Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCUREMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Influence of module requirements on flat plate module design evolution

Photovoltaic module design features and performance characteristics have undergone significant evolutionary changes between pre-1975 First Generation configurations and current Third Generation design technology. A major contributor to this evolution was an iterative process of continuing design guideline and specification development for major module procurements. Module manufacturers have actively responded to these evolving requirements through progressively improving designs. This iterative/feedback process is described. Interim design guidelines and preliminary design options reflecting the LSA 1982 Module Technical Readiness Specification (November 1979) are described with respect to previous design and performance requirements.

Arnett, J. C.↗

Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

Source record↗

Development of an All-Metal Thick Film Cost Effective Metallization System for Solar Cells

Materials including copper powders, silver-fluoride, and silicon wafers were procured and copper pastes were prepared. Electrodes made with copper pastes were analyzed and compared with the raw materials. A needle-like structure was observed on the electroded solar cells, and was identified as eutectic copper-silicon by electron probe X-ray spectroscopy. The existence of this phase was thought to benefit electrical and metallurgical properties of the contact. Subsequently electrodes made from new material were also shown to contain this phase while simultaneously having poor adhesion.

Ross, B.↗

The changing tide: Federal support of civilian-sector R and D

The involvement of the Federal government in civilian sector research and development is discussed. Relevant policies are put in an historical perspective. The roles played by industrial research and public funding are reveiwed. Government support of basic an generic research, clientele-oriented applied research, and research with commercial ends is studied. Procurement, anti-trust, and patent policies, all of which affect the climate for private research and development, are examined.

Fusfeld, H. I.↗

Technical change in US industry: A cross-industry analysis

The nature of the public policies which have influenced the pace and pattern of technical progress in a number of American industries is studied with the view of assessing the broad effects of these policies. The industries studied are agriculture, pharmaceuticals, semiconductors, computers, civil aircraft, automobiles and residential construction. The policies considered include research and development funding as well as government procurement, education, information dissemination, patent protection, licensing, regulations, and anti-trust policies.

Nelson, R. R.↗

Cryogenic fluid management experiment

The cryogenic fluid management experiment (CFME), designed to characterize subcritical liquid hydrogen storage and expulsion in the low-q space environment, is discussed. The experiment utilizes a fine mesh screen fluid management device to accomplish gas-free liquid expulsion and a thermodynamic vent system to intercept heat leak and control tank pressure. The experiment design evolved from a single flight prototype to provision for a multimission (up to 7) capability. A detailed design of the CFME, a dynamic test article, and dedicated ground support equipment were generated. All materials and parts were identified, and components were selected and specifications prepared. Long lead titanium pressurant spheres and the flight tape recorder and ground reproduce unit were procured. Experiment integration with the shuttle orbiter, Spacelab, and KSC ground operations was coordinated with the appropriate NASA centers, and experiment interfaces were defined. Phase 1 ground and flight safety reviews were conducted. Costs were estimated for fabrication and assembly of the CFME, which will become the storage and supply tank for a cryogenic fluid management facility to investigate fluid management in space.

Eberhardt, R. N.↗

Development of design, qualification, screening, and application requirements for plastic encapsulated solid-state devices for space applications

Test data were collected on 1035 plastic encapsulated devices and 75 hermetically scaled control group devices that were purchased from each of five different manufacturers in the categories of (1) low power Schottsky TTL (bipolar) digital circuits; (2) CMOS digital circuits; (3) operational amplifier linear circuits; and (4) NPN transistors. These parts were subjected to three different initial screening conditions, then to extended life testing, to determine any possible advantages or trends for any particular screen. Several tests were carried out in the areas of flammability testing, humidity testing, high pressure steam (auroclave) testing, and high temperature storage testing. Test results are presented. Procurement and application considerations for use of plastic encapsulated semiconductors are presented and a statistical analysis program written to study the log normal distributions resulting from life testing is concluded.

Source record↗

Selling to NASA

The prospective NASA contractor is provided with information that describes the agency and its procurement practices. Products include ideas, manufacturing capabilities, fabricated components, construction, basic materials, and specialized services. NASA assistance in marketing these and other products is emphasized. Small and minority business enterprises are discussed. The agency's scientific and technical information activities are also discussed.

Source record↗

Electromechanical actuators

Materials illustrating a presentation on the development of electromechanical actuators (EMA) for electric flight systems are presented. Technology issues are identified, and major steps relative to EMA development, NASA's role, and a technology procurement plan are outlined.

Bigham, J.↗

Prototype Regional Observation and Forecast System (PROFS)

The prototype regional observation and forecast system (PROFS) outputs are demonstrated, functional design specifications to be used to procure and implement operational systems are outlined. Advanced candidate technologies are evaluated as an integral part of the process that leads to these outputs. Evaluation insures that future weather service systems will contain the optimum mix of technologies to be most cost effective in reducing the annual losses and deaths that are directly attributed to severe weather.

Hinkelman, J. W., Jr.↗

The Alaska experience

The management responsibilities of the Alaska Department of Natural Resources are summarized and the establishment of a geoprocessor system is described. Specific capabilities were defined based on surveys of potential users and pre-existing systems. The procurement process, the initially purchased equipment, and system upgrading are described. Cost, installation and maintenance, site location, training, and staffing of the system are examined.

Mutter, D. L.↗

LANDSAT Remote Sensing: Observations of an Appalachian mountaintop surface coal mining and reclamation operation

The potential benefits of using LANDSAT remote sensing data by state agencies as an aide in monitoring surface coal mining operations are reviewed. A mountaintop surface mine in eastern Kentucky was surveyed over a 5 year period using satellite multispectral scanner data that were classified by computer analyses. The analyses were guided by aerial photography and by ground surveys of the surface mines procured in 1976. The application of the LANDSAT data indicates that: (1) computer classification of the various landcover categories provides information for monitoring the progress of surface mining and reclamation operations; (2) successive yearly changes in barren and revegetated areas can be qualitatively assessed for surface mines of 100 acres or more of disrupted area; (3) barren areas consisting of limestone and shale mixtures may be recognized, and revegetated areas in various stages of growth may be identified against the hilly forest background.

Source record↗

Space transportation - Reflections and projections

The history of U.S. manned spaceflight and the vehicles used is discussed. The programs began with low budgets and handwritten charts, then proceeded through the Redstone Mercury launch in 1961 and the Atlas Mercury orbital mission in 1962, with the decision to begin the Apollo project coming between those flights. Use of a sole source procurement with a nonprofit institution like the MIT Draper Laboratory for the Apollo guidance system is noted to have expedited the speed of paperwork. A lunar orbital rendezvous was chosen in October 1962 for the Saturn CV-launched Apollo. The Gemini capsule, eliminated early as a lunar module, served to expose problems of operation in a zero-g environment. The benefits of humans in space were made apparent in the process of fixing the Skylab solar panels. The Shuttle capabilities are reviewed, and the necessity for a vehicle for access and return from GEO is emphasized. Finally, attention is given to a single stage to orbit vehicle and launch systems for a Solar Power Satellite.

Disher, J. H.↗

ESTL tracking and data relay satellite /TDRSS/ simulation system

The Tracking Data Relay Satellite System (TDRSS) provides single access forward and return communication links with the Shuttle/Orbiter via S-band and Ku-band frequency bands. The ESTL (Electronic Systems Test Laboratory) at Lyndon B. Johnson Space Center (JSC) utilizes a TDRS satellite simulator and critical TDRS ground hardware for test operations. To accomplish Orbiter/TDRSS relay communications performance testing in the ESTL, a satellite simulator was developed which met the specification requirements of the TDRSS channels utilized by the Orbiter. Actual TDRSS ground hardware unique to the Orbiter communication interfaces was procured from individual vendors, integrated in the ESTL, and interfaced via a data bus for control and status monitoring. This paper discusses the satellite simulation hardware in terms of early development and subsequent modifications. The TDRS ground hardware configuration and the complex computer interface requirements are reviewed. Also, special test hardware such as a radio frequency interference test generator is discussed.

Kapell, M. H.↗

Photovoltaic module reliability improvement through application testing and failure analysis

During the first four years of the U.S. Department of Energy (DOE) National Photovoltatic Program, the Jet Propulsion Laboratory Low-Cost Solar Array (LSA) Project purchased about 400 kW of photovoltaic modules for test and experiments. In order to identify, report, and analyze test and operational problems with the Block Procurement modules, a problem/failure reporting and analysis system was implemented by the LSA Project with the main purpose of providing manufacturers with feedback from test and field experience needed for the improvement of product performance and reliability. A description of the more significant types of failures is presented, taking into account interconnects, cracked cells, dielectric breakdown, delamination, and corrosion. Current design practices and reliability evaluations are also discussed. The conducted evaluation indicates that current module designs incorporate damage-resistant and fault-tolerant features which address field failure mechanisms observed to date.

Dumas, L. N.↗

Labeling Solar-Cell Modules

Photocopying machine produces durable identification label. Process used for double glass photovoltaic-cell modules. Matrix of cells sandwiched between thin, flexible glass mats and covered above and below by protective sheets of glass. Label contains such information as manufacturer, model number, voltage and power ratings, and serial number. May also contain electrical-shock hazard warning and identification of positive and negative terminals. Method saves expense of procuring and applying conventional labels.

Watson, E. G.↗

Space fabrication demonstration system composite beam cap fabricator

A detailed design for a prototype, composite beam cap fabricator was established. Inputs to this design included functional tests and system operating requirements. All required materials were procured, detail parts were fabricated, and one composite beam cap forming machine was assembled. The machine was demonstrated as a stand-alone system. Two 12-foot-long beam cap members were fabricated from laminates graphite/polysulfane or an equivalent material. One of these members, which as structurally tested in axial compression, failed at 490 pounds.

Source record↗