains is to reduce costs and increase market coverage. Procuring and purchasing requested items in a timely manner are the two most important issues for supply chain stockholders. Group purchasing is one of the purchasing strategies in supply chains. It offers great potential by ordering large volumes to decrease expenses which can increase services to customers. A clustering optimization approach is employed to model group purchasing for a set of pharmacies in the field of healthcare. The proposed model determines a cooperation strategy based on factors such as distance between pharmacies and procurement expenditure in this network. Moreover, the proposed multi-objective group purchasing model is optimized using both goal programming and non-dominated sorting genetic algorithm. To illustrate the application of the proposed model, designing a purchasing group organization for Chalus city pharmacies is investigated. Purchasing groups are established in the way that sum of pharmacies ordering quantity has been located in the second or the third level of discount rate. Thus, the results show that GPOs can take the advantage of this cooperation.

97 MATHEMATICS AND COMPUTING↗

Biodiesel production from engineered sugarcane lipids under uncertain feedstock compositions: Process design and techno-economic analysis

In this study, different process schemes were designed and evaluated for biodiesel production from engineered cane lipids with uncertain fatty acid compositions. Four different process schemes were compared under (i) thermal glycerolysis and (ii) enzymatic glycerolysis approaches. These schemes were based on the biodiesel yield and economic indicators such as the net present value (NPV) and the minimum selling price (MSP) of biodiesel. A scheme with polar lipid separation under thermal glycerolysis resulted in the maximum NPV ($\$96.5$ million) and minimum MSP ($\$1107$ /ton biodiesel), respectively. Through local sensitivity analysis, it was concluded that the cane lipid percentage is the most significant factor influencing process economics. A conjoint analysis of the lipid procurement price and cane lipid percent suggested that 15% cane lipids with a low lipid procurement price ($\$0.536$ /kg) results in a positive NPV. When the cane lipid price is higher (> $\$0.80$ /kg), a 20% lipid content should be considered to achieve a positive NPV. At 20% cane lipids, the worst-case and best-case scenarios were evaluated by analyzing the interplay of the three most important parameters, Here, the best-case scenario revealed that the minimum NPV under any process scheme could yield more than $\$100$ million (or MSP: $\$0.80$ /L), and the worst-case analysis showed that losses incurred by the plant could be as high as 80 million (MSP: $\$1.36$ /L). A Monte Carlo simulation indicated that there is a 70% chance of the plant being profitable (NPV > 0).

09 BIOMASS FUELS↗