Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PRA Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Multi-State Physics Models of Aging Passive Components in Probabilistic Risk Assessment

Multi-state Markov modeling has proved to be a promising approach to estimating the reliability of passive components - particularly metallic pipe components - in the context of probabilistic risk assessment (PRA). These models consider the progressive degradation of a component through a series of observable discrete states, such as detectable flaw, leak and rupture. Service data then generally provides the basis for estimating the state transition rates. Research in materials science is producing a growing understanding of the physical phenomena that govern the aging degradation of passive pipe components. As a result, there is an emerging opportunity to incorporate these insights into PRA. This paper describes research conducted under the Risk-Informed Safety Margin Characterization Pathway of the Department of Energy’s Light Water Reactor Sustainability Program. A state transition model is described that addresses aging behavior associated with stress corrosion cracking in ASME Class 1 dissimilar metal welds – a component type relevant to LOCA analysis. The state transition rate estimates are based on physics models of weld degradation rather than service data. The resultant model is found to be non-Markov in that the transition rates are time-inhomogeneous and stochastic. Numerical solutions to the model provide insight into the effect of aging on component reliability.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Development of an Integrated Mechanistic Source Term Assessment Capability for Lead- and Sodium-Cooled Fast Reactors

The scope of this project entails development of mechanistic source term assessment capabilities to inform and guide plant design activities and to support license applications. The main objective of this project is to couple NL’s SAS4A safety analysis code with the FAI’s FATE facility modeling code for mechanistic source term assessments in liquid-metal-cooled fast reactors. The end product is a coupled SAS4A-FATE code system for integrated mechanistic source term assessments and Level-2 PRA as the precursor for off-site dispersion analyses (Level-3 PRA). The SAS4A code is used to model system transients with fuel failures and its results are linked to the FATE code to predict radionuclide transport through the reactor vessel cover gas and containment system. The integrated code package offers a state-of-the-art radionuclide tracking capability for a spectrum of accident scenarios consistent with the plant dynamic response including the reactivity feedback to support Probabilistic Risk Assessments (PRA).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Light Water Reactor Sustainability Program: Upgrade of EMRALD to a Modern JavaScript-based Framework

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is a software tool developed at Idaho National Laboratory for researching the capabilities of dynamic probabilistic risk assessment. It provides a simple interface to represent complex interactions often seen when developing dynamic models. EMRALD can also interface with other applications by modifying inputs, running, and using their results within EMRALD for dynamic and integrated assessment. This report goes over the work performed as part of the Risk-Informed Systems Analysis Pathway under the Light Water Reactor Sustainability program to upgrade the EMRALD software.

97 MATHEMATICS AND COMPUTING↗

Probabilistic Risk Assessment of a Light-Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This report details an expansion of the original two generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to a light-water reactor, one for a pressurized-water reactor and one for a boiling-water reactor. The new material in this revision includes a new HES design, direct electrical coupling of the nuclear power plant to the High-Temperature Electrolysis Facility (HTEF), and a smaller 100-MWt HTEF analysis. The results investigate the applicability of the potential licensing approaches, which do not require a full United States Nuclear Regulatory Commission licensing review. The PRAs are generic and include some assumptions. We eliminated many conservative assumptions from the preliminary pressurized-water reactor PRA report using design data for both the HES and HTEF. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 5.6%. The PRA results for core damage frequency and large early release frequency support the use of RG 1.174 as further risk information that supports a change without a full licensing amendment review. Further insights provided through hazard analyses and sensitivity studies confirm with high confidence that the safety case for licensing an HES addition and an HTEF sited 1.0 km from the nuclear power plant is strong and that the placement of a HTEF at 0.5 km is also a viable case. Site-specific information can alter these conclusions.

08 HYDROGEN↗

A Framework to Integrate Human Reliability Data Obtained from Different Sources Based on the Complexity Scores of Proceduralized Tasks

For many decades, PSA (Probabilistic Safety Assessment) or PRA (Probabilistic Risk Assessment) techniques have been used to enhance the operational safety of nuclear power plants (NPPs) based on the consideration of potential hazards that could result in an unexpected consequence. As human error is one of the potential hazards, diverse human reliability analysis (HRA) methods have been proposed to provide a systematic way to estimate the likelihood of human errors (i.e., human error probability, HEP) in specific task contexts. Accordingly, it is evident that the quality of HRA results strongly depends on the credibility of HEP estimations. This implies that, in terms of enhancing this credibility, the collection of raw information (HRA data) that is helpful for understating when and why human errors occur is a crucial issue. In order to address this issue, in this study, the feasibility of a framework to integrate HRA data obtained from different sources is investigated based on the complexity of proceduralized tasks.

99 GENERAL AND MISCELLANEOUS↗

Integration of Advanced Probabilistic Analysis Techniques with Multi-Physics Models

An integrated simulation platform that couples probabilistic analysis-based tools with model-based simulation tools can provide valuable insights for reactive and proactive responses to plant operating conditions. The objective of this work is to demonstrate the benefits of a partial implementation of the Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) Detailed Framework Specification through the coupling of advanced PRA capabilities and accurate multi-physics plant models. Coupling a probabilistic model with a multi-physics model will aid in design, operations, and safety by providing a more accurate understanding of plant behavior. This represents the first attempt at actually integrating these two types of analyses for a control system used for operations, on a faster than real-time basis. This report documents the development of the basic communication capability to exchange data with the probabilistic model using Reliability Workbench (RWB) and the multi-physics model using Dymola. The communication pathways from injecting a fault (i.e., failing a component) to the probabilistic and multi-physics models were successfully completed. This first version was tested with prototypic models represented in both RWB and Modelica. First, a simple event tree/fault tree (ET/FT) model was created to develop the software code to implement the communication capabilities between the dynamic-link library (dll) and RWB. A program, written in C#, successfully communicates faults to the probabilistic model through the dll. A systems model of the Advanced Liquid-Metal Reactor–Power Reactor Inherently Safe Module (ALMR-PRISM) design developed under another DOE project was upgraded using Dymola to include proper interfaces to allow data exchange with the control application (ConApp). A program, written in C+, successfully communicates faults to the multi-physics model. The results of the example simulation were successfully plotted.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Operational Availability - Extended Mission Operations

Presentation to support a Summit/TIM with various Stakeholders (Ground and Flight) to perform a GAP analysis associated with ground and spacecraft maintenance, maintainability, and availability activities in order to identify missing Agency planning and guidance materials.

Simulation↗

Estimating Orion Heat Shield Failure Due To Ablator Cracking During The EFT-1 Mission

The Orion EFT-1 heatshield suffered from two major certification challenges: First, the mechanical properties used in design were not evident in the flight hardware and second, the flight article itself cracked during fabrication. The combination of these events motivated the Orion Program to pursue an engineering-level Probabilistic Risk Assessment (PRA) as part of heatshield certification rationale. The PRA provided loss of Mission (LOM) likelihoods considering the probability of a crack occurring during the mission and the likelihood of subsequent structure over-temperature. The methods and input data for the PRA are presented along with a discussion of the test data used to anchor the results. The Orion program accepted an EFT-1 Loss of Vehicle (LOV) risk of 1-in-160,000 due to in-mission Avcoat cracking based on the results of this analysis. Conservatisms in the result, along with future considerations for Exploration Missions (EM) are also addressed.

Avcoat↗

Modeling In-Space Aborts for NASA Human Exploration Missions

NASA is developing capabilities for crewed missions beyond Low Earth Orbit (LEO) for the first time in nearly 50 years. Given the greater distances from Earth that these missions will entail, it is prudent to develop in-space abort capabilities in order to save the crew in the event of critical life-threatening failures that may occur. NASA has developed a Cross Program PRA (XPRA) of the integrated vehicle, from pre-launch through landing and rescue of the crew. An ascent abort model has already been developed as part of this XPRA model to assess the risk associated with failures during prelaunch and ascent. The scope of the analysis discussed here is focused on aborts associated with the in-space portion of the mission up to and including the Trans-Lunar Injection (TLI) burn, which places the Orion spacecraft on a trajectory to the Moon.

Bigler, Mark A.↗

Technical and Licensing Considerations for Micro-Reactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of micro-reactors (i.e., reactors capable of producing about 1 MW(th) to 20 MW(th) of energy from nuclear fission). It is envisioned that micro-reactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. The objective of this effort is to explore the technical issues and the approach required to reach a finding of "reasonable assurance of public health and safety" for this new and different class of reactors. The analysis performed here leverages available micro-reactor design and testing data available from national laboratory experience as well as commercial design information to explore technical issues. Some factors considered include source term, accidents that would need to be analyzed, and the extent of the probabilistic risk assessment (PRA). The technical evaluation was performed within the framework of the Licensing Modernization Project (LMP) to identify licensing basis events, classification of structures, systems and components, and defense-in-depth needed to provide regulatory certainty. With this framework and technical evaluation in mind, the scope and content of a micro-reactor licensing application is discussed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Causal CCF Parameter Estimations 2020

This report documents the quantitative results of the causal common-cause failure (CCF) parameter estimations for the failure cause groups “component,” “design,” “environment,” “human,” and “other,” based on CCF data through 2020 in the U.S. Nuclear Regulatory Commission (NRC) CCF database: https://rads.inl.gov/Pages/CCF.aspx. This report utilizes the same data period (2006–2020) and CCF templates as INL/EXT-21-62940, Revision 1, CCF Parameter Estimations, 2020 Update. The 2015 causal CCF prior distributions for the specific failure cause groups (instead of the 2015 generic CCF prior distributions) were used in this report to estimate the associated causal CCF parameters. All the 2015 causal CCF prior distributions and generic CCF prior distributions were developed in INL/EXT-21-43723, Developing Generic Prior Distributions for Common Cause Failure Alpha Factors and Causal Alpha Factors, using CCF data from 1997 to 2015. These quantitative results were developed to support the causal alpha factor model and should be used as appropriate in probabilistic risk assessment (PRA) studies such as the NRC Significance Determination Process for commercial nuclear power plants in the United States.

99 GENERAL AND MISCELLANEOUS↗

Quantification of margins and uncertainty for risk-informed decision analysis.

QMU stands for 'Quantification of Margins and Uncertainties'. QMU is a basic framework for consistency in integrating simulation, data, and/or subject matter expertise to provide input into a risk-informed decision-making process. QMU is being applied to a wide range of NNSA stockpile issues, from performance to safety. The implementation of QMU varies with lab and application focus. The Advanced Simulation and Computing (ASC) Program develops validated computational simulation tools to be applied in the context of QMU. QMU provides input into a risk-informed decision making process. The completeness aspect of QMU can benefit from the structured methodology and discipline of quantitative risk assessment (QRA)/probabilistic risk assessment (PRA). In characterizing uncertainties it is important to pay attention to the distinction between those arising from incomplete knowledge ('epistemic' or systematic), and those arising from device-to-device variation ('aleatory' or random). The national security labs should investigate the utility of a probability of frequency (PoF) approach in presenting uncertainties in the stockpile. A QMU methodology is connected if the interactions between failure modes are included. The design labs should continue to focus attention on quantifying uncertainties that arise from epistemic uncertainties such as poorly-modeled phenomena, numerical errors, coding errors, and systematic uncertainties in experiment. The NNSA and design labs should ensure that the certification plan for any RRW is supported by strong, timely peer review and by an ongoing, transparent QMU-based documentation and analysis in order to permit a confidence level necessary for eventual certification.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Mars 2020 Risk Integration and Uncertainty Working Group Status Report, FY 2017

This report provides a list of accomplishments of the Mars 2020 Risk Integration and Uncertainty Working Group for the fiscal year 2017 which includes participation in the Technical Information Meeting #2, review and comments on the methodologies and results provided in the Mars 2020 Safety Analysis Report (SAR) Draft Databook, development of a Probabilistic Risk Assessment model in the risk assessment program SAPHIRE using the data provided in the SAR Databook, and an independent launch risk analysis based on the Mars 2020 launch vehicle’s lineage and design similarity to other launch vehicles.

99 GENERAL AND MISCELLANEOUS↗

Using FMECA to Support Maintainability and FRACA

Presentation to support a Summit/TIM with various Stakeholders (Ground and Flight) to perform a GAP analysis associated with ground and spacecraft maintenance, maintainability, and availability activities in order to identify missing Agency planning and guidance materials.

Modelling↗

Assessment of coated cladding impact on large-break LOCA with TRACE-DAKOTA

Since 2011, the U.S. Department of Energy has launched new research and development (R&D) programs for developing new accident tolerant fuels (ATFs). These new fuel concepts are expected to bring several advancements in terms of plant safety. However, development, licensing, as well as deployment of ATF require a substantial investment among fuel vendors, operating utilities, and regulatory authorities. For ATF to be economically feasible, credited safety benefits may be necessary to provide an economic incentive for transition of nuclear power plants from Zr/UO2-based fuel technologies to ATFs. As a result, it is essential to evaluate the economic viability of ATF by conducting a comprehensive safety benefits study informed by R&D and demonstration studies. In the present work, based on the best estimate plus uncertainty methodology, sensitivity analysis and uncertainty quantification for key safety quantities under LB-LOCA are performed for the Peach Bottom boiling water reactor (BWR) with GE14 nuclear fuel design adopting the ATF concepts. A coupled TRACE-DAKOTA analysis framework is adopted to perform the uncertainty quantification. Based on the computational results and obtained statistics, the coping time increase, fuel performance improvement as well as the most dominating phenomena during the accident for Cr-coated cladding are investigated in detail. Overall, the results obtained are useful for subsequent plant PRA study and support a move to more modernized performance-based regulatory requirements to realize plant economic benefits.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Hazards and Probabilistic Risk Assessments of Advanced Nuclear Reactors Coupled with Industrial Facilities

This report provides a roadmap and tool kit for site specific risk assessments across a broad range of industrial customers co-located with advanced nuclear power plants (ANPP) that are not currently built and operating in the U.S. This report builds upon the body of work sponsored by the Department of Energy (DOE) Integrated Energy Systems Pathway that has produced industrial requirements studies and techno-economic assessments on the topics of feasibility of ANPP supported industrial processes. This report also leverages the DOE Light Water Reactor Sustainability (LWRS) program that has presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors (LWRs) co-located with hydrogen production facilities. Many of the hazard assessments and risk assessments performed for the LWRS report are agnostic to whether the nuclear reactor is an ANPP or were adapted to the ANPP focus. The report performs hazards assessments to include industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, wood pulp and paper mills, and hydrogen production. Hydrogen production facilities are assessed in depth through prior reports in the LWRS program and the results are leveraged in this report. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the nuclear power plant by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. A modular high temperature gas-cooled reactor (MHTGR) PRA only existing on paper was modeled and verified in modern PRA software. This will provide a tool for representative ANPP probabilistic analyses for future research.

10 SYNTHETIC FUELS↗

3D Simulation of External Flooding Events for the RISMC Pathway

Incorporating 3D simulations as part of the Risk-Informed Safety Margins Characterization (RISMIC) Toolkit allows analysts to obtain a more complete picture of complex system behavior for events including external plant hazards. External events such as flooding have become more important recently – however these can be analyzed with existing and validated simulated physics toolkits. In this report, we describe these approaches specific to flooding-based analysis using an approach called Smoothed Particle Hydrodynamics. The theory, validation, and example applications of the 3D flooding simulation are described. Integrating these 3D simulation methods into computational risk analysis provides a spatial/visual aspect to the design, improves the realism of results, and can prove visual understanding to validate the analysis of flooding.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Risk Management of NASA Projects

Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

Sarper, Hueseyin↗