Advancing Risk‐Informed Decision Making in Managing Defense Nuclear Waste in the United States: Opportunities and Challenges for Risk Analysis

Abstract An omnibus spending bill in 2014 directed the Department of Energy to analyze how effectively Department of Energy (DOE) identifies, programs, and executes its plans to address public health and safety risks that remain as part of DOE's remaining environmental cleanup liabilities. A committee identified two dozen issues and associated recommendations for the DOE, other federal agencies, and the U.S. Congress to consider, as well as other stakeholders such as states and tribal nations. In regard to risk assessment, the committee described a risk review process that uses available data, expert experience, identifies major data gaps, permits input from key stakeholders, and creates an ordered set of risks based on what is known. Probabilistic risk assessments could be a follow‐up from these risk reviews. In regard to risk management, the states, in particular, have become major drivers of how resources are driven. States use different laws, different priorities, and challenge DOE's policies in different ways. Land use decisions vary, technology choices are different, and other notable variations are apparent. The cost differences associated with these differences are marked. The net result is that resources do not necessarily go to the most prominent human health and safety risks, as seen from the national level.

Greenberg, Michael R.↗

Regulatory Treatment of Non-Core Sources of Radioactivity for Advanced Reactor Designs

The recent resurgence in advance (non-light water) reactor development has been paralleled by the development of risk-informed performance-based (RIPB) licensing pathways. Specifically, the creation of the RIPB Licensing Modernization Project (LMP) approach and subsequent endorsement by the U.S. Nuclear Regulatory Commission (NRC) now provides advanced reactor vendors with a defined RIPB method to develop an affirmative safety case for licensing. In addition, the Technology Inclusive Content of Applications Project (TICAP) has published guidance on developing a license application based on the LMP approach. To support the utilization of risk information as part of advanced reactor design and licensing efforts, the American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS) Joint Committee on Nuclear Risk Management (JCNRM) has developed a probabilistic risk assessment (PRA) standard for advanced reactors. The standard, which was formerly approved by the American National Standards Institute (ANSI) in 2021 and recently endorsed by the NRC in trial use Regulatory Guide (RG) 1.247, is an integral standard, covering from initiating events to offsite consequence. A major feature of the standard is that it permits the inclusion of any source of radioactivity material at the site within the plant PRA. Therefore, non-core sources of radioactivity, such as fuel storage, fuel processing, and purification systems, can be included within a single comprehensive plant PRA. For those advanced reactor vendors utilizing a RIPB licensing approach, there is an opportunity to include the non-core sources of radioactivity within the RIPB framework for licensing decision-making, such as the categorization of events, classification of structures, systems, and components (SSCs), and evaluation of the adequacy of defense-in-depth (DID). For advanced reactor designs that contain multiple non-core sources of radioactivity, or for monolithic plant sites that include associated fuel facilities, this approach could potentially simplify licensing applications through the use of a single, uniform, and consistent decision-making framework across all radioactive sources at the site. In addition, a RIPB approach could provide additional insights regarding plant behavior, flexibility regarding licensing decision-making, and potentially allow the use of risk information as part of the plant oversight process. Risk-informing these aspects of advanced reactor licensing would also be consistent with the NRC’s risk policy statement. However, there is diverse regulation and guidance regarding the licensing of non-core sources of radioactivity and generally limited experience using RIPB approaches for the evaluation as part of licensing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessment of verification and validation status - RELAP5-3D and RAVEN

The United States nuclear industry is facing a strong challenge to ensure maximum safety while enhancing economic benefit. Safety is a key parameter to all aspects related to light water reactor (LWR) nuclear power plants (NPPs), especially cost savings. Since the goal is to extend the lifetimes of these NPPs, the traditional deterministic safety concept may not guarantee a current economic asset. The Light Water Reactor Sustainability (LWRS) Program has been promoting a wide range of research and development (R&D) in this field to maximize the safety, economics, and performance of these NPPs through improved scientific understanding. One of the best practices to achieve this goal is to identify and optimize safety margins, which can lead to cost reduction. To do this, under the LWRS framework, the Risk-Informed Systems Analysis (RISA) Pathway will focus on the optimization of safety margin and minimization of uncertainties to ensure both safety and economics at the highest level. The RISA Pathway will provide enhanced capabilities for analyzing and characterizing LWR systems performance by developing and demonstrating methods, tools, and data to enable risk-informed margins management (RIMM). The goals of the RISA Pathway are twofold: (1) deploy the risk-informed tools and methods that enable better representation of safety margins and factors that contribute to cost and safety; and (2) conduct advanced risk assessment applications with industry to support margin management strategies that enable more cost-effective plant operation. The tools and methods provided by the RISA Pathway will support effective margin management for both active and passive safety systems, structures, and components (SSC) of an NPP. The tools and methods used in the RISA Pathway should have high confidence and highest technical maturity for and implementation to industry at its current setting. They should also have a capability to support risk-informed decision making for both probabilistic and deterministic elements of safety. The RISA Pathway will, therefore, perform a comprehensive assessment of verification and validation (V&V) status of RISA Toolkit to enhance credibility RISA Toolkit which be used by industry. This report summarizes assessment technical maturity of RISA thermal-hydraulics accident analysis code RELAP5-3D and multi-purpose probabilistic risk analysis tool RAVEN V&V status including specific information of the tool such as capability and features, quality assurance program, developer/independent V&V record, separation/integral tests history, user documents, and feedback.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reducing the Risk of Human Space Missions with INTEGRITY

The INTEGRITY Program will design and operate a test bed facility to help prepare for future beyond-LEO missions. The purpose of INTEGRITY is to enable future missions by developing, testing, and demonstrating advanced human space systems. INTEGRITY will also implement and validate advanced management techniques including risk analysis and mitigation. One important way INTEGRITY will help enable future missions is by reducing their risk. A risk analysis of human space missions is important in defining the steps that INTEGRITY should take to mitigate risk. This paper describes how a Probabilistic Risk Assessment (PRA) of human space missions will help support the planning and development of INTEGRITY to maximize its benefits to future missions. PRA is a systematic methodology to decompose the system into subsystems and components, to quantify the failure risk as a function of the design elements and their corresponding probability of failure. PRA provides a quantitative estimate of the probability of failure of the system, including an assessment and display of the degree of uncertainty surrounding the probability. PRA provides a basis for understanding the impacts of decisions that affect safety, reliability, performance, and cost. Risks with both high probability and high impact are identified as top priority. The PRA of human missions beyond Earth orbit will help indicate how the risk of future human space missions can be reduced by integrating and testing systems in INTEGRITY.

Jones, Harry W.↗

Dynamic Medical Risk Assessment Supported by Inference Networks

The Human Research Program's next generation risk model, the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT), provides researchers with estimates of astronaut medical and health risk. MEDPRATs Susceptibility Inference Network (SIN) facilitates the dynamic component of this tool. The SIN provides MEDPRAT with a "memory" that allows the system to use knowledge of what simulation events have occurred to alter the representative probability that future simulation events will occur during a given trial. The SIN allows for the medical events being simulated to be related to, and influence the likelihood of one another, providing a more robust risk estimate. We present initial work of our efforts to mathematically quantify and represent these dependent relationships between medical events.

McIntyre, L.↗

Probabilistic Methods for Structural Reliability and Risk

A probabilistic method is used to evaluate the structural reliability and risk of select metallic and composite structures. The method is a multiscale, multifunctional and it is based on the most elemental level. A multifactor interaction model is used to describe the material properties which are subsequently evaluated probabilistically. The metallic structure is a two rotor aircraft engine, while the composite structures consist of laminated plies (multiscale) and the properties of each ply are the multifunctional representation. The structural component is modeled by finite element. The solution method for structural responses is obtained by an updated simulation scheme. The results show that the risk for the two rotor engine is about 0.0001 and the composite built-up structure is also 0.0001.

Chamis, Christos C.↗

Seismic Fragility Analysis of a Condensate Storage Tank with Age-Related Degradations

The Korea Atomic Energy Research Institute (KAERI) is conducting a five-year research project to develop a realistic seismic risk evaluation system which includes the consideration of aging of structures and components in nuclear power plants (NPPs). The KAERI research project includes three specific areas that are essential to seismic probabilistic risk assessment (PRA): (1) probabilistic seismic hazard analysis, (2) seismic fragility analysis including the effects of aging, and (3) a plant seismic risk analysis. Since 2007, Brookhaven National Laboratory (BNL) has entered into a collaboration agreement with KAERI to support its development of seismic capability evaluation technology for degraded structures and components. The collaborative research effort is intended to continue over a five year period. The goal of this collaboration endeavor is to assist KAERI to develop seismic fragility analysis methods that consider the potential effects of age-related degradation of structures, systems, and components (SSCs). The research results of this multi-year collaboration will be utilized as input to seismic PRAs. This report describes the research effort performed by BNL for the Year 4 scope of work. This report was developed as an update to the Year 3 report by incorporating a major supplement to the Year 3 fragility analysis. In the Year 4 research scope, an additional study was carried out to consider an additional degradation scenario, in which the three basic degradation scenarios, i.e., degraded tank shell, degraded anchor bolts, and cracked anchorage concrete, are combined in a non-perfect correlation manner. A representative operational water level is used for this effort. Building on the same CDFM procedure implemented for the Year 3 Tasks, a simulation method was applied using optimum Latin Hypercube samples to characterize the deterioration behavior of the fragility capacity as a function of age-related degradations. The results are summarized in Section 5 and Appendices G through I.

42 ENGINEERING↗

Probabilistic Methods for Structural Reliability and Risk

A probabilistic method is used to evaluate the structural reliability and risk of select metallic and composite structures. The method is a multiscale, multifunctional and it is based on the most elemental level. A multi-factor interaction model is used to describe the material properties which are subsequently evaluated probabilistically. The metallic structure is a two rotor aircraft engine, while the composite structures consist of laminated plies (multiscale) and the properties of each ply are the multifunctional representation. The structural component is modeled by finite element. The solution method for structural responses is obtained by an updated simulation scheme. The results show that the risk for the two rotor engine is about 0.0001 and the composite built-up structure is also 0.0001.

Chamis, Christos C.↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities

While probabilistic risk assessment (PRA) of nuclear facilities is expected to include internal and external hazards for a risk-informed and performance-based design, the current state of practice treats each hazard independently. However, such an independent treatment of hazards may not account for the correlations between different hazards and their response of and damage to the structures, systems, and components (SSCs) in a plant resulting in underestimating the overall risk. This project proposes to advance the multi-hazard PRA of nuclear facilities to more adequately evaluate concurrent hazards and contribute to an increased safety of nuclear plants. A framework for multi-hazard PRA will be developed by identifying concurrent hazard events (both internal and external) and event sequences that include interdependencies through the response of SSCs. An example application of the multi-hazard PRA framework will be demonstrated by considering a generic pressurized water reactor (PWR) subjected to seismic and internal flooding hazards. Computational models for the response of components will be developed to generated multi-hazard fragility surfaces under seismic and flooding loads. A PRA model consisting of event and fault trees will also be developed to quantify the multi-hazard risk profile and compare it with the independent hazard risk profile. Overall, by advancing the multi-hazard PRA of nuclear facilities, this project enhances nuclear safety and reduces costs by mitigating unforeseen consequences caused by correlations between concurrent hazards.

97 - MATHEMATICS AND COMPUTING↗

First-of-a-Kind Risk-Informed Digital Twin for Operational Decision Making

A digital twin (DT) is a digital model or a collection of models of a physical entity. DTs in the nuclear arena can be used from plant design through decommissioning. Decisions are typically a priori or made offline. Risk-informed decision making is identifying what can go wrong, its frequency, and the consequences of its failure. Ideally risk-informed decision making reflects the current state of the plant and provides a decision in real time. Traditionally, probabilistic risk assessments (PRAs) evaluate the failures of safety systems, the risk of core damage, and the offsite dose as the consequence. However, this DT evaluates the decisions on the control side rather than the protection side. It uses the same risk methods to probabilistically inform the decision-making process but in a different way. Rather than evaluating the risk of core damage, this DT evaluates the likelihood of avoiding a trip set point while maintaining plant safety. Performance-based assessments are identified via its probabilistic evaluation of operational alternatives based on system status. Because the purpose of the control system is to maintain system variables within prescribed operating ranges, upsets or challenges that can exceed a trip set point resulting in a plant transient and a challenge to plant mitigating systems based on actual plant conditions, are evaluated to safely maintain the plant within the operating ranges. The probabilistic portion of the model is autonomously and automatically adjusted, and the metric of interest (i.e. likelihood of avoiding a trip set point) is recalculated. The digital representation of the physical system (i.e. the DT) performs a deterministic performance–based assessment of the probabilistically identified alternatives identified to validate the probabilistic assessment. A decision-making algorithm selects the appropriate option based on the probabilistic and deterministic assessments and transmits a control signal to a component(s) to initiate a corrective action or informs an operator of its decision.

digital twin↗

Characterizing the Benefits of Seismic Isolation for Nuclear Structures: A Framework for Risk-Based Decision Making

This report provides a framework for assessing the benefits of seismic isolation and exercises the framework on a Generic Department of Energy Nuclear Facility (GDNF). These benefits are (1) reduction in the risk of unacceptable seismic performance and a dramatic reduction in the probability of unacceptable performance at beyond-design basis shaking, and (2) a reduction in capital cost at sites with moderate to high seismic hazard. The framework includes probabilistic risk assessment and estimates of overnight capital cost for the GDNF.

42 ENGINEERING↗

Risk-Informing Safety Reviews for Non-Reactor Nuclear Facilities

This paper describes a methodology used to model potential accidents in fuel cycle facilities that employ chemical processes to separate and purify nuclear materials. The methodology is illustrated with an example that uses event and fault trees to estimate the frequency of a specific energetic reaction that can occur in nuclear material processing facilities. The methodology used probabilistic risk assessment (PRA)-related tools as well as information about the chemical reaction characteristics, information on plant design and operational features, and generic data about component failure rates and human error rates. The accident frequency estimates for the specific reaction help to risk-inform the safety review process and assess compliance with regulatory requirements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Event-modeled Risk Assessment Using Linked Diagrams

In order to develop a dynamic probabilistic risk assessment capability, a prototype discrete event simulator was created as part of an LDRD that can model dynamic systems and generate probabilistic risk/reliability results. The development consisted of three major parts: 1. Development of a discrete event modeling software library 2. Design of a simulation object model for dynamic modeling 3. Construction of the graphical user interface (GUI) that will allow risk assessment analysts to more easily develop these models We called this new tool EMRALD. A key part of the EMRALD tool has been to develop an object-oriented software model that is flexible enough to support the varied dynamic simulation models (e.g., fails to operate, fails on demand). An object-oriented approach better matches the simulation model to real world objects and makes it more intuitive for the modeler. The interface represents actual physical components, specifically tracking how they interact. EMRALD is a discrete-event simulation tool that is coupled with a state-based diagramming graphical user interface. A key part of the EMRALD tool has been to develop an object-oriented software model that is flexible enough to support the varied dynamic simulation models (e.g., fails to operate, fails on demand). By having a state-based approach, we can integrate different hazards into a single comprehensive model. For example, a single model can include fire, flooding, transient, and seismic initiating events -- each of these events becomes a trigger into the state-based approach that tell the model to make a transition based upon the specific initiator. An object-oriented approach better matches the simulation model to real world objects and makes it more intuitive for the modeler. The interface represents actual physical components, specifically tracking how they interact.

Smith, CurtisLee↗

Cost- and Risk-Based Seismic Design Optimization of Nuclear Power Plant Safety Systems

Seismic analysis, design, and qualification of systems, structures, and components (SSCs) is a significant contributor to the capital cost of a nuclear power plant. To reduce capital costs of advanced nuclear power plants and make commercial nuclear energy more competitive, innovations are needed in their structural design and construction, and not just in the reactor core and associated systems. Seismic isolation has been identified as an important cost-cutting technology that enables standardization of equipment across various sites. This paper develops and demonstrates a cost- and risk-based seismic design optimization of a representative safety system in a nuclear power plant with the dual goals of minimizing overnight capital cost and meeting safety goals. The design optimization can also include component seismic isolation, in which case, the optimized design includes a set of equipment that needs to be seismically isolated to minimize capital cost. The open-source codes MASTODON and Dakota are used for seismic probabilistic risk assessment and design optimization, respectively. A generic nuclear facility with a safety system comprising SSCs that are common to nuclear power plants is considered for the demonstration of the design optimization and is assumed to be located at the Idaho National Laboratory site. Generic costs and seismic design cost functions are assumed for the SSCs of the safety system. The sum of the costs of the SSCs is minimized in the optimization process, while the risk of failure of the safety system is provided as a constraint. Furthermore, results show that the optimization process reduces capital costs significantly while automatically prioritizing the safety of SSCs that contribute most to the risk of the safety system.

42 ENGINEERING↗

Limitations of traditional tools for beyond design basis external hazard PRA

Probabilistic risk assessment (PRA) is being used increasingly by the nuclear industry for safety during normal operations as well as for the protection against external hazards. Computation of total risk in an external hazard PRA is dependent on hazard assessment, fragility assessment, and systems analysis. A systems analysis for propagation of component fragilities is conducted using event and fault trees. The event and fault trees for an actual power plant can be fairly large in size, which imposes computational challenges. Hence, certain assumptions are employed for computational efficiency. These assumptions typically represent the conditions imposed during the design basis (DB) scenario. The traditional PRA tools based on these assumptions are also widely applied to perform risk assessment in the context of beyond design basis (BDB) scenarios. However, some of these assumptions may not be valid for certain BDB scenarios. In addition, the probability of dependent failures also increases in BDB scenarios due to common cause failures (CCF) which usually results from design modifications, human errors, etc. In this manuscript, a simple and a relatively more complex illustrative examples are used to show the limitation of these assumptions in the numerical quantification of risk for the case of BDB conditions. Case studies with CCF events across multiple fault trees are also presented to illustrate the effect of these assumptions when traditional approach is used in BDB risk assessment. It is shown that the assumptions are valid for the case of DB conditions but may lead to excessively conservative risk estimates in the case of BDB conditions. Finally, a Bayesian network based top-down algorithm is proposed as an alternative tool for accurate numerical quantification of total risk in systems analysis.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Reduced order models for assessing CO 2 impacts in shallow unconfined aquifers

Risk assessment studies of potential CO 2 sequestration projects consider many factors, including the possibility of brine and/or CO 2 leakage from the storage reservoir. Detailed multiphase reactive transport simulations have been developed to predict the impact of such leaks on shallow groundwater quality; however, these simulations are computationally expensive and thus difficult to directly embed in a probabilistic risk assessment analysis. Here we present a process for developing computationally fast reduced-order models which emulate key features of the more detailed reactive transport simulations. A large ensemble of simulations that take into account uncertainty in aquifer characteristics and CO 2 /brine leakage scenarios were performed. Twelve simulation outputs of interest were used to develop response surfaces (RSs) using a MARS (multivariate adaptive regression splines) algorithm (Milborrow, 2015). A key part of this study is to compare different measures of ROM accuracy. We then show that for some computed outputs, MARS performs very well in matching the simulation data. The capability of the RS to predict simulation outputs for parameter combinations not used in RS development was tested using cross-validation. Again, for some outputs, these results were quite good. For other outputs, however, the method performs relatively poorly. Performance was best for predicting the volume of depressed-pH-plumes, and was relatively poor for predicting organic and trace metal plume volumes. We believe several factors, including the non-linearity of the problem, complexity of the geochemistry, and granularity in the simulation results, contribute to this varied performance. The reduced order models were developed principally to be used in probabilistic performance analysis where a large range of scenarios are considered and ensemble performance is calculated. We demonstrate that they effectively predict the ensemble behavior. But, the performance of the RSs is much less accurate when used to predict time-varying outputs from a single simulation. If an analysis requires only a small number of scenarios to be investigated, computationally expensive physics-based simulations would likely provide more reliable results. Finally, if the aggregate behavior of a large number of realizations is the focus, as will be the case in probabilistic quantitative risk assessment, the methodology presented here is relatively robust.

54 ENVIRONMENTAL SCIENCES↗

Improving online risk assessment with equipment prognostics and health monitoring

The current approach to evaluating the risk of nuclear power plant (NPP) operation relies on static probabilities of component failure, which are based on industry experience with the existing fleet of nominally similar light water reactors (LWRs). As the nuclear industry looks to advanced reactor designs that feature non-light water coolants (e.g., liquid metal, high temperature gas, molten salt), this operating history is not available. Many advanced reactor designs use advanced components, such as electromagnetic pumps, that have not been used in the US commercial nuclear fleet. Given the lack of rich operating experience, we cannot accurately estimate the evolving probability of failure for basic components to populate the fault trees and event trees that typically comprise probabilistic risk assessment (PRA) models. Online equipment prognostics and health management (PHM) technologies can bridge this gap to estimate the failure probabilities for components under operation. The enhanced risk monitor (ERM) incorporates equipment condition assessment into the existing PRA and risk monitor framework to provide accurate and timely estimates of operational risk.

active and passive components↗

Impact, a Tool Suite for Crew Health and Performance System Trade Analyses and Decision Support - Status of Development

Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database (consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources), dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the tool suite, its constituent parts and the plans for when it will deploy as an operational product, currently scheduled for the end of FY22. Recent development successes on the IMPACT project include the ability to cluster medical resources into medical capabilities and mutually-dependent bundles, the ability to perform trade analyses on different medical sets, different DRMs, and different crew complements, and the ability to specify mission segments as periods of time assigned to one or more members of the crew during which unique mission events occur (e.g., extravehicular activities, surface operations, gravity well adaptations, etc.). IMPACT is gearing up for its verification and validation phase to compile the data package necessary for a successful Transition to Operations (TtO), per the guidance in NPR 8900.1B .

IMPACT↗