Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROGRESS UPDATE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Operating Klystrons at the Spallation Neutron Source – Two Decades of Perspective

Klystron amplifiers have been operated at the Spallation Neutron Source (SNS) in support of the user program since 2006. SNS tubes have amassed over 100,000 hours of high-voltage and filament-on time providing a significant source of operational statistics for high power, high-duty klystrons. Additionally, the SNS Radiofrequency (RF) Systems Group has developed operational methods to mitigate specific reliability challenges, such as cathode arcing and output power instability. Despite much progress, many of these challenges persist, prompting the SNS to update the procedures used for klystron processing as well as develop a higher throughput test stand.

Moss, John [ORNL] (ORCID:0009000085988916)↗

MO-C-BRE-01: The WMIS-AAPM Joint Symposium: Advances in Molecular Imaging

This joint symposium of the World Molecular Imaging Society (WMIS) and the AAPM includes three luminary speakers discussing work in new paradigms of molecular imaging in cancer (Contag), applications of optical imaging technologies to radiation therapy (Pogue) and an update on PET imaging as a surrogate biomarker for cancer progression and response to therapy. Learning Objectives: Appreciate the current trends in molecular and systems imaging. Understand how optical imaging technologies, and particularly Cerenkov detectors, can be used in advancing radiation oncology. Stay current on new PET tracers - and targets - of interest in cancer treatment.

60 APPLIED LIFE SCIENCES↗

Enhanced Accident Tolerant Fuels for LWRs - A Preliminary Systems Analysis

The severe accident at Fukushima Daiichi nuclear plants illustrates the need for continuous improvements through developing and implementing technologies that contribute to safe, reliable and cost-effective operation of the nuclear fleet. Development of enhanced accident tolerant fuel contributes to this effort. These fuels, in comparison with the standard zircaloy – UO2 system currently used by the LWR industry, should be designed such that they tolerate loss of active cooling in the core for a longer time period (depending on the LWR system and accident scenario) while maintaining or improving the fuel performance during normal operations, operational transients, and design-basis events. This report presents a preliminary systems analysis related to most of these concepts. The potential impacts of these innovative LWR fuels on the front-end of the fuel cycle, on the reactor operation and on the back-end of the fuel cycle are succinctly described without having the pretension of being exhaustive. Since the design of these various concepts is still a work in progress, this analysis can only be preliminary and could be updated as the designs converge on their respective final version.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multiyear Research, Development and Demonstration Plan

The Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration (MYRD&D) Plan describes the goals, objectives, technical targets, tasks, and schedules for all activities within the Fuel Cell Technologies (FCT) Office, which is part of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. The MYRD&D Plan is a living document, which is revised periodically to reflect progress in the technologies, revisions to developmental timelines and targets, updates based on external reviews, and changes in the scope of the FCT Office. The document was first published in 2003, and revised in 2005. The document was significantly revised in 2012 to reflect scientific advancements and the changing technological landscape. Any revisions made to the MYRD&D Plan are conducted through a rigorous Change Control process as documented in the Systems Integration section of this report. The hydrogen and fuel cell activities within DOE continue to receive extensive review by stakeholders in the hydrogen and fuel cell community, including panels of the National Research Council and the National Academy of Engineering.

research development demonstration hydrogen fuel c↗

Argillite And Crystalline Disposal Research: Accomplishments And Path-Forward.

The intention of this document is to provide a path-forward for research and development (R&D) for two host rock media-specific (argillite and crystalline) disposal research work packages within the Used Fuel Disposition Campaign (UFDC). The two work packages, Argillite Disposal R&D and Crystalline Disposal R&D, support the achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program. These two work packages cover many of the fundamental technical issues that will have multiple implications to other disposal research work packages by bridging knowledge gaps to support the development of the safety case. The path-forward begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclear-fuel-and-high-levelradioactive- waste). The path-forward will be maintained as a living document and will be updated as needed in response to available funding and the progress of multiple R&D tasks in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program. This path forward is developed based on the report of “Used Fuel Disposition Campaign Disposal Research and Development Roadmap (FCR&D-USED- 2011-000065 REV0)” (DOE, 2011). This document delineates the goals and objectives of the UFDC R&D program, needs for generic disposal concept design, and summarizes the prioritization of R&D issues.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A mechanistic model for creep and thermal aging in Alloy 709

This report describes a physics-based model for creep and thermal aging in Alloy 709. Alloy 709 is an advanced austenitic alloy, targeted for use in future Sodium Fast Reactors (SFRs) and other advanced reactors. The material has superior high temperature properties compared to currently qualified 316 and 304 stainless steels. However, the available creep and thermal aging test database for Alloy 709 is significantly more limited compared to the historical materials. The physics-based model developed here is one way to accelerate the qualification of the material by providing more accurate long-term predictions for creep properties and thermal aging, compared to current empirical time-extrapolate techniques. The crystal plasticity finite element model is used to predict the deformation and failure of alloy 709. The same setup for the CPFE model is used in both the baseline model calibration process and the simulation campaigns for parameter inference. Specific constitutive choices are made for Alloy 709 to capture the primary deformation mechanisms. The dislocation creep formulation developed by Hu and Cocks is extended to account for coupled precipitation formation and the grain boundary cavitation model developed by Sham, Needleman, et al. is used to model grain boundary cavitation-induced failure. A novel update algorithm is proposed to render the semi-discrete constitutive update for the Sham-Needleman model unconditionally stable. A progressive calibration approach is adopted based on the observations that several types of material responses can be effectively decoupled. A surrogate model is trained based on full-fledged CPFE simulations to accelerate the forward model evaluations, and stochastic variational inference (SVI) is used to calibrate the unknown microstructural model parameters. The calibrated mechanistic model is used to predict the long-term creep life of Alloy 709, and the predictions are compared against classical empirical approaches.

36 MATERIALS SCIENCE↗

Weekly Update - Neutron Imaging Machine Build

The neutron imaging machine build effort continues to make solid progress in installing equipment, wiring up subsystems, and aligning the overall machine in anticipation of performing the accelerator readiness review for the authorization safety basis.

42 ENGINEERING↗

Biofuels Campus for Accelerated Development

The award was intended for Biofuels Center of North Carolina to create a functioning Biofuels Company Accelerator, for various companies to work toward establishing biofuels production viability in North Carolina and the southeast. To achieve this outcome, DOE funds were used to refurbish eight existing laboratories for compliance with safety and code regulations. These labs were located in the headquarters building and were originally constructed in 1969 and used extensively until 1994. Completely idled, the laboratories required significant updating and modification to make them functional. According to the Final Progress Report, the project funds were used to renovate the laboratories. Janice Ford was the Technical Project Officer who managed this Congressionally Directed Project. The project’s period of performance was from 11/01/2010 through 10/31/2011. Biofuels Center of North Carolina dissolved 12/10/2013.

09 BIOMASS FUELS↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi - September 2024 Meeting Notes

Information obtained from Fukushima Daiichi Nuclear Power Station (Daiichi) is required to inform future Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. Commercial nuclear power plants. A collaborative U.S. and Japanese effort was initiated in 2014 by the Department of Energy Office of Nuclear Energy to identify Daiichi examination needs and evaluate recent Daiichi examination data to address these needs. This document summarizes information presented at and findings, action items, and recommendations by U.S. and Japanese experts in reactor safety and plant operations during the September 2024 Forensics Effort meeting. Significant safety insights were obtained in several areas: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties and knowledge gaps in severe accident modeling progression, these insights continue to be used to assess whether additional updates are needed in guidance for severe accident prevention, mitigation, and emergency planning. Furthermore, Daiichi-related activities, such as code modeling improvements and analysis, testing, and new technology deployment efforts, have the potential to offer additional safety and economic benefits to the operating fleet and new light water reactor (LWR) and non-LWR designs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

97 MATHEMATICS AND COMPUTING↗

Some Beam Dynamics and Related Studies of Possible Changes to the ILC Baseline Design

Since the completion of the ILC Reference Design Report (RDR) in 2007, global R and D has continued on all ILC systems in a coordinated program titled Technical Design Phase 1. This program, which is planned and coordinated by the Program Managers and the Technical Area Group Leaders, will transition to a Phase 2 in 2010 which has the goal of producing a more complete Technical Design Report in 2012. In this transition there will be a re-baseline process which will update and or modify the RDR baseline design taking into account progress with systems design and progress with various technologies coming from the continuing R and D programs. The RDR design was considered by some to be a conservative one and many of the topics being studied for inclusion in a new baseline are directed towards more optimum cost versus risk designs. Some of these are engineering systems design modifications, both technical and civil, while others are accelerator parameters, technical system designs and beam dynamics optimizations. A few of the latter are described here.

43 PARTICLE ACCELERATORS↗

Project PARETO – DOE’s Produced Water Optimization Initiative

The data will take the form of a poster communicating DOE’s progress on Project PARETO, including recent developments in the PARETO framework, updates to efforts in water treatment modelling, and a new water sharing extension that facilitates water reuse.

Susarla, Naresh↗

Wood-to-Fuel for California's Transportation Sector using Autothermal Pyrolysis (Progress Report for FRD-17-002)

In the month of April, we planned to have the Site License Agreement with SPI signed and fully executed, make further progress on the market assessment for the Wood-to-Bio-oil Market Report, and hoped to have the subcontracts in place with Iowa State University and Frontline BioEnergy, LLC once we have approval from the CAM. We also plan to have the updated budget from Iowa State in order to send both updated sub-recipient budget sheets to the CAM for approval.We continue to make more progress towards getting our subcontracts in place and received the requested adjustments to ISU’s budget sheets. These were sent to the CAM on 4/30/2020. As the COVID-19 situation is country-wide, we anticipate slower responses from our partners due to similar delays in their organizations to what we are experiencing internally. Although their response times will be slower, both ISU and Frontline are continuing to make good progress on their work for the demonstration in Iowa for this summer, which is assisting with keeping us on schedule for the overall effort. We are continuing to work on the required documents for our subcontracts – though neither will be placed before we receive official approval from our CAM – so that once we have approval, we can place them very quickly.

09 BIOMASS FUELS↗

Update on the Development of Externally Powered Dielectric-Loaded Accelerating Structures

We report on recent progress in a program to develop an RF-driven Dielectric-Loaded Accelerating (DLA) structure, capable of supporting high gradient acceleration. Previous high power tests revealed that the earlier DLA structures suffered from multipactor and arcing at the dielectric joint. A few new DLA structures have been designed to alleviate this limitation including the coaxial coupler based DLA structure and the clamped DLA structure. These structures were recently fabricated and high power tested at the NRL X-band Magnicon facility. Results show the multipactor can be reduced by the TiN coating on the dielectric surface. Gradient of 15 MV/m has also been tested without dielectric breakdown in the test of the clamped DLA structure. Detailed results are reported, and future plans discussed.

43 PARTICLE ACCELERATORS↗

Update on the development of externally powered dielectric-loaded accelerating structures.

We report on recent progress in a program to develop an RF-driven Dielectric-Loaded Accelerating (DLA) structure, capable of supporting high gradient acceleration. Previous high power tests revealed that the earlier DLA structures suffered from multipactor and arcing at the dielectric joint. A few new DLA structures have been designed to alleviate this limitation including the coaxial coupler based DLA structure and the clamped DLA structure. These structures were recently fabricated and high power tested at the NRL X-band Magnicon facility. Results show the multipactor can be reduced by the TiN coating on the dielectric surface. Gradient of 15 MV/m has also been tested without dielectric breakdown in the test of the clamped DLA structure. Detailed results are reported, and future plans discussed.

36 MATERIALS SCIENCE↗

Quarkonium States at B-Factories

An overview is given on recent progress in the study of quarkonium spectroscopy at the B-factories. In particular, an updated status report is presented of the long list of 'charmonium-like' resonances newly discovered, whose assignment as true charmonium states is in most cases at least controversial. Also, new measurements on the decay properties of bottomonium states above open-B production thresholds are shown. Much of the progress attained in recent years in the study of the quarkonium spectra is owed to the measurements performed at B-factories. The impressive amount of data recorded by the BABAR and Belle experiments has made it possible to study rare decay chains and to look for as yet undiscovered resonances in the charmonium and bottomonium mass regions. Results presented here are based on different subsamples of the full datasets recorded up to now by the two experiments, corresponding to integrated luminosities of about 430 fb{sup -1}(BABAR - final) and about 850 fb{sup -1}(Belle). Significant contributions also come from the analysis of the various data samples recorded by the CLEO detector.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

FY 2017-Progress Report on the Design and Construction of the Sodium Loop SMT-3

This report provides an update on the design of a forced-convection sodium loop to be used for the evaluation of sodium compatibility of advanced Alloy 709 with emphasis on long term exposures of tensile, creep, fatigue, creep fatigue, and fracture toughness ASTM-size specimens in support of ASME Code qualification and NRC licensing. The report is a deliverable (Level 4) in FY17 (M4AT-17AN1602094), under the Work Package AT-17AN160209, “Sodium Compatibility” performed by Argonne National Laboratory (ANL), as part of the Advanced Materials Program for the Advanced Reactor Technology. This work package enables the development of advanced structural materials by providing corrosion, microstructure, and mechanical property data from the standpoint of sodium compatibility of advanced structural alloys. The first sodium loop (SMT-1) with a single tank was constructed in 2011 at ANL and has been in operation for exposure of subsize sheet specimens of advanced alloys at a single temperature. The second sodium loop with dual tanks (SMT-2) was constructed in 2013 and has been in operation for the exposure of subsize sheet specimens of advanced alloys at two different temperatures. The current loop (SMT-3) has been designed to incorporate sufficient chamber capacity to expose a large number of ASTM-size specimens to evaluate the sodium effects on tensile, creep, fatigue, creep-fatigue, and fracture toughness properties, in support of ASME Code Qualification and USNRC Licensing. The design of individual components for the third sodium loop SMT-3 is almost complete. The design also has been sent to an outside vendor for piping analysis to be in compliance with ASME Code. A purchase order has been placed with an outside vendor for the fabrication of major components such as the specimen exposure tanks. However, we have contracted with another vendor to establish the piping design in compliance with ASME design codes. The piping design was completed in FY2017 and the information is being transmitted to the tank fabricator. The SMT-3 loop will be located in Building 206 adjacent to the currently operating SMT-2 loop. In addition, we have demolished the aged power supply system in Building 206 and installed a new transformer, wiring, and power panels for the new loop. Procurement of some of the long lead items such as valves, EM pumps, EM flowmeters, etc. is in progress and will continue in FY 2018. The construction of components such as cold trap, economizers, piping arrangement etc. will be performed in the central shops at ANL. About 150 liters of sodium for the loop will be procured in early FY2018. The loop system is designed to circulate sodium through the sample tanks and the associated loop without an operator for an extended period of time. With the three sodium loops (with single-tank, dual-tank and four–tanks), materials can be tested at different sodium temperatures, and large tensile, creep, fatigue, creep-fatigue, and fracture toughness specimens can be exposed to sodium for extended periods of time and generate data on mechanical properties in support of ASME Code Qualification and USNRC Licensing of advanced Alloy 709 for use as a structural material in SFRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗